US3814480A US00344183A US34418373A US3814480A US 3814480 A US3814480 A US 3814480A US 00344183 A US00344183 A US 00344183A US 34418373 A US34418373 A US 34418373A US 3814480 A US3814480 A US 3814480A
Authority
US
United States
Prior art keywords
fracture
gas
formation
gas producing
mine passage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US00344183A
Inventor
H Dahl
J Davis
P Ehlers
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Consolidation Coal Co
ConocoPhillips Co
Original Assignee
Continental Oil Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Continental Oil Co filed Critical Continental Oil Co
Priority to US00344183A priority Critical patent/US3814480A/en
Priority to CA185,140A priority patent/CA991006A/en
Application granted granted Critical
Publication of US3814480A publication Critical patent/US3814480A/en
Assigned to CONSOLIDATION COAL COMPANY, A CORP OF DE. reassignment CONSOLIDATION COAL COMPANY, A CORP OF DE. ASSIGNMENT OF ASSIGNORS INTEREST. SUBJECT TO LICENSE RECITED Assignors: CONOCO, INC.
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose

Definitions

  • the rock formation is then fractured and the fracture formed'therebyis extended to the extent that the shear cracks to be formed by the subsidence of the overburden due to the collapse of the. roof of the mine passage during the mining-operation will intersect the extended fracture.
  • Gas from the gas producing formation is allowed to flow through the shear cracks in the overburden to and through' the fracture to the well bore where it is then vented to the atmosphere or otherwise suitably produced.
  • the buildup of methane gas or the like is usually controlled in one of two ways.
  • the gob is left open around the edges and openings called bleeder entries are left to carryoffthe gas in dilution with fresh air as it is forced from the gob by its own pressure together with the pressure of the conventional ventilation system.
  • the gob is sealed using permanent stoppings formed of concrete block or some similar construction material.
  • One current method of completing a vertical well bore for gob gas control initially calls for drilling a hole to a point near the top of the coal seam being mined. This hole is drilled prior to the time subsidence of the overburden occurs resulting from the collapse of the mine passage roof.
  • a string of pipe is run down the well bore.
  • the pipe string is solid at its upper portion and is slotted at its lower portion.
  • the solid section of the pipe string is long enough to cover the water bearing strata near the surface of the ground and the annular space between the solid section of the pipe string and the well bore is filled with cement.
  • the slotted section of the pipe string is positioned adjacent to the strata which are expected to yield gas as these strata are cracked during subsidence of the overburden.
  • the method comprises the steps of drilling a well bore into a selected fracturable.
  • rock formation fracturing the selected rock formation to form a fracture therein intermediate the gas producing formation and the mine passage and communicating with the well bore, so that the shear cracks formed by allowing theroof of the mine passage to collapse will intersect the fracture; and allowing gas from the gas producing formation to flow from the gas producing formation through at least one shear crack communicating between the gas producing formation and the fracture, and through the fracture to the well bore.
  • an object of the present invention to provide an effective method for controlling the accumulation of methane gas or the like in.underground mines such as coal mines which is more efficient and economical than prior methods.
  • Another object of the present invention is to provide an effective method for preventing the communication of methane gas or the like between a gas producing formation and a mine passage located therebelow when the roof of the mine passage is allowed to collapse during extensive mining operations.
  • a further object of the present invention is to provide a method for preventing the accumulation of undesirable gasses such as methane gas in underground mines in concentrations of an unsafe and illegal amount.
  • FIG. 1 there is illustrated therein a typical coal mining operation.
  • a first coal seam 10 is shown beneath the ground surface 12.
  • a second coal seam 14 is also shown disposed between the first coal seam l0 and the ground surface 12.
  • coal seams are typically gas producing formations in which methane gas, among others, is present.
  • Another gas producing formation is illustrated at 16 and may typically be formed of limestone or sandstone.
  • first and second fracturable rock formations l8 and 20 are intermediate the coal seams l and 14.
  • Each of these rock formations may suitably comprise a layer of tight sandstone 22 overlying a layer of unfractured shale 24, these layers being separated by a bedding plane 26.
  • the bedding plane 26 in each of the rock formations 18 and extends between the first coal seam 10 and the two gas producing formations 14 and 16.
  • the coal seam 10 includes a mine passage 28 which is formed during the first mining in the development phase of the coal seam 10.
  • the mine passage 28 may typically be formed by utilizing the room and pillar technique.
  • rooms 30 are formed in the coal seam 10 by removing a portion of the coal from the coal seam.
  • the roof 32 of the mine passage 28 is supported by pillars 34 of coal which are not removed during the first mining operation.
  • the mine passage 28 is described as being formed by the room and pillar method, the method of the present invention will find suitable application in other forms of underground mining such as the form known as the longwall technique.
  • the method of the present invention is directed to the prevention of gas communication between the gas producing formations 14 and 16 and the gob 36 in the minepassage 28 as described above.
  • a borehole 40 is drilled by conventional methods from the ground surface 12 into the overburden above the mine passage 28 as the first step of the method of the present invention.
  • the borehole or well 40 is sunk to a depth such that it intersects the fracturable rock formations l8 and 20.
  • Suitable casing is positioned in the borehole 40 and cemented in place.
  • the formation 18 is then fractured and propped open at the bedding plane 26 by a suitable fracturing method, such as hydraulic fracturing. Hydraulic fracturing is a well known technique and therefore need not be described in detail herein.
  • the fracturing of the rock formation 18 forms a substantially horizontal fracture 42 along the respective bedding plane 26.
  • the fracture 42 is extended to the point that any shear cracks 38 to be later formed by the subsidence of the overburden resulting from the collapse of the roof 32 of the mine passage 28 will intersect the fracture 42.
  • the high viscosity property of the fracturing fluids should be of a temporary nature (as a cellulose base. biodegradable fluid for instance) in order that the low pressures in the gas zone can displace it from the fracture.
  • the pillars 34 When the fracturing fluid isremoved from the fracture 42, the pillars 34 may then be mined or robbed thereby removing a portion of the support of the roof 32. As the roof 32 progressively collapses, due to removal of the supporting pillars 34, forming the rubble zone or gob 36, the shear cracks 38 are formed in the overburden strata communicating between the gas producing formations 14- and 16 and the fracture 42. The gas from the gas producing formations l4 and 16 is then allowed to flow through the shear cracks 38 to the fracture 42, and through the fracture 42 to the borehole where the gas may be vented to the atmosphere or otherwise suitably produced and disposed of.
  • the bedding plane 26 of the fracturable rock formation 20 may also be fractured and propped as described above, forming an additional fracture 44 along the respective bedding plane 26.
  • Such additional fracturing will provide additional flow paths for the gas emanating from the gas producing formations 14 and 16 and flowing through the shear cracks 38 and into the fracture 44 formed in the rock formation 20, to flow through the fracture 44 to the borehole 40.
  • a method of preventing gas communication between a gas producing formation and a mine passage having a roof and lying in a position below the gas producing formation, with at least one fracturable rock formation interposed between the gas producing formation and the mine passage, when the roof of the mine passage is allowed to collapse during the mining operation thereby forming shear cracks in the overburden communicating between the gas producing formation and the mine passage resulting from subsidence of the overburden, comprising the steps of:
  • a method of preventing gas communication between a gas producing formation and an underground mine passage having a roof and extending'beneath the gas producing formation, with at least one fracturable rock formation interposed between the gas producing formation and the mine passage, when the roof of the mine passage is allowed to collapse during mining operations, thereby forming shear cracks in the overburden communicating between the gas producing formation and the mine passage resulting from subsidence of the overburden, comprising the steps of:
  • propping the extended fracture with a propping agent to retain the fracture in an open condition and facilitate gas flow therethrough.
  • step of fracturing the rock formation is characterized further as including the application of hydraulic pressure to the rock formation.
  • each additional fracture to the extent that at least a portion of the shear cracks to be formed by the subsidence of the overburden resulting from the collapse of the roof of the mine passage will intersect each additional fracture;

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

A method of preventing gas communication between a gas producing formation and a mine passage located therebelow. The method includes the drilling of a well bore into a fracturable rock formation disposed between the gas producing formation and the mine passage. The rock formation is then fractured and the fracture formed thereby is extended to the extent that the shear cracks to be formed by the subsidence of the overburden due to the collapse of the roof of the mine passage during the mining operation will intersect the extended fracture. Gas from the gas producing formation is allowed to flow through the shear cracks in the overburden to and through the fracture to the well bore where it is then vented to the atmosphere or otherwise suitably produced.

Description

les-aoas SR United States Patent 1191 Dahl et a].
[111 3,814,480 1 June 4,1974
[ METHOD OF CONTROLLING GAS ACCUMULATION IN UNDERGROUND MINES [75] Inventors: H. Douglas Dahl, Ponca City, Okla.;
J. Gilbert Davis, II, Morgantown, W. Va.; Peter L. Ehlers, Oklahoma City, Okla.
[73] Assignee: Continental Oil Company, Ponca City, Okla.
[22] Filed: Mar. 23, 1973 [211 Appl. No.: 344,183
1521 u.s.c1. .Q..-.....'.....-.-.;L.;... .1;.'.'....."299/2, 166/30 8 [51] Int. Cl. E2lc 37/00 [58] Field of Search 299/2, l0, l2, 4; 166/308,
[56] References Cited UNITED STATES PATENTS 1.867.758 7/1932 Ranney 299/2 2.508949 5/1950 Howard 299/2 3,058,730 10/1962 Bays 299/4 3.743.355 7/1972 Blackwell ct al. 299/12 Primary Examirier-David H; Brown Attorney, Agent, or Firm-William J. Miller 5 7 ABSTRACT A method of preventing gas communication between a gas producing formation and a mine passage located therebelow. The method includes the drilling of a well bore into a fracturable rock'formation disposed between the gas producing formation and the mine passage. The rock formation is then fractured and the fracture formed'therebyis extended to the extent that the shear cracks to be formed by the subsidence of the overburden due to the collapse of the. roof of the mine passage during the mining-operation will intersect the extended fracture. Gas from the gas producing formation is allowed to flow through the shear cracks in the overburden to and through' the fracture to the well bore where it is then vented to the atmosphere or otherwise suitably produced.
10 Claims, 3 DrawingFigures 1 METHOD OF CONTROLLING GAS ACCUMULATION IN UNDERGROUND MINES BACKGROUND OF THE INVENTION Customary methods of controlling methane or other naturally occurring gasses to prevent the formation of explosive gas/air mixtures within underground mines involve the use of large quantities of ventilating air to sweep .out the methane gas, or the like, in concentrations of less than two percent methane gas. The lower explosive limit is generally considered to be five per cent methane gas. Such practice has been reasonably successful in the case of the construction of development tunnels where all parts of the mined area are readily accessible and the ventilating air can be readily directed as desired.
The prior art practices have not, however, been as successful during the major extraction phase when the roof of the mine passage is allowed to collapse and large areas of rubble are permitted to form. These rubble areas are generally called gob.
The buildup of methane gas or the like is usually controlled in one of two ways. In the first method, the gob is left open around the edges and openings called bleeder entries are left to carryoffthe gas in dilution with fresh air as it is forced from the gob by its own pressure together with the pressure of the conventional ventilation system. Under the second method, the gob is sealed using permanent stoppings formed of concrete block or some similar construction material. I
Both current methods of gob gas control are considered very difficult to utilize because of restrictions set forth in recent federal coal mine safety legislation which limit concentrations of methane gas or the like to two percent or less in any accessible entries. Because of this difficulty; several coalcompanies are attempting to solve the gob gas problem by drilling vertical boreholes to the mine from the ground surface. These boreholes or wells tap the gas accumulation and produce it directly to the surface in order to reduce the methane concentrations in the ventilation system. This technique can be quite effective, but has been only moderately successful since only about 33 percent of the wells have been good.
One current method of completing a vertical well bore for gob gas control initially calls for drilling a hole to a point near the top of the coal seam being mined. This hole is drilled prior to the time subsidence of the overburden occurs resulting from the collapse of the mine passage roof. Next, a string of pipe is run down the well bore. The pipe string is solid at its upper portion and is slotted at its lower portion. The solid section of the pipe string is long enough to cover the water bearing strata near the surface of the ground and the annular space between the solid section of the pipe string and the well bore is filled with cement. The slotted section of the pipe string is positioned adjacent to the strata which are expected to yield gas as these strata are cracked during subsidence of the overburden.
SUMMARY OF THE INVENTION at least one fracturable rock formation interposed be-- tween the gas producing formation and the mine passage, when the roof of the mine passage is allowed to collapse during the mining operation thereby forming shear'cracks in the overburden communicating between the gas producing formation and the mine pas sage resulting from subsidence of the overburden. The method comprises the steps of drilling a well bore into a selected fracturable. rock formation; fracturing the selected rock formation to form a fracture therein intermediate the gas producing formation and the mine passage and communicating with the well bore, so that the shear cracks formed by allowing theroof of the mine passage to collapse will intersect the fracture; and allowing gas from the gas producing formation to flow from the gas producing formation through at least one shear crack communicating between the gas producing formation and the fracture, and through the fracture to the well bore.
It is, therefore, an object of the present invention to provide aneffective method for controlling the accumulation of methane gas or the like in.underground mines such as coal mines which is more efficient and economical than prior methods.
Another object of the present invention is to provide an effective method for preventing the communication of methane gas or the like between a gas producing formation and a mine passage located therebelow when the roof of the mine passage is allowed to collapse during extensive mining operations.
A further object of the present invention is to provide a method for preventing the accumulation of undesirable gasses such as methane gas in underground mines in concentrations of an unsafe and illegal amount.
Other objects and advantages of the present invention will be evident from the detailed description when read in conjunction with the accompanying drawing.
BRIEF DESCRIPTION OF THE DRAWING DESCRIPTION OF THE PREFERRED EMBODIMENT Referring now to the drawings, and to FIG. 1 in particular, there is illustrated therein a typical coal mining operation. A first coal seam 10 is shown beneath the ground surface 12. A second coal seam 14 is also shown disposed between the first coal seam l0 and the ground surface 12. As is well known, coal seams are typically gas producing formations in which methane gas, among others, is present.
Another gas producing formation is illustrated at 16 and may typically be formed of limestone or sandstone. Intermediate the coal seams l and 14 are first and second fracturable rock formations l8 and 20. Each of these rock formations may suitably comprise a layer of tight sandstone 22 overlying a layer of unfractured shale 24, these layers being separated by a bedding plane 26. It will be noted that the bedding plane 26 in each of the rock formations 18 and extends between the first coal seam 10 and the two gas producing formations 14 and 16.
The coal seam 10 includes a mine passage 28 which is formed during the first mining in the development phase of the coal seam 10. The mine passage 28 may typically be formed by utilizing the room and pillar technique. In the first mining operation rooms 30 are formed in the coal seam 10 by removing a portion of the coal from the coal seam. The roof 32 of the mine passage 28 is supported by pillars 34 of coal which are not removed during the first mining operation.
It should be understood that while the mine passage 28 is described as being formed by the room and pillar method, the method of the present invention will find suitable application in other forms of underground mining such as the form known as the longwall technique.
After the first mining operation is completed, it is common practice to mine the coal in the supporting pillars 34 and allow the roof 32 to progressively collapse. When the roof is allowed to collapse a rubble zone or gob 36 is formed in the mine passage 28. As a result of the collapse of the roof 32 the overburden is left partially unsupported and is subject to subsidence. During subsidence, substantially vertical shear cracks 38 are formed in the various strata in the overburden, many of which provide gas communication between the rubble zone 36 and the gas producing formations 14 and 16. High pressure methane gas, or the like, will then flow from the gas producing formations 14 and 16 through the shear cracks 38 to the gob 36, thereby introducing undesirable gasses into the mine passage 28 This situation is most clearly illustrated in FIG. 1.
The method of the present invention is directed to the prevention of gas communication between the gas producing formations 14 and 16 and the gob 36 in the minepassage 28 as described above. Referring now to FIGS. '2 and 3, a borehole 40 is drilled by conventional methods from the ground surface 12 into the overburden above the mine passage 28 as the first step of the method of the present invention. The borehole or well 40 is sunk to a depth such that it intersects the fracturable rock formations l8 and 20. Suitable casing is positioned in the borehole 40 and cemented in place. The formation 18 is then fractured and propped open at the bedding plane 26 by a suitable fracturing method, such as hydraulic fracturing. Hydraulic fracturing is a well known technique and therefore need not be described in detail herein.
The fracturing of the rock formation 18 forms a substantially horizontal fracture 42 along the respective bedding plane 26. By the application of additional hydraulic pressure, the fracture 42 is extended to the point that any shear cracks 38 to be later formed by the subsidence of the overburden resulting from the collapse of the roof 32 of the mine passage 28 will intersect the fracture 42. It is desirable to utilize high viscosity fracturing fluids for extending the fracture 42 so that suitable propping agents may be readily dispensed throughout the fracture 42 thereby maximizing the fracture opening when the fracturing fluid is removed from the fracture.
The high viscosity property of the fracturing fluids should be of a temporary nature (as a cellulose base. biodegradable fluid for instance) in order that the low pressures in the gas zone can displace it from the fracture.
When the fracturing fluid isremoved from the fracture 42, the pillars 34 may then be mined or robbed thereby removing a portion of the support of the roof 32. As the roof 32 progressively collapses, due to removal of the supporting pillars 34, forming the rubble zone or gob 36, the shear cracks 38 are formed in the overburden strata communicating between the gas producing formations 14- and 16 and the fracture 42. The gas from the gas producing formations l4 and 16 is then allowed to flow through the shear cracks 38 to the fracture 42, and through the fracture 42 to the borehole where the gas may be vented to the atmosphere or otherwise suitably produced and disposed of.
In a similar manner, the bedding plane 26 of the fracturable rock formation 20 may also be fractured and propped as described above, forming an additional fracture 44 along the respective bedding plane 26. Such additional fracturing will provide additional flow paths for the gas emanating from the gas producing formations 14 and 16 and flowing through the shear cracks 38 and into the fracture 44 formed in the rock formation 20, to flow through the fracture 44 to the borehole 40.
As clearly illustrated in FIG. 3, successive mining or robbing of the pillars 34 results in progressive collapse of the roof 32 and increased formation of gob 36 in the mine passage 28 and occurrence of shear cracks 38 in the overburden strata.
It is important to note that the fracturing of the fracturable rock formations 18 and 20 should be performed prior to the secondary mining operation or robbing of the pillars 34 so that maximum extension of the fractures 42 and 44 will be obtained. It is well known that a hydraulically formed fracture usually cannot be extended beyond the first major crack encountered since such a major crack would absorb virtually all the applied hydraulic force. The shear cracks 38 formed during the subsidence of the overburden strata have been found to extend several hundred feet above a coal seam being mined.
While we have disclosed the employment of multiple fractures per well, it is believed that a single fracture as described above would be sufficient in most cases. In practicing the method of the present invention, it is believed most advantageous to select for fracture the fracturable rock formation nearest the roof of the coal seam being mined so that, as nearly as possible, only those shear cracks in communication with the mine passage would be tapped by the fracture formed therein. It should also be noted that additional boreholes may be sunk in the overburden communicating with the fractures formed therein for the purpose of extending these fractures over a wider area,
From the foregoing detailed description of the method of the present invention, it may be seen that the present invention readily obtains the objectives set forth herein. Changes may be made in the arrangement or combination of apparatus or the specific techniques employed in practicing the method of the present invention as described in the drawings and the specification without departing from the spirit and scope of the invention as defined in the following claims.
What is claimed is:
1. A method of preventing gas communication between a gas producing formation and a mine passage having a roof and lying in a position below the gas producing formation, with at least one fracturable rock formation interposed between the gas producing formation and the mine passage, when the roof of the mine passage is allowed to collapse during the mining operation thereby forming shear cracks in the overburden communicating between the gas producing formation and the mine passage resulting from subsidence of the overburden, comprising the steps of:
drilling a well bore into a selected rock formation;
fracturing the selected rock formation to form a fracture therein intermediate the gas producing formation and themine passage and communicating with the well bore, so that the shear cracks formed by allowing the roof of the mine passage to collapse will intersect the fracture; and
allowing gas from the gas producing formation to flow from the gas producing formation through at least one shear crack communicating between the gas producing formation and the fracture, and through the fracture to the well bore.
2. The method as defined in claim 1 wherein the step of fracturing the rock formation is characterized further as including the application of hydraulic pressure to the rock formation.
3. The method as-defined in claim 1 characterized further to include the additional steps of:
fracturing at least one additional fracturable rock formation to form a fracture therein intermediate the gas producing formation and the mine passage and communicating with the well bore so that shear cracks formed by allowing the roof of the mine passage to collapse will intersect the additional fracture; and
allowing gas from the gas producing formation to flow through at least one shear crack communicatv to retain the fracture in an open condition and facilitate gas flow therethrough.
6. A method of preventing gas communication between a gas producing formation and an underground mine passage having a roof and extending'beneath the gas producing formation, with at least one fracturable rock formation interposed between the gas producing formation and the mine passage, when the roof of the mine passage is allowed to collapse during mining operations, thereby forming shear cracks in the overburden communicating between the gas producing formation and the mine passage resulting from subsidence of the overburden, comprising the steps of:
drilling a borehole into a selected fracturable rock formation;
fracturing the selected rock formation to form a fracture therein communicating with the borehole;
extending the fracture to the extent that at least a portion of the shear cracks to be formed by the subsidence of the overburden resulting from the collapse of the roof of the mine passage will intersect the fracture; and
allowing gas from the gas producing formation to flow through at least one shear crack communicating between the gas producing formation and the fracture, and through the fracture to the borehole.
7. The method as defined in claim 6 characterized further to include the additional step of:
propping the extended fracture with a propping agent to retain the fracture in an open condition and facilitate gas flow therethrough.
8. The method as defined in claim 6 wherein the step of fracturing the rock formation is characterized further as including the application of hydraulic pressure to the rock formation.
9. The method as defined in claim 6 characterized further to include the additional steps of:
fracturing at least one additional fracturable rock formation to form a fracture therein communicating with the borehole;
extending each additional fracture to the extent that at least a portion of the shear cracks to be formed by the subsidence of the overburden resulting from the collapse of the roof of the mine passage will intersect each additional fracture; and
allowing gas from the gas producing formation to flow through at least one shear crack communicating between the gas producing formation and each additional fracture, and through each additional fracture to the borehole.
10. The method as defined in claim 6 characterized further to include the additional step of:
producing the gas'from the borehole.

Claims (10)

1. A method of preventing gas communication between a gas producing formation and a mine passage having a roof and lying in a position below the gas producing formation, with at least one fracturable rock formation interposed between the gas producing formation and the mine passage, when the roof of the mine passage is allowed to collapse during the mining operation thereby forming shear cracks in the overburden communicating between the gas producing formation and the mine passage resulting from subsidence of the overburden, comprising the steps of: drilling a well bore into a selected rock formation; fracturing the selected rock formation to form a fracture therein intermediate the gas producing formation and the mine passage and communicating with the well bore, so that the shear cracks formed by allowing the roof of the mine passage to collapse will intersect the fracture; and allowing gas from the gas producing formation to flow from the gas producing formation through at least one shear crack communicating between the gas producing formation and the fracture, and through the fracture to the well bore.
2. The method as defined in claim 1 wherein the step of fracturing the rock formation is characterized further as including the application of hydraulic pressure to the rock formation.
3. The method as defined in claim 1 characterized further to include the additional steps of: fracturing at least one additional fracturable rock formation to form a fracture therein intermediate the gas producing formation and the mine passage and communicating with the well bore so that shear cracks formed by allowing the roof of the mine passage to collapse will intersect the additional fracture; and allowing gas from the gas producing formation to flow through at least one shear crack communicating between the gas producing formation and the additional fracture, and through the additional fracture to the well bore.
4. The method as defined in claim 1 characterized further to include the additional step of: extending the fracture to the extent that at least a portion of the shear cracks formed by the subsidence of the overburden resulting from the collapse of the roof of the mine passage will intersect the extended fracture.
5. The method as defined in claim 4 characterized further to include the additional step of: propping the extended fracture with a propping agent to retain the fracture in an open condition and facilitate gas flow therethrough.
6. A method of preventing gas communication between a gas producing formation and an underground mine passage having a roof and extending beneath the gas producing formation, with at least one fracturable rock formation interposed between the gas producing formation and the mine passage, when the roof of the mine passage is allowed to collapse during mining operations, thereby forming shear cracks in the overburden communicating between the gas producing formation and the mine passage resulting from subsidence of the overburden, comprising the steps of: drilling a borehole into a selected fracturable rock formation; fracturing the selected rock formation to form a fracture therein communicating with the borehole; extending the fracture to the extent that at least a portion of the shear cracks to be formed by the subsidence of the overburden resulting from the collapse of the roof of the mine passage will intersect the fracture; and allowing gas from the gas producing formation to flow through at least one shear crack communicating between the gas producing formation and the fracture, and through the fracture to the borehole.
7. The method as defined in claim 6 characterized further to include the additional step of: propping the extended fracture with a propping agent to retain the fracture in an open condition and facilitate gas flow therethrough.
8. The method as defined in claim 6 wherein the step of fracturing the rock formation is characterized further as including the application of hydraulic pressure to the rock formation.
9. The method as defined in claim 6 characterized further to include the additional steps of: fracturing at least one additional fracturable rock formation to form a fracture therein communicating with the borehole; extending each additional fracture to the extent that at least a portion of the shear cracks to be formed by the subsidence of the overburden resulting from the collapse of the roof of the mine passage will intersect each additional fracture; and allowing gas from the gas producing formation to flow through at least one shear crack communicating between the gas producing formation and each additional fracture, and through each additional fracture to the borehole.
10. The method as defined in claim 6 characterized further to include the additional step of: producing the gas from the borehole.
US00344183A 1973-03-23 1973-03-23 Method of controlling gas accumulation in underground mines Expired - Lifetime US3814480A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US00344183A US3814480A (en) 1973-03-23 1973-03-23 Method of controlling gas accumulation in underground mines
CA185,140A CA991006A (en) 1973-03-23 1973-11-06 Method of controlling gas accumulation in underground mines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US00344183A US3814480A (en) 1973-03-23 1973-03-23 Method of controlling gas accumulation in underground mines

Publications (1)

Publication Number Publication Date
US3814480A true US3814480A (en) 1974-06-04

Family

ID=23349411

Family Applications (1)

Application Number Title Priority Date Filing Date
US00344183A Expired - Lifetime US3814480A (en) 1973-03-23 1973-03-23 Method of controlling gas accumulation in underground mines

Country Status (2)

Country Link
US (1) US3814480A (en)
CA (1) CA991006A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4089374A (en) * 1976-12-16 1978-05-16 In Situ Technology, Inc. Producing methane from coal in situ
EP0002877A2 (en) * 1978-01-02 1979-07-11 Stamicarbon B.V. Method for the removal of methane
EP0027678A1 (en) * 1979-10-19 1981-04-29 Noval Technologies Ltd Method for recovering methane from coal seams
US4272128A (en) * 1980-01-30 1981-06-09 Jacoby Charles H Method of creating a safe environment in salt mining
US4283089A (en) * 1980-06-12 1981-08-11 Conoco, Inc. Pretreatment for fracturing coal seams
US4303274A (en) * 1980-06-04 1981-12-01 Conoco Inc. Degasification of coal seams
US4452489A (en) * 1982-09-20 1984-06-05 Methane Drainage Ventures Multiple level methane drainage shaft method
US4471840A (en) * 1983-06-23 1984-09-18 Lasseter Paul A Method of coal degasification
US5417286A (en) * 1993-12-29 1995-05-23 Amoco Corporation Method for enhancing the recovery of methane from a solid carbonaceous subterranean formation
US5419396A (en) * 1993-12-29 1995-05-30 Amoco Corporation Method for stimulating a coal seam to enhance the recovery of methane from the coal seam
US20050211438A1 (en) * 2004-03-29 2005-09-29 Stromquist Marty L Methods of stimulating water sensitive coal bed methane seams
WO2009018458A1 (en) * 2007-07-31 2009-02-05 San Juan Coal Company Use of foam to increase resistance to gas flow in mine applications and apparatus for delivering same
CN104131831A (en) * 2014-06-12 2014-11-05 中国矿业大学 Coal-bed gas well vertical three-dimensional united extraction method
US20190145260A1 (en) * 2017-03-20 2019-05-16 China University Of Mining And Technology Method for constructing networked preferential gas migration pathways and diverting and extracting gas
US20220251956A1 (en) * 2021-02-08 2022-08-11 Taiyuan University Of Technology Multi-level cross mining areas surface well pattern deployment method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1867758A (en) * 1931-07-10 1932-07-19 Ranney Leo Process of degasifying coal and other carbonaceous material in situ
US2508949A (en) * 1949-04-07 1950-05-23 Frank A Howard Collection and removal of mine gas
US3058730A (en) * 1960-06-03 1962-10-16 Fmc Corp Method of forming underground communication between boreholes
US3743355A (en) * 1971-10-12 1973-07-03 Exxon Production Research Co Method of withdrawing hazardous gases from subterranean formations

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1867758A (en) * 1931-07-10 1932-07-19 Ranney Leo Process of degasifying coal and other carbonaceous material in situ
US2508949A (en) * 1949-04-07 1950-05-23 Frank A Howard Collection and removal of mine gas
US3058730A (en) * 1960-06-03 1962-10-16 Fmc Corp Method of forming underground communication between boreholes
US3743355A (en) * 1971-10-12 1973-07-03 Exxon Production Research Co Method of withdrawing hazardous gases from subterranean formations

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4089374A (en) * 1976-12-16 1978-05-16 In Situ Technology, Inc. Producing methane from coal in situ
EP0002877A2 (en) * 1978-01-02 1979-07-11 Stamicarbon B.V. Method for the removal of methane
EP0002877A3 (en) * 1978-01-02 1979-08-08 Stamicarbon B.V. Method for the removal of methane
US4245699A (en) * 1978-01-02 1981-01-20 Stamicarbon, B.V. Method for in-situ recovery of methane from deeply buried coal seams
EP0027678A1 (en) * 1979-10-19 1981-04-29 Noval Technologies Ltd Method for recovering methane from coal seams
US4272128A (en) * 1980-01-30 1981-06-09 Jacoby Charles H Method of creating a safe environment in salt mining
US4303274A (en) * 1980-06-04 1981-12-01 Conoco Inc. Degasification of coal seams
US4283089A (en) * 1980-06-12 1981-08-11 Conoco, Inc. Pretreatment for fracturing coal seams
US4452489A (en) * 1982-09-20 1984-06-05 Methane Drainage Ventures Multiple level methane drainage shaft method
US4471840A (en) * 1983-06-23 1984-09-18 Lasseter Paul A Method of coal degasification
US5417286A (en) * 1993-12-29 1995-05-23 Amoco Corporation Method for enhancing the recovery of methane from a solid carbonaceous subterranean formation
US5419396A (en) * 1993-12-29 1995-05-30 Amoco Corporation Method for stimulating a coal seam to enhance the recovery of methane from the coal seam
US5494108A (en) * 1993-12-29 1996-02-27 Amoco Corporation Method for stimulating a coal seam to enhance the recovery of methane from the coal seam
US20050211438A1 (en) * 2004-03-29 2005-09-29 Stromquist Marty L Methods of stimulating water sensitive coal bed methane seams
WO2009018458A1 (en) * 2007-07-31 2009-02-05 San Juan Coal Company Use of foam to increase resistance to gas flow in mine applications and apparatus for delivering same
US20090033140A1 (en) * 2007-07-31 2009-02-05 Pile James D Use Of Foam To Increase Resistance To Gas Flow In Mine Applications And Apparatus For Delivering Same
CN104131831A (en) * 2014-06-12 2014-11-05 中国矿业大学 Coal-bed gas well vertical three-dimensional united extraction method
CN104131831B (en) * 2014-06-12 2016-10-12 中国矿业大学 A kind of coal bed gas well three-dimensional associating pumping method up and down
US20190145260A1 (en) * 2017-03-20 2019-05-16 China University Of Mining And Technology Method for constructing networked preferential gas migration pathways and diverting and extracting gas
US10487656B2 (en) * 2017-03-20 2019-11-26 China University Of Mining And Technology Method for constructing networked preferential gas migration pathways and diverting and extracting gas
US20220251956A1 (en) * 2021-02-08 2022-08-11 Taiyuan University Of Technology Multi-level cross mining areas surface well pattern deployment method
US11649701B2 (en) * 2021-02-08 2023-05-16 Taiyuan University Of Technology Multi-level cross mining areas surface well pattern deployment method

Also Published As

Publication number Publication date
CA991006A (en) 1976-06-15

Similar Documents

Publication Publication Date Title
US3814480A (en) Method of controlling gas accumulation in underground mines
CA2614569C (en) Method of increasing reservoir permeability
US4595239A (en) Oil recovery mining apparatus
US3775073A (en) In situ gasification of coal by gas fracturing
CA1099301A (en) Mine enhanced hydrocarbon recovery technique
CN106223998B (en) Rock protective layer face gas administering method under a kind of closely tight roof
US4303274A (en) Degasification of coal seams
CN104929567A (en) Low-cost construction process for passing through goaf
US4465401A (en) Minimizing subsidence effects during production of coal in situ
CN108894813B (en) Gas outburst elimination method combining underground drilling, ground fracturing and underground extraction
US4448252A (en) Minimizing subsidence effects during production of coal in situ
CN112593936B (en) Advanced comprehensive control method for multi-disaster area of deep mine
EA030263B1 (en) Mining method for gassy and low permeability coal seams
CN108412453A (en) A kind of coal mining water controls system and construction method altogether with gas
CN107387082A (en) A kind of method for weakening coal seam tight roof
CN110043309B (en) Arrangement method for closing gas extraction well of coal mine and well body installation method
US4093310A (en) Sealing an underground coal deposit for in situ production
US1867758A (en) Process of degasifying coal and other carbonaceous material in situ
US4265570A (en) Mine roof control
US4623283A (en) Method for controlling water influx into underground cavities
US3612608A (en) Process to establish communication between wells in mineral formations
US4437520A (en) Method for minimizing subsidence effects during production of coal in situ
CN112627723A (en) Ground drilling method for coal bed gas development of coal mine goaf
US3020954A (en) Method of fracturing in wells
Dobson et al. Mining Technology Assists Oil Recovery from Wyoming Field

Legal Events

Date Code Title Description
AS Assignment

Owner name: CONSOLIDATION COAL COMPANY, A CORP OF DE.

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST. SUBJECT TO LICENSE RECITED;ASSIGNOR:CONOCO, INC.;REEL/FRAME:004923/0180

Effective date: 19870227