CN201756788U - Internally arranged construction bench moving according to floors of elevator shaft under construction - Google Patents

Internally arranged construction bench moving according to floors of elevator shaft under construction Download PDF

Info

Publication number
CN201756788U
CN201756788U CN2010201570349U CN201020157034U CN201756788U CN 201756788 U CN201756788 U CN 201756788U CN 2010201570349 U CN2010201570349 U CN 2010201570349U CN 201020157034 U CN201020157034 U CN 201020157034U CN 201756788 U CN201756788 U CN 201756788U
Authority
CN
China
Prior art keywords
elevator shaft
frame
construction
main frame
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201570349U
Other languages
Chinese (zh)
Inventor
孟向惠
李焕军
彭玉明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jincheng Group Co Ltd
Original Assignee
Jincheng Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jincheng Group Co Ltd filed Critical Jincheng Group Co Ltd
Priority to CN2010201570349U priority Critical patent/CN201756788U/en
Application granted granted Critical
Publication of CN201756788U publication Critical patent/CN201756788U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses an internally arranged construction bench moving according to floors of an elevator shaft under construction, which comprises a main frame body, an inclined corrugation and a bench surface wherein the main frame body is a rectangle shaped construction frame arranged in the elevator shaft and is constituted with the same size as the elevator shaft under construction by standing rods, a lower frame and fastening pieces. The utility model introduces transverse rods connecting the inclined corrugation to respectively lock and locate the upper frame and the lower frame of the main body frame; the upper end of the inclined corrugation is lower than the upper frame of the main body frame and leans against the inner wall of the well facing the elevator shaft while the lower end is raised at the gate edge of the elevator shaft. The length of the transverse rods is wider than the elevator shaft gate and the transverse rods are clamped in the elevator shaft gate to constitute a safety mechanism for the inclined corrugation, which ensures that the main body frame does not sink down. When required being replaced, the main body frame is suspended from above, and the transverse rods conveniently detach the inclined corrugation, which makes the main body frame ascend or descend along with the elevator shaft to the construction position where the main body frame is re-installed. Simple in structure, convenient to build, and safe to use, the construction bench of the utility model is especially suitable for the construction work in small high-rise buildings or in elevator shafts of small high-rise buildings.

Description

In that to build elevator shaft built-in with layer builder's staging
Technical field
The utility model relates to a kind of building operations equipment, and specifically, the utility model relates to the built-in builder's staging of a kind of elevator shaft.
Background technology
The position that difficulty of construction is bigger in the building constructions is an elevator shaft, and particularly the elevator shaft of high-rise building makes difficulty of construction increase along with increasing of floor because of the vertical height height.The construction of lift well difficulty is mainly reflected in setting up of built-in builder's staging, and builder's staging is a supporting member, is constructor's working platform, whether rational in infrastructure it is, reliability how, all directly influences constructor's working environment, efficiency of construction, even be related to constructor's life security.Current, builder's staging is built in the stack successively in elevator shaft of main employing steel pipe and fastener in the construction work.The builder's staging that prior art is built is simple in structure, solid, reliable, and safety satisfies construction requirement.But prior art must successively superpose and build, and makes that high-rise building construction of lift well stand building amount is big, and it is many to take material, thereby increases building costs.
The utility model content
The utility model is primarily aimed at the deficiencies in the prior art, propose a kind of with steel pipe and fastener form removable installation in that to build elevator shaft built-in with layer builder's staging, this stand is with layer location and installation, supporting is reliable, stable, carrying capacity is big, and shifting function is easy.
The utility model is achieved through the following technical solutions technical goal.
In that to build elevator shaft built-in with layer builder's staging, it comprises main frame, slanting and the table top that is seated in the elevator shaft.The rectangular frame that described main frame is connected to form by vertical rod, lower frame and fastener, the main frame upper ledge plane of vertically-arranged are perpendicular to hoistway wall, and the upper ledge end face connects table top.Described slanting is tiltedly worn main frame for tilting 60 °~70 ° from bottom to top, the slanting upper end is lower than the upper ledge of main frame and leans against on the head-on interior borehole wall of elevator shaft, prop up at elevator well head door along the place bottom, and tilting side by side 4~6 slantings connect into demountable structure by horizontal cross bar.
Cross bar length is greater than the wide 300mm~500mm of elevator shaft door opening in the said structure, the cross bar that connects the slanting upper end directly leans on mutually with the vertical rod outer wall of main frame inboard, the cross bar that connects the slanting lower end comes to elevator shaft door opening inboard, and two place's cross bars constitute the locking mechanism of main frame and slanting.
The utility model compared with prior art has following good effect:
1, the detachable builder's staging of forming by main frame and slanting, simple in structure, displacement makes things convenient for, builds easily;
2, promote with layer, the building amount is few, the installation effectiveness height;
3, promote with layer, it is few to take material, and cost is low;
4, be provided with locking mechanism between main frame and the slanting, the main frame positioning support after the installation is reliable, stable, safety, and load-bearing property is good.
Description of drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is Fig. 1 vertical view.
The specific embodiment
Below with reference to the accompanying drawings and in conjunction with the embodiments, the utility model is described in further detail.
Shown in the accompanying drawing 1 in that to build elevator shaft built-in with layer builder's staging embodiment, it comprises main frame, slanting 5 and the table top 1 that is seated in the elevator shaft.Described main frame is a kind of rectangular frame member, and by treating that construction elevator well size builds, main frame upper ledge 2 planes of vertically-arranged are perpendicular to hoistway wall 8 by vertical rod 3, lower frame 6 and fastener 7, and upper ledge 2 end faces connect table top 1.During installation from top lifting main frame, slanting 5 tilting 60 ° tiltedly wear main frame from bottom to top.Slanting 5 upper ends be lower than the upper ledge 2 of main frame and lean against elevator shaft head-on on the borehole wall 8, prop up at elevator well head door along the place bottom, 4 tilting slantings 5 connect into demountable structure by horizontal cross bar 4 side by side.The cross bar 4 that connects slanting 5 upper ends is directly against the outer wall of the inboard vertical rod 3 of main frame, and cross bar 4 length that connect slanting 5 lower ends are than the wide 400mm of elevator shaft door opening, and cross bar 4 is directly against elevator shaft door opening inwall and holds the lower frame 6 of main frame.
The utility model utilizes tilting slanting 5 to support with the upper ledge 2 and lower frame 6 lockings of main frame respectively, makes the main frame installing and locating reliable, stable.Cross bar 4 length that connect slanting 5 are wideer than elevator shaft door opening, and cross bar 4 is stuck in the insurance institution that constitutes the slanting position in the elevator shaft door opening, guarantees that main frame does not sink.When needing displacement, adopt 2 lifting main frames, make main frame do to rise or fall operation, until treating the construction location installation in position along elevator shaft from top.

Claims (3)

1. one kind in that to build elevator shaft built-in with layer builder's staging, and it comprises main frame, slanting (5) and the table top (1) that is seated in the elevator shaft; It is characterized in that: the rectangular frame that described main frame is connected to form by vertical rod (3), lower frame (6) and fastener (7), main frame upper ledge (2) plane of vertically-arranged are perpendicular to hoistway wall (8), and upper ledge (2) end face connects table top (1); Described slanting (5) is tiltedly worn main frame for tilting 60 °~70 ° from bottom to top, slanting (5) upper end is lower than the upper ledge (2) of main frame and leans against on the head-on interior borehole wall (8) of elevator shaft, prop up at elevator well head door along the place bottom, and tilting side by side 4~6 slantings (5) connect into demountable structure by horizontal cross bar (4).
2. it is according to claim 1 in that to build elevator shaft built-in with layer builder's staging, it is characterized in that: the cross bar (4) that is connected with slanting (5) upper end is directly against inboard vertical rod (3) outer wall of main frame, the cross bar (4) that is connected with slanting (5) lower end is directly against elevator shaft door opening inwall, and the cross bar at this place (4) is held lower frame (6).
3. according to claim 1 in that to build elevator shaft built-in with layer builder's staging, it is characterized in that: the length of cross bar (4) is than the wide 300mm~500mm of elevator shaft door opening.
CN2010201570349U 2010-04-09 2010-04-09 Internally arranged construction bench moving according to floors of elevator shaft under construction Expired - Fee Related CN201756788U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201570349U CN201756788U (en) 2010-04-09 2010-04-09 Internally arranged construction bench moving according to floors of elevator shaft under construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201570349U CN201756788U (en) 2010-04-09 2010-04-09 Internally arranged construction bench moving according to floors of elevator shaft under construction

Publications (1)

Publication Number Publication Date
CN201756788U true CN201756788U (en) 2011-03-09

Family

ID=43644061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201570349U Expired - Fee Related CN201756788U (en) 2010-04-09 2010-04-09 Internally arranged construction bench moving according to floors of elevator shaft under construction

Country Status (1)

Country Link
CN (1) CN201756788U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015694A (en) * 2012-11-28 2013-04-03 泰兴市第一建筑安装工程有限公司 Lifting type steel pipe scaffold operation platform for elevator hoistway

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015694A (en) * 2012-11-28 2013-04-03 泰兴市第一建筑安装工程有限公司 Lifting type steel pipe scaffold operation platform for elevator hoistway
CN103015694B (en) * 2012-11-28 2015-07-01 泰兴市第一建筑安装工程有限公司 Lifting type steel pipe scaffold operation platform for elevator hoistway

Similar Documents

Publication Publication Date Title
CN201268938Y (en) Corner hanging cradle for working aloft
CN102777030A (en) Method for building up formwork construction platform of lift shaft
CN205773024U (en) A kind of convenient pipeline lifting auxiliary device
CN202577925U (en) Lifting type platform in elevator shaft
CN201756788U (en) Internally arranged construction bench moving according to floors of elevator shaft under construction
CN103075001A (en) Steel tube fastener slip form platform system
CN108946542A (en) A kind of small gun carriage and its construction method
CN202658867U (en) Overhanging construction platform
CN208732495U (en) A kind of small gun carriage
CN202023353U (en) Integral lifting scaffold for building operations
CN107338965A (en) The discharging of modularization ready-package and outer protection integrated system for assembled architecture
CN204059906U (en) Elevator hoistways Integral lifting type steel scaffold
CN209011528U (en) A kind of all steel attachment type raise scaffold
CN202990406U (en) Bowl buckle type scaffold
CN201062431Y (en) Lifting device for cantilever scaffold
CN107313597A (en) Modularization ready-package discharging platform for assembled architecture
CN208251142U (en) A kind of overhanging type Prefabricated steel construction basis of construction elevator
CN209855192U (en) Automatic lifting frame for shaped elevator shaft way
CN202672694U (en) Shaft construction circulation operating platform
CN203257073U (en) Elevator shaft operating platform
CN103291078B (en) A kind of steel girder erection equipment
CN203320922U (en) Supporting device for forming of elevator shaft template
CN202672762U (en) Truss-type security channel for building construction
CN201236477Y (en) Integral climbing scaffold for high-rise building
CN104695694A (en) Worm and gear lead screw lifting type attached scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110309

Termination date: 20160409