CN102852546A - Method for pre-pumping coal roadway stripe gas of single soft protruded coal seam of unexploited area - Google Patents
Method for pre-pumping coal roadway stripe gas of single soft protruded coal seam of unexploited area Download PDFInfo
- Publication number
- CN102852546A CN102852546A CN2011101811683A CN201110181168A CN102852546A CN 102852546 A CN102852546 A CN 102852546A CN 2011101811683 A CN2011101811683 A CN 2011101811683A CN 201110181168 A CN201110181168 A CN 201110181168A CN 102852546 A CN102852546 A CN 102852546A
- Authority
- CN
- China
- Prior art keywords
- coal
- coal seam
- gas
- seam
- horizontal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The invention provides a method for pre-pumping coal roadway stripe gas of a single soft protruded coal seam of an unexploited area and relates to the technical field of gas pumping. Through the method, outburst removal of the area with a single soft hypotonic protruded coal seam coal roadway stripe can be achieved. The method for pre-pumping the coal roadway stripe gas of the single soft protruded coal seam of the unexploited area comprises building a concordant layer horizontal well which is 3-6m away from the coal seam from the ground to a top plate and a base plate of the single soft protruded coal seam of the unexploited area, performing segmented fracturing after oriented perforating, enabling top plate and base plate rock terrane where coal seam gas is sealed and stored originally to be transformed into a pumping liberation layer with developed fracture networks, enabling the pumping liberation layer to be communicated with the coal seam in a large-area mode through the fracture networks, performing decompression and aerogenesis by dewatering, determining whether to perform negative pressure pumping according to water production conditions, enabling the coal seam gas to be desorbed and diffused continuously, and pumping the gas massively by pumping a horizontal well opening in the liberation layer. By pumping the gas massively, the outburst prevention index in the coal roadway stripe can be reduced to below the safety standard in the outburst prevention rules, and safe and speedy drivage is achieved.
Description
Technical field
The present invention relates to the single soft projecting coal bed method of taking out in advance coal road band gas in a kind of unworked country.Concrete pointer proposes a kind of method of taking out in advance coal road band gas by the ground level fractured well to single, soft, hypotonic, projecting coal bed.
Background technology
Mine gas has become the maximum harm of China's coal-mine safety in production, is " the first killer " who threatens miner's life.The control gas disaster is eliminated coal and Gas Outburst, realizes that the fundamental way that coal and gas resources green are adopted altogether is to extract coal gas out.
Increase along with the coal mine excavation degree of depth, the increase of gas bearing capacity and gas pressure, a lot of low gaseous mines develop into highly gassy mine and projecting mine gradually, and outstanding disaster is more and more serious, to such an extent as at this coal seam drilling like this to coal body slight disturbance often just can bring out coal and Gas Outburst." control coal and Gas Outburst regulation " explicitly points out the principle that protrusion-dispelling work adheres to that regional outburst prevention measures is gone ahead of the rest, local prevent outburst measure replenishes, and regional outburst prevention measures comprises the exploitation topping and takes out in advance coal-bed gas two classes.China seriously outstanding mining area is structure coal intense development district substantially entirely, and especially Henan area institute mining coal seam is commonly single, soft, hypotonic, high prominent coal seam reservoirs, and the unprotect layer can be adopted, and gas govenance can only be to take out coal-bed gas as main in advance.Coal almost is typical granulated coal or rotten rib coal entirely.But soft because of institute's mining coal seam ature of coal, permeability is low, the destruction type of coal almost is III, IV, V class coal entirely, natural crack connective relatively poor, if do not take anti-reflection measure, extracting result is very poor, the single underground gas extraction that carries out is difficult to the purpose that the short time realizes the coal seam extinction and obtain the high concentration gas resource, often takes out the contour engineering input in lane take intensive cloth hole and Seam Roof And Floor rock and carries out extraction as cost.And this type of coal seam reservoirs is broken serious, and the cleat has not existed, and gas bearing capacity is large, gas pressure is high, and in coal seam internal drilling constructional difficulties, spray orifice, the hole of collapsing, plug-hole and bit freezing phenomenon are serious when drilling, and boring is beaten not dark, and concentration decline is fast, and extracting result is poor.Especially face first coal road in first exploiting field of high prominent Geological Structures In Coal Mine coal intense development, the mash gas dynamic phenomenon is more serious, and it is larger to adopt present anti-reflection technology directly coal seam reservoirs to be carried out anti-reflection enhanced transformation difficulty, cause high prominent heading driving speed very low, every drill footage per month only has about 30m, be difficult to reach and take out, adopt, dig balance, limited the mine safety High-efficient Production.
Chinese patent 200810230940.4 discloses " coal mine down-hole drilling hydraulic fracturing anti-reflection mash gas extraction technique ", this technology is at first chosen the pressure break place in the down-hole, determine pressure type according to coal body type, tunnel layout and structure development degree, adopt roof and floor concordant boring and hydraulic fracture, the fracturing of roof and floor layer-through drilling, this coal seam concordant boring and hydraulic fracture or this coal seam layer-through drilling hydraulic fracturing technology, carry out the anti-reflection draining coal seam gas of pressure break.But this technology can only have been arranged under coal mine under the condition in digging tunnel and implemented, and still can't use for the prominent primitive coalbed of the soft height in unworked country that does not have the tunnel to arrange.
Summary of the invention
The objective of the invention is to carry out regional extinction for leading single, soft, hypotonic to the unworked country, high prominent Coal roadway band, the single soft height in a kind of unworked country method that coal road band gas is taken out in prominent coal seam in advance is provided.By surface water horizontal well in advance with the extensive extraction of the gas in the coal seam out, make coal seam gas-bearing capacity in the coal road band and gas pressure be reduced to safety standard in the protrusion-dispelling regulation, realize safely and fast driving.
The present invention is achieved through the following technical solutions:
The method that coal road band gas is taken out in the prominent coal seam of the single soft height in a kind of unworked country in advance, it is characterized in that: use for reference surface water horizontal well cbm development technique, single soft projecting coal bed top (end) the plate construction concordant horizontal well from ground to the unworked country, perforation, pressure break, drainage and step-down, aerogenesis, and determine whether to carry out the negative pressure mash gas extraction according to producing the regimen condition
Stable when the prominent roof of single, soft, hypotonic height, easily during pore-forming, the horizontal well mash gas extraction of constructing preferentially adopting from ground to roof; During, easier pore-forming more stable than top board when the prominent seat earth of single, soft, hypotonic height, the horizontal well mash gas extraction of constructing preferentially adopting from ground to seat earth; When the prominent Seam Roof And Floor of single, soft, hypotonic height all stable, easily during pore-forming, can adopt from ground to top, coal seam, the base plate multi-branched horizontal well mash gas extraction of constructing respectively for shortening in advance the phase of taking out.
Described horizontal hole of constructing in roof is vertical to be positioned at 3 ~ 6m directly over the coal seam, transversely in the heading certain limit of intending driving, and horizontal hole drilling direction and tunnelling opposite direction.
Described horizontal hole of constructing in seat earth is vertical to be positioned at 3 ~ 6m under the coal seam, transversely in the heading certain limit of intending driving, and horizontal hole drilling direction and tunnelling opposite direction.
Described horizontal hole of constructing in roof is vertical to be positioned at 3 ~ 6m directly over the coal seam, the horizontal hole of constructing in seat earth is vertical to be positioned at 3 ~ 6m under the coal seam, transversely in the heading certain limit of intending driving, and horizontal hole drilling direction and tunnelling opposite direction.
Described horizontal well from ground construction is taked three opening structures, all is lowered to protective casing, leakiness stratum, a game clock layer sleeve pipe sealing earth's surface, and cement returns to ground; Two drive a well cements the well after entering now protective casing, and cement returns to more than the 100m of coal top; Three horizontal holes that spud in, protective casing is lowered to rear well cementation.
The horizontal well of described construction in roof, downward semi-circular orientation perforation only in horizontal circular borehole; The horizontal well of construction in seat earth, the semi-circular orientation perforation only makes progress in horizontal circular borehole; Form artificial plane of weakness with this.
Described pressure break is at a certain distance lower packet enforcement of horizontal hole section staged fracturing, intensive treatment is carried out in one section rock stratum between horizontal hole and the coal seam, extend take plan pick coal road as this section Seam Roof And Floor preexisting crack in each certain limit of axis both sides in the horizontal after making pressure break, expansion, and produce new a large amount of artificial crack, the crack that the artificial plane of weakness that Seam Roof And Floor is formed along oriented perforating through fracturing reform obtains is linked up with the coal seam as far as possible, finally play anti-reflection deblocking effect and (namely increase the gas permeability of rock stratum, remove the rock stratum to the ability of sealing up for safekeeping of gas in the coal seam), the adjoining rock of originally sealing coal-bed gas up for safekeeping is transformed into " the extraction Protective Coal Seam " of Fracture Networks prosperity.
Described extraction Protective Coal Seam refers to and produces a large amount of cracks by reinforcement process and make rock stratum in the close coal seam certain limit that gas permeability increases substantially, thickness is generally about 10m, and by removing the rock stratum to the ability of sealing up for safekeeping of gas in the coal seam with the crack of coal seam conducting.
Carrying out the negative pressure mash gas extraction behind the described drainage and step-down is to utilize draining, hypotensive effect, coal-bed gas is reached below the critical desorption pressures, and in negative pressure extraction process, make constantly desorb from the coal seam, the diffusion of gas that is enclosed in the coal seam, migrate to " extraction Protective Coal Seam " seepage flow by the Fracture Networks that is communicated with the coal seam, again by the horizontal hole in " extraction Protective Coal Seam " rock stratum by extensive extraction out.The coal-bed gas that reaches to intend to dig heading and be in the certain limit of axis both sides is down to the safety standard that requires in the protrusion-dispelling regulation.
The single soft projecting coal bed method of taking out in advance coal road band gas in unworked country of the present invention, single for the unworked country, soft, hypotonic, high prominent coal seam, do not changing under original geostatic stress state, use " coal bed gas is sealed mechanism up for safekeeping ", " coal bed gas migration mechanism ", " coalbed methane reservoir strengthening mechanism ", " gas pumping mechanism of disturbance ", use for reference surface water horizontal well cbm development technique, move towards orientation construction concordant horizontal well along the coal road of intending driving in from ground to the Seam Roof And Floor rock stratum, if form artificial orientation's face by oriented perforating, utilize the pressure break effect of water under high pressure, intensive treatment is carried out in one section rock stratum between Seam Roof And Floor rock stratum horizontal hole and the coal seam, anti-reflection deblocking, originally this section adjoining rock of sealing coal-bed gas up for safekeeping is transformed into " the extraction Protective Coal Seam " of crack connected network prosperity, and the Fracture Networks that obtains by fracturing reform is communicated with " extraction Protective Coal Seam " with the coal seam large tracts of land, pass through drainage and step-down, the multiple disturbance of the operations such as negative pressure extraction and tunnelling etc., the gas that desorbs from the coal seam is migrated in " extraction Protective Coal Seam " rapidly by artificial crack, and then by surface water horizontal well in advance with the extensive extraction of the gas in the coal seam out, make coal seam gas-bearing capacity and gas pressure in the coal road band be reduced to the safety standard that requires in the protrusion-dispelling regulation, accomplish that really regional outburst prevention measures in advance, local prevent outburst measure replenishes, fundamentally eliminate single, soft, hypotonic, coal and Gas Outburst in the high prominent Coal roadway tunneling process are dangerous, realize safely and fast driving.
When adopting the single soft projecting coal bed method of taking out in advance coal road band gas in unworked country to carry out taking out in advance before the coal road band gas overpressure, the surface water horizontal well of implementing at one time in the section gas amount of extraction be not less than total mash gas extraction amount with all layer-through drillings of roof and floor rock gangway (drill hole density of layer-through drilling is as the criterion with the layer-through drilling averag density of implementing mine) of ground level well horizontal hole equal in length, and then the special-purpose rock of replacement roof and floor is taken out the lane, can avoid digging rock and take out the high engineering input in lane, can strengthen finding time in advance in advance of coal road band again, guarantee mine " take out; the pick; adopt " balance.
Description of drawings
Fig. 1 the present invention is directed to from ground to single soft hypotonic height the stereogram that construction level well the prominent roof is taken out coal road band gas in advance;
Fig. 2 is the A-A ' sectional drawing before Fig. 1 implements pressure break;
Fig. 3 is the B-B ' sectional drawing before Fig. 1 implements pressure break;
Fig. 4 is that Fig. 1 implements post-fracturing A-A ' sectional drawing;
Fig. 5 is that Fig. 1 implements post-fracturing B-B ' sectional drawing;
Fig. 6 the present invention is directed to from ground to single soft hypotonic height the stereogram that construction level well the prominent seat earth is taken out coal road band gas in advance;
Fig. 7 is the A-A ' sectional drawing before Fig. 6 implements pressure break;
Fig. 8 is the B-B ' sectional drawing before Fig. 6 implements pressure break;
Fig. 9 is that Fig. 6 implements post-fracturing A-A ' sectional drawing;
Figure 10 is that Fig. 6 implements post-fracturing B-B ' sectional drawing;
Figure 11 the present invention is directed to from ground to single soft hypotonic height the stereogram that the multi-branched horizontal well of constructing prominent coal seam Di Ding, the base plate is taken out coal road band gas in advance;
Figure 12 is the A-A ' sectional drawing before Figure 11 implements pressure break;
Figure 13 is the B-B ' sectional drawing before Figure 11 implements pressure break;
Figure 14 is that Figure 11 implements post-fracturing A-A ' sectional drawing;
Figure 15 is that Figure 11 implements post-fracturing B-B ' sectional drawing.
The specific embodiment
Embodiment 1:
The method that single soft projecting coal bed top board construction surface water horizontal well is taken out coal road band gas in advance to the unworked country.Be 5.7m for thickness, single, soft, hypotonic, the high prominent coal seam 6 of the nearly level of buried depth 685m, the destruction type of this layer coal is the V class, and it is Powdered that ature of coal mostly is, and coal is rotten rib coal; Gas bearing capacity is 21m
3/ t, gas pressure is 1.5MPa; Coal seam immediate roof 7 is Sandy Silt and aleuritic texture rock, thick 1.96-9.97m, and average 5.27m, old top is packsand, thick 1.22-11.95 rice, average thick 5.05 meters; Coal seam immediate bottom 8 is Sandy Silt or carbonaceous mud stone, thick 0.74-17.93 rice, and average 7.00 meters, past is sandstone, thick 0.45-26.5m, average thick 10.70m.Seat earth has limestone aquifer, and upper apart from coal seam 20~30m, karst and cranny development are unbalanced.
Implementation step is as follows:
(1) according to 5 locus, tunnel of intending driving, 1 chooses solution space layout well location on ground;
(2) adopt three to drive a well body structure to roof 7 wellbore constructions, eye 2 diameters that drive a well are 311.1mm, are lowered to the J55 grade of steel protective casing of Φ 244.5mm, leakiness stratum, a game clock layer sleeve pipe sealing earth's surface, and cement returns to ground 1; Two eye 3 diameters that drive a well are 215.9mm, cement the well after being lowered to the J55 grade of steel protective casing of Φ 177.8mm, and cement returns to more than the coal 6 top 100m; Three horizontal hole 4 diameters that spud in are 152.4mm, are lowered to the J55 grade of steel protective casing sealing roof 7 of Φ 127mm.Adopting the guiding drilling technology to make three, to open horizontal hole 46 be 3 ~ 6m apart from the coal seam, for guaranteeing Erkaijing well 3 and three spud sections, 4 cementing qualities, make bunch tube placed in the middle, open high angle hole section 3 two and adopt the wheeled rigidity centralizer of spiral roll and bouble-bow elastic centralizer cross-reference, three open horizontal segment 4 uses rigid vortex centralizer, improves displacement efficiency by spiral flow replacement technology.
(3) perforation was prepared pressure break after drilling engineering was transferred, according to 16 bullets/m downward semi-circular orientation perforation only in horizontal circular borehole 4, according to fixed fracturing scheme the Roof Rock Strata of Coal Seam 7 between horizontal hole 4 and the coal seam 6 is implemented staged fracturing behind the perforation, the adjoining rock of originally sealing coal-bed gas up for safekeeping is transformed into the extraction Protective Coal Seam 9 of crack connected network prosperity.
(4) after ground shut-in well, draining, step-down, utilize the negative pressure extraction, make constantly desorb from coal seam 6, the diffusion of gas that is enclosed in the coal seam 6, migrate to extraction Protective Coal Seam 9 seepage flow by the Fracture Networks that is communicated with the coal seam, again by the horizontal hole 4 in extraction Protective Coal Seam 9 rock stratum by extensive extraction out.
Embodiment 2:
The method that single soft projecting coal bed construction of bottom plates surface water horizontal well is taken out coal road band gas in advance to the unworked country.Be 4.8m for thickness, single, soft, hypotonic, the high prominent coal seam 6 of the nearly level of buried depth 720m, the destruction type of this layer coal is the III class, ature of coal mostly is chunky shape; Gas bearing capacity is 14m
3/ t, gas pressure is 1.2MPa; Immediate roof 7 plates in coal seam are black mudstone and carbonaceous mud stone, thick 2.8-7.2m, and average 5.4m, old top is middle kern stone, thick 8.1-12.3 rice, average thick 9.5 meters; Coal seam immediate bottom 8 is Sandy Silt or mud stone, thick 2.4-15.6 rice, and average 10.3 meters, past is sandstone, thick 3.5-27.8m, average thick 14.5m.Roof 7 has group sandstone crack, Shanxi artesian water, apart from coal seam 5~30m.The floor strata general integrity is better.
Implementation step is as follows:
(1) according to 5 locus, tunnel of intending driving, 1 chooses solution space layout well location on ground;
(2) adopt three to drive a well body structure to roof 7 wellbore constructions, eye 2 diameters that drive a well are 311.1mm, are lowered to the N80 grade of steel protective casing of Φ 244.5mm, leakiness stratum, a game clock layer sleeve pipe sealing earth's surface, and cement returns to ground 1; Two eye 3 diameters that drive a well are 215.9mm, are lowered to the N80 grade of steel protective casing sealing coal seam 6 of Φ 177.8mm, and cement returns to more than the 100m of coal 6 top; Three horizontal hole 4 diameters that spud in are 152.4mm, are lowered to sealing seat earth 8 behind the N80 grade of steel protective casing of Φ 127mm.Adopting the guiding drilling technology to make three, to open horizontal hole 46 be 3 ~ 6m apart from the coal seam, for guaranteeing Erkaijing well 3 and three spud sections, 4 cementing qualities, make bunch tube placed in the middle, open high angle hole section 3 two and adopt the wheeled rigidity centralizer of spiral roll and bouble-bow elastic centralizer cross-reference, three open horizontal segment 4 uses rigid vortex centralizer, improves displacement efficiency by spiral flow replacement technology.
(3) perforation was prepared pressure break after drilling engineering was transferred, according to 16 bullets/m semi-circular orientation perforation upwards only in horizontal circular borehole 4, according to fixed fracturing scheme the Roof Rock Strata of Coal Seam 7 between horizontal hole 4 and the coal seam 6 is implemented staged fracturing behind the perforation, the adjoining rock of originally sealing coal-bed gas up for safekeeping is transformed into the extraction Protective Coal Seam 9 of crack connected network prosperity.
(4) after ground shut-in well, draining, step-down, utilize the negative pressure extraction, make constantly desorb from coal seam 6, the diffusion of gas that is enclosed in the coal seam 6, migrate to extraction Protective Coal Seam 9 seepage flow by the Fracture Networks that is communicated with the coal seam, again by the horizontal hole 4 in extraction Protective Coal Seam 9 rock stratum by extensive extraction out.
Embodiment 3:
The method that single soft projecting coal bed roof and floor construction ground multi-branched horizontal well is taken out coal road band gas in advance to the unworked country.Be 6.68m for thickness, single, soft, hypotonic, the high prominent coal seam 6 of the nearly level of buried depth 700m, the destruction type of this layer coal is the IV class, ature of coal mostly is granular and chunky shape; Gas bearing capacity is 28m
3/ t, gas pressure is 1.7MPa; Coal seam immediate roof 7 is Sandy Silt, thick 2.6-6.9m, and average 4.8m, old top is packsand, thick 3.2-16.5 rice, average thick 8.4 meters; Coal seam immediate bottom 8 is Sandy Silt or carbonaceous mud stone, thick 2.4-15.6 rice, and average 7.6 meters, past is sandstone, thick 1.8-20.6m, average thick 12.5m.Seam Roof And Floor is stable, and karst and cranny development are unbalanced.
Implementation step is as follows:
(1) according to 5 locus, tunnel of intending driving, 1 chooses solution space layout well location on ground;
(2) adopt three to drive a well body structure to roof 7 and seat earth 8 construction multi-branched horizontal wells, the horizontal well of at first in roof 7, constructing, this branch horizontal well one drive a well the eye 2 diameters be 311.1mm, be lowered to the N80 grade of steel protective casing of Φ 244.5mm, leakiness stratum, one game clock layer sleeve pipe sealing earth's surface, cement return to ground 1; Two eye 3 diameters that drive a well are 215.9mm, cement the well after being lowered to the N80 grade of steel protective casing of Φ 177.8mm, and cement returns to more than the coal 6 top 100m; Three horizontal hole 4 diameters that spud in are 152.4mm, are lowered to the N80 grade of steel protective casing sealing roof 7 of Φ 127mm.
(3) after the horizontal well drilling of construction in roof 7 finishes, construct again branch horizontal well in the seat earth, this branch horizontal well one drive a well the eye 2 diameters be 311.1mm, be lowered to the N80 grade of steel protective casing of Φ 244.5mm, leakiness stratum, one game clock layer sleeve pipe sealing earth's surface, cement return to ground 1; Two eye 3 diameters that drive a well are 215.9mm, are lowered to the N80 grade of steel protective casing sealing coal seam 6 of Φ 177.8mm, and cement returns to more than the 100m of coal 6 top; Three horizontal hole 4 diameters that spud in are 152.4mm, are lowered to the N80 grade of steel protective casing sealing seat earth 8 of Φ 127mm.Adopting the guiding drilling technology to make three, to open horizontal hole 46 be 3 ~ 6m apart from the coal seam, for guaranteeing Erkaijing well 3 and three spud sections, 4 cementing qualities, make bunch tube placed in the middle, open high angle hole section 3 two and adopt the wheeled rigidity centralizer of spiral roll and bouble-bow elastic centralizer cross-reference, three open horizontal segment 4 uses rigid vortex centralizer, improves displacement efficiency by spiral flow replacement technology.
(3) perforation was prepared pressure break after drilling engineering was transferred, carry out perforation according to 16 bullets/m, the semi-circular orientation perforation only makes progress in the horizontal circular borehole 4 of branch in roof 7, the semi-circular orientation perforation only makes progress in the horizontal circular borehole 4 of branch in seat earth 8, respectively the Roof Rock Strata of Coal Seam 7 between horizontal hole 4 and the coal seam 6 and seat earth 8 are implemented staged fracturing according to fixed fracturing scheme behind the perforation, the adjoining rock of originally sealing coal-bed gas up for safekeeping is transformed into the extraction Protective Coal Seam 9 of crack connected network prosperity.
(4) after ground shut-in well, draining, step-down, utilize the negative pressure extraction, make constantly desorb from coal seam 6, the diffusion of gas that is enclosed in the coal seam 6, migrate to extraction Protective Coal Seam 9 seepage flow by the Fracture Networks that is communicated with the coal seam, again by the horizontal hole 4 in extraction Protective Coal Seam 9 rock stratum by extensive extraction out.
Claims (10)
1. single soft projecting coal bed method of taking out in advance coal road band gas in unworked country, it is characterized in that: adopt surface water horizontal well cbm development technique, single soft projecting coal bed top or construction of bottom plates concordant horizontal well from ground to the unworked country, perforation, pressure break, drainage and step-down, aerogenesis, and determine whether to carry out the negative pressure mash gas extraction according to producing the regimen condition.
2. the single soft projecting coal bed method of taking out in advance coal road band gas in unworked country according to claim 1, it is characterized in that: stable when the prominent roof of single, soft, hypotonic height, easily during pore-forming, the horizontal well mash gas extraction of constructing adopting from ground to roof; During, easier pore-forming more stable than top board when the prominent seat earth of single, soft, hypotonic height, the horizontal well mash gas extraction of constructing adopting from ground to seat earth; When the prominent Seam Roof And Floor of single, soft, hypotonic height all stable, easily during pore-forming, can adopt from ground to top, coal seam, the base plate multi-branched horizontal well mash gas extraction of constructing respectively for shortening in advance the phase of taking out.
3. the single soft projecting coal bed method of taking out in advance coal road band gas in unworked country according to claim 2, it is characterized in that: vertical 3 ~ 6m directly over the coal seam, horizontal hole drilling direction and the tunnelling opposite direction of being positioned at of described horizontal hole of in roof, constructing.
4. the single soft projecting coal bed method of taking out in advance coal road band gas in unworked country according to claim 2, it is characterized in that: vertical 3 ~ 6m under the coal seam, horizontal hole drilling direction and the tunnelling opposite direction of being positioned at of described horizontal hole of in seat earth, constructing.
5. the single soft projecting coal bed method of taking out in advance coal road band gas in unworked country according to claim 2, it is characterized in that: adopt from ground to the top, coal seam, when base plate is constructed respectively the multi-branched horizontal well mash gas extraction, described horizontal hole of constructing in roof is vertical to be positioned at 3 ~ 6m directly over the coal seam, vertical 3 ~ 6m under the coal seam, horizontal hole drilling direction and the tunnelling opposite direction of being positioned at of the horizontal hole of in seat earth, constructing.
6. the single soft projecting coal bed method of taking out in advance coal road band gas in unworked country according to claim 1, it is characterized in that: described horizontal well from ground construction is taked three opening structures, all be lowered to protective casing, leakiness stratum, a game clock layer sleeve pipe sealing earth's surface, cement returns to ground; Two drive a well cements the well after entering now protective casing, and cement returns to more than the 100m of coal top; Three horizontal holes that spud in, protective casing is lowered to rear well cementation.
7. the prominent coal seam of the single soft height in the unworked country according to claim 1 method of taking out in advance coal road band gas is characterized in that: the horizontal well of described construction in roof, downward semi-circular orientation perforation only in horizontal circular borehole; The horizontal well of construction in seat earth, the semi-circular orientation perforation only makes progress in horizontal circular borehole; Form artificial plane of weakness with this.
8. the prominent coal seam of the single soft height in the unworked country according to claim 1 method of taking out in advance coal road band gas, it is characterized in that: described pressure break is at a certain distance lower packet enforcement of horizontal hole section staged fracturing, intensive treatment is carried out in one section rock stratum between horizontal hole and the coal seam, extend take plan pick coal road as this section Seam Roof And Floor preexisting crack in each certain limit of axis both sides in the horizontal after making pressure break, expansion, and produce new a large amount of artificial crack, the crack that the artificial plane of weakness that Seam Roof And Floor is formed along oriented perforating through fracturing reform obtains is linked up with the coal seam as far as possible, finally play anti-reflection deblocking effect and (namely increase the gas permeability of rock stratum, remove the rock stratum to the ability of sealing up for safekeeping of gas in the coal seam), the adjoining rock of originally sealing coal-bed gas up for safekeeping is transformed into " the extraction Protective Coal Seam " of Fracture Networks prosperity.
9. the prominent coal seam of the single soft height in the unworked country according to claim 8 method of taking out in advance coal road band gas, it is characterized in that: described extraction Protective Coal Seam refers to and produces a large amount of cracks by reinforcement process and make rock stratum in the close coal seam certain limit that gas permeability increases substantially, thickness is 8-12m, and by removing the rock stratum to the ability of sealing up for safekeeping of gas in the coal seam with the crack of coal seam conducting.
10. the prominent coal seam of the single soft height in the unworked country according to claim 1 method of taking out in advance coal road band gas, it is characterized in that: carrying out the negative pressure mash gas extraction behind the described drainage and step-down is to utilize draining, hypotensive effect, coal-bed gas is reached below the critical desorption pressures, and in negative pressure extraction process, make constantly desorb from the coal seam, the diffusion of gas that is enclosed in the coal seam, migrate to " extraction Protective Coal Seam " seepage flow by the Fracture Networks that is communicated with the coal seam, again by the horizontal hole in " extraction Protective Coal Seam " rock stratum by extensive extraction out; The coal-bed gas that reaches to intend to dig heading and be in the certain limit of axis both sides is down to the safety standard that requires in the protrusion-dispelling regulation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110181168.3A CN102852546B (en) | 2011-06-30 | 2011-06-30 | Method for pre-pumping coal roadway stripe gas of single soft protruded coal seam of unexploited area |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110181168.3A CN102852546B (en) | 2011-06-30 | 2011-06-30 | Method for pre-pumping coal roadway stripe gas of single soft protruded coal seam of unexploited area |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102852546A true CN102852546A (en) | 2013-01-02 |
CN102852546B CN102852546B (en) | 2015-04-29 |
Family
ID=47399478
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110181168.3A Expired - Fee Related CN102852546B (en) | 2011-06-30 | 2011-06-30 | Method for pre-pumping coal roadway stripe gas of single soft protruded coal seam of unexploited area |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102852546B (en) |
Cited By (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103147734A (en) * | 2013-03-08 | 2013-06-12 | 中煤科工集团重庆研究院 | Method for multi-section hydraulic fracture along coal layer of underground coal mine |
CN103967472A (en) * | 2014-05-26 | 2014-08-06 | 中煤科工集团西安研究院有限公司 | Horizontal well forced gas drainage method with coal bed gas subjected to staged fracturing |
CN104131831A (en) * | 2014-06-12 | 2014-11-05 | 中国矿业大学 | Coal-bed gas well vertical three-dimensional united extraction method |
CN104763398A (en) * | 2015-02-11 | 2015-07-08 | 中国石油集团长城钻探工程有限公司 | Mining method for deformed coal coalbed methane for V-shaped well bottom plate auxiliary layer |
CN104879159A (en) * | 2015-06-11 | 2015-09-02 | 河南理工大学 | Gas permeability-increase extraction device and method for soft coal seam stoping face |
CN105971662A (en) * | 2016-07-05 | 2016-09-28 | 重庆大学 | Method for gas extraction by coal seam roof weakening through L-shaped drilling staged fracturing |
CN106593393A (en) * | 2016-12-09 | 2017-04-26 | 太原理工大学 | Method for improving permeability of broken and soft oil and gas reservoir |
CN106639877A (en) * | 2016-12-31 | 2017-05-10 | 河南理工大学 | Track varying drilling method and device |
CN106907175A (en) * | 2017-05-02 | 2017-06-30 | 中国矿业大学 | The efficient extraction coal roadway stripe gas of base plate concordant long drilled holes staged fracturing and region outburst elimination method |
CN106979031A (en) * | 2017-04-18 | 2017-07-25 | 中交路桥华南工程有限公司 | The gas drainage system and tunnel structure in a kind of tunnel |
CN107916953A (en) * | 2017-11-24 | 2018-04-17 | 陕西省煤层气开发利用有限公司 | Gas drainage system, pumping method and construction technology based on roof horizontal drilling |
CN108150212A (en) * | 2017-11-29 | 2018-06-12 | 中国神华能源股份有限公司 | Extinguishing method |
CN108643960A (en) * | 2018-05-21 | 2018-10-12 | 河南工程学院 | A kind of ground region band coal mine gas extinction technique |
CN108756884A (en) * | 2018-06-12 | 2018-11-06 | 王帆 | Coal mine tight roof full face ground shifts to an earlier date outburst elimination method |
CN109519211A (en) * | 2019-01-15 | 2019-03-26 | 中煤科工集团重庆研究院有限公司 | Method for extracting gas in mining area by using pre-extraction coal bed gas ground well |
CN109539920A (en) * | 2018-12-27 | 2019-03-29 | 西安通源石油科技股份有限公司 | A kind of top plate fracturing method and device of coal mining |
CN110173240A (en) * | 2019-06-19 | 2019-08-27 | 陕西浩兴坤达新能源科技有限公司 | A kind of coal mine gas drainage method |
CN110306961A (en) * | 2019-06-19 | 2019-10-08 | 陕西浩兴坤达新能源科技有限公司 | It is a kind of along roof Floor water horizontal well drilling well staged fracturing method |
CN110318674A (en) * | 2019-06-13 | 2019-10-11 | 太原理工大学 | A kind of method of back fracturing protrusion-dispelling |
CN110953015A (en) * | 2019-12-25 | 2020-04-03 | 太原理工大学 | Soft low-permeability coal seam long-drill-hole directional segmented fracturing efficient gas extraction method |
CN110984944A (en) * | 2019-11-22 | 2020-04-10 | 中国石油天然气股份有限公司 | Fracturing method for improving strip-shaped high-water-saturation reservoir development effect |
WO2020151207A1 (en) * | 2019-01-25 | 2020-07-30 | 安徽理工大学 | Coordinative extraction and pressure relief method for high confined water high gas coal seam group |
CN112211595A (en) * | 2020-10-20 | 2021-01-12 | 吕梁学院 | Construction method of coal-bed gas well at critical position |
CN112253070A (en) * | 2020-10-10 | 2021-01-22 | 中煤科工集团西安研究院有限公司 | Method for eliminating outburst by sectional seam-making and coal-washing of horizontal well in linkage mode of top and bottom of thick coal seam |
CN112593936A (en) * | 2020-11-27 | 2021-04-02 | 陕西彬长孟村矿业有限公司 | Advanced comprehensive prevention and control method for multiple disaster areas of deep mine |
CN112855087A (en) * | 2021-03-22 | 2021-05-28 | 河北佐和佑石油技术发展有限公司 | Coal bed gas horizontal well system transformation method |
CN113863915A (en) * | 2021-10-15 | 2021-12-31 | 中国华能集团有限公司 | System and method for improving physical properties of low-permeability structural coal reservoir by utilizing acidification technology |
CN114233369A (en) * | 2021-12-28 | 2022-03-25 | 山西晋煤集团技术研究院有限责任公司 | Method for accurately eliminating coal and gas outburst by combining up and down of well |
CN116122774A (en) * | 2023-01-03 | 2023-05-16 | 中煤科工西安研究院(集团)有限公司 | Outburst prevention method for combined operation layer gas extraction area of ultra-close coal seam well up-down combination operation |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2350504A1 (en) * | 1998-11-20 | 2000-06-02 | Cdx Gas, Llc | Method and system for accessing subterranean deposits from the surface |
US20020185906A1 (en) * | 2001-05-31 | 2002-12-12 | Stolarczyk Larry G. | Drilling, image, and coal-bed methane production ahead of mining |
RU2282722C1 (en) * | 2004-12-27 | 2006-08-27 | Открытое акционерное общество "Газпром" (ОАО "Газпром") | Coal bed degassing method |
CN102031950A (en) * | 2010-12-06 | 2011-04-27 | 煤炭科学研究总院西安研究院 | Hole-forming process method for comb gas extraction borehole in coal seam roof |
CN102080518A (en) * | 2011-01-17 | 2011-06-01 | 河南理工大学 | Method for extracting gas from coal seam roof complex branched well |
CN102086774A (en) * | 2011-01-17 | 2011-06-08 | 中联煤层气国家工程研究中心有限责任公司 | Drainage method of gas in coal bed |
-
2011
- 2011-06-30 CN CN201110181168.3A patent/CN102852546B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2350504A1 (en) * | 1998-11-20 | 2000-06-02 | Cdx Gas, Llc | Method and system for accessing subterranean deposits from the surface |
US20020185906A1 (en) * | 2001-05-31 | 2002-12-12 | Stolarczyk Larry G. | Drilling, image, and coal-bed methane production ahead of mining |
RU2282722C1 (en) * | 2004-12-27 | 2006-08-27 | Открытое акционерное общество "Газпром" (ОАО "Газпром") | Coal bed degassing method |
CN102031950A (en) * | 2010-12-06 | 2011-04-27 | 煤炭科学研究总院西安研究院 | Hole-forming process method for comb gas extraction borehole in coal seam roof |
CN102080518A (en) * | 2011-01-17 | 2011-06-01 | 河南理工大学 | Method for extracting gas from coal seam roof complex branched well |
CN102086774A (en) * | 2011-01-17 | 2011-06-08 | 中联煤层气国家工程研究中心有限责任公司 | Drainage method of gas in coal bed |
Non-Patent Citations (1)
Title |
---|
肖家平等: "地面"L"型钻井瓦斯抽采设备与抽采管路系统优化探讨", 《煤炭技术》 * |
Cited By (40)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103147734A (en) * | 2013-03-08 | 2013-06-12 | 中煤科工集团重庆研究院 | Method for multi-section hydraulic fracture along coal layer of underground coal mine |
CN103967472A (en) * | 2014-05-26 | 2014-08-06 | 中煤科工集团西安研究院有限公司 | Horizontal well forced gas drainage method with coal bed gas subjected to staged fracturing |
CN104131831A (en) * | 2014-06-12 | 2014-11-05 | 中国矿业大学 | Coal-bed gas well vertical three-dimensional united extraction method |
CN104131831B (en) * | 2014-06-12 | 2016-10-12 | 中国矿业大学 | A kind of coal bed gas well three-dimensional associating pumping method up and down |
CN104763398A (en) * | 2015-02-11 | 2015-07-08 | 中国石油集团长城钻探工程有限公司 | Mining method for deformed coal coalbed methane for V-shaped well bottom plate auxiliary layer |
CN104879159A (en) * | 2015-06-11 | 2015-09-02 | 河南理工大学 | Gas permeability-increase extraction device and method for soft coal seam stoping face |
CN105971662A (en) * | 2016-07-05 | 2016-09-28 | 重庆大学 | Method for gas extraction by coal seam roof weakening through L-shaped drilling staged fracturing |
CN106593393A (en) * | 2016-12-09 | 2017-04-26 | 太原理工大学 | Method for improving permeability of broken and soft oil and gas reservoir |
CN106639877A (en) * | 2016-12-31 | 2017-05-10 | 河南理工大学 | Track varying drilling method and device |
CN106639877B (en) * | 2016-12-31 | 2019-12-20 | 河南理工大学 | Variable-track drilling method and device |
CN106979031A (en) * | 2017-04-18 | 2017-07-25 | 中交路桥华南工程有限公司 | The gas drainage system and tunnel structure in a kind of tunnel |
CN106907175B (en) * | 2017-05-02 | 2019-06-04 | 中国矿业大学 | The efficient extraction coal roadway stripe gas of bottom plate concordant long drilled holes staged fracturing and region outburst elimination method |
CN106907175A (en) * | 2017-05-02 | 2017-06-30 | 中国矿业大学 | The efficient extraction coal roadway stripe gas of base plate concordant long drilled holes staged fracturing and region outburst elimination method |
CN107916953A (en) * | 2017-11-24 | 2018-04-17 | 陕西省煤层气开发利用有限公司 | Gas drainage system, pumping method and construction technology based on roof horizontal drilling |
CN108150212A (en) * | 2017-11-29 | 2018-06-12 | 中国神华能源股份有限公司 | Extinguishing method |
CN108150212B (en) * | 2017-11-29 | 2020-04-24 | 中国神华能源股份有限公司 | Fire extinguishing method |
CN108643960A (en) * | 2018-05-21 | 2018-10-12 | 河南工程学院 | A kind of ground region band coal mine gas extinction technique |
CN108756884A (en) * | 2018-06-12 | 2018-11-06 | 王帆 | Coal mine tight roof full face ground shifts to an earlier date outburst elimination method |
CN109539920A (en) * | 2018-12-27 | 2019-03-29 | 西安通源石油科技股份有限公司 | A kind of top plate fracturing method and device of coal mining |
CN109539920B (en) * | 2018-12-27 | 2023-08-25 | 通源石油科技集团股份有限公司 | Top plate fracturing method and device for coal exploitation |
CN109519211A (en) * | 2019-01-15 | 2019-03-26 | 中煤科工集团重庆研究院有限公司 | Method for extracting gas in mining area by using pre-extraction coal bed gas ground well |
WO2020151207A1 (en) * | 2019-01-25 | 2020-07-30 | 安徽理工大学 | Coordinative extraction and pressure relief method for high confined water high gas coal seam group |
CN110318674A (en) * | 2019-06-13 | 2019-10-11 | 太原理工大学 | A kind of method of back fracturing protrusion-dispelling |
CN110306961A (en) * | 2019-06-19 | 2019-10-08 | 陕西浩兴坤达新能源科技有限公司 | It is a kind of along roof Floor water horizontal well drilling well staged fracturing method |
CN110173240A (en) * | 2019-06-19 | 2019-08-27 | 陕西浩兴坤达新能源科技有限公司 | A kind of coal mine gas drainage method |
CN110984944A (en) * | 2019-11-22 | 2020-04-10 | 中国石油天然气股份有限公司 | Fracturing method for improving strip-shaped high-water-saturation reservoir development effect |
CN110953015B (en) * | 2019-12-25 | 2021-04-13 | 太原理工大学 | Soft low-permeability coal seam long-drill-hole directional segmented fracturing efficient gas extraction method |
CN110953015A (en) * | 2019-12-25 | 2020-04-03 | 太原理工大学 | Soft low-permeability coal seam long-drill-hole directional segmented fracturing efficient gas extraction method |
CN112253070B (en) * | 2020-10-10 | 2023-08-15 | 中煤科工集团西安研究院有限公司 | Method for sectional seam making, coal washing and outburst elimination of thick coal seam top-bottom linkage horizontal well |
CN112253070A (en) * | 2020-10-10 | 2021-01-22 | 中煤科工集团西安研究院有限公司 | Method for eliminating outburst by sectional seam-making and coal-washing of horizontal well in linkage mode of top and bottom of thick coal seam |
CN112211595B (en) * | 2020-10-20 | 2022-05-06 | 吕梁学院 | Construction method of coal-bed gas well at critical position |
CN112211595A (en) * | 2020-10-20 | 2021-01-12 | 吕梁学院 | Construction method of coal-bed gas well at critical position |
CN112593936A (en) * | 2020-11-27 | 2021-04-02 | 陕西彬长孟村矿业有限公司 | Advanced comprehensive prevention and control method for multiple disaster areas of deep mine |
CN112855087A (en) * | 2021-03-22 | 2021-05-28 | 河北佐和佑石油技术发展有限公司 | Coal bed gas horizontal well system transformation method |
CN113863915A (en) * | 2021-10-15 | 2021-12-31 | 中国华能集团有限公司 | System and method for improving physical properties of low-permeability structural coal reservoir by utilizing acidification technology |
CN113863915B (en) * | 2021-10-15 | 2024-01-19 | 中国华能集团有限公司 | System and method for improving physical properties of low-permeability structural coal reservoir by using acidification technology |
CN114233369A (en) * | 2021-12-28 | 2022-03-25 | 山西晋煤集团技术研究院有限责任公司 | Method for accurately eliminating coal and gas outburst by combining up and down of well |
CN114233369B (en) * | 2021-12-28 | 2023-10-31 | 山西晋煤集团技术研究院有限责任公司 | Method for precisely eliminating coal and gas outburst by up-and-down combination |
CN116122774A (en) * | 2023-01-03 | 2023-05-16 | 中煤科工西安研究院(集团)有限公司 | Outburst prevention method for combined operation layer gas extraction area of ultra-close coal seam well up-down combination operation |
CN116122774B (en) * | 2023-01-03 | 2024-10-18 | 中煤科工西安研究院(集团)有限公司 | Outburst prevention method for combined operation layer gas extraction area of ultra-close coal seam well up-down combination operation |
Also Published As
Publication number | Publication date |
---|---|
CN102852546B (en) | 2015-04-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102852546B (en) | Method for pre-pumping coal roadway stripe gas of single soft protruded coal seam of unexploited area | |
CN104863629B (en) | A kind of method taking out absciss layer gas and draining slip casting under overlying strata using combined drilling and counterboring | |
CN102392677A (en) | Permeability improvement technology for coal bed gas reservoir cap by using three-dimensional fracture network modification | |
CN101915072B (en) | Method for extracting coal bed gas in stable mining region by ground well drilling | |
CN107905834A (en) | A kind of hypotonic high prominent coal seam architecture gas production method | |
CN104929567A (en) | Low-cost construction process for passing through goaf | |
CN104131831A (en) | Coal-bed gas well vertical three-dimensional united extraction method | |
CN102392678A (en) | Gas drainage method combining surface and underground fracturing and permeability improvement | |
CN107387082A (en) | A kind of method for weakening coal seam tight roof | |
CN104806217A (en) | Combined separated layer fracturing, grouping and layer-combining mining method for coal bed well group | |
CN102493831B (en) | Method for extracting coal seam gas through ground fracturing and underground horizontal drill holes | |
CN107100625B (en) | Overlying strata water filling filling, which reduces, leads high water retaining mining method | |
WO2015103861A1 (en) | Method for extracting gas by drilling hole in gob-side entry retaining y-type ventilation high-position return airway | |
CN104879159A (en) | Gas permeability-increase extraction device and method for soft coal seam stoping face | |
CN105804786B (en) | A kind of weak seam bottom plate layer-through drilling pressure rushes anti-reflection method | |
CN109025940B (en) | CO for tight oil reservoir2Fracturing oil displacement integrated oil extraction method | |
CN107620581B (en) | Construction method of one-well dual-purpose coal mine shaft inspection hole | |
CN109339856A (en) | A kind of method that face gas is administered | |
CN114294046B (en) | Coal mine area full-coverage underground three-dimensional extraction method | |
CN110306965A (en) | A kind of method for increasing for coal bed gas low yield wellblock | |
CN111022108A (en) | Method for extracting gas in goaf | |
CN110043309A (en) | Close the method for arranging and well bore installation method of the gas drainage well of coal mine | |
CN113279811A (en) | Reconstruction method and construction method for layered old goaf roof on ultra-thick coal seam | |
CN106014345B (en) | A kind of lower part caving method exploits the pumping method for the compound old dead zone coal bed gas to be formed | |
CN105971563B (en) | A kind of lower part tool post method exploits the pumping method for the compound old dead zone coal bed gas to be formed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150429 Termination date: 20190630 |
|
CF01 | Termination of patent right due to non-payment of annual fee |