CN102777030A - Method for building up formwork construction platform of lift shaft - Google Patents

Method for building up formwork construction platform of lift shaft Download PDF

Info

Publication number
CN102777030A
CN102777030A CN2012102773382A CN201210277338A CN102777030A CN 102777030 A CN102777030 A CN 102777030A CN 2012102773382 A CN2012102773382 A CN 2012102773382A CN 201210277338 A CN201210277338 A CN 201210277338A CN 102777030 A CN102777030 A CN 102777030A
Authority
CN
China
Prior art keywords
steel pipe
platform
support body
well type
type support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102773382A
Other languages
Chinese (zh)
Inventor
张媛媛
高锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN2012102773382A priority Critical patent/CN102777030A/en
Publication of CN102777030A publication Critical patent/CN102777030A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The invention discloses a method for building up a formwork construction platform of a lift shaft. The method comprises the following steps: 1, building up a platform; 2, building up a frame body; 3, installing a sliding support; 4, constructing a formwork; 5, concreting; 6, disassembling the formwork; and 7, lifting and hoisting the platform. With the adoption of the method provided by the invention, the platform can be moved upwards conveniently in a hoisted manner and can be fixed according to the requirement of the support to an operating platform by the formwork; the fixing method is simple and easy to operate, the safety performance is high, and the working efficiency can be improved.

Description

A kind of elevator hoistways template construction Platforms Construct Method of Super
Technical field
The present invention relates to the erection method of template construction operating platform, relate in particular to setting up of a kind of elevator hoistways template construction platform.
Background technology
In the current highrise building concrete structure construction process; Template and support system thereof are bigger to workmanship and duration influence, in order to satisfy the requirement of template and support system, in industry, have produced multiple mould material and supporting form; In the concrete structure construction that with the template is the master; The formwork erection operating platform form of elevator shaft, the general employing landed scaffold or set up method such as temporary platform, and setting up the temporary platform main method has following 2 kinds:
1, adopt short scaffold tube, the holder of U type is inserted at two ends, adopts fastener to connect into intersecting parallels, tightens the holder of U type, on support circumferential concrete wall, lays flitch and template hard protection structure on intersecting parallels horizontal support platform top;
2, pre-buried diameter 20 above reinforcing bars in mixing concrete; Scaffold tube one end is enclosed within on the embedded bar head; One end connects the big bearing of beam with elevator door position; Form the horizontal simply supported beam of twice, top adopts two steel pipes and fastener to process intersecting parallels horizontal support platform, lays flitch and template hard protection structure on intersecting parallels horizontal support platform top;
The method of setting up with upper mounting plate all needs set aside pre-embedded for every layer, and security performance is relatively poor, is prone to security incident takes place, and the platform of setting up all need once be set up and removed for every layer, can not have enough to meet the need use.For this reason, need be a kind of practical, the operation platform that can have enough to meet the need, improves safety at the set-up time of shortening template operation platform.Satisfy the needs of elevator hoistways inner formword operation platform.
Summary of the invention
The objective of the invention is to overcome the deficiency of prior art, provide a kind of installation simple and easy, remove conveniently, can have enough to meet the need a kind of elevator hoistways template construction Platforms Construct Method of Super of using and having improved operating efficiency through lifting.
A kind of elevator hoistways template construction Platforms Construct Method of Super of the present invention, it may further comprise the steps:
(1) platform is set up, and the step that described platform is set up is:
(a) two ends of two oblique steel pipes that are provided with are at interval tilted to be supported on respectively on the concrete wall on elevator door opposite and on the concrete floor of elevator shaft doorway;
(b) place oblique steel pipe near the below of elevator door one side and adopt cruciform fastening for falsework to be connected respectively short steel pipes with two oblique steel pipes;
(c) also adopt cruciform fastening for falsework to install respectively two the first horizontal steel pipe in location and horizontal steel pipe tops that place oblique steel pipe at interval, second location less than the elevator hoistways width perpendicular to oblique steel pipe locking;
(2) support body is set up, and the step that described support body is set up is:
On described platform, set up well type support body; Described well type support body is made up of perpendicular steel pipe, the first horizontal steel pipe and the second horizontal steel pipe, the 3rd horizontal steel pipe; The bottom of two perpendicular steel pipes in the left side of described well type support body leans against the inboard of the horizontal steel pipe in second location; The bottom of two perpendicular steel pipes on the right side of described well type support body leans against the inboard of the horizontal steel pipe in first location, and two perpendicular steel pipes on the right side of said well type support body link to each other with oblique steel pipe through a rotary buckle;
(3) installation of sliding support, the installation steps of described sliding support are:
(a) set up the right-angled intersection steel pipe frame that the steel pipe two ends all are equipped with universal wheel at the middle part of support body, universal wheel is pointed to four interior angles of the elevator hoistways of the floor of having accomplished concreting; Described right-angled intersection steel pipe frame links to each other with the perpendicular steel pipe of well type support body;
(b) establish flitch and template on decussation steel pipe support body upper berth;
(4) template construction: the derrick drilling setting up does to accomplish installing of Lift well mould plate;
(5) concreting: build the elevator shaft concrete together with the construction floor;
(6) form removable:, inner formword is placed on the well type support body when the elevator shaft concrete reaches intensity with form removable;
(7) platform promotes lifting, and the step that described platform promotes lifting is:
Use tower crane to promote hoisting platform,, platform is upwards promoted through interim suspension centre is set; When rising to the last layer that arrives template support floor; Adopt rope to carry out short steel pipes on the traction rotation platform, then platform is slowly fallen, through fixing once more of oblique steel pipe on the platform; Derrick integral body is placed in the hoistway, accomplishes once promoting lifting.。
Adopt the inventive method, platform can be through lifting, and it is movable to make progress easily, and fixes according to the needs of template support operation platform, and fixing means is simple, is prone to row, and security performance is reliable, can increase work efficiency.
Description of drawings
Fig. 1 is the sectional drawing of the platform set up in a kind of elevator hoistways template construction Platforms Construct Method of Super of the present invention;
Fig. 2 is the sectional drawing in the platform lifting process in a kind of elevator hoistways template construction Platforms Construct Method of Super of the present invention;
Fig. 3 is the vertical view of the platform shown in Fig. 1;
Fig. 4 is the vertical view of the cross steel pipe that adopts in a kind of elevator hoistways template construction Platforms Construct Method of Super of the present invention;
Fig. 5 is the vertical view of the well type support body set up in a kind of elevator hoistways template construction Platforms Construct Method of Super of the present invention.
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment the present invention is done to describe in detail.
A kind of elevator hoistways template construction Platforms Construct Method of Super of the present invention shown in accompanying drawing; It may further comprise the steps: (1) platform is set up, and the step that described platform is set up is: (a) two ends of two oblique steel pipes 2 that are provided with are at interval tilted to be supported on respectively on the concrete wall on elevator door opposite and on the concrete floor of elevator shaft doorway; (b) place oblique steel pipe 2 near the below of elevator door one side and adopt cruciform fastening for falsework to be connected respectively short steel pipes 1 with two oblique steel pipes 2; (c) also adopt cruciform fastening for falsework to install respectively two the horizontal steel pipe 4 of the first horizontal steel pipe 3 in location and second location tops that place oblique steel pipe 2 at interval less than the elevator hoistways width perpendicular to oblique steel pipe 2 lockings; (2) support body is set up; The step that described support body is set up is: on described platform, set up well type support body; Described well type support body is made up of perpendicular steel pipe 5, the first horizontal steel pipe 6 and second horizontal steel pipe the 10, the 3rd horizontal steel pipe 13; The bottom of two perpendicular steel pipes in the left side of described well type support body leans against the inboard of the horizontal steel pipe 4 in second location; The bottom of two perpendicular steel pipes on the right side of described well type support body leans against the inboard of the horizontal steel pipe 3 in first location, and two perpendicular steel pipes on the right side of said well type support body link to each other with oblique steel pipe 2 through 2 rotary buckles 16; (3) installation of sliding support; The installation steps of described sliding support are: (a) set up the right-angled intersection steel pipe frame 11 that the steel pipe two ends all are equipped with universal wheel 12 at the middle part of support body, universal wheel is pointed to four interior angles of the elevator hoistways of the floor of having accomplished concreting; Described right-angled intersection steel pipe frame (11) links to each other with the perpendicular steel pipe (5) of well type support body; (b) establish flitch and template on decussation steel pipe support body upper berth; (4) template construction: the derrick drilling setting up does to accomplish installing of Lift well mould plate 17; (5) concreting: build elevator shaft concrete 15 together with the construction floor; (6) form removable:, inner formword is placed on the well type support body when the elevator shaft concrete reaches intensity with form removable; (7) platform promotes lifting, and the step that described platform promotes lifting is: use tower crane to promote hoisting platform, through interim suspension centre is set; Platform is upwards promoted, when rising to the last layer that arrives template support floor, adopt rope to carry out short steel pipes 1 on the traction rotation platform; Then platform is slowly fallen; Through fixing once more of oblique steel pipe 2 on the platform, derrick integral body is placed in the hoistway, accomplish once promoting lifting.9 is elevator hoistways safety protective doors among Fig. 1 and Fig. 2, and 7 and 15 all is concrete components, 7 concrete components of having built for the n layer, and 15 is n+1 layer concrete member, also cast.
Embodiment 1
(1) platform is set up, and the step that described platform is set up is: (a) two ends of two oblique steel pipes 2 that are provided with are at interval tilted to be supported on respectively on the concrete wall on elevator door opposite and on the concrete floor of elevator shaft doorway; (b) place oblique steel pipe 2 near the below of elevator door one side and adopt cruciform fastening for falsework to be connected respectively short steel pipes 1 with two oblique steel pipes 2; (c) also adopt cruciform fastening for falsework to install respectively two the horizontal steel pipe 4 of the first horizontal steel pipe 3 in location and second location tops that place oblique steel pipe 2 at interval less than the elevator hoistways width perpendicular to oblique steel pipe 2 lockings; (2) support body is set up; The step that described support body is set up is: on described platform, set up well type support body; Described well type support body is made up of perpendicular steel pipe 5, the first horizontal steel pipe 6 and second horizontal steel pipe the 10, the 3rd horizontal steel pipe 13; The bottom of two perpendicular steel pipes in the left side of described well type support body leans against the inboard of the horizontal steel pipe 4 in second location; The bottom of two perpendicular steel pipes on the right side of described well type support body leans against the inboard of the horizontal steel pipe 3 in first location, and two perpendicular steel pipes on the right side of said well type support body link to each other with oblique steel pipe 2 through 2 rotary buckles 16; (3) installation of sliding support; The installation steps of described sliding support are: (a) set up the right-angled intersection steel pipe frame 11 that the steel pipe two ends all are equipped with universal wheel 12 at the middle part of support body, universal wheel is pointed to four interior angles of the elevator hoistways of the floor of having accomplished concreting; Described right-angled intersection steel pipe frame (11) links to each other with the perpendicular steel pipe (5) of well type support body; (b) establish flitch and template on decussation steel pipe support body upper berth; (4) template construction: the derrick drilling setting up does to accomplish installing of Lift well mould plate 17; (5) concreting: build elevator shaft concrete 15 together with the construction floor; (6) form removable:, inner formword is placed on the well type support body when the elevator shaft concrete reaches intensity with form removable; (7) platform promotes lifting, and the step that described platform promotes lifting is: use tower crane to promote hoisting platform, through interim suspension centre is set; Platform is upwards promoted, when rising to the last layer that arrives template support floor, adopt rope to carry out short steel pipes 1 on the traction rotation platform; Then platform is slowly fallen; Through fixing once more of oblique steel pipe 2 on the platform, derrick integral body is placed in the hoistway, accomplish once promoting lifting.
Adopt this method security performance reliable through construction, can increase work efficiency, reduce the carrying of template, accelerated construction speed.

Claims (1)

1. elevator hoistways template construction Platforms Construct Method of Super is characterized in that it may further comprise the steps:
(1) platform is set up, and the step that described platform is set up is:
(a) two ends of two oblique steel pipes (2) that are provided with are at interval tilted to be supported on respectively on the concrete wall on elevator door opposite and on the concrete floor of elevator shaft doorway;
(b) place oblique steel pipe (2) near the below of elevator door one side and adopt cruciform fastening for falsework to be connected respectively short steel pipes (1) with two oblique steel pipes (2);
(c) two first horizontal steel pipes in location (3) and second less than the elevator hoistways width being located horizontal steel pipe (4) top that places oblique steel pipe (2) at interval also adopts cruciform fastening for falsework perpendicular to tiltedly steel pipe (2) locking installation respectively;
(2) support body is set up, and the step that described support body is set up is:
On described platform, set up well type support body; Described well type support body is made up of perpendicular steel pipe (5), the first horizontal steel pipe (6) and the second horizontal steel pipe (10), the 3rd horizontal steel pipe (13); The bottom of two perpendicular steel pipes in the left side of described well type support body leans against the inboard of the second horizontal steel pipe in location (4); The bottom of two perpendicular steel pipes on the right side of described well type support body leans against the inboard of the first horizontal steel pipe in location (3), and two perpendicular steel pipes on the right side of said well type support body link to each other with oblique steel pipe (2) through 2 rotary buckles (16);
(3) installation of sliding support, the installation steps of described sliding support are:
(a) set up the right-angled intersection steel pipe frame (11) that the steel pipe two ends all are equipped with universal wheel (12) at the middle part of support body, universal wheel is pointed to four interior angles of the elevator hoistways of the floor of having accomplished concreting; Described right-angled intersection steel pipe frame (11) links to each other with the perpendicular steel pipe (5) of well type support body;
(b) establish flitch and template on decussation steel pipe support body upper berth;
(4) template construction: the derrick drilling setting up does to accomplish installing of Lift well mould plate (17);
(5) concreting: build elevator shaft concrete (15) together with the construction floor;
(6) form removable:, inner formword is placed on the well type support body when the elevator shaft concrete reaches intensity with form removable;
(7) platform promotes lifting, and the step that described platform promotes lifting is:
Use tower crane to promote hoisting platform,, platform is upwards promoted through interim suspension centre is set; When rising to the last layer that arrives template support floor; Adopt rope to carry out short steel pipes on the traction rotation platform (1), then platform is slowly fallen, through fixing once more of oblique steel pipe (2) on the platform; Derrick integral body is placed in the hoistway, accomplishes once promoting lifting.
CN2012102773382A 2012-08-06 2012-08-06 Method for building up formwork construction platform of lift shaft Pending CN102777030A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102773382A CN102777030A (en) 2012-08-06 2012-08-06 Method for building up formwork construction platform of lift shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102773382A CN102777030A (en) 2012-08-06 2012-08-06 Method for building up formwork construction platform of lift shaft

Publications (1)

Publication Number Publication Date
CN102777030A true CN102777030A (en) 2012-11-14

Family

ID=47122124

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102773382A Pending CN102777030A (en) 2012-08-06 2012-08-06 Method for building up formwork construction platform of lift shaft

Country Status (1)

Country Link
CN (1) CN102777030A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015694A (en) * 2012-11-28 2013-04-03 泰兴市第一建筑安装工程有限公司 Lifting type steel pipe scaffold operation platform for elevator hoistway
CN103174284A (en) * 2013-03-20 2013-06-26 江苏扬州建工建设集团有限公司 Lifting handling frame of construction of elevator shaft structure
CN104631822A (en) * 2014-12-16 2015-05-20 中冶天工集团有限公司 Construction Method of High-rise Reinforced Concrete Elevator Shaft
CN105155830A (en) * 2015-09-11 2015-12-16 杭州江润科技有限公司 Construction method for combined type fixed and integral lifting of elevator shaft stereotyped operation platform
CN106006301A (en) * 2016-07-27 2016-10-12 中建局集团建设发展有限公司 High-altitude switching assisting device and construction method of super-high-rise construction elevator
CN109610860A (en) * 2018-12-21 2019-04-12 中建三局第三建设工程有限责任公司 Elevator well opening simultaneous protection device in a kind of main structure construction
CN109972813A (en) * 2019-04-29 2019-07-05 北京天恒建设集团有限公司 Integrated form integral construction plateform system in a kind of elevator
CN112343064A (en) * 2020-11-27 2021-02-09 中铁七局集团第五工程有限公司 Construction method for dismantling large-section annular concrete support beam of deep foundation pit
CN114517575A (en) * 2022-03-15 2022-05-20 中铁八局集团建筑工程有限公司 Formwork-attached assembling type double-layer integral hoisting elevator shaft construction method
CN115095130A (en) * 2022-07-22 2022-09-23 中国十七冶集团有限公司 Aluminum film cast-in-place elevator shaft lifting multi-aspect protection operating platform and using method
CN115162699A (en) * 2022-09-01 2022-10-11 中建八局第二建设有限公司 Lifting type boarding passage in elevator shaft and construction method thereof
CN115217345A (en) * 2022-07-31 2022-10-21 中冶建工集团有限公司 Hard protection synchronous installation construction method for elevator shaft

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101824910A (en) * 2009-11-17 2010-09-08 新疆建工(集团)有限责任公司 Quick template supporting construction method of elevator shaft
CN201714054U (en) * 2010-06-28 2011-01-19 倪树华 Climbing platform system for construction of elevator shaft of high-rise building
CN202090577U (en) * 2011-05-24 2011-12-28 南通市中房建设工程有限公司 Template supporting construction platform for lift wells in high-rise buildings
CN202117302U (en) * 2011-06-07 2012-01-18 广州建筑股份有限公司 Platform frame moving device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101824910A (en) * 2009-11-17 2010-09-08 新疆建工(集团)有限责任公司 Quick template supporting construction method of elevator shaft
CN201714054U (en) * 2010-06-28 2011-01-19 倪树华 Climbing platform system for construction of elevator shaft of high-rise building
CN202090577U (en) * 2011-05-24 2011-12-28 南通市中房建设工程有限公司 Template supporting construction platform for lift wells in high-rise buildings
CN202117302U (en) * 2011-06-07 2012-01-18 广州建筑股份有限公司 Platform frame moving device

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015694A (en) * 2012-11-28 2013-04-03 泰兴市第一建筑安装工程有限公司 Lifting type steel pipe scaffold operation platform for elevator hoistway
CN103015694B (en) * 2012-11-28 2015-07-01 泰兴市第一建筑安装工程有限公司 Lifting type steel pipe scaffold operation platform for elevator hoistway
CN103174284A (en) * 2013-03-20 2013-06-26 江苏扬州建工建设集团有限公司 Lifting handling frame of construction of elevator shaft structure
CN104631822A (en) * 2014-12-16 2015-05-20 中冶天工集团有限公司 Construction Method of High-rise Reinforced Concrete Elevator Shaft
CN105155830A (en) * 2015-09-11 2015-12-16 杭州江润科技有限公司 Construction method for combined type fixed and integral lifting of elevator shaft stereotyped operation platform
CN106006301B (en) * 2016-07-27 2018-01-16 中建一局集团建设发展有限公司 A kind of Super High construction elevator high-altitude conversion servicing unit and construction method
CN106006301A (en) * 2016-07-27 2016-10-12 中建局集团建设发展有限公司 High-altitude switching assisting device and construction method of super-high-rise construction elevator
CN109610860A (en) * 2018-12-21 2019-04-12 中建三局第三建设工程有限责任公司 Elevator well opening simultaneous protection device in a kind of main structure construction
CN109610860B (en) * 2018-12-21 2021-03-23 中建三局第三建设工程有限责任公司 Synchronous protector of elevartor shaft entrance to a cave in major structure construction
CN109972813A (en) * 2019-04-29 2019-07-05 北京天恒建设集团有限公司 Integrated form integral construction plateform system in a kind of elevator
CN112343064A (en) * 2020-11-27 2021-02-09 中铁七局集团第五工程有限公司 Construction method for dismantling large-section annular concrete support beam of deep foundation pit
CN114517575A (en) * 2022-03-15 2022-05-20 中铁八局集团建筑工程有限公司 Formwork-attached assembling type double-layer integral hoisting elevator shaft construction method
CN115095130A (en) * 2022-07-22 2022-09-23 中国十七冶集团有限公司 Aluminum film cast-in-place elevator shaft lifting multi-aspect protection operating platform and using method
CN115217345A (en) * 2022-07-31 2022-10-21 中冶建工集团有限公司 Hard protection synchronous installation construction method for elevator shaft
CN115162699A (en) * 2022-09-01 2022-10-11 中建八局第二建设有限公司 Lifting type boarding passage in elevator shaft and construction method thereof

Similar Documents

Publication Publication Date Title
CN102777030A (en) Method for building up formwork construction platform of lift shaft
CN108033367B (en) Synchronous lifting device and lifting method for steel column and cylinder frame alternately supported steel platform and tower crane
CN202450774U (en) Shaft template of small-step-pitch self-climbing elevator
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
KR20180127066A (en) Prefabricated shoring system
CN105692470A (en) Internal climbing tower crane and operating method thereof
CN104480863B (en) The steel anchor beam installation and locating method of Cable stayed Bridge Main Tower construction
CN102877637A (en) Method for implementing operating platform in bottom wall construction of cantilever beam
JP6503716B2 (en) Demolition system and demolition method
CN106150057B (en) A kind of split blade type hydraulic pressure lift climbing frame
CN103132702A (en) Longspan pipe truss pulling bar lifting and overhead rotating emplacing construction method
CN108862081A (en) A kind of chain block crane boom and the application in the adjusting of beam steel protective layer thickness
CN103375022B (en) Multi-functional dynamic rail attached lifting scaffold
KR101364198B1 (en) Variable scaffold for vuilding outer wall construction
CN109252656B (en) High-rise building climbing template and assembling, pouring and lifting method
JP3074765U (en) Pillar building construction system equipment
KR100647977B1 (en) Lifting method of formwork scaffolding with detachable cylinder and moving pump
JP2010242308A (en) Method for demolishing high-rise building of concrete slab structure, and concrete slab demolition equipment
JPH09317183A (en) Building construction method
CN201649606U (en) Following type elevator hoistway construction platform
CN101240661A (en) Large steel girder member bar turning device and its member bar turning method
CN201635390U (en) Automatic formwork supporting machine for high-rise building elevator shaft construction
CN203867198U (en) Slip equipment for high-rise steel structure transfer layer truss
CN216305335U (en) Assembled elevator shaft operating platform for high-rise building
CN214656379U (en) Integral steelframe platform rollover construction system of high mound hydraulic jacking

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121114