CN104695694A - Worm and gear lead screw lifting type attached scaffold - Google Patents

Worm and gear lead screw lifting type attached scaffold Download PDF

Info

Publication number
CN104695694A
CN104695694A CN201310653364.5A CN201310653364A CN104695694A CN 104695694 A CN104695694 A CN 104695694A CN 201310653364 A CN201310653364 A CN 201310653364A CN 104695694 A CN104695694 A CN 104695694A
Authority
CN
China
Prior art keywords
worm
steel
threaded shaft
scaffold
lead screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310653364.5A
Other languages
Chinese (zh)
Inventor
王青玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310653364.5A priority Critical patent/CN104695694A/en
Publication of CN104695694A publication Critical patent/CN104695694A/en
Pending legal-status Critical Current

Links

Landscapes

  • Types And Forms Of Lifts (AREA)
  • Movable Scaffolding (AREA)

Abstract

The invention relates to a worm and gear lead screw lifting type attached scaffold, and belongs to the field of scaffolds in building construction. The worm and gear lead screw lifting type attached scaffold comprises four parts of an upper frame, a lower frame, wall attaching machines and a worm and gear lead screw lifter, wherein the upper frame coats a rail of the lower frame; the worm and gear lead screw lifter is mounted at the upper part of the lower frame; the top end of the lead screw is fixed at the bottom of the upper frame; the wall attaching machines are respectively mounted on the upper frame and the lower frame, and are connected with a building outer wall; and closed steel nets or steel pipes are mounted at the outer sides, with trusses, of the two ends of the upper frame to form the scaffold. The worm and gear lead screw lifting type attached scaffold has the following advantages: the worm and gear lead screw lifter performs the ascending and the descending; the rail is arranged in the middle of the scaffold body, so that the distance from the wall can be adjusted according to the engineering condition; the ascending and the descending are separately performed, and the scaffold is jacked upwards from the bottom without generating falling; the stress fulcrum is on the N-1 floor, so that the ascending is not influenced by the concrete strength; and even if the reserved hole is slightly deviated, the wall attaching machines also can be adjusted in any direction, so that the labor intensity of workers is relieved.

Description

A kind of attaching scaffold of worm gear-worm screw-threaded shaft lifting
Technical field
The present invention relates to the attaching scaffold of a kind of worm gear-worm screw-threaded shaft lifting, belong to the scaffold field of building operations.
Background technology
In recent years along with the increase of highrise building, there is multiple attaching scaffold in construction market, and their feature is that scaffold is attached on skin, by Motor Driven Elevating Calabash, it is compared with traditional external scaffolding, and material usage is few, at the bottom of use cost, and building is more high more economical.Its shortcoming is by guide rail guide seats and wall connecting integral elevating, if jacking equipment goes wrong in lifting process, whole support body will drop, so set up catching device; With through-wall bolt, guide seats is fixed on skin, the too large normal lifting just affecting track of preformed hole deviation, must punch again; Track, outside the building between wall and scaffold support body, makes to form about 40cm gap between skin and scaffold support body; By Motor Driven Elevating Calabash, support body will be raised to N layer, the stress point of electric block just must be located at N+1 layer, if it is too fast to run into speed of application, the concrete of N+1 layer does not also have up to standard, and support body cannot raise just affects engineering construction, and present solution increases support body, support body add the weight that higher position adds support body, too increase the load of the jacking equipments such as electric block.Above situation adds the danger coefficient in construction, constructor and property is caused to greatly threatening and affecting.
Summary of the invention
The technical problem to be solved in the present invention, there are provided the attaching scaffold of a kind of worm gear-worm screw-threaded shaft lifting, the whole support body tenesmus described in background technology can be solved, preformed hole deviation is too large, form about 40cm gap between skin and scaffold support body, stress point must be located at the problem of N+1 layer.
The present invention is carried out by following technical scheme, a kind of attaching scaffold of worm gear-worm screw-threaded shaft lifting, it comprises added, undercarriage, attached wall device, worm gear-worm screw-threaded shaft elevator four part, describedly addedly be sleeved on the track of undercarriage, worm gear-worm screw-threaded shaft elevator is arranged on the top of undercarriage, the top of leading screw is fixed on added bottom, added and undercarriage is all equipped with attached wall device, for being connected with skin, added two ends are installed outside truss and are installed airtight steel mesh or steel pipe formation scaffold.
Described added square steel pipe is welded, and there is pilot hole centre, is provided with directive wheel in pilot hole, for coordinating with the track of undercarriage, bottom connects in leading screw, and two ends are installed outside truss and installed airtight steel mesh or steel pipe, and inner side is equipped with attached wall device and is connected with skin.
Described undercarriage is also welded with square steel pipe, and both sides are provided with track, and top is provided with worm gear-worm screw-threaded shaft elevator, and inner side is also equipped with attached wall device and is connected with skin, and two ends and outside are provided with airtight steel mesh.
Described worm gear-worm screw-threaded shaft elevator is made up of worm and gear and leading screw, and during work, leading screw does up and down vertically movement.
Described attached wall device is rectangle steel framework, is welded with square steel.Two leading screws are vertically welded with in rectangle steel framework, leading screw is 10cm to the distance of frame, on leading screw, cover has thick walled steel tube, the long 5cm of steel pipe, big nut is had above steel pipe, between two steel pipes, horizontal welding is connected to round steel, on round steel, also cover has thick walled steel tube, the long 15cm of steel pipe, is welded with the steel plate of 15 × 15cm below steel pipe, thickness of slab 1cm, there is Φ 33 circular hole steel plate center, such round steel can move up and down by the adjustment of big nut, and steel plate can move left and right again on round steel, facilitates docking of Φ 33 circular hole and body of wall preformed hole.Attached wall device is connected by through-wall bolt with body of wall, is added with adjustment block between attached wall device and body of wall, is used for adjusting the distance between attached wall device and body of wall, adjustment block is the steel plate of Φ 150, thickness of slab 5cm, there is Φ 33 circular hole center, and the usage quantity of adjustment block can carry out suitable increase and decrease according to project situation.
Advantage of the present invention is: added and undercarriage is all equipped with attached wall device, is separately fixed on skin, can adjusts from wall distance according to project situation; During rising, undercarriage maintains static as fulcrum, open added attached wall device, by worm gear-worm screw-threaded shaft elevator, be raised to desired location added, fix added after, open the attached wall device of undercarriage, by worm gear-worm screw-threaded shaft elevator, undercarriage is raised to desired location, owing to being push up from bottom to top, so can not drop, and stressed fulcrum is at N-1 layer; Preformed hole is deviation slightly, and attached wall device also can carry out adjustment up and down, alleviates the labour intensity of workman.
Accompanying drawing explanation
Fig. 1: a kind of attaching scaffold combination perspective view of worm gear-worm screw-threaded shaft lifting.
Fig. 2: a kind of attaching scaffold combination of worm gear-worm screw-threaded shaft lifting has steel mesh perspective view.
Fig. 3: the perspective view of undercarriage.
Fig. 4: added perspective view.
Fig. 5: the perspective view of attached wall device.
Fig. 6: the perspective view of worm gear-worm screw-threaded shaft elevator.
Fig. 7: the perspective view that worm gear-worm screw-threaded shaft elevator is uncapped.
Detailed description of the invention
As shown in Figure 1, it comprises added (1), undercarriage (2), attached wall device (3), worm gear-worm screw-threaded shaft elevator (4) four part, added (1) is sleeved on the track of undercarriage (2), worm gear-worm screw-threaded shaft elevator (4) is arranged on the top of undercarriage (2), the top of leading screw is fixed on the bottom of added (1), added (1) and undercarriage (2) are all equipped with attached wall device (3), for being connected with skin, the two ends of added (1) are installed outside truss and are installed airtight steel mesh or steel pipe formation scaffold.During rising, undercarriage (2) maintains static as fulcrum, open the attached wall device (3) of added (1), by worm gear-worm screw-threaded shaft elevator (4), added (1) is raised to desired location, after fixing added (1), open the attached wall device of undercarriage (2), by worm gear-worm screw-threaded shaft elevator (4), undercarriage (2) is raised to desired location, and during decline, order is contrary.

Claims (5)

1. the attaching scaffold of a worm gear-worm screw-threaded shaft lifting, it is primarily of added (1), undercarriage (2), attached wall device (3), worm gear-worm screw-threaded shaft elevator (4) four part forms, it is characterized in that: added (1) is sleeved on the track of undercarriage (2), worm gear-worm screw-threaded shaft elevator (4) is arranged on the top of undercarriage (2), the top of leading screw is fixed on the bottom of added (1), added (1) and undercarriage (2) are all equipped with attached wall device (3), for being connected with skin, the two ends of added (1) are installed outside truss and are installed airtight steel mesh or steel pipe formation scaffold.
2. the attaching scaffold of a kind of worm gear-worm screw-threaded shaft lifting according to claim 1, it is characterized in that: added (1) is welded with square steel pipe, there is pilot hole centre, in pilot hole, directive wheel is installed, for coordinating with the track of undercarriage (2), bottom connects in leading screw, and two ends are installed outside truss and installed airtight steel mesh or steel pipe, and inner side is equipped with attached wall device (3) and is connected with skin.
3. the attaching scaffold of a kind of worm gear-worm screw-threaded shaft lifting according to claim 1, it is characterized in that: undercarriage (2) is also welded with square steel pipe, both sides are provided with track, top is provided with worm gear-worm screw-threaded shaft elevator (4), inner side is also equipped with attached wall device (3) and is connected with skin, and two ends and outside are provided with airtight steel mesh.
4. the attaching scaffold of a kind of worm gear-worm screw-threaded shaft lifting according to claim 1, is characterized in that: worm gear-worm screw-threaded shaft elevator (4) is made up of worm and gear and leading screw, and during work, leading screw does up and down vertically movement.
5. the attaching scaffold of a kind of worm gear-worm screw-threaded shaft lifting according to claim 1, is characterized in that: attached wall device is rectangle steel framework, is welded with square steel.Two leading screws are vertically welded with in rectangle steel framework, leading screw is 10cm to the distance of frame, on leading screw, cover has thick walled steel tube, the long 5cm of steel pipe, big nut is had above steel pipe, between two steel pipes, horizontal welding is connected to round steel, on round steel, also cover has thick walled steel tube, the long 15cm of steel pipe, is welded with the steel plate of 15 × 15cm below steel pipe, thickness of slab 1cm, there is Φ 33 circular hole steel plate center, such round steel can move up and down by the adjustment of big nut, and steel plate can move left and right again on round steel, facilitates docking of Φ 33 circular hole and body of wall preformed hole.
CN201310653364.5A 2013-12-09 2013-12-09 Worm and gear lead screw lifting type attached scaffold Pending CN104695694A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310653364.5A CN104695694A (en) 2013-12-09 2013-12-09 Worm and gear lead screw lifting type attached scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310653364.5A CN104695694A (en) 2013-12-09 2013-12-09 Worm and gear lead screw lifting type attached scaffold

Publications (1)

Publication Number Publication Date
CN104695694A true CN104695694A (en) 2015-06-10

Family

ID=53343205

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310653364.5A Pending CN104695694A (en) 2013-12-09 2013-12-09 Worm and gear lead screw lifting type attached scaffold

Country Status (1)

Country Link
CN (1) CN104695694A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703293A (en) * 2017-02-22 2017-05-24 常熟建工建设集团有限公司 Safe and quick construction method for pouring cylinder body concrete
CN111764637A (en) * 2020-07-30 2020-10-13 浙江维安建筑支护科技有限公司 An intelligent unlocking scaffold

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001020537A (en) * 1999-07-07 2001-01-23 Takenaka Komuten Co Ltd Tower support equipment for lifting equipment
CN2418187Y (en) * 2000-01-24 2001-02-07 姚康华 Attaching lifting-scaffold
US20060131107A1 (en) * 2004-12-17 2006-06-22 Structure D'acier Orleans Inc. Suspended cable scaffold assembly
CN102561672A (en) * 2012-01-06 2012-07-11 西安理工大学 Attached scaffold mechanism for high-rise building
CN203701552U (en) * 2013-12-09 2014-07-09 王青玲 Attached scaffold for lifted through worm, gear and screw rod

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001020537A (en) * 1999-07-07 2001-01-23 Takenaka Komuten Co Ltd Tower support equipment for lifting equipment
CN2418187Y (en) * 2000-01-24 2001-02-07 姚康华 Attaching lifting-scaffold
US20060131107A1 (en) * 2004-12-17 2006-06-22 Structure D'acier Orleans Inc. Suspended cable scaffold assembly
CN102561672A (en) * 2012-01-06 2012-07-11 西安理工大学 Attached scaffold mechanism for high-rise building
CN203701552U (en) * 2013-12-09 2014-07-09 王青玲 Attached scaffold for lifted through worm, gear and screw rod

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703293A (en) * 2017-02-22 2017-05-24 常熟建工建设集团有限公司 Safe and quick construction method for pouring cylinder body concrete
CN111764637A (en) * 2020-07-30 2020-10-13 浙江维安建筑支护科技有限公司 An intelligent unlocking scaffold

Similar Documents

Publication Publication Date Title
CN201679222U (en) Double mast climbing work platform
CN205296803U (en) Elevator automatic lifting operation panel
WO2020052291A1 (en) Construction elevator wall-attaching frame mounting platform attached to steel platform formwork and method therefor
CN201417657Y (en) Installation device of indoor transformer
CN104929353A (en) Detachable stepwise automatic climbing operating platform for elevator shafts
CN110565937A (en) Door type integral lifting steel platform
CN214995818U (en) Climbing type construction operation platform outside building
CN103193137A (en) Full-automatic overhead lifting machine and application method thereof
CN104291222B (en) The inner hard protection of a kind of high-rise building Core Walls Structure hangs integrated system with row
CN103967263B (en) Hydraulic automatic jumping discharging platform
CN205773024U (en) Convenient pipeline promotes auxiliary device
CN205777531U (en) Floor slab construction beam string shuttering supporting equipment
CN203143872U (en) Mobile platform for elevator installation construction
CN106121253B (en) Installation component adjustable auxiliary installation device and method
CN204752026U (en) Tower crane escape way
CN103112766A (en) Construction elevator suspending over basement roof of building and construction method thereof
CN104695694A (en) Worm and gear lead screw lifting type attached scaffold
CN202441045U (en) Rail-type electric attached lifting scaffold
CN203701552U (en) Attached scaffold for lifted through worm, gear and screw rod
CN204917759U (en) High floor tower crane attaches wall structure
CN202689498U (en) Liftable scaffold for simple and easy building outer wall
CN217461450U (en) Electric formwork climbing frame
CN204402001U (en) For the mobile operating platform system that structure for steel structure roof inner slab is installed
CN203846841U (en) Power transmission line iron tower and rest platform thereof
CN109372242A (en) A kind of construction of lift well security improvement stage apparatus and application method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150610

WD01 Invention patent application deemed withdrawn after publication