CN204728675U - A kind of high rise elevator well is with layer activity operations frame - Google Patents
A kind of high rise elevator well is with layer activity operations frame Download PDFInfo
- Publication number
- CN204728675U CN204728675U CN201520425271.1U CN201520425271U CN204728675U CN 204728675 U CN204728675 U CN 204728675U CN 201520425271 U CN201520425271 U CN 201520425271U CN 204728675 U CN204728675 U CN 204728675U
- Authority
- CN
- China
- Prior art keywords
- iron
- long
- frame
- support bar
- operating platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000000694 effects Effects 0.000 title claims abstract description 13
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 85
- 229910052742 iron Inorganic materials 0.000 claims abstract description 39
- 239000000725 suspension Substances 0.000 claims abstract description 12
- 238000000034 method Methods 0.000 claims abstract description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 9
- 238000010276 construction Methods 0.000 claims description 9
- 239000010959 steel Substances 0.000 claims description 9
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- -1 operating platform Substances 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000009415 formwork Methods 0.000 description 2
- 230000007306 turnover Effects 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The utility model discloses a kind of high rise elevator well with layer activity operations frame, comprise lift port, long i iron, hole, operating platform, suspension ring, bracing frame, short i iron, frame pipe, support bar, described long i iron and short i iron are provided with two, described in two, described in long i iron and two, a short i iron is welded into entirety, forms brace summer, brace summer tilts to be fixed in the elevator shaft at adjacent lift port place respectively by corner cut process by long i iron two ends described in two, described long i iron is respectively arranged with side opening in long i iron end positions, described frame pipe through two side holes and long i iron fixed by snap, described in two, bracing frame is fixed respectively by buckle by frame pipe two ends, support frame as described above is fixedly connected with support bar, the operating platform with multiple suspension ring is provided with above support bar, compared with prior art, the beneficial effects of the utility model to effectively reduce financial cost, simultaneously simple to operate, use safety.
Description
Technical field
The utility model relates to a kind of building handling frame, and especially a kind of high rise elevator well is with layer activity operations frame.
Background technology
In current high-rise building elevator shaft, shear wall formwork construction operation platform generally adopts console mode steel tube fastener scaffold, exposes such as scaffold building, removes trouble, affect template construction progress, is not easy to the inspecting for acceptance of hoistway formwork installation quality, is not easy to building waste cleaning in hoistway, long-term overstocking lease many drawbacks such as equipment in a large number in practice of construction.
Conventional method method needs from the end to top, to set up scaffold in elevator shaft, after agent structure completes, scaffold in elevator shaft is removed, whole process scaffold set up with remove cumbersome, it is long that lease equipment overstocks the time, lease expenses is high, and model sheetinstallat is also cumbersome, is not easy to inspect for acceptance to the quality of model sheetinstallat.Due to narrow space in hoistway, certain difficulty can be caused to model sheetinstallat and dismounting in the position of scaffold, and workman often changes scaffold step pitch privately, causes scaffold in use to there is certain potential safety hazard.
Utility model content
The purpose of this utility model is to provide a kind of high rise elevator well with layer activity operations frame, to solve the problem proposed in above-mentioned background technology.
The purpose of this utility model is achieved by following technical proposals: a kind of high rise elevator well is with layer activity operations frame, comprise lift port, long i iron, hole, operating platform, suspension ring, bracing frame, short i iron, frame pipe, support bar, described long i iron and short i iron are provided with two, described in two, described in long i iron and two, a short i iron is welded into entirety, forms brace summer; Brace summer tilts to be fixed in the elevator shaft at adjacent lift port place respectively by corner cut process by long i iron two ends described in two, described long i iron is respectively arranged with side opening in long i iron end positions, described frame pipe through two side holes and long i iron fixed by snap, described in two, bracing frame is fixed respectively by buckle by frame pipe two ends, support frame as described above is fixedly connected with support bar, is provided with the operating platform with multiple suspension ring above support bar.
Further, described support bar is steel pipe, and it is fixing in the reserved preformed hole in 40cm place, corner that support bar two ends are inserted into construction of lift well story shear the foot of a wall portion.
Further, described preformed hole is 60mm × 60mm hole.
Further, described operating platform is equipped with template and flitch.
Further, described suspension ring are four diameters is 18mm round steel, lays respectively at both sides, operating platform every limit.
Compared with prior art, the beneficial effects of the utility model are that this novel a kind of high rise elevator well is with layer activity operations frame, without the need to setting up scaffold in elevator shaft inside from the end to top, simplify the construction technology of operating platform, save lease equipment consumption, reduce hiring cost, can directly be shelved on first step operating platform bottom template when elevator shaft inner side template is installed, embedded bar is not needed to support, on construction layer is provided with, lower two step operating platforms, be convenient to administrative staff inspect for acceptance to model sheetinstallat quality, elevator shaft inner side template can with operating platform entirety upwards hoisted in position after removing, time saving and energy saving, there is larger economic benefit and social benefit, this operating platform coordinates steel pipe shelf above simultaneously, at a form removal, tie up reinforcing bar, in the process such as concreting, the guarantee of safety convenient is provided to workman's work progress, this operating platform uses conventional material to make, simply be easy to make, turnover uses, adopt tower crane handling to construction floor, quick facility, this operating platform maximum economic benefit is that disposable input material is little, turnover uses, save steel pipe, the lease such as buckle material.
Accompanying drawing explanation
Fig. 1 is the utility model elevation;
Fig. 2 is the utility model top view;
In figure: 1, lift port, 2, No. 16 long i iron, 3, hole, 4, operating platform, 5, suspension ring, 6, bracing frame, 7, No. 16 short i iron, 8, frame pipe, 9, support bar.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment; technical scheme in the utility model embodiment is clearly and completely described; obviously; described embodiment is only the utility model part embodiment; instead of whole embodiments; based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
As Fig. 1, shown in 2, the utility model discloses a kind of high rise elevator well with layer activity operations frame, comprise lift port 1, No. 16 long i iron 2, hole 3, operating platform 4, suspension ring 5, bracing frame 6, No. 16 short i iron 7, frame pipe 8, support bar 9, described in two, No. 16 long i iron 2 and two No. 16 short i iron 7 are welded into entirety, form brace summer, described in two, corner cut process is done at No. 16 long i iron 2 two ends respectively, so that contact with two end supports place maximum area respectively, brace summer is made to tilt to be fixed in the elevator shaft at adjacent lift port 1 place, described in two, No. 16 long i iron 2 are in the hole 3 drilling through φ 50mm apart from two ends 611mm and 484mm place respectively, then the frame pipe 8 of Φ 48*3.5mm is passed two side holes 3, frame pipe 8 described in two and No. 16 long i iron 2 fixed by snap, prevent frame pipe 8 from sliding, bracing frame 6 is fixed by buckle by two frame pipe 8 two ends, support frame as described above 6 is fixedly connected with support bar 9, the operating platform 4 with multiple suspension ring 5 is provided with above its support bar 9, described support bar 9 is Φ 48*3.5 steel pipe, and support bar 9 two ends are inserted in preformed hole also fixing, further improve safety, described preformed hole is 60mm × 60mm hole that construction of lift well story shear the foot of a wall portion reserves far from 40cm place, corner, described operating platform 4 is equipped with template and wood, and constructability personnel construct, described suspension ring 5 are four φ 18 round steel, lay respectively at the position of operating platform 4 every both sides, limit difference setback 100mm, for allocating and transporting with layer with tower crane.
To those skilled in the art, obvious the utility model is not limited to the details of above-mentioned one exemplary embodiment, and when not deviating from spirit of the present utility model or essential characteristic, can realize the utility model in other specific forms.Therefore, no matter from which point, all should embodiment be regarded as exemplary, and be nonrestrictive, scope of the present utility model is limited by claims instead of above-mentioned explanation, and all changes be therefore intended in the implication of the equivalency by dropping on claim and scope are included in the utility model.Any Reference numeral in claim should be considered as the claim involved by limiting.
In addition, be to be understood that, although this manual is described according to embodiment, but not each embodiment only comprises an independently technical scheme, this narrating mode of manual is only for clarity sake, those skilled in the art should by manual integrally, and the technical scheme in each embodiment also through appropriately combined, can form other embodiments that it will be appreciated by those skilled in the art that.
Claims (5)
1. a high rise elevator well is with layer activity operations frame, comprise lift port (1), long i iron (2), hole (3), operating platform (4), suspension ring (5), bracing frame (6), short i iron (7), frame pipe (8), support bar (9), it is characterized in that: described long i iron (2) and short i iron (7) are provided with two, described in two, described in long i iron (2) and two, a short i iron (7) is welded into entirety, forms brace summer, brace summer tilts to be fixed in the elevator shaft at adjacent lift port (1) place respectively by corner cut process by long i iron (2) two ends described in two, upper close long i iron (2) end positions of described long i iron (2) is respectively arranged with side opening (3), described frame pipe (8) is fixed by snap through two side holes (3) and long i iron (2), bracing frame (6) is fixed respectively by buckle by frame pipe (8) two ends described in two, support frame as described above (6) is fixedly connected with support bar (9), support bar (9) top is provided with the operating platform (4) with multiple suspension ring (5).
2. a kind of high rise elevator well according to claim 1 is with layer activity operations frame, it is characterized in that: described support bar (9) is steel pipe, it is fixing in the reserved preformed hole in 40cm place, corner that support bar (9) two ends are inserted into construction of lift well story shear the foot of a wall portion.
3. a kind of high rise elevator well according to claim 2 is with layer activity operations frame, it is characterized in that: described preformed hole is 60mm × 60mm hole.
4. a kind of high rise elevator well according to claim 1 is with layer activity operations frame, it is characterized in that: described operating platform (4) is equipped with template and flitch.
5. a kind of high rise elevator well according to claim 1 is with layer activity operations frame, it is characterized in that: described suspension ring (5) are four diameters is 18mm round steel, lays respectively at the every both sides, limit of operating platform (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520425271.1U CN204728675U (en) | 2015-06-19 | 2015-06-19 | A kind of high rise elevator well is with layer activity operations frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520425271.1U CN204728675U (en) | 2015-06-19 | 2015-06-19 | A kind of high rise elevator well is with layer activity operations frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204728675U true CN204728675U (en) | 2015-10-28 |
Family
ID=54387036
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520425271.1U Expired - Fee Related CN204728675U (en) | 2015-06-19 | 2015-06-19 | A kind of high rise elevator well is with layer activity operations frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204728675U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853928A (en) * | 2019-01-30 | 2019-06-07 | 山西三建集团有限公司 | Set up the interior posture workbench and its erection method of elevator shear wall formwork for placing |
CN110821136A (en) * | 2019-11-27 | 2020-02-21 | 中国航天建设集团有限公司 | Instrument formula elevartor shaft operation platform |
-
2015
- 2015-06-19 CN CN201520425271.1U patent/CN204728675U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853928A (en) * | 2019-01-30 | 2019-06-07 | 山西三建集团有限公司 | Set up the interior posture workbench and its erection method of elevator shear wall formwork for placing |
CN110821136A (en) * | 2019-11-27 | 2020-02-21 | 中国航天建设集团有限公司 | Instrument formula elevartor shaft operation platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201158933Y (en) | High-rise maintaining scaffold device with extruding structure | |
CN201695681U (en) | Integral self-elevating type elevator hoistway tube mold | |
CN205025074U (en) | Elevator well steel bracing promotes double -deck scaffold operation platform of formula | |
CN203891443U (en) | Shear wall elevator shaftway assembly type operation platform | |
CN209011528U (en) | A kind of all steel attachment type raise scaffold | |
CN203499229U (en) | Operating platform for construction of elevator shaft | |
CN102635225A (en) | Equipment hoisting platform and method for super high-rise buildings | |
CN202831601U (en) | Lifting type structural construction operation platform for elevator shaft | |
CN202370234U (en) | Tool type elevator hoistway construction platform | |
CN204728675U (en) | A kind of high rise elevator well is with layer activity operations frame | |
CN204645570U (en) | One can have enough to meet the need elevator shaft protective platform | |
CN206233546U (en) | A kind of elevator hoistways workbench | |
CN202401769U (en) | Detachable concrete cloth machine for self-elevating creeping formwork system | |
CN205296799U (en) | Construction of elevator well and protection platform | |
CN104499706A (en) | Elevator well template platform and construction method thereof | |
CN203891442U (en) | High-rise elevator shaft template supporting platform | |
CN203654754U (en) | Double-layered overhanging type discharging platform | |
CN204456813U (en) | A kind of single support operation platform for elevator hoistways | |
CN204126237U (en) | A kind of elevator hoistway construction platform | |
CN204326487U (en) | A kind of novel movable lift-type hoistway operation platform | |
CN106320681A (en) | Elevator shaft standard operation platform and implementation platform | |
CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
CN205976396U (en) | Portable operation platform that indoor construction and installation used | |
CN209651673U (en) | A kind of construction elevator attaching structure of lifting platform | |
CN203320922U (en) | Supporting device for forming of elevator shaft template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151028 Termination date: 20170619 |
|
CF01 | Termination of patent right due to non-payment of annual fee |