CN103015694B - Lifting type steel pipe scaffold operation platform for elevator hoistway - Google Patents

Lifting type steel pipe scaffold operation platform for elevator hoistway Download PDF

Info

Publication number
CN103015694B
CN103015694B CN201210493771.XA CN201210493771A CN103015694B CN 103015694 B CN103015694 B CN 103015694B CN 201210493771 A CN201210493771 A CN 201210493771A CN 103015694 B CN103015694 B CN 103015694B
Authority
CN
China
Prior art keywords
steel pipe
steel pipes
elevator hoistways
connection
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210493771.XA
Other languages
Chinese (zh)
Other versions
CN103015694A (en
Inventor
陆玉萍
陈钧颐
胥岳
苏登祥
韩群林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taixing Construction Group Co. Ltd.
Original Assignee
TAIXING FIRST CONSTRUCTION INSTALLATION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIXING FIRST CONSTRUCTION INSTALLATION CO Ltd filed Critical TAIXING FIRST CONSTRUCTION INSTALLATION CO Ltd
Priority to CN201210493771.XA priority Critical patent/CN103015694B/en
Publication of CN103015694A publication Critical patent/CN103015694A/en
Application granted granted Critical
Publication of CN103015694B publication Critical patent/CN103015694B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The invention relates to a lifting type steel pipe scaffold operation platform for an elevator hoistway, which comprises at least two primary steel pipes installed in the elevator hoistway; the lower ends of the primary steel pipes prop against the floor of a hallway on one side of the elevator hoistway, and the upper ends prop against the inner wall on the other side of the elevator hoistway; at least two vertical steel pipes are connected with each primary steel pipe vertically; the tops of corresponding paired vertical steel pipes on adjacent primary steel pipes are connected with transverse steel pipes horizontally; and scaffolding platforms are fully spread on all transverse steel pipes vertically. The connection and supporting structures between the steel pipes and the platforms are provided with reinforcing steel pipes, so that the connection is firm and reliable, and the use is safe; moreover, the scaffold operation platform can be used in a integrated lifting and circulated manner layer by layer through a tower crane according to the construction speed, reserved holes and repeated assembly do not required; and accordingly, the labor and the materials are saved, the construction period and construction cost are reduced, and the potential safety hazard because the traditional scaffold is set up very high is avoided.

Description

A kind of elevator hoistways lift-type steel pipe feet hand operation platform
Technical field
The present invention relates to a kind of operating platform, particularly a kind of elevator hoistways lift-type steel pipe feet hand operation platform.
Background technology
During the elevator hoistways construction of current highrise building, generally erection construction scaffold in elevator hoistways, utilizes scaffold to carry out the reinforcement installation of elevator hoistways and formwork erection is constructed.Time higher for building height, need to adopt steel pipe feet hand to add shaped steel and unload the mode set up, scaffold is successively set up, efficiency of construction is low, need to use a large amount of scaffolding steel pipe, scaffolding steel pipe turn around time is longer, rents that cost high, be unfavorable for construction cost saving, there is potential safety hazard in scaffold excessive height simultaneously.
Summary of the invention
The object of the invention is to overcome above-mentioned defect, provide a kind of structure simple, firm, it is convenient to set up, and construction cost is low, the elevator hoistways lift-type steel pipe feet hand operation platform that security performance is high.
In order to achieve the above object, the technical solution used in the present invention is: a kind of elevator hoistways lift-type steel pipe feet hand operation platform, it is characterized in that: comprise at least two and be obliquely installed the main steel pipe in elevator hoistways, main steel pipe lower end leans on elevator hoistways one side hall ground, main steel pipe upper end leans on elevator hoistways opposite side inwall, the main steel pipe of every root is all vertically connected with at least two perpendicular steel pipes, perpendicular steel pipe top level connection joint corresponding between two on adjacent main steel pipe has horizontal steel pipe, vertical completely paving scaffold floor platform on all horizontal steel pipes.
Further, adjacent main fastener for connection erects the junction of steel pipe through strengthening fastener for connection.
Further, described two erect bottom steel pipes through strengthening fastener for connection.
Further, bottom corresponding between two on adjacent main steel pipe perpendicular steel pipe with reinforcement fastener for connection place through strengthening fastener for connection.
Further, adjacent main steel pipe and inwall intersection, side, elevator hoistways entrance hall are provided with a reinforcement steel pipe, and the two ends strengthening steel pipe connect adjacent main steel pipe, and the two ends strengthening steel pipe exceed door opening both sides, elevator hoistways entrance hall 0.3m.
Again further, described main steel pipe and ground, entrance hall angle are not less than 60 °.
Structure of the present invention is simple, it is convenient to assemble, connection between steel pipe and platform, braced structures are equipped with reinforcement steel pipe, and it is firm to connect, use safety, and tower crane can be utilized successively to propose circulation use on the whole according to speed of application, without the need to reserving hole, assembling need not be repeated, use manpower and material resources sparingly, reduce construction period and construction cost, avoid the too high potential safety hazard brought of traditional scaffold building.
Accompanying drawing explanation
Accompanying drawing 1 is structural representation of the present invention.
In figure: main steel pipe 1, scaffold floor platform 2, perpendicular steel pipe 3, horizontal steel pipe 4, steel pipe 5 is strengthened at middle part, and steel pipe 6 is strengthened in bottom, entrance hall 7, elevator hoistways 8, Heave Here 9.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described.
Shown in Fig. 1, a kind of elevator hoistways lift-type steel pipe feet hand operation platform comprises two perpendicular steel pipes of main 2, four, steel pipe 1, scaffold floor platform, 3, two horizontal steel pipes 4, three middle part and strengthens steel pipe 5 and four bottoms reinforcement steel pipes 6.Two main steel pipes 1 are set in parallel in elevator hoistways 8 in inclination 60 degree, and the bottom of the main steel pipe 1 of every root leans in the inwall entrance hall 6 of the side of elevator hoistways 8 on ground, and the top of the main steel pipe 1 of every root leans on the inwall of elevator shaft 7 opposite side; Be connected and fixed through horizontal steel pipe 4 between the top main steel pipe of every root 1 being all vertically fixedly connected with the perpendicular steel pipe 3 that position is corresponding on two perpendicular steel pipes, 3, two main steel pipes 1, two horizontal steel pipes 4 completely spread scaffold floor platform 2; Strengthen steel pipe 5 through middle part between the main steel pipe 1 that on two main steel pipes 1, position is corresponding and perpendicular steel pipe 3 junction to be connected and fixed, the main steel pipe 1 that two main steel pipe 1 positions are corresponding and inwall intersection, side, elevator hoistways 8 entrance hall are strengthened steel pipe 5 and are connected and fixed through middle part, middle part is strengthened steel pipe 5 and exceeded two ends connection 0.3m; On the main steel pipe 1 of every root two perpendicular steel pipes 3 bottom between strengthen steel pipe 6 through bottom and be connected and fixed, strengthen steel pipe 6 through bottom between the main steel pipe 1 that on two main steel pipes 1, position is corresponding and perpendicular steel pipe 3 junction and be connected and fixed.
After layer construction, this operating platform is promoted to lower one deck, at its scaffold floor Platform center, Heave Here 8 is set away from the borehole wall side in entrance hall, this operating platform is tilted to sling, the horizontal width controlling the operating platform tilted is less than elevator shaft mouth width, and operating platform being promoted to lower one deck needs the elevator hoistways of construction to support.

Claims (2)

1. an elevator hoistways lift-type steel pipe feet hand operation platform, it is characterized in that: comprise at least two and be obliquely installed the main steel pipe in elevator hoistways, main steel pipe lower end leans on elevator hoistways one side hall ground, main steel pipe upper end leans on elevator hoistways opposite side inwall, the main steel pipe of every root is all vertically connected with at least two perpendicular steel pipes, perpendicular steel pipe top level connection joint corresponding between two on adjacent main steel pipe has horizontal steel pipe, the horizontal steel pipe being connected horizontally on perpendicular steel pipe top corresponding is between two arranged between two perpendicular steel pipe top, vertical completely paving scaffold floor platform on all horizontal steel pipes, fastener for connection is strengthened through two bottoms bottom described two perpendicular steel pipes, strengthen fastener for connection place with two bottoms bottom perpendicular steel pipe corresponding between two on adjacent main steel pipe and strengthen fastener for connection through other two bottoms, between described other two bottoms reinforcement steel pipe is arranged on bottom two perpendicular steel pipes, at its scaffold floor Platform center, Heave Here is set away from the borehole wall side in entrance hall, fastener for connection is strengthened through middle part in the junction that adjacent main fastener for connection erects steel pipe, and described middle part is strengthened steel pipe and is positioned at the top of main steel pipe and the left side of perpendicular steel pipe, adjacent main steel pipe and inwall intersection, side, elevator hoistways entrance hall are provided with in the middle part of another strengthens steel pipe, and the two ends strengthening steel pipe in the middle part of this another connect adjacent main steel pipe, and the two ends strengthening steel pipe in the middle part of this another exceed door opening both sides, elevator hoistways entrance hall 0.3m.
2. a kind of elevator hoistways lift-type steel pipe feet hand operation platform according to claim 1, is characterized in that: described main steel pipe and ground, entrance hall angle are not less than 60 °.
CN201210493771.XA 2012-11-28 2012-11-28 Lifting type steel pipe scaffold operation platform for elevator hoistway Active CN103015694B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210493771.XA CN103015694B (en) 2012-11-28 2012-11-28 Lifting type steel pipe scaffold operation platform for elevator hoistway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210493771.XA CN103015694B (en) 2012-11-28 2012-11-28 Lifting type steel pipe scaffold operation platform for elevator hoistway

Publications (2)

Publication Number Publication Date
CN103015694A CN103015694A (en) 2013-04-03
CN103015694B true CN103015694B (en) 2015-07-01

Family

ID=47964751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210493771.XA Active CN103015694B (en) 2012-11-28 2012-11-28 Lifting type steel pipe scaffold operation platform for elevator hoistway

Country Status (1)

Country Link
CN (1) CN103015694B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441090B (en) * 2018-12-28 2023-09-22 重庆建工住宅建设有限公司 Integral lifting elevator shaft construction platform

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201756788U (en) * 2010-04-09 2011-03-09 锦宸集团有限公司 Internally arranged construction bench moving according to floors of elevator shaft under construction
CN102777030A (en) * 2012-08-06 2012-11-14 中国建筑第六工程局有限公司 Method for building up formwork construction platform of lift shaft
CN203008346U (en) * 2012-11-28 2013-06-19 泰兴市第一建筑安装工程有限公司 Lifting type steel tube scaffold operation platform for elevator hoistway

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201756788U (en) * 2010-04-09 2011-03-09 锦宸集团有限公司 Internally arranged construction bench moving according to floors of elevator shaft under construction
CN102777030A (en) * 2012-08-06 2012-11-14 中国建筑第六工程局有限公司 Method for building up formwork construction platform of lift shaft
CN203008346U (en) * 2012-11-28 2013-06-19 泰兴市第一建筑安装工程有限公司 Lifting type steel tube scaffold operation platform for elevator hoistway

Also Published As

Publication number Publication date
CN103015694A (en) 2013-04-03

Similar Documents

Publication Publication Date Title
CN102900022B (en) Cable stayed bridge leaning tower hydraulic climbing mould construction method
CN205025074U (en) Elevator well steel bracing promotes double -deck scaffold operation platform of formula
CN110606437A (en) Walking type small electric elevator suitable for transferring materials between floors by reverse construction method
CN105696788A (en) Lifting elevator liftway formwork system
CN202370234U (en) Tool type elevator hoistway construction platform
US9440820B2 (en) Escalator lifting frame and method of using the same
CN205531399U (en) Interim support frame is installed in high -order steel truss segmentation
CN202483154U (en) High bearing capacity suspending scaffold
CN103015694B (en) Lifting type steel pipe scaffold operation platform for elevator hoistway
CN107687251A (en) A kind of hoistway operation platform and building method
CN203783105U (en) Fast construction operating platform used for section steel column interior pouring concrete
CN209568688U (en) A kind of elevating construction platform
CN203008346U (en) Lifting type steel tube scaffold operation platform for elevator hoistway
CN210764005U (en) Walking type small electric elevator suitable for transferring materials between floors by reverse construction method
CN203891442U (en) High-rise elevator shaft template supporting platform
CN204456813U (en) A kind of single support operation platform for elevator hoistways
CN111622347A (en) Cross-shaped node connecting structure of assembled frame structure and construction method thereof
CN205955165U (en) Elevator shaft operation platform
CN203320922U (en) Supporting device for forming of elevator shaft template
CN211172783U (en) Prefabricated staircase structure
CN212405472U (en) Cross node connection structure of assembled frame structure
CN204728675U (en) A kind of high rise elevator well is with layer activity operations frame
CN103993729A (en) High rise elevator shaft formwork erecting platform
CN113047594A (en) Movable climbing frame for elevator shaft and erection method thereof
CN112627543A (en) Shaft inner lifting frame for mounting steel beams of core tube elevator shaft and steel beam construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No. 87, Jinchuan Road, Taixing City, Taizhou, Jiangsu

Patentee after: Taixing Construction Group Co. Ltd.

Address before: 225400 Daqing East Road, Taixing City, Taizhou, Jiangsu Province, No. 21

Patentee before: Taixing First Construction Installation Co., Ltd.