CN102561714A - 预制墙板安装调整平台 - Google Patents

预制墙板安装调整平台 Download PDF

Info

Publication number
CN102561714A
CN102561714A CN2012100752150A CN201210075215A CN102561714A CN 102561714 A CN102561714 A CN 102561714A CN 2012100752150 A CN2012100752150 A CN 2012100752150A CN 201210075215 A CN201210075215 A CN 201210075215A CN 102561714 A CN102561714 A CN 102561714A
Authority
CN
China
Prior art keywords
hydraulic jack
prefabricated panel
prefabricated
panel
rotating shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100752150A
Other languages
English (en)
Other versions
CN102561714B (zh
Inventor
窦立军
赵庆明
王坦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changchun Institute of Applied Chemistry of CAS
Changchun Institute Technology
Original Assignee
Changchun Institute Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changchun Institute Technology filed Critical Changchun Institute Technology
Priority to CN201210075215.0A priority Critical patent/CN102561714B/zh
Publication of CN102561714A publication Critical patent/CN102561714A/zh
Application granted granted Critical
Publication of CN102561714B publication Critical patent/CN102561714B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

一种预制墙板安装调整平台,其特征在于:包括车体、旋转轴及其摇柄、液压千斤顶、螺栓杆及螺帽、止动楔、数据采集系统,液压千斤顶置于车体的凹槽内并通过旋转轴与车体连接,液压千斤顶活塞顶部设预留孔,穿过预留孔设一螺栓杆,数据采集系统与液压千斤顶连接,用于读取数据以及控制液压千斤顶活塞竖向位移。本发明通过调整相应的构件,将预制墙板在水平面内沿板厚方向、沿板长方向准确定位,以及在铅垂方向准确定位,解决吊车较难实现的预制墙板安装准确对位的问题,不仅能保证预制墙板安装的安全可靠,而且操作简单,施工安装方便,建筑成本较低,缩短了目前将预制墙板准确定位所需的时间,加快了施工进度,进而提高了综合效益。

Description

预制墙板安装调整平台
技术领域
本发明属于土木工程技术领域,具体为预制墙板安装调整平台。
背景技术
目前,在工地现场安装预制墙板时,是由吊车先将预制墙板吊至预安装位置附近,由工人手工采用推、挪等方式将预制墙板的预留孔与已安装预制墙板的预留钢筋对准位置,然后吊车再将预制墙板缓缓降至预定位置,最后将墙板临时固定,进行下一步工序。其中,在将待安装预制墙板的预留孔与已安装预制墙板的预留钢筋对位的过程中,存在以下两点问题:1、预制墙板自重较大,为保证墙板之间的连接所设置的预留钢板较多,将每一个预留孔与预留钢筋准确对位的难度较大;尤其是在进行高空安装时,更费时、费力。2、将预留孔与预留钢筋在水平面内对准位置后,吊车将预制墙板缓缓降至预定高度的精度很难控制,尤其是进行微调时,难度更大。
发明内容:
本发明所要解决的技术问题是提供一种建筑成本低、操作简单、安全可靠的平台,来解决预制墙板工地现场安装调整就位较难的问题。
为解决上述技术问题,本发明提供一种预制墙板安装调整平台,其特征在于:包括车体、旋转轴及其摇柄、液压千斤顶、螺栓杆及螺帽、止动楔、数据采集系统,液压千斤顶置于车体的凹槽内并通过旋转轴与车体连接,液压千斤顶活塞顶部设预留孔,穿过预留孔设一螺栓杆,数据采集系统与液压千斤顶连接,用于读取数据以及控制液压千斤顶活塞竖向位移。
本发明通过调整相应的构件,将预制墙板在水平面内沿板厚方向、沿板长方向准确定位,以及在铅垂方向准确定位,解决吊车较难实现的预制墙板安装准确对位的问题,不仅能保证预制墙板安装的安全可靠,而且操作简单,施工安装方便,建筑成本较低,缩短了目前将预制墙板准确定位所需的时间,加快了施工进度,进而提高了综合效益。
附图说明
图1是本发明的结构示意图。
图2是本发明安装调整预制墙板主视图。
图3是本发明安装调整预制墙板左视图。
图4是本发明安装调整预制墙板俯视图。
具体实施方式
参照图1,本发明包括车体1、螺母2、旋转轴3及其摇柄4、液压千斤顶5、螺栓杆6及其螺帽7、止动楔8、以及数据采集系统9。液压千斤顶5置于车体1的凹槽内,通过旋转轴3将液压千斤顶5与车体1连接,并由螺母2限制旋转轴3沿其轴向与车体1无相对水平与竖向位移,只沿其轴向转动;当摇动摇柄4时,由于旋转轴3与液压千斤顶5螺纹连接,带动液压千斤顶5沿车体1的凹槽滑动。液压千斤顶5的活塞顶部设预留孔,在定位预制墙板时,可将螺栓杆6穿入,并由螺帽7固定,定位并支撑预制墙板。液压千斤顶5与数据采集系统9连接,读取数据以及控制液压千斤顶5的活塞竖向位移。
参照图2、图3、图4,施工安装阶段,预制墙板吊装至指定位置后,进行下列操作:
第一步,将预制墙板沿板厚方向的定位:
在预制墙板10两侧各布置两个调整平台(此时螺栓杆6与螺帽7未安装),其中与预制墙板相对的两个调整平台的液压千斤顶5连接至一台数据采集系统9。首先将调整平台移至预制墙板两侧附近,然后通过旋转摇柄4,使液压千斤顶5沿车体1内凹槽滑动;由相对的两个车体1的液压千斤顶5的底座调整预制墙板沿板厚方向(z向)的位置,最后,预制墙板两侧的两个车体1上的液压千斤顶5的底座将预制墙板夹紧,实现预制墙板沿板厚方向(z向)定位。
第二步,将预制墙板沿板长方向的定位:
通过数据采集系统9将两侧液压千斤顶5的活塞调整至相应高度,将螺栓杆6穿过两侧液压千斤顶5的活塞预留孔及预制墙板上与之对应的预留孔,并用螺帽7固定,然后,推动车体1,将预制墙板沿板长方向(x向)定位,并用止动楔8制动车体1,防止车体1沿板长方向(x向)的移动。
第三步,将预制墙板沿板高方向的定位:
松开吊车吊钩,由数据采集系统9控制液压千斤顶5的活塞高度,将预制墙板降至指定位置,实现沿板高方向(y向)的定位,最后将预制墙板用临时支撑固定,移走调整平台,进行下一道施工工序。

Claims (1)

1.一种预制墙板安装调整平台,其特征在于:包括车体、旋转轴及其摇柄、液压千斤顶、螺栓杆及螺帽、止动楔、数据采集系统,液压千斤顶置于车体的凹槽内并通过旋转轴与车体连接,液压千斤顶活塞顶部设预留孔,穿过预留孔设一螺栓杆,数据采集系统与液压千斤顶连接,用于读取数据以及控制液压千斤顶活塞竖向位移。
CN201210075215.0A 2012-03-21 2012-03-21 预制墙板安装调整平台 Active CN102561714B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210075215.0A CN102561714B (zh) 2012-03-21 2012-03-21 预制墙板安装调整平台

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210075215.0A CN102561714B (zh) 2012-03-21 2012-03-21 预制墙板安装调整平台

Publications (2)

Publication Number Publication Date
CN102561714A true CN102561714A (zh) 2012-07-11
CN102561714B CN102561714B (zh) 2014-02-19

Family

ID=46408181

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210075215.0A Active CN102561714B (zh) 2012-03-21 2012-03-21 预制墙板安装调整平台

Country Status (1)

Country Link
CN (1) CN102561714B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104314318A (zh) * 2014-11-12 2015-01-28 山东三箭建设工程股份有限公司 一种高精度定位导向装置及其使用方法
CN107762000A (zh) * 2017-10-31 2018-03-06 中国二十二冶集团有限公司 装配式钢结构三层组合钢柱夹心保温外墙板封堵方法
CN108643594A (zh) * 2018-06-29 2018-10-12 浙江省二建钢结构有限公司 悬挑钢梁的手动式矫正装置及其施工方法
CN112095847A (zh) * 2020-09-11 2020-12-18 西安建筑科技大学 一种方便安装的联肢钢板剪力墙

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07145673A (ja) * 1993-11-22 1995-06-06 Kawasaki Heavy Ind Ltd 地下式貯槽における屋根コーナー部へのプレート据付装置
CN2663585Y (zh) * 2003-10-31 2004-12-15 润弘精密工程事业股份有限公司 调整预铸楼板高度的辅助支撑组件
CN2692266Y (zh) * 2003-12-24 2005-04-13 贺绍瑜 一种新型建材空心墙条板隔墙专用安装机
US20100281818A1 (en) * 2009-05-07 2010-11-11 Southworth George L Method for building wind turbine tower
CN102203361A (zh) * 2008-10-23 2011-09-28 奥贝里克斯控股有限公司 一种混凝土构件的提升装置和方法
CN102235094A (zh) * 2010-04-22 2011-11-09 上海市第七建筑有限公司 预制构件位置精调施工方法
CN202081659U (zh) * 2011-05-26 2011-12-21 余宜盛 砌墙机的安平支架
CN202520000U (zh) * 2012-03-21 2012-11-07 长春工程学院 预制墙板安装调整平台

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07145673A (ja) * 1993-11-22 1995-06-06 Kawasaki Heavy Ind Ltd 地下式貯槽における屋根コーナー部へのプレート据付装置
CN2663585Y (zh) * 2003-10-31 2004-12-15 润弘精密工程事业股份有限公司 调整预铸楼板高度的辅助支撑组件
CN2692266Y (zh) * 2003-12-24 2005-04-13 贺绍瑜 一种新型建材空心墙条板隔墙专用安装机
CN102203361A (zh) * 2008-10-23 2011-09-28 奥贝里克斯控股有限公司 一种混凝土构件的提升装置和方法
US20100281818A1 (en) * 2009-05-07 2010-11-11 Southworth George L Method for building wind turbine tower
CN102235094A (zh) * 2010-04-22 2011-11-09 上海市第七建筑有限公司 预制构件位置精调施工方法
CN202081659U (zh) * 2011-05-26 2011-12-21 余宜盛 砌墙机的安平支架
CN202520000U (zh) * 2012-03-21 2012-11-07 长春工程学院 预制墙板安装调整平台

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104314318A (zh) * 2014-11-12 2015-01-28 山东三箭建设工程股份有限公司 一种高精度定位导向装置及其使用方法
CN107762000A (zh) * 2017-10-31 2018-03-06 中国二十二冶集团有限公司 装配式钢结构三层组合钢柱夹心保温外墙板封堵方法
CN108643594A (zh) * 2018-06-29 2018-10-12 浙江省二建钢结构有限公司 悬挑钢梁的手动式矫正装置及其施工方法
CN112095847A (zh) * 2020-09-11 2020-12-18 西安建筑科技大学 一种方便安装的联肢钢板剪力墙

Also Published As

Publication number Publication date
CN102561714B (zh) 2014-02-19

Similar Documents

Publication Publication Date Title
CN101307605B (zh) 高精度设备底座安装方法
CN102561714B (zh) 预制墙板安装调整平台
CN102296581B (zh) 纵向导轨安装方法及装置
CN107227864B (zh) 预制装配式水平构件高效工具式支撑系统及施工方法
CN103468850B (zh) 转炉提前整体安装方法
CN108691277A (zh) 用于节段预制拼装梁在架设过程中定位的三维调整工装
CN202520000U (zh) 预制墙板安装调整平台
CN106436747A (zh) 一种桩基全自动托换装置及施工方法
CN202265778U (zh) 高精度预制梁定位结构
CN210105874U (zh) 用于隧道内的中隔墙及其安装设备
CN202482772U (zh) 铁路桥梁防落梁挡块安装系统
CN104895336A (zh) 一种劲性混合结构钢梁的安装就位方法
CN204530501U (zh) 一种便于施工时控制拱肋线形的支架支座
KR100475544B1 (ko) 고층건물의 콘크리트벽체 시공을 위한 거푸집 승강시스템
CN204138087U (zh) 电梯导轨支架
CN206319628U (zh) 一种建筑装配式墙板安装机
CN102392540A (zh) 高精度预制梁定位方法及定位结构
CN214884616U (zh) 一种pc外挂墙板连接结构
EP3752442B1 (en) Elevator installation method and apparatus
CN210395423U (zh) 一种塔机基础安装定位装置
CN102505863A (zh) 一种多轨道滑移施工无线激光同步控制装置
KR200366291Y1 (ko) 고층건물의 콘크리트벽체 시공을 위한 거푸집 승강시스템
CN209652767U (zh) 同步架设主梁和桥面板的装置
CN210457072U (zh) 一种电梯吊钩的安装连接结构
CN103592116B (zh) 一种盾构管片试验机的加载油缸定位系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant