- CN102852546B CN102852546B CN201110181168.3A CN201110181168A CN102852546B CN 102852546 B CN102852546 B CN 102852546B CN 201110181168 A CN201110181168 A CN 201110181168A CN 102852546 B CN102852546 B CN 102852546B
- Authority
- CN
- China
- Prior art keywords
- coal
- coal seam
- gas
- seam
- pumping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000003245 coal Substances 0.000 title claims abstract description 189
- 238000000034 method Methods 0.000 title claims abstract description 24
- 238000005086 pumping Methods 0.000 title abstract description 11
- 239000011435 rock Substances 0.000 claims abstract description 27
- 238000000605 extraction Methods 0.000 claims description 46
- 230000001681 protective effect Effects 0.000 claims description 38
- 238000007789 sealing Methods 0.000 claims description 18
- 238000010276 construction Methods 0.000 claims description 17
- 238000005553 drilling Methods 0.000 claims description 17
- 239000004568 cement Substances 0.000 claims description 16
- 239000002352 surface water Substances 0.000 claims description 8
- 238000009792 diffusion process Methods 0.000 claims description 5
- 230000035699 permeability Effects 0.000 claims description 5
- 230000000694 effects Effects 0.000 claims description 3
- 230000008569 process Effects 0.000 claims description 3
- 238000003795 desorption Methods 0.000 claims description 2
- 230000001077 hypotensive effect Effects 0.000 claims description 2
- 230000002787 reinforcement Effects 0.000 claims description 2
- 230000002265 prevention Effects 0.000 abstract description 6
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 3
- 230000006837 decompression Effects 0.000 abstract 1
- 229910000831 Steel Inorganic materials 0.000 description 12
- 239000010959 steel Substances 0.000 description 12
- 238000005516 engineering process Methods 0.000 description 11
- 241000209094 Oryza Species 0.000 description 6
- 235000007164 Oryza sativa Nutrition 0.000 description 6
- 235000009566 rice Nutrition 0.000 description 6
- 230000007246 mechanism Effects 0.000 description 4
- 239000003610 charcoal Substances 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 3
- 238000005065 mining Methods 0.000 description 3
- 230000008033 biological extinction Effects 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 239000013589 supplement Substances 0.000 description 2
- 230000005641 tunneling Effects 0.000 description 2
- 206010060904 Freezing phenomenon Diseases 0.000 description 1
- 235000019738 Limestone Nutrition 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 239000003034 coal gas Substances 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 239000006028 limestone Substances 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 239000000047 product Substances 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The invention provides a method for pre-pumping coal roadway stripe gas of a single soft protruded coal seam of an unexploited area and relates to the technical field of gas pumping. Through the method, outburst removal of the area with a single soft hypotonic protruded coal seam coal roadway stripe can be achieved. The method for pre-pumping the coal roadway stripe gas of the single soft protruded coal seam of the unexploited area comprises building a concordant layer horizontal well which is 3-6m away from the coal seam from the ground to a top plate and a base plate of the single soft protruded coal seam of the unexploited area, performing segmented fracturing after oriented perforating, enabling top plate and base plate rock terrane where coal seam gas is sealed and stored originally to be transformed into a pumping liberation layer with developed fracture networks, enabling the pumping liberation layer to be communicated with the coal seam in a large-area mode through the fracture networks, performing decompression and aerogenesis by dewatering, determining whether to perform negative pressure pumping according to water production conditions, enabling the coal seam gas to be desorbed and diffused continuously, and pumping the gas massively by pumping a horizontal well opening in the liberation layer. By pumping the gas massively, the outburst prevention index in the coal roadway stripe can be reduced to below the safety standard in the outburst prevention rules, and safe and speedy drivage is achieved.
Description
Technical field
The present invention relates to a kind of single soft projecting coal bed method of taking out coal roadway stripe gas in advance in unworked country.Concrete pointer, to single, soft, hypotonic, projecting coal bed, proposes a kind of method of being taken out coal roadway stripe gas by ground level fractured well in advance.
Background technology
Mine gas has become the maximum harm of China's coal-mine safety in production, is to threaten miner's life " the first killer ".Control gas disaster, eliminates coal and gas prominent, and realizing the green fundamental way of adopting altogether of coal and non-coal resource is extract coal gas out.
Along with the increase of the coal mine excavation degree of depth, the increase of gas bearing capacity and gas pressure, a lot of low gaseous mine develops into highly gassy mine and projecting mine gradually, and outstanding disaster is more and more serious, to such an extent as to often just coal and gas prominent can be brought out in the disturbance that this coal seam drilling is slight to coal body like this." control coal and gas prominent specifies " explicitly points out the principle that outburst prevention work adheres to that region outburst prevention measures is leading, local prevent outburst measure supplements, and region outburst prevention measures comprises exploitation topping and takes out coal-bed gas two class in advance.China seriously outstanding mining area is deformation coal intense development district substantially entirely, and especially Henan area institute mining coal seam is commonly single, soft, hypotonic, height dashes forward coal seam reservoirs, and unprotect layer can be adopted, and gas govenance can only to take out coal-bed gas in advance.Coal is almost typical granulated coal or rotten rib coal entirely.But because institute's mining coal seam ature of coal is soft, permeability is low, the Failure type of coal is almost III, IV, V class coal entirely, the connectedness of natural fissure is poor, if do not take anti-reflection measure, extracting result is very poor, the single underground gas extraction that carries out is difficult to the object that the short time realizes coal seam extinction and acquisition high concentration gas resource, often drops into as cost carries out extraction with the contour engineering in intensive cloth hole and Seam Roof And Floor Yan Chou lane.And this type of coal seam reservoirs is broken serious, cleat has not existed, and gas bearing capacity is large, gas pressure is high, and in coal seam internal drilling constructional difficulties, when drilling, spray orifice, collapse hole, plug-hole and bit freezing phenomenon are serious, and boring is beaten not dark, and concentration decline is fast, and extracting result is poor.Especially in the face of the first bar coal road in first exploiting field of high prominent Geological Structures In Coal Mine coal intense development, mash gas dynamic phenomenon is more serious, and it is larger to adopt current anti-reflection technology directly to carry out anti-reflection enhanced transformation difficulty to coal seam reservoirs, cause high prominent heading driving speed very low, every drill footage per month only has about 30m, be difficult to reach and take out, adopt, dig balance, limit mine safety High-efficient Production.
Chinese patent 200810230940.4 discloses " coal mine down-hole drilling hydraulic fracturing anti-reflection mash gas extraction technique ", first this technology chooses pressure break place in down-hole, according to coal body type, roadway layout and structured fault zone determination pressure type, adopt roof and floor concordant boring and hydraulic fracture, the fracturing of roof and floor layer-through drilling, this coal seam concordant boring and hydraulic fracture or this coal seam layer-through drilling hydraulic fracturing technology, carry out the anti-reflection draining coal seam gas of pressure break.But this technology can only be implemented under underground coal mine has arranged the condition in digging tunnel, still cannot apply for there is no the soft height in the unworked country of roadway layout primitive coalbed of dashing forward.
Summary of the invention
The object of the invention is in order to advanced single to unworked country, soft, hypotonic, high prominent Coal roadway band carries out region extinction, provide the single soft height in a kind of unworked country coal seam of dashing forward to take out the method for coal roadway stripe gas in advance.By surface water horizontal well in advance by extensive for the gas in coal seam extraction out, make the coal seam gas-bearing capacity in coal roadway stripe and gas pressure be reduced to protrusion-dispelling specify in safety standard, realize tunnel safely and fast.
The present invention is achieved through the following technical solutions:
The method of coal roadway stripe gas is taken out in the single soft height in a kind of unworked country coal seam of dashing forward in advance, it is characterized in that: use for reference surface water horizontal well cbm development technique, single soft projecting coal bed top (end) the plate construction concordant horizontal well from ground to unworked country, perforation, pressure break, drainage and step-down, aerogenesis, and determine whether to carry out negative pressure mash gas extraction according to product regimen condition
When single, soft, hypotonic height dash forward roof stable, easily pore-forming time, preferentially adopt the horizontal well mash gas extraction of constructing to roof from ground; When single, soft, hypotonic height dash forward that seat earth is more stable than top board, easier pore-forming time, preferentially adopt the horizontal well mash gas extraction of constructing to seat earth from ground; When single, soft, hypotonic height dash forward Seam Roof And Floor all stable, easily pore-forming time, in order to shorten, the phase of taking out in advance can adopt from ground to top, coal seam, base plate constructs multi-branched horizontal well mash gas extraction respectively.
Be positioned at 3 ~ 6m directly over coal seam on the described horizontal hole of constructing in roof is vertical, transversely in the heading certain limit apart from plan driving, and horizontal hole drilling direction is contrary with tunnelling direction.
Be positioned at 3 ~ 6m immediately below coal seam on the described horizontal hole of constructing in seat earth is vertical, transversely in the heading certain limit apart from plan driving, and horizontal hole drilling direction is contrary with tunnelling direction.
3 ~ 6m directly over coal seam is positioned on the described horizontal hole of constructing in roof is vertical, 3 ~ 6m immediately below coal seam is positioned on the horizontal hole of constructing in seat earth is vertical, transversely in the heading certain limit apart from plan driving, and horizontal hole drilling direction is contrary with tunnelling direction.
Described takes three opening structures from the horizontal well of ground construction, enters protective casing all down, and one opens leakiness stratum, surface pipe sealing earth's surface, and cement returns to ground; Two drive a well enter protective casing now after cement the well, cement returns to coal top more than 100m; Three spud in horizontal hole, enter rear well cementation under protective casing.
The horizontal well of described construction in roof, only downward semi-circular orientation perforation in horizontal circular borehole; The horizontal well of construction in seat earth, only upwards semi-circular orientation perforation in horizontal circular borehole; Artificial plane of weakness is formed with this.
Described pressure break is in horizontal hole section lower packet enforcement at a certain distance staged fracturing, intensive treatment is carried out to section rock stratum of between horizontal hole and coal seam, in the horizontal to intend digging coal road for this section of Seam Roof And Floor preexisting crack extension in each certain limit in axis both sides after making pressure break, expansion, and produce new a large amount of artificial crack, the crack making Seam Roof And Floor obtain along the artificial plane of weakness that oriented perforating is formed through fracturing reform is in the vertical linked up with coal seam as far as possible, finally play anti-reflection deblocking effect and (namely increase the gas permeability of rock stratum, remove rock stratum and ability is sealed up for safekeeping to gas in coal seam), originally the adjoining rock sealing coal-bed gas up for safekeeping is transformed into " the extraction Protective Coal Seam " of Fracture Networks prosperity.
Described extraction Protective Coal Seam refers to the rock stratum produced by reinforcement process in close coal seam certain limit that a large amount of crack makes gas permeability increase substantially, thickness is generally about 10m, and seals ability by the releasing rock stratum, crack with coal seam conducting up for safekeeping to gas in coal seam.
Carrying out negative pressure mash gas extraction after described drainage and step-down is utilize draining, hypotensive effect, coal-bed gas is made to reach below critical desorption pressures, and in negative pressure extraction process, make gas constantly desorb from coal seam, the diffusion be enclosed in coal seam, migrated to " extraction Protective Coal Seam " seepage flow by the Fracture Networks be communicated with coal seam, then by the horizontal hole in " extraction Protective Coal Seam " rock stratum by extensive extraction out.Reach to intend to dig heading for the coal-bed gas in the certain limit of axis both sides be down to protrusion-dispelling specify in the safety standard of requirement.
The single soft projecting coal bed method of taking out coal roadway stripe gas in advance in unworked country of the present invention, single for unworked country, soft, hypotonic, high prominent coal seam, do not changing under original crustal stress states, application " coal bed gas seals mechanism up for safekeeping ", " coal bed gas migration mechanism ", " coalbed methane reservoir strengthening mechanism ", " gas pumping mechanism of disturbance ", use for reference surface water horizontal well cbm development technique, in Seam Roof And Floor rock stratum, orientation construction concordant horizontal well is moved towards along the coal road intending driving from ground, if form artificial orientation face by oriented perforating, utilize the pressure break effect of water under high pressure, intensive treatment is carried out to section rock stratum of between Seam Roof And Floor rock stratum horizontal hole and coal seam, anti-reflection deblocking, originally this section of adjoining rock sealing coal-bed gas up for safekeeping is transformed into " the extraction Protective Coal Seam " of crack connected network prosperity, and by the Fracture Networks that fracturing reform obtains, " extraction Protective Coal Seam " is communicated with coal seam large area, pass through drainage and step-down, the multiple disturbance etc. of the operations such as negative pressure extraction and tunnelling, the gas desorbed from coal seam is made to migrate rapidly in " extraction Protective Coal Seam " by artificial crack, and then by surface water horizontal well in advance by extensive for the gas in coal seam extraction out, make the coal seam gas-bearing capacity in coal roadway stripe and gas pressure be reduced to protrusion-dispelling specify in require safety standard, really accomplish that region outburst prevention measures is leading, local prevent outburst measure supplements, fundamentally eliminate single, soft, hypotonic, coal and gas prominent in high prominent Coal roadway tunneling process is dangerous, realize tunneling safely and fast.
When taking out in advance before adopting the single soft projecting coal bed method of taking out coal roadway stripe gas in advance in unworked country to carry out coal roadway stripe gas overpressure, the surface water horizontal well implemented at one time in section the gas amount of extraction be not less than total mash gas extraction amount of the roof and floor rock gangway all layer-through drilling (drill hole density of layer-through drilling with the layer-through drilling averag density of implementing mine be as the criterion) equal with ground level well radial bore length, and then replace the special Yan Chou lane of roof and floor, digging Yan Chou lane high engineering can be avoided to drop into, the advanced of coal roadway stripe can be strengthened again find time in advance, guarantee that mine " is taken out, pick, adopt " balance.
Accompanying drawing explanation
Fig. 1 the present invention is directed to the stereogram taking out coal roadway stripe gas from ground to construction level well single soft hypotonic height dashes forward roof in advance;
Fig. 2 is the A-A ' sectional drawing before Fig. 1 implements pressure break;
Fig. 3 is the B-B ' sectional drawing before Fig. 1 implements pressure break;
Fig. 4 is that Fig. 1 implements post-fracturing A-A ' sectional drawing;
Fig. 5 is that Fig. 1 implements post-fracturing B-B ' sectional drawing;
Fig. 6 the present invention is directed to the stereogram taking out coal roadway stripe gas from ground to construction level well single soft hypotonic height dashes forward seat earth in advance;
Fig. 7 is the A-A ' sectional drawing before Fig. 6 implements pressure break;
Fig. 8 is the B-B ' sectional drawing before Fig. 6 implements pressure break;
Fig. 9 is that Fig. 6 implements post-fracturing A-A ' sectional drawing;
Figure 10 is that Fig. 6 implements post-fracturing B-B ' sectional drawing;
Figure 11 the present invention is directed to the stereogram taking out coal roadway stripe gas from ground to multi-branched horizontal well of constructing single soft hypotonic height dashes forward coal seam Di Ding, base plate in advance;
Figure 12 is the A-A ' sectional drawing before Figure 11 implements pressure break;
Figure 13 is the B-B ' sectional drawing before Figure 11 implements pressure break;
Figure 14 is that Figure 11 implements post-fracturing A-A ' sectional drawing;
Figure 15 is that Figure 11 implements post-fracturing B-B ' sectional drawing.
Detailed description of the invention
Embodiment 1:
To unworked country, single soft projecting coal bed top board construction surface water horizontal well takes out the method for coal roadway stripe gas in advance.Be single, soft, hypotonic, the high prominent coal seam 6 of the nearly level of 5.7m, buried depth 685m for thickness, the Failure type of this layer of coal is V class, and ature of coal mostly is Powdered, and coal is rotten rib coal; Gas bearing capacity is 21m
3/ t, gas pressure is 1.5MPa; Coal seam immediate roof 7 is Sandy Silt and aleuritic texture rock, thick 1.96-9.97m, average 5.27m, and old top is packsand, thick 1.22-11.95 rice, on average thick 5.05 meters; Coal seam immediate bottom 8 is Sandy Silt or charcoal mudrock, thick 0.74-17.93 rice, average 7.00 meters, and past is sandstone, thick 0.45-26.5m, average thick 10.70m.Seat earth has limestone aquifer, upper apart from coal seam 20 ~ 30m, karst and cranny development unbalanced.
implementation step is as follows:
(1) according to the locus, tunnel 5 of intending driving, choose solution space on ground 1 and arrange well location;
(2) adopt and three drive a well body structure to roof 7 wellbore construction, eye 2 diameter that drives a well is 311.1mm, under enter the J55 grade of steel protective casing of Φ 244.5mm, one opens leakiness stratum, surface pipe sealing earth's surface, and cement returns to ground 1; Two eye 3 diameters that drive a well are 215.9mm, under enter the J55 grade of steel protective casing of Φ 177.8mm after cement the well, cement returns to coal 6 and pushes up more than 100m; Three horizontal hole 4 diameters that spud in are 152.4mm, under enter the J55 grade of steel protective casing sealing roof 7 of Φ 127mm.Adopting guide digging technology to make three to open horizontal hole 4 apart from coal seam 6 is 3 ~ 6m, for ensureing Erkaijing well 3 and three spud section 4 cementing qualities, make bunch tube placed in the middle, open high angle hole section 3 two and adopt the wheeled rigidity centralizer of spiral roll and bouble-bow elastic centralizer cross-reference, three open horizontal segment 4 uses rigid vortex centralizer, replaces technology improve displacement efficiency by spiral flow.
(3) drilling engineering is transferred rear perforation and is prepared pressure break, according to 16 bullets/m only downward semi-circular orientation perforation in horizontal circular borehole 4, according to fixed fracturing scheme, staged fracturing is implemented to the Roof Rock Strata of Coal Seam 7 between horizontal hole 4 and coal seam 6 after perforation, the adjoining rock originally sealing coal-bed gas up for safekeeping is transformed into the extraction Protective Coal Seam 9 of crack connected network prosperity.
(4) after ground shut-in well, draining, step-down, utilize negative pressure extraction, make gas constantly desorb from coal seam 6, the diffusion be enclosed in coal seam 6, migrated to extraction Protective Coal Seam 9 seepage flow by the Fracture Networks be communicated with coal seam, then by the horizontal hole 4 in extraction Protective Coal Seam 9 rock stratum by extensive extraction out.
Embodiment 2:
To unworked country, single soft projecting coal bed construction of bottom plates surface water horizontal well takes out the method for coal roadway stripe gas in advance.Be single, soft, hypotonic, the high prominent coal seam 6 of the nearly level of 4.8m, buried depth 720m for thickness, the Failure type of this layer of coal is III class, and ature of coal mostly is chunky shape; Gas bearing capacity is 14m
3/ t, gas pressure is 1.2MPa; Coal seam immediate roof 7 plate is black mudstone and charcoal mudrock, thick 2.8-7.2m, average 5.4m, and old top is middle kern stone, thick 8.1-12.3 rice, on average thick 9.5 meters; Coal seam immediate bottom 8 is Sandy Silt or mud stone, thick 2.4-15.6 rice, average 10.3 meters, and past is sandstone, thick 3.5-27.8m, average thick 14.5m.Roof 7 has Shanxi group sandstone crack artesian water, apart from coal seam 5 ~ 30m.Floor strata general integrity is better.
implementation step is as follows:
(1) according to the locus, tunnel 5 of intending driving, choose solution space on ground 1 and arrange well location;
(2) adopt and three drive a well body structure to roof 7 wellbore construction, eye 2 diameter that drives a well is 311.1mm, under enter the N80 grade of steel protective casing of Φ 244.5mm, one opens leakiness stratum, surface pipe sealing earth's surface, and cement returns to ground 1; Two eye 3 diameters that drive a well are 215.9mm, under enter the N80 grade of steel protective casing sealing coal seam 6 of Φ 177.8mm, cement returns to coal 6 and pushes up more than 100m; Three horizontal hole 4 diameters that spud in are 152.4mm, under enter sealing seat earth 8 after the N80 grade of steel protective casing of Φ 127mm.Adopting guide digging technology to make three to open horizontal hole 4 apart from coal seam 6 is 3 ~ 6m, for ensureing Erkaijing well 3 and three spud section 4 cementing qualities, make bunch tube placed in the middle, open high angle hole section 3 two and adopt the wheeled rigidity centralizer of spiral roll and bouble-bow elastic centralizer cross-reference, three open horizontal segment 4 uses rigid vortex centralizer, replaces technology improve displacement efficiency by spiral flow.
(3) drilling engineering is transferred rear perforation and is prepared pressure break, according to 16 bullets/m only upwards semi-circular orientation perforation in horizontal circular borehole 4, according to fixed fracturing scheme, staged fracturing is implemented to the Roof Rock Strata of Coal Seam 7 between horizontal hole 4 and coal seam 6 after perforation, the adjoining rock originally sealing coal-bed gas up for safekeeping is transformed into the extraction Protective Coal Seam 9 of crack connected network prosperity.
(4) after ground shut-in well, draining, step-down, utilize negative pressure extraction, make gas constantly desorb from coal seam 6, the diffusion be enclosed in coal seam 6, migrated to extraction Protective Coal Seam 9 seepage flow by the Fracture Networks be communicated with coal seam, then by the horizontal hole 4 in extraction Protective Coal Seam 9 rock stratum by extensive extraction out.
Embodiment 3:
To unworked country, single soft projecting coal bed roof and floor construction ground multi-branched horizontal well takes out the method for coal roadway stripe gas in advance.Be single, soft, hypotonic, the high prominent coal seam 6 of the nearly level of 6.68m, buried depth 700m for thickness, the Failure type of this layer of coal is IV class, and ature of coal mostly is granular and chunky shape; Gas bearing capacity is 28m
3/ t, gas pressure is 1.7MPa; Coal seam immediate roof 7 is Sandy Silt, thick 2.6-6.9m, average 4.8m, and old top is packsand, thick 3.2-16.5 rice, on average thick 8.4 meters; Coal seam immediate bottom 8 is Sandy Silt or charcoal mudrock, thick 2.4-15.6 rice, average 7.6 meters, and past is sandstone, thick 1.8-20.6m, average thick 12.5m.Seam Roof And Floor stablize, karst and cranny development unbalanced.
implementation step is as follows:
(1) according to the locus, tunnel 5 of intending driving, choose solution space on ground 1 and arrange well location;
(2) three body structures that drive a well are adopted to construct multi-branched horizontal well to roof 7 and seat earth 8, first the horizontal well of construction in roof 7, this branch horizontal well one eye 2 diameter that drives a well is 311.1mm, under enter the N80 grade of steel protective casing of Φ 244.5mm, one opens leakiness stratum, surface pipe sealing earth's surface, and cement returns to ground 1; Two eye 3 diameters that drive a well are 215.9mm, under enter the N80 grade of steel protective casing of Φ 177.8mm after cement the well, cement returns to coal 6 and pushes up more than 100m; Three horizontal hole 4 diameters that spud in are 152.4mm, under enter the N80 grade of steel protective casing sealing roof 7 of Φ 127mm.
(3) after the horizontal well drilling of construction in roof 7 terminates, branch horizontal well again in construction coal base plate, this branch horizontal well one eye 2 diameter that drives a well is 311.1mm, under enter the N80 grade of steel protective casing of Φ 244.5mm, one opens leakiness stratum, surface pipe sealing earth's surface, and cement returns to ground 1; Two eye 3 diameters that drive a well are 215.9mm, under enter the N80 grade of steel protective casing sealing coal seam 6 of Φ 177.8mm, cement returns to coal 6 and pushes up more than 100m; Three horizontal hole 4 diameters that spud in are 152.4mm, under enter the N80 grade of steel protective casing sealing seat earth 8 of Φ 127mm.Adopting guide digging technology to make three to open horizontal hole 4 apart from coal seam 6 is 3 ~ 6m, for ensureing Erkaijing well 3 and three spud section 4 cementing qualities, make bunch tube placed in the middle, open high angle hole section 3 two and adopt the wheeled rigidity centralizer of spiral roll and bouble-bow elastic centralizer cross-reference, three open horizontal segment 4 uses rigid vortex centralizer, replaces technology improve displacement efficiency by spiral flow.
(3) drilling engineering is transferred rear perforation and is prepared pressure break, perforation is carried out according to 16 bullets/m, only upwards semi-circular orientation perforation in branch levels circular borehole 4 in roof 7, only upwards semi-circular orientation perforation in branch levels circular borehole 4 in seat earth 8, respectively staged fracturing is implemented to the Roof Rock Strata of Coal Seam 7 between horizontal hole 4 and coal seam 6 and seat earth 8 according to fixed fracturing scheme after perforation, the adjoining rock originally sealing coal-bed gas up for safekeeping is transformed into the extraction Protective Coal Seam 9 of crack connected network prosperity.
(4) after ground shut-in well, draining, step-down, utilize negative pressure extraction, make gas constantly desorb from coal seam 6, the diffusion be enclosed in coal seam 6, migrated to extraction Protective Coal Seam 9 seepage flow by the Fracture Networks be communicated with coal seam, then by the horizontal hole 4 in extraction Protective Coal Seam 9 rock stratum by extensive extraction out.
Claims (3)
1. the single soft projecting coal bed method of taking out coal roadway stripe gas in advance in unworked country, it is characterized in that: adopt surface water horizontal well cbm development technique, single soft projecting coal bed top or construction of bottom plates concordant horizontal well from ground to unworked country, perforation, pressure break, drainage and step-down, aerogenesis, and determine whether to carry out negative pressure mash gas extraction according to product regimen condition;
Adopt from ground to top, coal seam, base plate constructs multi-branched horizontal well mash gas extraction respectively, 3 ~ 6m directly over coal seam is positioned on the described horizontal hole of constructing in roof is vertical, be positioned at 3 ~ 6m immediately below coal seam on the horizontal hole of constructing in seat earth is vertical, horizontal hole drilling direction is contrary with tunnelling direction;
Described takes three opening structures from the horizontal well of ground construction, enters protective casing all down, and one opens leakiness stratum, surface pipe sealing earth's surface, and cement returns to ground; Two drive a well enter protective casing now after cement the well, cement returns to coal top more than 100m; Three spud in horizontal hole, enter rear well cementation under protective casing;
Described pressure break is in horizontal hole section lower packet enforcement at a certain distance staged fracturing, intensive treatment is carried out to section rock stratum of between horizontal hole and coal seam, in the horizontal to intend digging coal road for this section of Seam Roof And Floor preexisting crack extension in each certain limit in axis both sides after making pressure break, expansion, and produce new a large amount of artificial crack, the crack making Seam Roof And Floor obtain along the artificial plane of weakness that oriented perforating is formed through fracturing reform is in the vertical linked up with coal seam as far as possible, finally play anti-reflection deblocking effect, namely the gas permeability of rock stratum is increased, remove rock stratum and ability is sealed up for safekeeping to gas in coal seam, originally the adjoining rock sealing coal-bed gas up for safekeeping is transformed into " the extraction Protective Coal Seam " of Fracture Networks prosperity.
2. the single soft projecting coal bed method of taking out coal roadway stripe gas in advance in unworked country according to claim 1, it is characterized in that: described extraction Protective Coal Seam refers to the rock stratum produced by reinforcement process in close coal seam certain limit that a large amount of crack makes gas permeability increase substantially, thickness is 8-12m, and seals ability by the releasing rock stratum, crack with coal seam conducting up for safekeeping to gas in coal seam.
3. the single soft projecting coal bed method of taking out coal roadway stripe gas in advance in unworked country according to claim 1, it is characterized in that: carrying out negative pressure mash gas extraction after described drainage and step-down is utilize draining, hypotensive effect, coal-bed gas is made to reach below critical desorption pressures, and in negative pressure extraction process, make gas constantly desorb from coal seam, the diffusion be enclosed in coal seam, migrated to " extraction Protective Coal Seam " seepage flow by the Fracture Networks be communicated with coal seam, then by the horizontal hole in " extraction Protective Coal Seam " rock stratum by extensive extraction out; Reach to intend to dig heading for the coal-bed gas in the certain limit of axis both sides be down to protrusion-dispelling specify in the safety standard of requirement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110181168.3A CN102852546B (en) | 2011-06-30 | 2011-06-30 | Method for pre-pumping coal roadway stripe gas of single soft protruded coal seam of unexploited area |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110181168.3A CN102852546B (en) | 2011-06-30 | 2011-06-30 | Method for pre-pumping coal roadway stripe gas of single soft protruded coal seam of unexploited area |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102852546A CN102852546A (en) | 2013-01-02 |
CN102852546B true CN102852546B (en) | 2015-04-29 |
Family
ID=47399478
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110181168.3A Expired - Fee Related CN102852546B (en) | 2011-06-30 | 2011-06-30 | Method for pre-pumping coal roadway stripe gas of single soft protruded coal seam of unexploited area |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102852546B (en) |
Families Citing this family (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103147734A (en) * | 2013-03-08 | 2013-06-12 | 中煤科工集团重庆研究院 | Method for multi-section hydraulic fracture along coal layer of underground coal mine |
CN103967472B (en) * | 2014-05-26 | 2016-08-31 | 中煤科工集团西安研究院有限公司 | A kind of coal bed gas staged fracturing horizontal well enhanced gas extraction method |
CN104131831B (en) * | 2014-06-12 | 2016-10-12 | 中国矿业大学 | A kind of coal bed gas well three-dimensional associating pumping method up and down |
CN104763398A (en) * | 2015-02-11 | 2015-07-08 | 中国石油集团长城钻探工程有限公司 | Mining method for deformed coal coalbed methane for V-shaped well bottom plate auxiliary layer |
CN104879159B (en) * | 2015-06-11 | 2017-07-28 | 河南理工大学 | A kind of devices and methods therefor of weak seam stope anti-reflection mash gas extraction |
CN105971662A (en) * | 2016-07-05 | 2016-09-28 | 重庆大学 | Method for gas extraction by coal seam roof weakening through L-shaped drilling staged fracturing |
CN106593393A (en) * | 2016-12-09 | 2017-04-26 | 太原理工大学 | Method for improving permeability of broken and soft oil and gas reservoir |
CN106639877B (en) * | 2016-12-31 | 2019-12-20 | 河南理工大学 | Variable-track drilling method and device |
CN106979031B (en) * | 2017-04-18 | 2023-05-09 | 中交路桥华南工程有限公司 | Gas drainage system and tunnel structure in tunnel |
CN106907175B (en) * | 2017-05-02 | 2019-06-04 | 中国矿业大学 | High-efficiency strip gas drainage of coal roadway and method for regional outburst elimination by staged fracturing with long boreholes along the floor |
CN107916953A (en) * | 2017-11-24 | 2018-04-17 | 陕西省煤层气开发利用有限公司 | Gas drainage system, pumping method and construction technology based on roof horizontal drilling |
CN108150212B (en) * | 2017-11-29 | 2020-04-24 | 中国神华能源股份有限公司 | Fire extinguishing method |
CN108643960A (en) * | 2018-05-21 | 2018-10-12 | 河南工程学院 | A kind of ground region band coal mine gas extinction technique |
CN108756884A (en) * | 2018-06-12 | 2018-11-06 | 王帆 | Coal mine tight roof full face ground shifts to an earlier date outburst elimination method |
CN109539920B (en) * | 2018-12-27 | 2023-08-25 | 通源石油科技集团股份有限公司 | Top plate fracturing method and device for coal exploitation |
CN109519211B (en) * | 2019-01-15 | 2020-10-09 | 中煤科工集团重庆研究院有限公司 | Method for extracting gas in mining area by using pre-extraction coal bed gas ground well |
CN109653787B (en) * | 2019-01-25 | 2024-05-03 | 安徽理工大学 | Coordinated extraction pressure relief method for high-pressure-bearing water and high-gas coal seam group |
CN110318674B (en) * | 2019-06-13 | 2020-10-23 | 太原理工大学 | A method for cracking and outburst prevention of roadway roof |
CN110173240A (en) * | 2019-06-19 | 2019-08-27 | 陕西浩兴坤达新能源科技有限公司 | A kind of coal mine gas drainage method |
CN110306961A (en) * | 2019-06-19 | 2019-10-08 | 陕西浩兴坤达新能源科技有限公司 | It is a kind of along roof Floor water horizontal well drilling well staged fracturing method |
CN110984944B (en) * | 2019-11-22 | 2022-03-29 | 中国石油天然气股份有限公司 | Fracturing method for improving strip-shaped high-water-saturation reservoir development effect |
CN110953015B (en) * | 2019-12-25 | 2021-04-13 | 太原理工大学 | Soft low-permeability coal seam long-drill-hole directional segmented fracturing efficient gas extraction method |
CN112253070B (en) * | 2020-10-10 | 2023-08-15 | 中煤科工集团西安研究院有限公司 | Method for sectional seam making, coal washing and outburst elimination of thick coal seam top-bottom linkage horizontal well |
CN112211595B (en) * | 2020-10-20 | 2022-05-06 | 吕梁学院 | Construction method of coal-bed gas well at critical position |
CN112593936B (en) * | 2020-11-27 | 2023-05-02 | 陕西彬长孟村矿业有限公司 | Advanced comprehensive control method for multi-disaster area of deep mine |
CN112855087A (en) * | 2021-03-22 | 2021-05-28 | 河北佐和佑石油技术发展有限公司 | Coal bed gas horizontal well system transformation method |
CN113863915B (en) * | 2021-10-15 | 2024-01-19 | 中国华能集团有限公司 | System and method for improving physical properties of low-permeability structural coal reservoir by using acidification technology |
CN114233369B (en) * | 2021-12-28 | 2023-10-31 | 山西晋煤集团技术研究院有限责任公司 | Method for precisely eliminating coal and gas outburst by up-and-down combination |
CN116122774B (en) * | 2023-01-03 | 2024-10-18 | 中煤科工西安研究院(集团)有限公司 | Outburst prevention method for combined operation layer gas extraction area of ultra-close coal seam well up-down combination operation |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2350504A1 (en) * | 1998-11-20 | 2000-06-02 | Cdx Gas, Llc | Method and system for accessing subterranean deposits from the surface |
RU2282722C1 (en) * | 2004-12-27 | 2006-08-27 | Открытое акционерное общество "Газпром" (ОАО "Газпром") | Coal bed degassing method |
CN102031950A (en) * | 2010-12-06 | 2011-04-27 | 煤炭科学研究总院西安研究院 | Hole-forming process method for comb gas extraction borehole in coal seam roof |
CN102080518A (en) * | 2011-01-17 | 2011-06-01 | 河南理工大学 | Method for extracting gas from coal seam roof complex branched well |
CN102086774A (en) * | 2011-01-17 | 2011-06-08 | 中联煤层气国家工程研究中心有限责任公司 | Drainage method of gas in coal bed |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6497457B1 (en) * | 2001-05-31 | 2002-12-24 | Larry G. Stolarczyk | Drilling, image, and coal-bed methane production ahead of mining |
-
2011
- 2011-06-30 CN CN201110181168.3A patent/CN102852546B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2350504A1 (en) * | 1998-11-20 | 2000-06-02 | Cdx Gas, Llc | Method and system for accessing subterranean deposits from the surface |
RU2282722C1 (en) * | 2004-12-27 | 2006-08-27 | Открытое акционерное общество "Газпром" (ОАО "Газпром") | Coal bed degassing method |
CN102031950A (en) * | 2010-12-06 | 2011-04-27 | 煤炭科学研究总院西安研究院 | Hole-forming process method for comb gas extraction borehole in coal seam roof |
CN102080518A (en) * | 2011-01-17 | 2011-06-01 | 河南理工大学 | Method for extracting gas from coal seam roof complex branched well |
CN102086774A (en) * | 2011-01-17 | 2011-06-08 | 中联煤层气国家工程研究中心有限责任公司 | Drainage method of gas in coal bed |
Non-Patent Citations (1)
Title |
---|
地面"L"型钻井瓦斯抽采设备与抽采管路系统优化探讨;肖家平等;《煤炭技术》;20090810;第28卷(第08期);173-174 * |
Also Published As
Publication number | Publication date |
---|---|
CN102852546A (en) | 2013-01-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102852546B (en) | Method for pre-pumping coal roadway stripe gas of single soft protruded coal seam of unexploited area | |
CN109339746B (en) | Roof separation layer water and coal-based gas collaborative dredging and discharging method | |
CN102080518B (en) | Method for extracting gas from coal seam roof complex branched well | |
CN101915072B (en) | Method for extracting coal bed gas in stable mining region by ground well drilling | |
CN105804754B (en) | A kind of coal seam is Main aquifer pitshaft method for uncovering coal | |
CN102392677A (en) | Permeability improvement technology for coal bed gas reservoir cap by using three-dimensional fracture network modification | |
CN107905834A (en) | A kind of hypotonic high prominent coal seam architecture gas production method | |
CN104879159B (en) | A kind of devices and methods therefor of weak seam stope anti-reflection mash gas extraction | |
CN102493831B (en) | Method for extracting coal seam gas through ground fracturing and underground horizontal drill holes | |
CN104929567A (en) | Low-cost construction process for passing through goaf | |
CN100356036C (en) | Method for pumping out gas from mining coal layer roof | |
CN108868706A (en) | Directional drilling supercritical carbon dioxide fracturing replacement exploitation of gas hydrate method | |
CN107387082A (en) | A kind of method for weakening coal seam tight roof | |
CN113006867B (en) | A multi-hazard joint prevention method for coal seam in high gas and low-lying island working face before mining | |
CN111441817B (en) | Enhanced Gas Drainage Method by Coal Seam Drilling Jet Fracturing and Mining Pressure Synergy | |
CN114837608B (en) | Multi-stage graded grouting method for rebuilding mined overlying rock water-resisting layer | |
CN104806285A (en) | Coal mine goaf gas control method based on ground horizontal well | |
CN109339856A (en) | A kind of method that face gas is administered | |
CN114439428B (en) | Enhanced extraction method for coal bed gas horizontal well of coal group under goaf group | |
CN110306965A (en) | A kind of stimulation method for coalbed methane low-yield well area | |
CN114294046B (en) | Coal mine area full-coverage underground three-dimensional extraction method | |
CN107620581B (en) | Construction method of one-well dual-purpose coal mine shaft inspection hole | |
CN111022108A (en) | Method for extracting gas in goaf | |
CN114542164A (en) | An integrated method for co-production of deep coal seam fluidized coal and coalbed methane and CO2 storage | |
CN106014345B (en) | A kind of lower part caving method exploits the pumping method for the compound old dead zone coal bed gas to be formed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150429 Termination date: 20190630 |
|
CF01 | Termination of patent right due to non-payment of annual fee |