CN102561666A - Pointing construction method for pottery clay split bricks - Google Patents
Pointing construction method for pottery clay split bricks Download PDFInfo
- Publication number
- CN102561666A CN102561666A CN2012100647934A CN201210064793A CN102561666A CN 102561666 A CN102561666 A CN 102561666A CN 2012100647934 A CN2012100647934 A CN 2012100647934A CN 201210064793 A CN201210064793 A CN 201210064793A CN 102561666 A CN102561666 A CN 102561666A
- Authority
- CN
- China
- Prior art keywords
- jointing
- slurry
- brick
- potter
- riving
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention discloses a pointing construction method for pottery clay split bricks. The method comprises the process flows of: stirring pointing agent slurry, quickly filling the slurry into bags, extruding to brick gaps, compacting and troweling, and wiping the slurry overflowing from two sides of the gaps. The method is a construction technology capable of ensuring the compactness and reducing the pollution rate; by engineering practice, the work efficiency can be greatly improved, and the pointing progress is quickened; a pointing agent is saved, the cost is reduced, and remarkable economic benefits are obtained; the compactness after the pointing agent is finally set is ensured, and the occurrence probability of alkali return is reduced; and the cleaning expense of an outer wall is saved, the cleaning water is saved, and the method has positive meaning for environment friendliness and energy conservation.
Description
Technical field
The present invention relates to metope jointing construction field in the construction work, particularly potter's clay rive that brick outer wall decorative effect etc. is had relatively high expectations, engineering quantity is bigger the jointing construction.
Background technology
The metope jointing is handled with cement mortar (also can add pigment) the brickwork joint of brick wall or the stone seam of stone wall, makes its visual effect better, also protects structure.The potter's clay brick jointing of riving is that the decoration of outside wall face is a potter's clay when riving brick, and the seam that each potter's clay is rived between the brick is handled with cement mortar, makes its visual effect better, also protects structure.
The potter's clay brick of riving promptly is the brick of riving of primary raw material preparation with potter's clay.The brick of riving is claimed the pairing brick again; Produce by German Green company initiative,, burn till and to rive into two and gain the name before back or the use because of it be double-deck when the extrusion modling; Be the ideal green building material product, be widely used in places such as building, parking lot, subway, square, passage.The color harmony specification of brick of riving can satisfy the modeling requirement of various specific (special) requirements and building.The brick of riving is promptly to can be used for various decorating outer wall of building, also can be used as part in the whole building incrustation and decorates with the various inner wall surfaces in non-bedroom and decorate, and can also make space pattern or decoration view.The brick of riving possesses the ability of adverse circumstances resisted and corrosive substance (acid rain, contaminated air, dust storm) erosion, can keep the color and the outward appearance of its glamour all the time, and is lasting.Be the ideal material of decoration of exterior wall, exterior wall tile transverse joint and perps generally are 5mm at present, require to adopt the joint filling of black gap filler.
Brick is surperficial to be pit pitted skin shape because of potter's clay is rived, so adopt traditional method of on the exterior wall tile face, completely scraping jointing agent---and promptly wet and collude method, the rate that pollutes is bigger, and the brick face is difficult to clean, and influences impression; And adopt another conventional method---the dried method of colluding, and this method " feeds jointing agent " to go in the seam along brickwork joint with pallet, spatula, and the spatula that forms with Φ 6 reinforcement fabrications then is with jointing agent compacting troweling; This method can only be with mixing the dry state that low amounts of water mixes " hand is pinched agglomerating, land and bloom " in the jointing agent; Can't guarantee the compactness after the jointing agent final set, anti-alkali phenomenon is general, influences the exterior wall impression.
Summary of the invention
For solving the rive deficiency of brick jointing method construction of present exterior wall potter's clay, a kind of new potter's clay brick jointing job practices of riving, this method are a kind ofly can promptly guarantee compactness, reduce the job practices of pollution rate again.
The technical scheme that the present invention adopts in order to realize its technical purpose is: a kind of potter's clay brick jointing job practices of riving may further comprise the steps:
Steps A, stirring jointing agent slurry;
Step B, the jointing agent slurry that stirs is fast packed in the sack;
Step C, the jointing agent slurry in the sack is clamp-oned in the brickwork joint;
Step D, with jointing agent slurry compacting troweling in the brickwork joint;
Step e, will stitch the slurry that overflows both sides and wipe.
Further, above-mentioned potter's clay is rived in the brick jointing job practices: in the described steps A, the jointing agent slurry is that the jointing agent dry mash that the clear water of 1 part of quality adds 4 parts of quality mixes.
Further, above-mentioned potter's clay is rived in the brick jointing job practices: in the described steps A, comprise step by step following:
Steps A 01, in appropriate containers, inject measured clear water, add the jointing agent dry mash again, fully stir with electric mixer low speed, the limit of falling the powder, limit is stirred to even nothing caking, does not have deposition thick paste shape, leaves standstill 3 ~ 5 minutes, stirs 1 ~ 2 minute again.
Further, above-mentioned potter's clay is rived in the brick jointing job practices: employed sack adopts piping bag among the described step B.Manage as supporting tool by diameter 100PVC when packing the jointing agent slurry into piping bag.
Further, above-mentioned potter's clay is rived in the brick jointing job practices: among the described step D, the jointing agent slurry is filled up brickwork joint, the tooled joint time is 20~30 minutes.
Further, above-mentioned potter's clay is rived in the brick jointing job practices: in the described step e, be the opportunity that slurry is wiped, when the slurry that overflows brickwork joint when treating tooled joint reaches air dried condition.To stitch the slurry that overflows both sides with sponge wipes.
Goal of the invention of the present invention is to work out a cover can promptly guarantee compactness, reduce the construction technology of pollution rate again;
The present invention adopts " the crowded jointing method of bag " to carry out exterior wall jointing construction, through after the engineering practice, sums up the advantage of four aspects:
1. increase work efficiency greatly, accelerated the jointing progress; Can increase work efficiency about 10%.
2. the way of completely scraping with respect to " the wet method of colluding " has been saved jointing agent greatly, has reduced cost, has obtained remarkable economic efficiency;
3. use the way of dry jointing agent with respect to " the dried method of colluding ", guaranteed the compactness after the jointing agent final set greatly, reduced the probability of happening of anti-alkali;
4. saved the outside Wall Cleaning expense, saved water for cleaning simultaneously, environmental protection and energy saving have been had positive effect.Every square metre of using water wisely 12L.
Below in conjunction with specific embodiment the present invention is done comparatively detailed description.
Description of drawings
Fig. 1 is a process chart of the present invention.
The specific embodiment
Embodiment 1, and is as shown in Figure 1, and present embodiment is a kind of " bag crowded jointing method " to the rive job practices of brick jointing of potter's clay; Behind the jointing agent scientific matching; Pack slurry in the piping bag into, and then clamp-on slurry in the brickwork joint, jointing agent compacting in will stitching at last, troweling get final product.Mount the sack of colored usefulness when piping bag used herein can the use birthday cake.
In the present embodiment, rive brick exterior wall tile transverse joint and perps of potter's clay is 5mm, requires to adopt the joint filling of black gap filler, specifically comprises following processing step:
The first step: stir the jointing agent slurry
In appropriate containers; The empty bucket of the coatings of generally selecting for use in the concrete work progress injects measured clear water, presses 1:4 (weight ratio) again and adds the jointing agent dry mash; Fully stir with electric mixer low speed; The limit of falling the powder, limit is stirred to even nothing caking, does not have deposition thick paste shape, leaves standstill 3 ~ 5 minutes, stirs and can use in 1 ~ 2 minute.
Second step: bag is gone in quick charging
In the present embodiment can by Φ 100PVC sleeve pipe fixedly piping bag as support slurry is packed in the piping bag efficiently.
The 3rd step: seam is gone in material extrusion
Hold the piping bag of filling slurry, the jointing agent slurry is clamp-oned in the brickwork joint.
The 4th step: with jointing agent slurry compacting troweling in the brickwork joint
The bag squeezing fills up (under the hot weather construction situation) after about 20~30 minutes of the tooled joint time behind the brickwork joint; As under the temperature condition of different, the tooled joint time is answered proper extension, can adopt the finger pressure testing during working control several times, waits to feel certain intensity is arranged but is best tooled joint opportunity under the situation that still has plasticity.20~30 minutes time is definite when summer, but should confirm with the curdled appearance of slurry the opportunity of tooled joint; Be the best when promptly treating that in slurry initial set a period of time it becomes plastic state.
Utilize " spatula " that Ф 6 steel bar ends are made with gap filler compacting, troweling.
The 5th step: will stitch a small amount of slurry that the beam side overflows and wipe
The brick both sides of riving after the spatula jointing is intact are extruded a little remaining gap filler of coming in addition; Need utilize this moment wet sponge to clean, the scouring time will begin in the intact back of tooled joint in about 20 ~ 30 minutes, but had specifically presented air dried condition with the assurance gap filler but unhardened (not touching with one's hand after promptly finger is pinched the gap filler of emerging gently; But behind the powdering); The scouring process can not expire wall cleans, and must clean along seam, in order to avoid bring gap filler into the brick surface crater of riving in the scouring process.
Claims (8)
1. potter's clay brick jointing job practices of riving is characterized in that: may further comprise the steps:
Steps A, stirring jointing agent slurry;
Step B, the jointing agent slurry that stirs is fast packed in the sack;
Step C, the jointing agent slurry in the sack is clamp-oned in the brickwork joint;
Step D, with jointing agent slurry compacting troweling in the brickwork joint;
Step e, will stitch the slurry that overflows both sides and wipe.
2. the potter's clay according to claim 1 brick jointing job practices of riving is characterized in that: in the described steps A, the jointing agent slurry is that the jointing agent dry mash that the clear water of 1 part of quality adds 4 parts of quality mixes.
3. the potter's clay according to claim 2 brick jointing job practices of riving is characterized in that: in the described steps A, comprise step by step following:
Steps A 01, in appropriate containers, inject measured clear water, add the jointing agent dry mash again, fully stir with electric mixer low speed, the limit of falling the powder, limit is stirred to even nothing caking, does not have deposition thick paste shape, leaves standstill 3 ~ 5 minutes, stirs 1 ~ 2 minute again.
4. the potter's clay according to claim 1 brick jointing job practices of riving is characterized in that: employed sack adopts piping bag among the described step B.
5. the potter's clay according to claim 4 brick jointing job practices of riving is characterized in that: when packing the jointing agent slurry into piping bag by diameter 100PVC pipe as supporting tool.
6. the potter's clay according to claim 1 brick jointing job practices of riving is characterized in that: among the described step D, the jointing agent slurry is filled up brickwork joint, the tooled joint time is after the material extrusion 20~30 minutes.
7. the potter's clay according to claim 1 brick jointing job practices of riving is characterized in that: in the described step e, be the opportunity that slurry is wiped, when the slurry that overflows brickwork joint when treating tooled joint reaches air dried condition.
8. the potter's clay according to claim 7 brick jointing job practices of riving is characterized in that: will stitch the slurry that overflows both sides with sponge and wipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100647934A CN102561666A (en) | 2012-03-13 | 2012-03-13 | Pointing construction method for pottery clay split bricks |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100647934A CN102561666A (en) | 2012-03-13 | 2012-03-13 | Pointing construction method for pottery clay split bricks |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102561666A true CN102561666A (en) | 2012-07-11 |
Family
ID=46408134
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012100647934A Pending CN102561666A (en) | 2012-03-13 | 2012-03-13 | Pointing construction method for pottery clay split bricks |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102561666A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971256A (en) * | 2016-05-16 | 2016-09-28 | 曾海平 | Plastic-steel mud plastic bag filling and smearing construction method |
CN107100286A (en) * | 2017-06-16 | 2017-08-29 | 中建八局第三建设有限公司 | A kind of clear-water concrete bolt hole closure and external corner method for repairing and constructing |
CN107816197A (en) * | 2017-11-09 | 2018-03-20 | 黄艳秋 | A kind of device tamped for the outer gap of geothermal heat pipeline |
CN111636589A (en) * | 2020-05-26 | 2020-09-08 | 上海宝冶集团有限公司 | Exterior wall clay brick and construction method of sandwich heat-insulating wall |
CN112282267A (en) * | 2020-06-19 | 2021-01-29 | 青岛中建联合集团有限公司 | Building exterior wall finishing material |
CN113503027A (en) * | 2021-07-09 | 2021-10-15 | 中国二十冶集团有限公司 | External wall construction method based on soft porcelain |
-
2012
- 2012-03-13 CN CN2012100647934A patent/CN102561666A/en active Pending
Non-Patent Citations (1)
Title |
---|
鄢广相: "外墙劈离砖填缝巧改进", 《建筑工人》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971256A (en) * | 2016-05-16 | 2016-09-28 | 曾海平 | Plastic-steel mud plastic bag filling and smearing construction method |
CN107100286A (en) * | 2017-06-16 | 2017-08-29 | 中建八局第三建设有限公司 | A kind of clear-water concrete bolt hole closure and external corner method for repairing and constructing |
CN107816197A (en) * | 2017-11-09 | 2018-03-20 | 黄艳秋 | A kind of device tamped for the outer gap of geothermal heat pipeline |
CN107816197B (en) * | 2017-11-09 | 2019-10-08 | 山东海筑暖通工程有限公司 | A kind of device tamped for gap outside geothermal heat pipeline |
CN111636589A (en) * | 2020-05-26 | 2020-09-08 | 上海宝冶集团有限公司 | Exterior wall clay brick and construction method of sandwich heat-insulating wall |
CN112282267A (en) * | 2020-06-19 | 2021-01-29 | 青岛中建联合集团有限公司 | Building exterior wall finishing material |
CN113503027A (en) * | 2021-07-09 | 2021-10-15 | 中国二十冶集团有限公司 | External wall construction method based on soft porcelain |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102561666A (en) | Pointing construction method for pottery clay split bricks | |
CN103253896B (en) | Flexible face brick | |
CN101886460B (en) | Press polishing method of plastered mesh cloth of inner wall | |
CN104108911A (en) | Production formula and construction technology of ultra-wear-resistant ground | |
CN101812909B (en) | Method for producing anti-pollution flexible real stone face tiles | |
CN102674773A (en) | Preparation method, products and construction method of improved adhesive for ceramic tiles | |
CN104151907A (en) | Reflectively thermal-insulation color putty paste | |
CN102535790A (en) | High-emulation elastic outer wall decoration panel and manufacturing method thereof | |
CN101736825A (en) | Method for construction of outer wall external heat preservation system | |
CN103788745A (en) | Elastic anti-cracking energy-saving putty cream for exterior walls and production method thereof | |
CN102225872A (en) | Micropore sealant of aerated concrete blocks and preparation method thereof | |
CN105315754A (en) | Waterproof putty paste capable of removing formaldehyde | |
CN103613339A (en) | Special adhering and sealing material for cement-based mosaic tile and preparation and using method thereof | |
CN104790606B (en) | Method and a kind of waterproof anti-crack mortar using wall paint decorative architecture thing metope | |
CN103362269A (en) | Heat-preserving decorative mold board for outer wall body and manufacturing method thereof | |
CN105178547A (en) | Large-unit ceramic thin sheet back-suspending and gluing structure and construction method thereof | |
CN105350775B (en) | A kind of construction technology of the decorating outer wall of building of imitative stone material dry suspending effect | |
CN105239745A (en) | Integral wallboard and board seam processing method | |
CN206110545U (en) | Various lining of wall | |
CN205025042U (en) | Big unit pottery sheet metal back of body kiss -coating bonds and constructs | |
CN103482946B (en) | Neutral mosaic adhesive | |
CN103467055A (en) | Mosaic binding agent integrating two purposes of binding and joint filling | |
CN104211440B (en) | A kind of preparation method for revealing aggregate concrete and its undisguised material rinsing agent used | |
CN204983179U (en) | Shear force wall split bolt hole prevention of seepage anti penetration structure of trembling with fear | |
CN205063236U (en) | Integration wallboard |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120711 |