CN106006301B - A kind of Super High construction elevator high-altitude conversion servicing unit and construction method - Google Patents
A kind of Super High construction elevator high-altitude conversion servicing unit and construction method Download PDFInfo
- Publication number
- CN106006301B CN106006301B CN201610598274.4A CN201610598274A CN106006301B CN 106006301 B CN106006301 B CN 106006301B CN 201610598274 A CN201610598274 A CN 201610598274A CN 106006301 B CN106006301 B CN 106006301B
- Authority
- CN
- China
- Prior art keywords
- construction
- elevator
- fixed
- altitude
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B9/00—Kinds or types of lifts in, or associated with, buildings or other structures
Landscapes
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Structural Engineering (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
本发明公开一种超高层施工电梯高空转换辅助装置及施工方法,其装置包括特殊标准节、转换基础钢梁以及附加基础层,其中,转换基础钢梁包括转接梁、转接梁支撑、固定梁、固定梁支撑;特殊标准节安装在待高空转换施工楼层的电梯标准节所处的位置,附加基础层设置在待高空转换施工楼层下一层;特殊标准节一端与转接梁连接,其另一端与固定梁连接。本发明提供的超高层施工电梯高空转换辅助装置,其结构合理,稳定可靠;本发明提供的施工方法,安全高效,工程施工方可将电梯井道分段移交给电梯施工方,提前插入施工,有效保证正式电梯竣工的节点,同时高空转换后的施工电梯也能有效的满足现场施工垂直运输能力。
The invention discloses an auxiliary device for high-altitude conversion of a super high-rise construction elevator and a construction method. beams and fixed beams; the special standard section is installed at the location of the elevator standard section on the floor to be converted from high altitude, and the additional base layer is set on the next floor of the construction floor to be converted from high altitude; one end of the special standard section is connected to the transfer beam, and the other The other end is connected with the fixed beam. The high-altitude conversion auxiliary device for super high-rise construction elevators provided by the present invention has a reasonable structure, is stable and reliable; the construction method provided by the present invention is safe and efficient, and the construction party can hand over the elevator shaft to the elevator construction party in sections, and insert the construction in advance, which is effective Ensure the completion of the official elevator, and the construction elevator after the high-altitude conversion can also effectively meet the vertical transportation capacity of the on-site construction.
Description
技术领域technical field
本发明涉及超高层建筑施工技术领域,尤其涉及一种超高层施工电梯高空转换辅助装置及施工方法。The invention relates to the technical field of super high-rise building construction, in particular to a super high-rise construction elevator high-altitude conversion auxiliary device and a construction method.
背景技术Background technique
随着超高层建筑的发展,经常会出现贯穿整个建筑的穿梭电梯。由于超高层建筑自身建筑高度大,电梯井道过长,导致正式电梯施工周期过长。同时因建筑施工特点所限,布置于其他井道的施工电梯不如穿梭电梯所占井道的利用率高。从绿色建筑的角度考虑,一般施工方将正式穿梭电梯井道作为物资的主要运输通道。因此,施工现场物资运输需求与正式穿梭电梯竣工节点的满足之间存在一定矛盾。目前,超高层建筑施工现场一般采用以下措施:或提前拆除施工电梯,提高其他垂直运输设备的运力,分摊施工电梯的运输任务;或在施工电梯拆除后,集中资源优先施工正式穿梭电梯,确保正式穿梭电梯的竣工节点。以上解决问题的措施不仅耗费大量人力、财力、物力,且存在耽误整体施工进度的风险。With the development of super high-rise buildings, there are often shuttle elevators that run through the entire building. Due to the high building height of super high-rise buildings and the long elevator shaft, the formal elevator construction period is too long. At the same time, due to the limitation of building construction characteristics, the construction elevators arranged in other shafts are not as high as the utilization rate of the shafts occupied by shuttle elevators. From the perspective of green building, the general construction party will formally shuttle the elevator shaft as the main transportation channel for materials. Therefore, there is a certain contradiction between the material transportation needs of the construction site and the satisfaction of the completion node of the formal shuttle elevator. At present, the following measures are generally adopted at the construction site of super high-rise buildings: either remove the construction elevator in advance, increase the capacity of other vertical transportation equipment, and share the transportation tasks of the construction elevator; Completion node of the shuttle elevator. The above measures to solve the problem not only consume a lot of manpower, financial and material resources, but also have the risk of delaying the overall construction progress.
发明内容Contents of the invention
本发明的目的是针对上述技术问题,提供一种结构合理、性能可靠的超高层施工电梯高空转换辅助装置,有效解决超高层施工现场垂直运输需求与正式穿梭电梯竣工节点之间的矛盾,节约能源,降低施工成本。本发明提供的施工方法,安全高效,工程施工方可将电梯井道分段移交给电梯施工方,提前插入施工,有效保证正式电梯竣工的节点,同时高空转换后的施工电梯也能有效的满足现场施工垂直运输能力。The purpose of the present invention is to address the above technical problems, to provide a high-altitude transfer auxiliary device for super high-rise construction elevators with reasonable structure and reliable performance, which can effectively solve the contradiction between the vertical transportation requirements of super high-rise construction sites and the completion nodes of official shuttle elevators, and save energy , reduce construction costs. The construction method provided by the invention is safe and efficient. The construction party can hand over the elevator shaft to the elevator construction party in sections, and insert the construction in advance to effectively ensure the completion of the formal elevator. At the same time, the construction elevator after high-altitude conversion can also effectively meet the requirements of the site. Construction vertical transport capacity.
本发明的技术方案:Technical scheme of the present invention:
为解决上述技术问题,本发明提供一种超高层施工电梯高空转换辅助装置,该辅助装置包括特殊标准节、转换基础钢梁以及附加基础层,其中,转换基础钢梁包括转接梁、转接梁支撑、固定梁、固定梁支撑;特殊标准节安装在待高空转换施工楼层的电梯标准节所处的位置,附加基础层设置在待高空转换施工楼层下一层;特殊标准节一端与转接梁连接,其另一端与固定梁连接;转接梁的底部固定在核心筒楼板上,转接梁靠近特殊标准节的底部通过转接梁支撑固定在核心筒楼板的侧壁上;固定梁固定在电梯井的侧壁上,固定梁靠近特殊标准节的底部通过固定梁支撑固定在电梯井的侧壁上;附加基础层与转换基础钢梁之间预留一定数量的电梯标准节。In order to solve the above technical problems, the present invention provides an auxiliary device for high-altitude conversion of super high-rise construction elevators. Beam support, fixed beam, fixed beam support; the special standard section is installed at the position where the elevator standard section of the construction floor to be converted from high altitude is located, and the additional base layer is set on the next floor of the construction floor to be converted from high altitude; one end of the special standard section is connected to the transfer Beam connection, the other end of which is connected with the fixed beam; the bottom of the transfer beam is fixed on the core tube floor, and the bottom of the transfer beam close to the special standard section is fixed on the side wall of the core tube floor through the transfer beam support; the fixed beam is fixed On the side wall of the elevator shaft, the bottom of the fixed beam close to the special standard section is fixed on the side wall of the elevator shaft through the support of the fixed beam; a certain number of elevator standard sections are reserved between the additional foundation layer and the conversion foundation steel beam.
进一步地,所述的特殊标准节包括横向工字钢、竖向工字钢、折弯槽钢、齿条、筋板、固定板以及电梯标准节;其中,横向工字钢、竖向工字钢、折弯槽钢焊接在电梯标准节的左右两侧,齿条焊接在电梯标准节的前后两侧,筋板焊接在横向工字钢和竖向工字钢之间,固定板焊接在竖向工字钢的侧面。Further, the special standard sections include horizontal I-beams, vertical I-beams, bent channel steels, racks, ribs, fixing plates and elevator standard sections; Steel and bent channel steel are welded on the left and right sides of the elevator standard section, the rack is welded on the front and rear sides of the elevator standard section, the rib plate is welded between the horizontal I-beam and the vertical I-beam, and the fixing plate is welded on the vertical I-beam. To the side of the I-beam.
进一步地,所述的转接梁包括转接钢梁组件、竖向槽钢以及转接梁连接板;竖向槽钢焊接在一对转接钢梁组件之间,转接梁连接板焊接在转接钢梁组件的侧面。Further, the transfer beam includes a transfer beam assembly, a vertical channel steel and a transfer beam connecting plate; the vertical channel steel is welded between a pair of transfer steel beam assemblies, and the transfer beam connecting plate is welded on Transfer the sides of the steel beam assembly.
进一步地,所述的固定梁包括固定钢梁组件、竖向槽钢以及固定梁连接板;竖向槽钢焊接在一对固定钢梁组件之间,固定梁连接板焊接在固定钢梁组件的侧面。Further, the fixed beam includes a fixed steel beam component, a vertical channel steel and a fixed beam connecting plate; the vertical channel steel is welded between a pair of fixed steel beam components, and the fixed beam connecting plate is welded on the fixed steel beam component side.
进一步地,所述的附加基础层一端固定在电梯井侧壁上的预埋件上,其另一端固定在待高空转换层下一层核心筒楼板的预埋件上;附加基础层主要由两根H型钢梁组成。Further, one end of the additional base layer is fixed on the embedded part on the side wall of the elevator shaft, and the other end is fixed on the embedded part of the core tube floor of the next layer of the high-altitude transfer layer; the additional base layer is mainly composed of two It is composed of H-shaped steel beams.
采用上述超高层施工电梯高空转换辅助装置的进行施工电梯高空转换的施工方法,包括以下步骤:The construction method for the high-altitude conversion of the construction elevator using the above-mentioned super-high-rise construction elevator high-altitude conversion auxiliary device comprises the following steps:
S1:特殊标准节安装在待高空转换施工楼层的电梯标准节所处的位置;S1: The special standard section is installed at the position where the elevator standard section of the construction floor to be converted from high altitude is located;
S2:当核心筒楼板施工超过待高空转换施工楼层时,开始转换基础钢梁施工,将转接梁的底部固定在待高空转换施工楼层上的预埋件上;将固定梁固定在电梯井的侧壁上的预埋件上;S2: When the construction of the core tube floor slab exceeds the construction floor to be converted from high altitude, start the conversion of the foundation steel beam construction, fix the bottom of the transfer beam to the embedded parts on the construction floor to be converted from high altitude; fix the fixed beam to the elevator shaft On the embedded parts on the side wall;
S3:将特殊标准节两侧的固定板分别与转接梁连接板及固定梁连接板使用螺栓固定;并将施工电梯吊笼调运至待高空转换施工楼层以上,并在待高空转换施工楼层设置下限位;S3: Fix the fixed plates on both sides of the special standard section with the connecting plate of the transfer beam and the connecting plate of the fixed beam respectively with bolts; transfer the construction elevator cage above the construction floor to be converted from high-altitude, and set it on the construction floor to be converted from high-altitude Lower limit;
S4:按照核心筒井道方案在转换基础钢梁楼层搭设防护;S4: Set up protection on the steel beam floor of the conversion foundation according to the core shaft shaft scheme;
S5:在待高空转换施工楼层的下一层搭设附加基础层,并在同层的对面井道搭设防护;S5: Set up an additional base layer on the next floor of the construction floor to be converted from height to altitude, and set up protection on the opposite shaft of the same floor;
S6:截断附加基础层以下的电梯标准节,载荷全部卸载至转换基础钢梁上;S6: cut off the elevator standard section below the additional base layer, and unload all the loads on the converted base steel beam;
S7:使用过渡装置将与附加基础层相邻的电梯标准节下端焊接在附加基础层的上端面;过渡装置包括弧形板、连接管,弧形板将电梯标准节的支撑柱的下端包裹,连接管焊接在弧形板与附加基础层之间。S7: Use the transition device to weld the lower end of the elevator standard section adjacent to the additional base layer to the upper end surface of the additional base layer; the transition device includes an arc-shaped plate and a connecting pipe, and the arc-shaped plate wraps the lower end of the support column of the elevator standard section, The connecting pipe is welded between the curved plate and the additional base layer.
S8:检查验收高空转换施工情况,恢复高空转换施工楼层以上的施工电梯的运行;拆卸附加基础层以下的电梯标准节,并在附加基础层的下一层搭设防护层,并移交电梯施工方施工。S8: Check and accept the construction situation of the high-altitude conversion, resume the operation of the construction elevator above the construction floor of the high-altitude conversion; dismantle the elevator standard section below the additional base layer, and erect a protective layer on the layer below the additional base layer, and hand it over to the elevator construction party for construction .
本发明有益效果:Beneficial effects of the present invention:
本发明提供的一种超高层施工电梯高空转换辅助装置,其结构合理、性能可靠,有效解决超高层施工现场垂直运输需求与正式穿梭电梯竣工节点之间的矛盾,节约能源,降低施工成本。本发明提供的施工方法,安全高效,工程施工方可将电梯井道分段移交给电梯施工方,提前插入施工,有效保证正式电梯竣工的节点,同时高空转换后的施工电梯也能有效的满足现场施工垂直运输能力。The invention provides a super-high-rise construction elevator high-altitude conversion auxiliary device, which has a reasonable structure and reliable performance, effectively solves the contradiction between the vertical transportation demand of the super-high-rise construction site and the formal completion node of the shuttle elevator, saves energy, and reduces construction costs. The construction method provided by the invention is safe and efficient. The construction party can hand over the elevator shaft to the elevator construction party in sections, and insert the construction in advance to effectively ensure the completion of the formal elevator. At the same time, the construction elevator after high-altitude conversion can also effectively meet the requirements of the site Construction vertical transport capacity.
附图说明Description of drawings
图1是本发明结构示意图;Fig. 1 is a structural representation of the present invention;
图2是本发明之特殊标准节结构示意图;Fig. 2 is the structural representation of the special standard section of the present invention;
图3是本发明之转接梁结构示意图;Fig. 3 is a structural schematic diagram of an adapter beam of the present invention;
图4是本发明之固定梁结构示意图;Fig. 4 is the structural representation of fixed beam of the present invention;
图5是本发明之附加基础层俯视图;Figure 5 is a top view of the additional base layer of the present invention;
图6是施工电梯截断时保险绳做法示意图;Fig. 6 is a schematic diagram of the way of safety rope when the construction elevator is cut off;
图7是施工电梯截断时保险绳做法俯视图;Fig. 7 is the top view of the way of safety rope when the construction elevator is cut off;
图8是本发明之附加基础层局部放大图;Figure 8 is a partial enlarged view of the additional base layer of the present invention;
图9是电梯标准节拆除示意图。Fig. 9 is a schematic diagram of removing a standard section of an elevator.
其中:in:
1.电梯标准节,2.特殊标准节,3.转接梁,4.转接梁支撑,5.固定梁,6.固定梁支撑,7.附加基础层,8.防护层,2-1.横向工字钢,2-2.竖向工字钢,2-3.折弯槽钢,2-4.齿条,2-5.筋板,2-6.固定板,9.卡环,10.保险绳,11.固定螺栓,12.吊轮支撑板,13.防护栏杆,14.卷扬机,15.钢跳板临时通道,16.拖曳绳,17.弧形板,18.连接管。1. Elevator standard section, 2. Special standard section, 3. Transfer beam, 4. Transfer beam support, 5. Fixed beam, 6. Fixed beam support, 7. Additional base layer, 8. Protective layer, 2-1 .Horizontal I-beam, 2-2. Vertical I-beam, 2-3. Bending channel steel, 2-4. Rack, 2-5. Rib plate, 2-6. Fixed plate, 9. Snap ring , 10. Safety rope, 11. Fixing bolt, 12. Hanging wheel support plate, 13. Protective railing, 14. Hoist, 15. Steel springboard temporary channel, 16. Towing rope, 17. Arc plate, 18. Connecting pipe.
具体实施方式detailed description
下面结合具体实施例和附图对本发明的一种超高层施工电梯高空转换辅助装置及施工方法进行详细说明:A kind of super-high-rise construction elevator high-altitude conversion auxiliary device and construction method of the present invention will be described in detail below in conjunction with specific embodiments and accompanying drawings:
图1所示一种超高层施工电梯高空转换辅助装置包括特殊标准节2、转换基础钢梁以及附加基础层7,其中,转换基础钢梁包括转接梁3、转接梁支撑4、固定梁5、固定梁支撑6;特殊标准节2安装在待高空转换施工楼层的电梯标准节1所处的位置,附加基础层7设置在待高空转换施工楼层下一层;特殊标准节2一端与转接梁3连接,其另一端与固定梁5连接;转接梁3的底部固定在待高空转换施工楼层上,转接梁3靠近特殊标准节2的底部通过转接梁支撑4固定在待施工楼层侧壁;固定梁5固定在电梯井的侧壁上,固定梁5靠近特殊标准节2的底部通过固定梁支撑6固定在电梯井的侧壁上;附加基础层7与转换基础钢梁之间预留一定数量的电梯标准节1。A high-altitude conversion auxiliary device for a super high-rise construction elevator shown in Figure 1 includes a special standard section 2, a conversion base steel beam and an additional base layer 7, wherein the conversion base steel beam includes an adapter beam 3, an adapter beam support 4, and a fixed beam 5. Fixed beam support 6; the special standard section 2 is installed at the position where the elevator standard section 1 of the construction floor to be converted from high altitude is located, and the additional base layer 7 is set on the next floor of the construction floor to be converted from high altitude; one end of the special standard section 2 is connected to the elevator The connecting beam 3 is connected, the other end of which is connected with the fixed beam 5; the bottom of the transfer beam 3 is fixed on the construction floor to be converted from high altitude, and the bottom of the transfer beam 3 close to the special standard section 2 is fixed on the construction floor by the transfer beam support 4 The side wall of the floor; the fixed beam 5 is fixed on the side wall of the elevator shaft, and the bottom of the fixed beam 5 close to the special standard section 2 is fixed on the side wall of the elevator shaft through the fixed beam support 6; Reserve a certain number of elevator standard sections 1.
图2是本发明之特殊标准节结构示意图,其包括横向工字钢2-1、竖向工字钢2-2、折弯槽钢2-3、齿条2-4、筋板2-5、固定板2-6以及电梯标准节1;其中,横向工字钢2-1、竖向工字钢2-2、折弯槽钢2-3焊接在电梯标准节1的左右两侧,齿条2-4焊接在电梯标准节1的前后两侧,筋板2-5焊接在横向工字钢2-1和竖向工字钢2-2之间,固定板2-6焊接在竖向工字钢2-2的侧面。Fig. 2 is a structural schematic diagram of a special standard section of the present invention, which includes a horizontal I-beam 2-1, a vertical I-beam 2-2, a bent channel steel 2-3, a rack 2-4, and a rib plate 2-5 , fixed plate 2-6, and elevator standard section 1; wherein, horizontal I-beam 2-1, vertical I-beam 2-2, and bent channel steel 2-3 are welded on the left and right sides of elevator standard section 1, and the teeth Bar 2-4 is welded on the front and rear sides of the elevator standard section 1, the rib plate 2-5 is welded between the horizontal I-beam 2-1 and the vertical I-beam 2-2, and the fixing plate 2-6 is welded on the vertical The side of the I-beam 2-2.
图3是本发明之转接梁结构示意图,其包括转接钢梁组件3-1、竖向槽钢3-2以及转接梁连接板3-3;竖向槽钢3-2焊接在一对转接钢梁组件3-1之间,转接梁连接板3-3焊接在转接钢梁组件3-1的侧面;转接钢梁组件3-1主要由H型钢梁拼焊而成。Fig. 3 is the structure schematic diagram of transfer beam of the present invention, and it comprises transfer steel beam assembly 3-1, vertical channel steel 3-2 and transfer beam connecting plate 3-3; Vertical channel steel 3-2 is welded in a Between the transfer steel beam assembly 3-1, the transfer beam connecting plate 3-3 is welded on the side of the transfer steel beam assembly 3-1; the transfer steel beam assembly 3-1 is mainly welded by H-shaped steel beam become.
图4是本发明之固定梁结构示意图,其包括固定钢梁组件5-1、竖向槽钢3-2以及固定梁连接板5-2;竖向槽钢3-2焊接在一对固定钢梁组件5-1之间,固定梁连接板5-2焊接在固定钢梁组件5-1的侧面;固定钢梁组件5-1主要由H型钢梁拼焊而成。Fig. 4 is the structural representation of fixed beam of the present invention, and it comprises fixed steel beam assembly 5-1, vertical channel steel 3-2 and fixed beam connecting plate 5-2; Vertical channel steel 3-2 is welded on a pair of fixed steel Between the beam components 5-1, the fixed beam connecting plate 5-2 is welded on the side of the fixed steel beam component 5-1; the fixed steel beam component 5-1 is mainly made of tailor-welded H-shaped steel beams.
图5是本发明之附加基础层俯视图,其一端固定在电梯井侧壁上的预埋件上,另一端固定在待高空转换层的下一层的预埋件上;附加基础层7主要由两根H型钢梁组成。Fig. 5 is the top view of the additional base layer of the present invention, one end of which is fixed on the embedded part on the side wall of the elevator shaft, and the other end is fixed on the embedded part of the next layer of the high-altitude conversion layer; the additional base layer 7 is mainly composed of It consists of two H-shaped steel beams.
采用上述超高层施工电梯高空转换辅助装置的进行施工电梯高空转换的施工方法,包括以下步骤,结合本实施例,详述具体施工步骤:The construction method for the high-altitude conversion of the construction elevator using the above-mentioned super-high-rise construction elevator high-altitude conversion auxiliary device includes the following steps. In combination with this embodiment, the specific construction steps are described in detail:
S1:特殊标准节2安装在待高空转换施工楼层LN的电梯标准节1所处的位置。S1: The special standard section 2 is installed at the position where the elevator standard section 1 of the construction floor LN to be converted from high altitude is located.
在此步骤中,特殊标准节2随升降机标准节加高,安装在待高空转换施工楼层的电梯标准节1所处的位置。In this step, the special standard section 2 is heightened along with the standard section of the elevator, and installed at the position where the standard section 1 of the elevator to be converted to the construction floor is located.
S2:当核心筒楼板施工超过待高空转换施工楼层时,开始转换基础钢梁施工,将转接梁3的底部固定在待高空转换施工楼层上的预埋件上;将固定梁5固定在电梯井的侧壁上的预埋件上;S2: When the construction of the core tube floor slab exceeds the construction floor to be converted from high altitude, start to convert the foundation steel beam construction, fix the bottom of the transfer beam 3 on the embedded parts on the construction floor to be converted from high altitude; fix the fixed beam 5 to the elevator On the embedded parts on the side wall of the well;
此步骤实施时,需选择升降机非添加电梯标准节1的适当时间。When this step is implemented, it is necessary to select the appropriate time for the elevator to be added to the standard section 1 of the elevator.
S3:将特殊标准节2两侧的固定板2-6分别与转接梁连接板3-3及固定梁连接板5-2使用螺栓固定;并将施工电梯吊笼调运至待高空转换施工楼层以上,并在待高空转换施工楼层设置下限位。S3: Fix the fixed plates 2-6 on both sides of the special standard section 2 with the connecting plate 3-3 of the transfer beam and the connecting plate 5-2 of the fixed beam respectively with bolts; transfer the construction elevator cage to the construction floor to be converted from high altitude above, and set the lower limit on the construction floor to be converted from high to low.
S4:按照核心筒井道方案在转换基础钢梁楼层搭设防护。S4: Set up protection on the steel beam floor of the conversion foundation according to the core shaft shaft scheme.
S5:在LN-1搭设附加基础层7,并在同层的对面井道搭设防护。S5: Build an additional foundation layer 7 on LN-1, and build protection on the opposite shaft of the same layer.
S6:截断LN-1以下的电梯标准节,载荷全部卸载至转换基础钢梁上。S6: Cut off the elevator standard section below LN-1, and unload all the loads on the steel beams of the conversion foundation.
在此步骤中,施工电梯标准节需使用保险绳固定,图6是施工电梯截断时保险绳做法示意图,卡环9固定在LN+3的侧壁上,一对固定螺栓11固定在电梯标准节1的对角位置,保险绳10连接卡环9与固定螺栓11,图7是施工电梯截断时保险绳做法俯视图。使用保险绳10固定施工电梯标准节,提高截断LN-1以下的电梯标准节操作的安全性。In this step, the standard section of the construction elevator needs to be fixed with a safety rope. Figure 6 is a schematic diagram of how the safety rope is used when the construction elevator is cut off. The snap ring 9 is fixed on the side wall of LN+3, and a pair of fixing bolts 11 are fixed on the standard section of the elevator. 1, the safety rope 10 connects the snap ring 9 and the fixing bolt 11, and Fig. 7 is a top view of the safety rope way when the construction elevator is cut off. Use the safety rope 10 to fix the standard section of the construction elevator, and improve the safety of the operation of the standard section of the elevator below the cut-off LN-1.
S7:使用过渡装置将与附加基础层7相邻的电梯标准节下端焊接在附加基础层7的上端面。S7: Weld the lower end of the elevator standard section adjacent to the additional base layer 7 to the upper end surface of the additional base layer 7 using a transition device.
在此步骤中,过渡装置包括弧形板17、连接管18,弧形板17将电梯标准节1的支撑柱的下端包裹,连接管18焊接在弧形板17与附加基础层7之间。图8是附加基础层局部放大图。In this step, the transition device includes an arc-shaped plate 17 and a connecting pipe 18. The arc-shaped plate 17 wraps the lower end of the support column of the elevator standard section 1, and the connecting pipe 18 is welded between the arc-shaped plate 17 and the additional base layer 7. Fig. 8 is a partially enlarged view of the additional base layer.
S8:检查验收高空转换施工情况,恢复高空转换施工楼层以上的施工电梯的运行;拆卸附加基础层7以下的电梯标准节,并在LN-2上搭设防护层8,并移交电梯施工方施工。S8: Check and accept the construction situation of the high-altitude conversion, resume the operation of the construction elevator above the construction floor of the high-altitude conversion; dismantle the elevator standard section below the additional base layer 7, and erect a protective layer 8 on LN-2, and hand over the construction to the elevator construction party.
在此步骤中,电梯标准节拆除采用卷扬机配合拆除调运的方法,图9是电梯标准节拆除示意图。卷扬机14固定在待高空转换施工楼层LN上,吊轮支撑板12固定在LN+1上;卷扬机14上的钢丝绳穿过吊轮,固定在电梯标准节1的顶部。In this step, the removal of the standard section of the elevator is carried out by means of a hoist combined with dismantling and transportation. Figure 9 is a schematic diagram of the removal of the standard section of the elevator. The hoist 14 is fixed on the construction floor LN to be transformed into high altitude, and the suspension wheel support plate 12 is fixed on the LN+1;
施工人员处在LN-1上操作,首先拆除LN-1上的防护栏杆13;接着,在LN-1上设置钢跳板临时通道15;接着,在电梯标准节1上设置拖曳绳16;最后,拆除电梯标准节1之间的固定螺栓,施工人员手持拖曳绳16向内拖曳,同时,卷扬机14松绳,即可将电梯标准节拆卸至核心筒楼板内。The construction workers are operating on LN-1, first remove the protective railing 13 on LN-1; then, set up a steel springboard temporary channel 15 on LN-1; then, set the towing rope 16 on the elevator standard section 1; finally, Remove the fixing bolts between the elevator standard sections 1, and the construction personnel hold the towing rope 16 to drag inward, and at the same time, the hoist 14 loosens the rope, and the elevator standard section can be disassembled into the core tube floor.
本发明提供的一种超高层施工电梯高空转换辅助装置,其结构合理、性能可靠,有效解决超高层施工现场垂直运输需求与正式穿梭电梯竣工节点之间的矛盾,节约能源,降低施工成本。本发明提供的施工方法,安全高效,工程施工方可将电梯井道分段移交给电梯施工方,提前插入施工,有效保证正式电梯竣工的节点,同时高空转换后的施工电梯也能有效的满足现场施工垂直运输能力。The invention provides a super-high-rise construction elevator high-altitude conversion auxiliary device, which has a reasonable structure and reliable performance, effectively solves the contradiction between the vertical transportation demand of the super-high-rise construction site and the formal completion node of the shuttle elevator, saves energy, and reduces construction costs. The construction method provided by the invention is safe and efficient. The construction party can hand over the elevator shaft to the elevator construction party in sections, and insert the construction in advance to effectively ensure the completion of the formal elevator. At the same time, the construction elevator after high-altitude conversion can also effectively meet the requirements of the site. Construction vertical transport capacity.
本发明不局限于上述实施方式,任何人在本发明的启示下都可得出其他各种形式的产品,但不论在其形状或结构上作任何变化,凡是具有与本申请相同或相近似的技术方案,均落在本发明的保护范围之内。The present invention is not limited to the above-mentioned embodiment, and anyone can draw other various forms of products under the enlightenment of the present invention, but no matter make any changes in its shape or structure, all those with the same or similar features as the present application The technical solutions all fall within the protection scope of the present invention.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610598274.4A CN106006301B (en) | 2016-07-27 | 2016-07-27 | A kind of Super High construction elevator high-altitude conversion servicing unit and construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610598274.4A CN106006301B (en) | 2016-07-27 | 2016-07-27 | A kind of Super High construction elevator high-altitude conversion servicing unit and construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106006301A CN106006301A (en) | 2016-10-12 |
| CN106006301B true CN106006301B (en) | 2018-01-16 |
Family
ID=57114601
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610598274.4A Expired - Fee Related CN106006301B (en) | 2016-07-27 | 2016-07-27 | A kind of Super High construction elevator high-altitude conversion servicing unit and construction method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106006301B (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107035200A (en) * | 2017-05-10 | 2017-08-11 | 南京瑞麒凰电子科技有限公司 | One kind overarm boatswain chair method of construction and overarm hanger plate structure |
| CN111021394A (en) * | 2019-11-29 | 2020-04-17 | 上海建工七建集团有限公司 | Construction elevator high-position conversion foundation and construction method thereof |
| CN114906758B (en) * | 2022-05-17 | 2024-10-25 | 深圳市金世纪工程实业有限公司 | Conversion structure and method for construction elevator foundation |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0654571A1 (en) * | 1993-05-14 | 1995-05-24 | Mitsubishi Jukogyo Kabushiki Kaisha | Zone module construction method of steel structure construction |
| CN102777030A (en) * | 2012-08-06 | 2012-11-14 | 中国建筑第六工程局有限公司 | Method for building up formwork construction platform of lift shaft |
| CN103556843A (en) * | 2013-11-12 | 2014-02-05 | 中国建筑东北设计研究院有限公司 | Outdoor platform evacuation system for vertical transportation trunk and branch conversion of high-rise building |
| CN104563280A (en) * | 2015-01-16 | 2015-04-29 | 中建三局集团有限公司 | Construction elevator base conversion steel bearing platform and construction elevator base conversion method |
| CN105384035A (en) * | 2014-09-03 | 2016-03-09 | 通力股份公司 | Guide rail installation arrangement and method for installing guide rails |
| CN205892419U (en) * | 2016-07-27 | 2017-01-18 | 中建一局集团建设发展有限公司 | Superelevation layer construction elevator high altitude conversion auxiliary device |
-
2016
- 2016-07-27 CN CN201610598274.4A patent/CN106006301B/en not_active Expired - Fee Related
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0654571A1 (en) * | 1993-05-14 | 1995-05-24 | Mitsubishi Jukogyo Kabushiki Kaisha | Zone module construction method of steel structure construction |
| CN102777030A (en) * | 2012-08-06 | 2012-11-14 | 中国建筑第六工程局有限公司 | Method for building up formwork construction platform of lift shaft |
| CN103556843A (en) * | 2013-11-12 | 2014-02-05 | 中国建筑东北设计研究院有限公司 | Outdoor platform evacuation system for vertical transportation trunk and branch conversion of high-rise building |
| CN105384035A (en) * | 2014-09-03 | 2016-03-09 | 通力股份公司 | Guide rail installation arrangement and method for installing guide rails |
| CN104563280A (en) * | 2015-01-16 | 2015-04-29 | 中建三局集团有限公司 | Construction elevator base conversion steel bearing platform and construction elevator base conversion method |
| CN205892419U (en) * | 2016-07-27 | 2017-01-18 | 中建一局集团建设发展有限公司 | Superelevation layer construction elevator high altitude conversion auxiliary device |
Non-Patent Citations (2)
| Title |
|---|
| 施工电梯高位基础转换施工模拟;刘春明,等;《山西建筑》;20160708;105,106 * |
| 超高层建筑施工电梯空中托换平台体系的设计与应用;徐磊,等;《建筑施工》;20140630;720-722 * |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106006301A (en) | 2016-10-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106436573B (en) | Construction method of steel truss support for super high cable tower with large span upper beam corbel | |
| CN205348725U (en) | Large -span, bearing structure that encorbelments by a wide margin | |
| CN104310165A (en) | Guide rail type adhesion construction lifter and construction method thereof | |
| CN104389419A (en) | Cantilevered formwork platform installation structure and construction method | |
| CN109162437B (en) | Integral steel platform for multi-tube steel plate shear wall and its construction method | |
| CN101555680B (en) | Large-span Pi type socle beam construction process in non-rope area of cable stayed bridge | |
| CN209780193U (en) | Suspension type scaffold | |
| CN106006301B (en) | A kind of Super High construction elevator high-altitude conversion servicing unit and construction method | |
| CN207903788U (en) | A kind of steel column drum rack alternating brace type steel platform and tower crane synchronous hoisting device | |
| CN205531399U (en) | Interim support frame is installed in high -order steel truss segmentation | |
| CN107816209A (en) | The large-scale Roof Truss construction technology of installation is lifted across outer both sides | |
| CN106567542A (en) | Super high-rise double tower building steel structure corridor assembling method | |
| CN103046743B (en) | A kind of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system and construction method | |
| CN204456881U (en) | Dismantling system of large-span building bailey frame | |
| CN204282803U (en) | To encorbelment formwork structure for mounting platform | |
| CN205892419U (en) | Superelevation layer construction elevator high altitude conversion auxiliary device | |
| CN112960566B (en) | Construction method of built-in tower crane of super high-rise building | |
| CN106522542A (en) | Single-station hydraulic formwork climbing system and climbing method thereof | |
| CN212866793U (en) | Assembled construction elevator stops layer platform | |
| CN211775667U (en) | A high-altitude construction platform for transmission lines spanning towers | |
| CN202090577U (en) | Template supporting construction platform for lift wells in high-rise buildings | |
| CN216616795U (en) | Operation platform for shaft wall construction in elevator shaft | |
| CN106121252B (en) | A kind of hydraulic stepping is from climbing material transfering device and method | |
| CN103882882A (en) | Integral jacking type tower crane foundation platform structure | |
| CN109440641B (en) | Maintenance trolley for maintaining large-span truss trestle |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB03 | Change of inventor or designer information |
Inventor after: Zhou Yuqi Inventor after: Li Yanhe Inventor after: Wang Lianfeng Inventor after: Wei Jian Inventor after: Hand in Inventor after: Zhao Yue Inventor before: Zhou Yuqi Inventor before: Li Yanhe Inventor before: Wei Jian |
|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180116 |