CN104929567A - Low-cost construction process for passing through goaf - Google Patents
Low-cost construction process for passing through goaf Download PDFInfo
- Publication number
- CN104929567A CN104929567A CN201510213176.XA CN201510213176A CN104929567A CN 104929567 A CN104929567 A CN 104929567A CN 201510213176 A CN201510213176 A CN 201510213176A CN 104929567 A CN104929567 A CN 104929567A
- Authority
- CN
- China
- Prior art keywords
- goaf
- well
- cement
- drilling
- sleeve pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The invention belongs to the technical field of coal gas mining, particularly relates to a low-cost construction process for passing through a goaf and aims to realize passing through a broken and collapsed belt of a permian formation to extract coal gas of carboniferous formation lower group coal. The low-cost construction process includes: adopting a three-holing well body structure for on-ground well drilling, and holing to bed rock for the first time; holing to a position of 22m below a baseplate of the goaf for the second time, lowering a bilayer sleeve, sealing and fixing a bottom port of the bilayer sleeve, and pouring cement between the bilayer sleeve and a well wall for well cementation; holing to a position of 50m below a baseplate of a lower group coal layer for the third time to finish drilling, lowering an inner-layer sleeve, performing well cementation and depth returning to the baseplate of the goaf, and performing well completion after solidification. No sleeve for replacing a drill rod is used, but conventional sleeves are adopted; red soil is filled between the bilayer sleeve and the well wall, cement paste is utilized to intrude the broken belt above the goaf, and the cement is utilized between the bilayer sleeve below the goaf and the well wall for well cementation to stabilize the goaf, so that the circumstance that a drill bit and a wellhole are buried caused by breaking and collapsing of the goaf can be prevented effectively.
Description
Technical field
The invention belongs to Coal-seam Gas Recovery Technologies field, be specifically related to a kind of low cost and pass through goaf construction technology.
Background technology
Part mining area coal-bearing strata is Permo-Carboniferous system stratum, and lower group of minable coal seam is contained on coal stratum, and group minable coal seam is contained on two folded stratum.Such mining area Metamorphic degree of seam is high, earth history period, not there is not a large amount of loss of gas because violent geological structure causes into coal-formed gas (the being mainly methane gas) phase, ton coal coal bed gas (coal mine gas) content is high, before carrying out coal mining, need to take ground coal bed gas well and down-hole extraction borehole extraction coal bed gas (coal mine gas), after reducing ton coal coal bed gas (coal mine gas) content, coal mining can be carried out.
Bury by coal that the depth, coal are thick, technology complexity, exploitation economy etc. affect, exploited for two folded containing of stratum in Permian System mining area ordinary priority and organized shallow-layer high seam, cause and above coal stratum, to define fragmentation to subside band, passing through in gob well work progress, the goaf fragmentation formed after passing through group coal mining subside band time, the fragmentation band that subsides can cause bury drills head, bury the problem of wellhole.Affecting by two folded stratum being organized fragmentation that coal mining the formed band that subsides, under causing effectively taking conventional coal bed gas ground well drainage coal stratum, organizing coal coal bed gas (coal mine gas).
Summary of the invention
The present invention to be subsided band to realize passing through two folded stratum crushings, and extraction coal organizes coal coal bed gas under stratum, and then provides a kind of low cost and pass through goaf construction technology.
A kind of low cost passes through goaf construction technology, and ground drilling adopts three to drive a well body structure, and its concrete steps are:
One opens: utilize drilling rod to drive drill bit one perforate to basement rock, and layer sleeve pipe to aperture bottom well cementing of cement, cement returns to ground;
Two open: adopt air DTH drilling to open below two perforates to gob floor 22m, then go up exhaust gas hidden hole drilling, under enter rock bit cunning eye, full well without hindrance rear under enter two layers of sleeve pipe, mouth at the bottom of sealing two layers of sleeve pipe, at two layers of well cementing of cement between sleeve pipe and the borehole wall, cement invades zone of fracture, Hou Ning;
Three open: utilize drill bit conventional mud to bore three perforates to 50m place finishing drilling below lower group of seat earth, under enter inner layer sleeve, cementing the well to return is deep to gob floor, Hou Ning completion.
Described two open in drilling process, and air latent drift top connects pressure fan, and sealing wellhead when creeping into connecting duct, to away from well head region, inject water liquid sand discharge at well head simultaneously.
Two layers of described sleeve pipe are connected with retracting device.
The described two two perforate top mouths opened in drilling process form seal area by cement returning shutoff.
Described three open in drilling process, and aperture is provided with preventer.
The present invention has following beneficial effect:
1, the present invention is on conventional drilling Process ba-sis, adds the instruments such as air compressor (blast machine) and down-hole hammer, efficiently can complete the drilling well of passing through goaf, can meet lower road pressing crack construction operation;
2, two spud in into time, by filling laterite between sleeve pipe and the borehole wall and the zone of fracture of above goaf formed after utilizing cement paste to invade to organize coal mining at two layers, two layers again below goaf utilize well cementing of cement between sleeve pipe and the borehole wall, make goaf firm, can effectively prevent goaf fragmentation to cave in bury drills head, wellhole;
3, compared with other the technique crossing goaf, the present invention does not use and replaces the sleeve pipe of drilling rod, employing be conventional cannula, and and common drilling technology combine and can realize goaf, therefore cost is low.
Accompanying drawing explanation
Fig. 1 is the casing programme schematic diagram of work progress of the present invention;
In figure: 1-cement, 2-bis-layers of sleeve pipe, 3-surface pipe, 4-retracting device, 5-seal area, 6-fill area, 7-goaf, 8-inner layer sleeve, 9-coal seam, A-mono-perforate, B-bis-perforate, C-tri-perforate.
Detailed description of the invention
As shown in Figure 1, cause bury drills head, bury wellhole when band is subsided in goaf (7) fragmentation formed after organize coal mining on passing through, ground drilling construction employing three drives a well body structure.Its Specific construction step is as follows:
One opens: utilize drilling rod to drive φ 444.5mm drill bit one perforate A to basement rock, and bottom lower φ 377.7mm surface pipe 3 to perforate A and well cementing of cement, cement returns to ground.
Two open: adopt φ 311.1mm air DTH drilling to open two perforate B, its top with a pressure fan (according to the situation of creeping into, in good time two pressure fans in parallel), during air DTH drilling, well head adopts special device sealing, and connecting duct is to away from well head, injects float water gaging liquid, take precautions against downhole safety and be beneficial to sand discharge at well head simultaneously.Down-the-hole hammer drill proceeds to coal seam goaf base plate less than 7 22m, then exhaust gas hidden hole drilling is gone up, under enter the sliding eye of φ 311.1mm rock bit, full well without hindrance rear under enter φ 244.5mm bis-layers of sleeve pipe 2, sealing two layers of sleeve pipe 2 end mouth, well cementing of cement between two layers of sleeve pipe 2 and the borehole wall, cement invades zone of fracture, Hou Ning.In work progress, the top mouth of two perforate B forms seal area 5 by cement returning shutoff, with the fuel gas loss in safety guarantee crack to well head, utilizes the retracting device 4 that two layers of sleeve pipe 2 connect to reclaim construction material simultaneously.
Three open: utilize φ 215.9mm drill bit conventional mud to creep into, preventer is installed in aperture, to drill below lower group of coal seam 9 base plate finishing drilling three perforate C after 50m, under enter φ 139.7mm inner layer sleeve 8, return at inner layer sleeve 8 well cementing of cement between the borehole wall and be deep to goaf 7 base plate, cement invades zone of fracture, Hou Ning completion.
In construction technological process of the present invention, following safety requirements need be met:
1, forbid in drill site to use naked light and smoking;
2, two spud in into time, monitor well implication amount, concentration at any time, if gas density exceeds standard, uses water drilling instead;
3, after three spudding wells pressure testing terminate, fill laterite at two walls that drive a well, ensure that follow-up inner layer sleeve 8 is straight, then drive a well in wall two and inject cement paste, shutoff crack, prevent fuel gas by crack loss to well head.
The component not making specified otherwise in the present invention is prior art.
Claims (5)
1. low cost passes through a goaf construction technology, and ground drilling adopts three to drive a well body structure, it is characterized in that concrete steps are:
One opens: utilize drilling rod to drive drill bit one perforate (A) to basement rock, and layer sleeve pipe (3) is to a perforate (A) bottom also well cementing of cement, cement returns to ground;
Two open: adopt air DTH drilling to open below two perforates (B) to goaf (7) base plate 22m, then exhaust gas hidden hole drilling is gone up, under enter the sliding eye of rock bit, full well without hindrance rear under enter two layers of sleeve pipe (2), sealing two layers of sleeve pipe (2) end mouth, well cementing of cement between two layers of sleeve pipe (2) and the borehole wall, cement invades zone of fracture, Hou Ning;
Three open: utilize drill bit conventional mud to bore three perforates (C) to 50m place finishing drilling below lower group of coal seam (9) base plate, under enter inner layer sleeve (8), cementing the well to return is deep to goaf (7) base plate, Hou Ning completion.
2. low cost according to claim 1 passes through goaf construction technology, be characterised in that: described two open in drilling process, air latent drift top connects pressure fan, and sealing wellhead when creeping into connecting duct, to away from well head region, inject water liquid sand discharge at well head simultaneously.
3. low cost according to claim 1 passes through goaf construction technology, is characterised in that: two layers of described sleeve pipe (2) are connected with retracting device (4).
4. pass through goaf construction technology according to low cost according to claim 1, be characterised in that: described 2 two perforates (B) of opening in drilling process are pushed up mouth and formed seal area (5) by cement returning shutoff.
5. low cost according to claim 1 passes through goaf construction technology, is characterised in that: described three open in drilling process, and aperture is provided with preventer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510213176.XA CN104929567A (en) | 2015-04-30 | 2015-04-30 | Low-cost construction process for passing through goaf |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510213176.XA CN104929567A (en) | 2015-04-30 | 2015-04-30 | Low-cost construction process for passing through goaf |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104929567A true CN104929567A (en) | 2015-09-23 |
Family
ID=54116960
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510213176.XA Pending CN104929567A (en) | 2015-04-30 | 2015-04-30 | Low-cost construction process for passing through goaf |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104929567A (en) |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106761543A (en) * | 2016-12-02 | 2017-05-31 | 淮北矿业股份有限公司 | A kind of method that section is missed by goaf that drills |
CN107313747A (en) * | 2017-08-17 | 2017-11-03 | 李建峰 | One kind only takes hot ground hot hole pore-fixing device and the method for not fetching water |
CN107313744A (en) * | 2017-07-18 | 2017-11-03 | 山西晋城无烟煤矿业集团有限责任公司 | A kind of small guide hole grouting and reinforcing coal bed gas well passes through the construction method in goaf |
CN107313716A (en) * | 2017-07-18 | 2017-11-03 | 山西晋城无烟煤矿业集团有限责任公司 | The coal bed gas well of the compound closure fragmented rock body of bottom hole passes through the boring method in goaf |
CN107620581A (en) * | 2017-07-31 | 2018-01-23 | 山西晋城无烟煤矿业集团有限责任公司 | The construction method of the dual-purpose mine shaft inspection hole of one well |
CN107816366A (en) * | 2017-10-25 | 2018-03-20 | 吉林大学 | A kind of multilayer goaf filling well is into well engineering method |
CN108798546A (en) * | 2018-06-27 | 2018-11-13 | 广东煤炭地质五二勘探队 | A kind of deep well cementing construction method and combinations thereof part |
CN109057795A (en) * | 2018-08-29 | 2018-12-21 | 山西晋城无烟煤矿业集团有限责任公司 | It is a kind of to cross goaf coal bed gas ground drilling method |
CN109403923A (en) * | 2018-09-28 | 2019-03-01 | 山西晋城无烟煤矿业集团有限责任公司 | A kind of coal bed gas T-type wears the short horizontal well construction method in goaf |
CN109441426A (en) * | 2018-11-27 | 2019-03-08 | 中国矿业大学(北京) | A kind of drilling hole stress directional monitoring device and method |
CN110318706A (en) * | 2019-07-15 | 2019-10-11 | 神华神东煤炭集团有限责任公司 | A kind of method that drilling operation crosses goaf |
CN110939408A (en) * | 2018-09-25 | 2020-03-31 | 山西省煤炭地质勘查研究院 | Optimized goaf coalbed methane ground extraction well body structure and well cementation method |
CN110939407A (en) * | 2018-09-25 | 2020-03-31 | 山西省煤炭地质勘查研究院 | Double-deck overlapping goaf ground drainage well structure and recovery unit |
CN111335936A (en) * | 2020-03-20 | 2020-06-26 | 淮南矿业(集团)有限责任公司 | Construction method of ground fire prevention and extinguishing channel of goaf target area |
CN111411909A (en) * | 2020-04-23 | 2020-07-14 | 山东省煤田地质局第一勘探队 | Artificial wall building method for treating drilling engineering in coal mining subsidence area |
CN111663918A (en) * | 2020-07-10 | 2020-09-15 | 中勘资源勘探科技股份有限公司 | Coal mining ground grouting process and grouting structure |
CN112682098A (en) * | 2020-12-28 | 2021-04-20 | 冀中能源股份有限公司邢东矿 | Large vertical-depth large-aperture coal gangue feeding hole and construction method thereof |
CN112901247A (en) * | 2021-04-06 | 2021-06-04 | 中国矿业大学 | Coal mine underground multistage sleeve long-distance fire prevention and extinguishing drilling construction method |
CN113863895A (en) * | 2021-04-30 | 2021-12-31 | 中国矿业大学 | Well body structure of oil and gas well penetrating through recoverable coal seam and construction method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1693654A (en) * | 2005-06-02 | 2005-11-09 | 淮南矿业(集团)有限责任公司 | Gas pressure relief method of ground drilling extraction minery and goaf |
CN102966304A (en) * | 2012-11-28 | 2013-03-13 | 吉林大学 | Mud retaining wall and air down-the-hole hammer drilling tool and drilling technology |
CN103835647A (en) * | 2012-11-23 | 2014-06-04 | 四川省地质工程勘察院 | Method for drilling floating pebble bed |
CN104405281A (en) * | 2014-10-20 | 2015-03-11 | 山西蓝焰煤层气集团有限责任公司 | Casing drilling technique for over-goaf |
-
2015
- 2015-04-30 CN CN201510213176.XA patent/CN104929567A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1693654A (en) * | 2005-06-02 | 2005-11-09 | 淮南矿业(集团)有限责任公司 | Gas pressure relief method of ground drilling extraction minery and goaf |
CN103835647A (en) * | 2012-11-23 | 2014-06-04 | 四川省地质工程勘察院 | Method for drilling floating pebble bed |
CN102966304A (en) * | 2012-11-28 | 2013-03-13 | 吉林大学 | Mud retaining wall and air down-the-hole hammer drilling tool and drilling technology |
CN104405281A (en) * | 2014-10-20 | 2015-03-11 | 山西蓝焰煤层气集团有限责任公司 | Casing drilling technique for over-goaf |
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106761543A (en) * | 2016-12-02 | 2017-05-31 | 淮北矿业股份有限公司 | A kind of method that section is missed by goaf that drills |
CN106761543B (en) * | 2016-12-02 | 2019-07-19 | 淮北矿业股份有限公司 | A method of drilling misses section by goaf |
CN107313744A (en) * | 2017-07-18 | 2017-11-03 | 山西晋城无烟煤矿业集团有限责任公司 | A kind of small guide hole grouting and reinforcing coal bed gas well passes through the construction method in goaf |
CN107313716A (en) * | 2017-07-18 | 2017-11-03 | 山西晋城无烟煤矿业集团有限责任公司 | The coal bed gas well of the compound closure fragmented rock body of bottom hole passes through the boring method in goaf |
CN107620581A (en) * | 2017-07-31 | 2018-01-23 | 山西晋城无烟煤矿业集团有限责任公司 | The construction method of the dual-purpose mine shaft inspection hole of one well |
CN107313747A (en) * | 2017-08-17 | 2017-11-03 | 李建峰 | One kind only takes hot ground hot hole pore-fixing device and the method for not fetching water |
CN107816366B (en) * | 2017-10-25 | 2019-06-07 | 吉林大学 | A kind of multilayer goaf filling well is at well engineering method |
CN107816366A (en) * | 2017-10-25 | 2018-03-20 | 吉林大学 | A kind of multilayer goaf filling well is into well engineering method |
CN108798546A (en) * | 2018-06-27 | 2018-11-13 | 广东煤炭地质五二勘探队 | A kind of deep well cementing construction method and combinations thereof part |
CN109057795A (en) * | 2018-08-29 | 2018-12-21 | 山西晋城无烟煤矿业集团有限责任公司 | It is a kind of to cross goaf coal bed gas ground drilling method |
CN110939408A (en) * | 2018-09-25 | 2020-03-31 | 山西省煤炭地质勘查研究院 | Optimized goaf coalbed methane ground extraction well body structure and well cementation method |
CN110939407A (en) * | 2018-09-25 | 2020-03-31 | 山西省煤炭地质勘查研究院 | Double-deck overlapping goaf ground drainage well structure and recovery unit |
CN109403923A (en) * | 2018-09-28 | 2019-03-01 | 山西晋城无烟煤矿业集团有限责任公司 | A kind of coal bed gas T-type wears the short horizontal well construction method in goaf |
CN109441426A (en) * | 2018-11-27 | 2019-03-08 | 中国矿业大学(北京) | A kind of drilling hole stress directional monitoring device and method |
CN110318706A (en) * | 2019-07-15 | 2019-10-11 | 神华神东煤炭集团有限责任公司 | A kind of method that drilling operation crosses goaf |
CN110318706B (en) * | 2019-07-15 | 2021-06-04 | 神华神东煤炭集团有限责任公司 | Method for drilling construction to pass through goaf |
CN111335936A (en) * | 2020-03-20 | 2020-06-26 | 淮南矿业(集团)有限责任公司 | Construction method of ground fire prevention and extinguishing channel of goaf target area |
CN111411909A (en) * | 2020-04-23 | 2020-07-14 | 山东省煤田地质局第一勘探队 | Artificial wall building method for treating drilling engineering in coal mining subsidence area |
CN111663918A (en) * | 2020-07-10 | 2020-09-15 | 中勘资源勘探科技股份有限公司 | Coal mining ground grouting process and grouting structure |
CN112682098A (en) * | 2020-12-28 | 2021-04-20 | 冀中能源股份有限公司邢东矿 | Large vertical-depth large-aperture coal gangue feeding hole and construction method thereof |
CN112901247A (en) * | 2021-04-06 | 2021-06-04 | 中国矿业大学 | Coal mine underground multistage sleeve long-distance fire prevention and extinguishing drilling construction method |
CN113863895A (en) * | 2021-04-30 | 2021-12-31 | 中国矿业大学 | Well body structure of oil and gas well penetrating through recoverable coal seam and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104929567A (en) | Low-cost construction process for passing through goaf | |
US8287050B2 (en) | Method of increasing reservoir permeability | |
CN105332684B (en) | A kind of water under high pressure is quick-fried and CO2The coal bed gas displacement extraction technique that pressure break is combined | |
CN102852546B (en) | Method for pre-pumping coal roadway stripe gas of single soft protruded coal seam of unexploited area | |
CN101275469B (en) | Yolk coal rock formation downward hole pumping and mining pressure relief mash gas construction method | |
CN103953386B (en) | Upstream-blocking and downstream-seepage method for extracting gas in mining area | |
CN102392677A (en) | Permeability improvement technology for coal bed gas reservoir cap by using three-dimensional fracture network modification | |
CN101915072B (en) | Method for extracting coal bed gas in stable mining region by ground well drilling | |
US4165903A (en) | Mine enhanced hydrocarbon recovery technique | |
CN107387082A (en) | A kind of method for weakening coal seam tight roof | |
CN109519149A (en) | A kind of coal bed gas passes through the full well cementing method of goaf well | |
CN108894813B (en) | Gas outburst elimination method combining underground drilling, ground fracturing and underground extraction | |
CN105804786B (en) | A kind of weak seam bottom plate layer-through drilling pressure rushes anti-reflection method | |
CN103835651A (en) | Single-hole directional drilling local grouting raise boring technology | |
CN108361001A (en) | A kind of deep trona drilling well exploitation cementing stage technique | |
US3814480A (en) | Method of controlling gas accumulation in underground mines | |
CN109403923A (en) | A kind of coal bed gas T-type wears the short horizontal well construction method in goaf | |
CN107620581A (en) | The construction method of the dual-purpose mine shaft inspection hole of one well | |
CN106014345B (en) | A kind of lower part caving method exploits the pumping method for the compound old dead zone coal bed gas to be formed | |
CN105927192A (en) | Method for exploiting coal bed methane in collapse old goafs and lower coal beds in combined manner | |
CN107313743B (en) | Method for repairing weak zone of coal seam floor water-resisting layer by utilizing coal seam gas well | |
CN112627723A (en) | Ground drilling method for coal bed gas development of coal mine goaf | |
US9580998B2 (en) | Recovery or storage process | |
CN106223898A (en) | The solid completion integral tubular column unit of a kind of two boiled water horizontal wells | |
Han et al. | Exploitation technology of pressure relief coalbed methane in vertical surface wells in the Huainan coal mining area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150923 |
|
RJ01 | Rejection of invention patent application after publication |