CN102505862A - Installing process of lightweight internal partition wallboards - Google Patents

Installing process of lightweight internal partition wallboards Download PDF

Info

Publication number
CN102505862A
CN102505862A CN2011103429157A CN201110342915A CN102505862A CN 102505862 A CN102505862 A CN 102505862A CN 2011103429157 A CN2011103429157 A CN 2011103429157A CN 201110342915 A CN201110342915 A CN 201110342915A CN 102505862 A CN102505862 A CN 102505862A
Authority
CN
China
Prior art keywords
wallboard
connecting portion
wallboards
cushion block
sign indicating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103429157A
Other languages
Chinese (zh)
Other versions
CN102505862B (en
Inventor
宋震峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jianhua New Wall Material Co Ltd
Original Assignee
ZHONGSHAN JIANHUA WALL MATERIALS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGSHAN JIANHUA WALL MATERIALS CO Ltd filed Critical ZHONGSHAN JIANHUA WALL MATERIALS CO Ltd
Priority to CN201110342915.7A priority Critical patent/CN102505862B/en
Publication of CN102505862A publication Critical patent/CN102505862A/en
Application granted granted Critical
Publication of CN102505862B publication Critical patent/CN102505862B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an installing process of lightweight internal partition wallboards. The installing process is characterized by comprising the following steps of: placing walling threads in a construction field; transporting wallboards by a traveling bogie to every installing region; coating mixed mortar at the joints of the wallboards; arranged a top cushioning block on the upper end of the wallboard, then erecting the wallboard, fixing with a wooden wedge, and then arranging a beam plate or an overdoor plate on the upper end of the wallboard; sequentially installing other wallboards, and connecting the corners of the wallboards or the joints of the wallboards and wall columns with composite connecting components; arranging fiber net belts at the joints of adjacent two wallboards, and sealing the board core holes at the top ends of the wallboards with foam rods; filling mortar to the joints of the wallboards and wallboards, beam plates and the overdoor plates so as to firmly connect; and removing wooden wedges for fixing the wallboards and filling mortar to the wooden wedge holes. For overcoming the defects in the prior art, the invention provides a simple-step, safe and reliable installing process of the lightweight internal partition wallboards.

Description

A kind of mounting process of lightweight inner partition wall plate
Technical field
The present invention relates to a kind of mounting process of lightweight inner partition wall plate.
Background technology
The technology of existing installation lightweight inner partition wall plate is relatively complicated, installs loaded down with trivial detailsly, because technologic defective, between wallboard and the wallboard, perhaps is connected firmly inadequately between wallboard and beam slab, the plate, and safety can not get assurance.
Summary of the invention
The objective of the invention is provides a kind of step simple in order to overcome weak point of the prior art, the mounting process of safe and reliable lightweight inner partition wall plate.
In order to achieve the above object, the present invention adopts following scheme:
A kind of mounting process of lightweight inner partition wall plate is characterized in that may further comprise the steps:
A, emit the wall line on construction ground;
B, travelling bogie is transported to each installation region with wallboard;
C, smear the mortar that mixes in the wallboard junction;
D, on wallboard upper end, top rubber cushion piece is set, holds up wallboard then, and fix, a beam slab or a door plate are set in the wallboard upper end then with timber wedge;
E, successively other wallboard is installed, in the wallboard corner or wallboard adopt composite connector to be connected with the wall column junction;
F, the fiber guipure is set, adopts foam rods shutoff plate core hole on the wallboard top in adjacent two wallboard junctions;
G, fill a mortar in wallboard and wallboard, beam slab, a door plate junction it is interconnected firmly;
H, withdraw from the fixedly timber wedge of wallboard, fill mortar in the timber wedge hole.
The mounting process of aforesaid a kind of lightweight inner partition wall plate is characterized in that the top rubber cushion piece described in the step D comprises plain cushion piece and angle cushion block.
The mounting process of aforesaid a kind of lightweight inner partition wall plate; It is characterized in that described plain cushion piece comprises the cushion block body; Be provided with a plurality of connection convex tendons in said cushion block body upper surface, can make slurry get into the through hole of cushion block body interior when on described cushion block body, being provided with a plurality of being in the milk.
The mounting process of aforesaid a kind of lightweight inner partition wall plate; It is characterized in that described angle cushion block comprises the cushion block body; Be provided with a plurality of connection convex tendons in said cushion block body upper surface; Can make slurry get into the through hole of cushion block body interior when on described cushion block body, being provided with a plurality of being in the milk, being provided with in both sides, described cushion block body lower surface can be if the cushion block body be fastened on the trip on the wallboard drift angle.
The mounting process of aforesaid a kind of lightweight inner partition wall plate adopts the angle sign indicating number to fix when it is characterized in that among the step D beam slab being set.
The mounting process of aforesaid a kind of lightweight inner partition wall plate; It is characterized in that described angle sign indicating number includes angle code book body; On the code book body of described angle, be provided with and be used for and wallboard upper end first connecting portion that is connected and second connecting portion that is used for being connected with beam slab; Described first connecting portion and second connecting portion are interconnected to the L type; The length of described first connecting portion is the twice of the second connecting portion length, on described first connecting portion and second connecting portion, is respectively equipped with connecting hole, adopts ail gun that nailing is set in said connecting hole wallboard and beam slab are firmly linked together.
The mounting process of aforesaid a kind of lightweight inner partition wall plate when it is characterized in that among the step D that a side at door does not have to be provided with under body of wall or the situation of door buttress width less than 100mm plate, adopts the holder sign indicating number to reinforce.
The mounting process of aforesaid a kind of lightweight inner partition wall plate; It is characterized in that the holder sign indicating number includes L type holder code book body; Described L type holder code book body comprises holder sign indicating number first connecting portion and holder sign indicating number second connecting portion; On described holder sign indicating number first connecting portion, be provided with connecting through hole; Described L type holder code book body can be fixedly connected with the wall column or the wallboard of door opening side through in said connecting through hole, squeezing into nailing, and a door plate is placed on described holder sign indicating number second connecting portion, and said holder sign indicating number first connecting portion is isometric with holder sign indicating number second connecting portion.
The mounting process of aforesaid a kind of lightweight inner partition wall plate; It is characterized in that the composite connector described in the step e comprises connecting reinforcement; Outside described connecting reinforcement, be arranged with the plug that can strengthen connecting reinforcement and wall column draw knot force; Described plug comprises cock body, and the centre is provided with the circular hole that vertically runs through whole cock body on described cock body, is evenly equipped with the elongated slot that a plurality of and said circular hole is communicated with at described cock body.
The mounting process of aforesaid a kind of lightweight inner partition wall plate; It is characterized in that the travelling bogie described in the step B includes vehicle frame; On described central frame beam, be welded with a wheel shaft; On said wheel shaft two ends, be respectively equipped with wheel, on described vehicle frame one car, be welded with a wall-panels supports frame, can wallboard be locked in the U type stirrup on the said wall-panels supports frame when on described wall-panels supports frame, being provided with the transportation wallboard; Described U type stirrup is movably connected on the described wall-panels supports frame on one side, and another checkpost can be located on the wallboard outside.
Deadlight length of the present invention is that 85mm, 100mm, three kinds of 120mm, width are arranged is that 600mm, a side have cloudy tenon, a side that positive tenon is arranged for 2400mm-3200mm, thickness.Auxilliary material is installed to be comprised: dry-mixed mortar, guipure, cement nail, reinforcing bar, plug, top glue, steel card, holder sign indicating number etc.Dry-mixed mortar has characteristics such as intensity height, shrinkage factor is little, adhesive property is strong; Top glue is divided into angle cushion block peace cushion block, and the angle cushion block is used for hollowcore slab, the plain cushion piece is used for solid slab, and top glue is placed in that the wallboard top makes body of wall top seam mortar thickness, plumpness is guaranteed and make body of wall have better anti-seismic performance; The steel card is directed against the antidetonation demand of body of wall and is provided with, and stability and anti-seismic performance that the steel card can improve body of wall are installed.Along with construction technology is improved corresponding improvement of auxilliary material meeting, the improvement of auxilliary material mainly is for the quality and the Security Target of the efficient that improves construction working, assurance construction, and the performance of body of wall each side is got a promotion.
The erector has: crowbar, trowel, 2M guiding ruler, spirit level, line rudder, steel ruler, iron hammer, timber wedge, electric saw, Churn drill, line of ink marker box, banister brush, bucket, broom, scaffold, ladder, level, fortune plate dolly and other instrument.Along with construction technology is improved employed instrument and also can correspondingly be improved, the improvement of instrument mainly is for the efficient that improves construction working, guarantees the quality and the Security Target of construction.
In sum, the present invention with respect to its beneficial effect of prior art is:
1, can reach the quality requirement of relevant acceptance criteria of country and regulation and stipulation by the lightweight inner partition wall body of construction technology construction of the present invention;
2, can guarantee the safe construction of wallboard by construction technology construction of the present invention, reduce construction safety hidden danger;
3, construction technology of the present invention uses dry-mixed mortar farthest to reduce wet work, and economic environmental protection is a kind of construction technology of economic environmental protection.
Description of drawings
Fig. 1 is with the fixing sketch map of wallboard of timber wedge;
Fig. 2 is for being provided with the sketch map of fiber guipure in adjacent two wallboard junctions;
Fig. 3 is the sketch map of holder sign indicating number among the present invention;
Fig. 4 is for using a sketch map that drags sign indicating number to connect a wallboard and a door plate;
Fig. 5 is the sketch map of plain cushion piece;
Fig. 6 is the sketch map of angle cushion block;
Fig. 7 is for being provided with the sketch map of plain cushion piece between beam slab and wallboard;
Fig. 8 is for being provided with the sketch map of angle cushion block between beam slab and wallboard;
Fig. 9 is the sketch map of angle sign indicating number;
Figure 10 is for connecting the sketch map of body of wall and beam slab with the angle sign indicating number;
Figure 11 is the sketch map of travelling bogie;
Figure 12 is the sketch map of composite connector;
Figure 13 is the sketch map of plug.
The specific embodiment
Below in conjunction with the description of drawings and the specific embodiment the present invention is further described:
The mounting process of a kind of lightweight inner partition wall plate shown in Fig. 1 to 13 may further comprise the steps:
A, emit the wall line on construction ground;
B, travelling bogie 1 is transported to each installation region with wallboard 2;
C, smear the mortar that mixes in wallboard 2 junctions;
D, top rubber cushion piece 3 is set on wallboard 2 upper ends, holds up wallboard 2 then, and fixing with timber wedge 4, a beam slab 5 or a door plate 6 are set in wallboard 2 upper ends then;
E, successively other wallboard is installed, in the wallboard corner or wallboard adopt composite connector 7 to be connected with the wall column junction;
F, fiber guipure 16 is set, adopts foam rods shutoff plate core hole on wallboard 2 tops in adjacent two wallboard junctions;
G, wallboard 2 with wallboard 2, beam slab 5, a mortar is filled in a door plate 6 junctions that it is interconnected firmly;
H, withdraw from the fixedly timber wedge 4 of wallboard 2, fill mortar in the timber wedge hole.
Top rubber cushion piece 3 described in the step D of the present invention comprises plain cushion piece 31 and angle cushion block 32.Described plain cushion piece 31 comprises cushion block body 33, is provided with a plurality of connection convex tendons 34 in said cushion block body 33 upper surfaces, can make slurry get into the through hole 35 of cushion block body 33 inside when on described cushion block body 33, being provided with a plurality of being in the milk.Described angle cushion block 32 comprises cushion block body 33; Be provided with a plurality of connection convex tendons 34 in said cushion block body 33 upper surfaces; Can make slurry get into the through hole 35 of cushion block body 33 inside when on described cushion block body 33, being provided with a plurality of being in the milk, being provided with in both sides, described cushion block body 33 lower surface can be if cushion block body 33 be fastened on the trip 36 on the wallboard drift angle.
Adopt angle sign indicating number 8 fixing when among the step D beam slab being set among the present invention.Wherein said angle sign indicating number 8 includes angle code book body 81; On described angle code book body 81, be provided with and be used for first connecting portion 82 that is connected with wallboard 2 upper ends and second connecting portion 83 that is used for being connected with beam slab; Described first connecting portion 82 and second connecting portion 83 are interconnected to the L type; The length of described first connecting portion 82 is twices of second connecting portion, 83 length; On described first connecting portion 82 and second connecting portion 83, be respectively equipped with connecting hole 84, adopt ail gun that nailing 10 is set in said connecting hole 84 wallboard 2 and beam slab 5 are firmly linked together.
When a side of door does not have to be provided with under body of wall or the situation of door buttress width less than 100mm plate 6, adopt holder sign indicating number 9 to reinforce among the step D of the present invention.Wherein holder sign indicating number 9 includes L type holder code book body 91; Described L type holder code book body 91 comprises holder sign indicating number first connecting portion 92 and holder sign indicating number second connecting portion 93; On described holder sign indicating number first connecting portion 92, be provided with connecting through hole 94; Described L type holder code book body 91 can be fixedly connected with the wall column or the wallboard of door opening side through in said connecting through hole 94, squeezing into nailing, and a door plate 6 is placed on described holder sign indicating number second connecting portion 93, and said holder sign indicating number first connecting portion 92 is isometric with holder sign indicating number second connecting portion 93.
Composite connector 7 described in the step e of the present invention comprises connecting reinforcement 71; Outside described connecting reinforcement 71, be arranged with the plug 72 that can strengthen connecting reinforcement 71 and wall column draw knot force; Described plug 72 comprises cock body 73; Be provided with the circular hole 74 that vertically runs through whole cock body 73 in the middle of on described cock body 73, be evenly equipped with the elongated slot 75 that a plurality of and said circular hole 74 is communicated with at described cock body 73.
Travelling bogie 1 described in the step B of the present invention includes vehicle frame 11; On described vehicle frame 11 centres, be welded with a wheel shaft 12; On said wheel shaft 12 two ends, be respectively equipped with wheel 13; On described vehicle frame 11 1 cars, be welded with a wall-panels supports frame 14; Can wallboard be locked in the U type stirrup 15 on the said wall-panels supports frame 14 when on described wall-panels supports frame 14, being provided with the transportation wallboard, Yi Bian described U type stirrup 15 is movably connected on the described wall-panels supports frame 14, another checkpost can be located on wallboard 2 outsides.
Concrete flow of installation of the present invention and method of operating:
One, the construction line-putting:
1, pores over drawing, understand the annexation of layout, body of wall and the agent structure in each room, understand scantlings such as body of wall, door and window.
2, according to the control line of each floor and the requirement of job site, open laying out instrument earlier and aim at beam and shear wall limit with infrared rays, make two line parallels from the control line amount to infrared rays with tape measure again.
3, the above-ground route that ejects, size is wanted accurately, and the room Founder can not have concentric reducer, and is parallel with control line.
4, will guarantee aisle, door and window hole size, above-ground route will eject two-wire, and door and window hole will carry out mark with symbol.
When 5, using tape measure, be error reduced in size, draw tape measure tiltedly not draw, preferably measure when taking measurements from 10 centimeters of tape measure.
6, a laser rays perpendicular to ground is arranged in the laying out instrument lower end, the red point that impinges upon ground with this laser rays is aimed at the ground line of ink marker, makes the right-angled intersection laser rays aim at the ground line of ink marker with fine setting, aims at laser rays and ejects antenna.
7, be as the criterion with the construction blueprint during unwrapping wire, run into agent structure face and drawing deviation when big, should give record and propose, and the installation person in charge is told somebody what one's real intentions are to main body construction unit.
8, according to the relief of agent structure, near absolute altitude line of the bullet door head, absolute altitude is flooring absolute altitude+1m, so that the installation of a door plate.
Two, vertical, level transportation:
1, wallboard is transported to floor according to field condition through vertical transport equipment after being transported to the building site.
2, there are tower crane and discharging platform in the building site: can wallboard be winched to the discharging platform of floor with tower crane, be transported to the installation position through level again.
3, there is people's Cargo Lift in the building site: the personnel selection Cargo Lift is transported to each floor with sheet material, is transported to the installation position through level again.
4, there is not the vertical transport equipment floor not high: to adopt crane handling wallboard to each layer discharging platform, be transported to the installation position through level again.
Three, level transportation:
1, packaged wallboard is transported to assigned address after, unpack, use the transportation of two-wheeled inflated wheel dolly.
2, unpack when dress people should stand in wallboard both sides, careful wallboard and topples over and hurt sb.'s feelings.
3, fortune needs two people's compounding practices during plate: a people raises an end of plate and (generally steel pipe is inserted under the positive tenon the 3rd core hole and lifts plate; The slotting core hole of height adjustment steel pipe according to the people); Another people stands in the side of plate; The proficiency backplate, handgrip fortune plate dolly is put under the plate, is adjusted to the centre position of plate.
Hand will be grabbed at fortune plate dolly steel pipe topmost when 4, putting dolly, and steel pipe that can not grasping operation plate dolly two ends avoids handle grip in the middle of plate and fortune plate dolly.Inflated wheel dolly maximum is capable of carrying a load of two boards, must not overhaul, and with on the dolly with anchor clamps clip wallboard, wallboard prevents to topple over.Fortune is during plate, two people one in front and one in back, the people can not stand in the side fortune plate of wallboard, prevents that the dolly rollover from hurting sb.'s feelings.
5, should cloudy tenon when the floor stacking plate down, positive tenon up, each specification is separately neat stacks, the needs that the stacking of plate will conveniently be installed the plate of corresponding specification, are placed on the corresponding position.
Can lean against the wall column limit when 6, stacking, lean to as far as possible on wall side column limit.Attention can not be pressed on the wall line that wallboard is installed, and can not be placed on passageway for fire apparatus and the corridor, can not be at the hole, face the limit and put plate.The plate that leans on wall column to stack will be stuck on the core hole of plate with the reinforcing bar card plate is fixed, and the monolithic wallboard is forbidden independent edge-on stacking, should keep flat or lean to the permanent position.
Four, matching board (confirming the size and the cutting of plate):
1, before wallboard was installed, the size of wallboard will cooperate right plate according to concrete height, the width of institute's construction part, should cut when the cutting of needs is arranged; Matching board should be selected qualified wallboard for use, has the defective plate of mass defects such as fracture, bending, scarce limit, arrisdefect, the out-of-flatness of plate face, honeycomb, pitted skin not allow to use;
2, using the height that tape measure measures needs to install position of wallboards before the matching board, on the basis of the actual height that measures, deduct 40mm, is exactly the on-the-spot actual height that wallboard is installed;
When 3, a face wall is installed to last piece wallboard, during width deficiency 600mm, as required wallboard is cut the back and install;
4, before the wallboard cutting, should finish line with the good size of tape measure amount and with pencil earlier;
When 5, cutting the termination, wallboard is kept flat on the ground, erect slightly the termination that can cut; When transverse cuts or vertical cutting, wallboard is kept flat and erects and cut;
Firmly want evenly when 6, cutting wallboard, at the uniform velocity cutting can not overexert, and avoids burning out electric circular saw; Simultaneously will be in the watering of saw blade side, the generation to saw blade is lowered the temperature and reduced the saw blade loss and reduce dust can not be spread across on the motor water in order to avoid cause short circuit or electric leakage accident.
7, the cement paste of clear board face immediately after the cutting is so that the installation of fortune plate and plate.
8, the cutting after will with plate and waste material answer pile up separately neat, waste material should in time clean out floor.
Five, install and fix:
1, with transporting the plate dolly, transports to the position that needs to install wallboard the wallboard of wallboard or well cutting.
2, in the core hole of the upper end of wallboard, put into the core hole that foam rods also can be sealed the wallboard upper end with guipure.When avoiding on Reinforcing wall slab, stitching, mortar bleeds in the core hole.
3, gluing cushion block, rubber cushion piece divide two kinds: a kind of is the angle cushion block, and a kind of is the plain cushion piece.The angle cushion block is installed and should be stuck in first core hole on both sides, wallboard termination; The plain cushion piece is installed, and should stamp some mortars on both sides, wallboard termination earlier, is bonded at the plain cushion piece on the mortar again.Every block of wallboard uses two cushion blocks.
4, riser is generally accomplished by three people's cooperations, and two people are placed on the plate that cuts on the fortune plate dolly, transport to the position that needs to install wallboard, put the lower end of wallboard in place, generally apart from the distance of above-ground route in 50mm; The another one people is ready to timber wedge, iron hammer, crowbar, mortar simultaneously; Before plate is transported to mortar beat wallboard and wall, post junction or on the cloudy tenon of a wallboard.
5, next piece wallboard is installed before, on the cloudy tenon of the wallboard that installs, make mortar, mortar must be full, generally mortar made " v " type.
6, three people stand in an end of gluing cushion block, and the hand support directly stands in firmly holds up wallboard simultaneously on the same line, require firmly evenly, will be with the positive tenon of plate by agent structure when first block of plate is installed.
7, after wallboard was holded up, not in place like plate, two people held up steady wallboard, be responsible for to take the workman of crowbar, vacillated now to the left, now to the right wallboard, let plate slightly move (posture of walking as the people), moved to the position of wall line, relied on wall or post to wallboard.(hold up the plate personnel to work good, hand should be held up on the plane of plate, can not hold up in the side, prevents to jam a finger, and simultaneously a pin diagonal brace is in the lower end of plate, when crowbar prizes, with hand, pin firmly, help fast with wallboard to the last line of ink marker.)
8, let wallboard tilt a little, put into crowbar, set upright wallboard, shake crowbar and make wallboard be close to wall or post.Below crowbar, foremost, put two overlapping timber wedges, the people is sitting on the crowbar, and a hand saver is lived wallboard, fluctuates repeatedly, lets wallboard up and down to line, and the mortar of extruding on wall and the plate guarantees that the mortar between wall, post and plate or plate and the plate is full, closely knit.
9, when extruding mortar, the verticality and the planeness of reply plate face are calibrated.After holding up wallboard, earlier temporary fixed with timber wedge, vertically make aluminium alloys parallel with the leptoprosopy of two meters long aluminium alloyss with metope near the wallboard face; Slowly transfer aluminium alloys again or on the accurate line of ink marker of being rivals in a contest, as not aiming at the line of ink marker up and down, move the position of following timber wedge adjustment plate with iron hammer; Make plate aim at the line of ink marker up and down, be placed on aluminium alloys the horizontal direction of wallboard then, check repeatedly whether the plane of wallboard is parallel with the line of ink marker; As not parallel, with iron hammer move timber wedge with plate adjust to parallel till.
10, after mortar is extruded, firmly, flat the rubber cushion piece on wallboard top top with strength to pressing down crowbar.Take the corresponding insertion of two timber wedges again from the wallboard both sides, urgent with iron hammer, temporary fixed timber wedge.
11, corner, wallboard and the agent structure junction of wallboard installation need nailing or break reinforcing bar.Churn drill is joined the bit bore of 10mm, in the hole, stamps the plug of 8mm, throws the reinforcing bar of a 6mm again into, and is stifled real the hole with mortar then.
During 12, like the need consolidation process, generally a reinforcing angle sign indicating number is installed at plate and plate tongue and groove place.An end earlier that the angle sign indicating number is short during installation is taken in the sky with the ail shooter nail, a long end is close to wallboard squeezes into nailing.
13, a door plate is installed before, according to the door high line of having put well of leader and the size of door opening, cut out 15 centimetres breach at a door both sides wallboard; Measure the accurate size of a required door plate again; Cut out a door plate of corresponding size, cut out four breach of breaking reinforcing bar at the two ends of a door plate then, stamp mortar at a door hole door plate is installed; Fix with timber wedge after adjusting a planeness of a plate and verticality, last breach in reservation is broken reinforcing bar and is squeegeeed with mortar.
When 14, a door plate such as need are reinforced, adopt the holder sign indicating number to hold a plate.During installation, will hold in the palm the inferior horn of sign indicating number earlier, peg with nailing near the door head.
15, after the face wall installation, check whole degree of gravity vertical forwall surface, planeness, perpendicularity deviation requires in positive and negative 3 millimeters, and the planeness deviation requires in positive and negative 2 millimeters, 5 millimeters of door and window hole permissible variation in dimension.
16, after the mortar strength that fluting, the mouth that punches on the wallboard will be waited until wallboard reaches 75%, just can go into operation fluting, the mouth that punches avoid destroying the overall structure of wallboard.
17, should accomplish after the installation that intact of worker is clear, ground refuse, scrap plate etc. and in time clean out floor.
Six, the situation that relates to fishplate bar is arranged:
1, when body of wall is lower than 3.25 meters, can use the disposable installation of plate,, the height of body of wall need carry out the fishplate bar construction when surpassing 3.25 meters.It is the two-layer installation wallboard of branch that fishplate bar is installed, a laminate below installing earlier, and next laminate installation of treating one wall is installed a laminate after three days again.
2, carry out matching board according to structure height, confirmed the specification of top plate and lower plywood and cut.Should note the levels fissure of displacement during matching board, fissure of displacement height should be 300mm--400mm.
3, with transporting the plate dolly, transport to the position that needs to install wallboard the wallboard of wallboard or well cutting.
4, accomplish fluently mortar on the structure wall column limit that is connected with wallboard, three people cooperate riser, and the planeness and the verticality of adjustment plate, more successively according to the installation wallboard that highly staggers.
5, install down one deck wallboard after 3 days, carry out the installation of last layer plate.Earlier stamp mortar before installing, stamp mortar, again plate is lifted the top to next laminate, be embedded in place, fissure of displacement hole, after the planeness and verticality of calibration plate, fix with timber wedge on the top of last layer plate at the top or the side of next laminate.
Seven, move back timber wedge:
1, the mortar maintenance between wallboard lower end and the ground just can be moved back timber wedge after three days.Other fixedly the timber wedge of wallboard should also should just can withdraw from after three days in the mortar maintenance.
2, earlier with about hammer gently beat timber wedge, timber wedge is withdrawed from after striking the pine wedge.
3, should reclaim immediately after timber wedge withdraws from, so that recycle.
4, should the timber wedge hole be filled up mortar and guarantee ground and to stitch smooth-going corner angle clearly demarcated in the wallboard lower end after timber wedge withdraws from, unclean like ground, mend real hole again after answering water to rinse well.
Eight, the situation that relates to fluting, line box is arranged:
The position of 1, on surfaces of wall, drawing and need slot with the line of ink marker is earlier aimed at the line of ink marker with electric circular saw again and is sawed out required groove, and the degree of depth of groove should not surpass 1/3 of body of wall.
When 2, hollowcore slab is slotted, open outlet box with the minitype cutting machine of cutting ceramics earlier, again between position that needs penetration pipe and line box; The groove of 150mm to 200mm is left in the aligned with core hole site; Load onto the line box and put on spool at place, core hole, the static line box is mended the horizontal line groove with mortar.
Nine, upright seam, a day seam are smeared mortar:
1, there is the groove of wide about 50mm the junction of wallboard and agent structure junction and wallboard and wallboard, should carry out the mortar reinforcement.The wallboard top is connected seam and also uses mortar and fill with agent structure.
When 2, smearing upright seam, evenly be put on mortar on the groove earlier, equal the mortar receipts, be stained with guipure again with trowel, simultaneously with guipure by advancing in the mortar pin groove.Notice that mortar can not high ejecting plate face, guipure can not expose at the mortar face, and smooth is answered on wallboard and wallboard seam crossing surface.
When 3, smearing the sky seam, use trowel mortar is clamp-oned the seam from the wallboard two sides, mortar is full closely knit in guaranteeing to stitch, and corner angle are upright.
4, after upright seam, a day seam have been smeared mortar, should in time clear up flooring.
Ten, mortar is smeared on corner, door limit:
1, when the wallboard at installing angle door limit place, is used for smearing mortar in the position that a side of corner is reserved 5-10mm as far as possible.
2, corner is smeared mortar: it is moistening on the corner to sprinkle water earlier, smears one deck bottoming mortar, and it is also fixing to lean against corner one side that needs equating with aluminium alloys again, and then it is floating with the corner to smear one deck mortar, and corner is smeared mortar should guarantee that the corner corner angle are upright vertical.
3, mortar is smeared on the door limit: moistening in the Men Bianchu watering earlier; Smear one deck bottoming mortar; Lean against the both sides on a limit and fixing with two aluminium alloyss again, and then it is floating with place, door limit to smear one deck mortar, mortar is smeared on a door limit should guarantee that an arris is upright vertical and guarantee that the door opening dimensional errors is no more than 10mm.
11, the garbage-cleaning of withdrawing from the arena:
1, tackles the building site every day before leaving offices and clear up, accomplish that intact of worker is clear.
2,, answer classify and pile up, cleaning in batches in work progress, producing rubbish.After accomplishing a floor or section, should floor be cleaned out.

Claims (10)

1. the mounting process of a lightweight inner partition wall plate is characterized in that may further comprise the steps:
A, emit the wall line on construction ground;
B, travelling bogie (1) is transported to each installation region with wallboard (2);
C, smear the mortar that mixes in wallboard (2) junction;
D, on wallboard (2) upper end, top rubber cushion piece (3) is set, holds up wallboard (2) then, and fixing with timber wedge (4), in wallboard (2) upper end a beam slab (5) or a plate (6) are set then;
E, successively other wallboard is installed, in the wallboard corner or wallboard adopt composite connector (7) to be connected with the wall column junction;
F, fiber guipure (16) is set, adopts foam rods shutoff plate core hole on wallboard (2) top in adjacent two wallboard junctions;
G, at wallboard (2) and wallboard (2), beam slab (5), a mortar is filled in a door plate (a 6) junction that it is interconnected firmly;
H, withdraw from the fixedly timber wedge (4) of wallboard (2), fill mortar in the timber wedge hole.
2. the mounting process of a kind of lightweight inner partition wall plate according to claim 1 is characterized in that the top rubber cushion piece (3) described in the step D comprises plain cushion piece (31) and angle cushion block (32).
3. the mounting process of a kind of lightweight inner partition wall plate according to claim 2; It is characterized in that described plain cushion piece (31) comprises cushion block body (33); Be provided with a plurality of connection convex tendons (34) in said cushion block body (33) upper surface, can make slurry get into the inner through hole (35) of cushion block body (33) when on described cushion block body (33), being provided with a plurality of being in the milk.
4. the mounting process of a kind of lightweight inner partition wall plate according to claim 2; It is characterized in that described angle cushion block (32) comprises cushion block body (33); Be provided with a plurality of connection convex tendons (34) in said cushion block body (33) upper surface; Can make slurry get into the inner through hole (35) of cushion block body (33) when on described cushion block body (33), being provided with a plurality of being in the milk, being provided with in described cushion block body (33) both sides, lower surface can be if cushion block body (33) be fastened on the trip (36) on the wallboard drift angle.
5. the mounting process of a kind of lightweight inner partition wall plate according to claim 1 adopts angle sign indicating number (8) fixing when it is characterized in that among the step D beam slab being set.
6. the mounting process of a kind of lightweight inner partition wall plate according to claim 3; It is characterized in that described angle sign indicating number (8) includes angle code book body (81); On described angle code book body (81), be provided with and be used for and wallboard (2) upper end first connecting portion (82) that is connected and second connecting portion (83) that is used for being connected with beam slab; Described first connecting portion (82) and second connecting portion (83) are interconnected to the L type; The length of described first connecting portion (82) is the twice of second connecting portion (83) length; On described first connecting portion (82) and second connecting portion (83), be respectively equipped with connecting hole (84), adopt ail gun that nailing is set in said connecting hole (84) wallboard (2) and beam slab (5) are firmly linked together.
7. the mounting process of a kind of lightweight inner partition wall plate according to claim 1 when it is characterized in that among the step D that a side at door does not have to be provided with under body of wall or the situation of door buttress width less than 100mm plate (6), adopts holder sign indicating number (9) to reinforce.
8. the mounting process of a kind of lightweight inner partition wall plate according to claim 4; It is characterized in that holder sign indicating number (9) includes L type holder code book body (91); Described L type holder code book body (91) comprises holder sign indicating number first connecting portion (92) and holder sign indicating number second connecting portion (93); On described holder sign indicating number first connecting portion (92), be provided with connecting through hole (94); Described L type holder code book body (91) can be fixedly connected with the wall column or the wallboard of door opening side through in said connecting through hole (94), squeezing into nailing, and a door plate (6) is placed on described holder sign indicating number second connecting portion (93), and said holder sign indicating number first connecting portion (92) and holder sign indicating number second connecting portion (93) are isometric.
9. the mounting process of a kind of lightweight inner partition wall plate according to claim 1; It is characterized in that the composite connector described in the step e (7) comprises connecting reinforcement (71); Outside described connecting reinforcement (71), be arranged with the plug (72) that can strengthen connecting reinforcement (71) and wall column draw knot force; Described plug (72) comprises cock body (73); In the middle of described cock body (73) is gone up, be provided with the circular hole (74) that vertically runs through whole cock body (73), be evenly equipped with the elongated slot (75) that a plurality of and said circular hole (74) is communicated with at described cock body (73).
10. the mounting process of a kind of lightweight inner partition wall plate according to claim 1; It is characterized in that the travelling bogie described in the step B (1) includes vehicle frame (11); On described vehicle frame (11) centre, be welded with a wheel shaft (12); On said wheel shaft (12) two ends, be respectively equipped with wheel (13), on described vehicle frame (11) one cars, be welded with a wall-panels supports frame (14), can wallboard be locked in the U type stirrup (15) on the said wall-panels supports frame (14) when on described wall-panels supports frame (14), being provided with the transportation wallboard; Described U type stirrup (15) is movably connected on the described wall-panels supports frame (14) on one side, and another checkpost can be located on wallboard (2) outside.
CN201110342915.7A 2011-11-03 2011-11-03 Installing process of lightweight internal partition wallboards Active CN102505862B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110342915.7A CN102505862B (en) 2011-11-03 2011-11-03 Installing process of lightweight internal partition wallboards

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110342915.7A CN102505862B (en) 2011-11-03 2011-11-03 Installing process of lightweight internal partition wallboards

Publications (2)

Publication Number Publication Date
CN102505862A true CN102505862A (en) 2012-06-20
CN102505862B CN102505862B (en) 2014-03-05

Family

ID=46217990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110342915.7A Active CN102505862B (en) 2011-11-03 2011-11-03 Installing process of lightweight internal partition wallboards

Country Status (1)

Country Link
CN (1) CN102505862B (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102777045A (en) * 2012-08-09 2012-11-14 龙信建设集团有限公司 Construction method for assembling light energy-saving composite wallboards on separation wall
CN102777042A (en) * 2012-07-27 2012-11-14 中山建华墙体材料有限公司 Installation technology of connecting board type inner separation wall
CN102777041A (en) * 2012-07-27 2012-11-14 中山建华墙体材料有限公司 Installation technology of inner separation wall body
CN102777040A (en) * 2012-07-27 2012-11-14 中山建华墙体材料有限公司 Installation process of stagger-joint dual-wallboard inner partition wall and dual-wallboard inner partition
CN103015621A (en) * 2013-01-06 2013-04-03 江苏建华新型墙材有限公司 Wall board with double rows of square holes
CN103046668A (en) * 2013-01-06 2013-04-17 江苏建华新型墙材有限公司 Wall spliced by wallboards
CN103216107A (en) * 2013-04-23 2013-07-24 东莞市彩丽建筑维护技术有限公司 Method for installing concrete light board wall and jacking and fixing device
CN103526863A (en) * 2013-11-01 2014-01-22 桂林永福龙港绿色环保建材有限公司 Mounting process capable of effectively avoiding vertical cracking of internal wall strip plates
CN103981984A (en) * 2013-11-01 2014-08-13 桂林永福龙港绿色环保建材有限公司 Anti-corrosion damping fixing bolt capable of effectively preventing vertical cracking of inner wall strip board
CN104213713A (en) * 2014-08-05 2014-12-17 马鞍山十七冶工程科技有限责任公司 Method for mounting self-heat-insulation light-weight interior wallboards and shear wallboards simultaneously
CN105155857A (en) * 2015-08-11 2015-12-16 孟凡林 Construction and installation method of architectural engineering partition wall boards
CN105155767A (en) * 2015-09-17 2015-12-16 华夏 Light interior partition wall board and walling method for wall body
CN106245921A (en) * 2016-07-28 2016-12-21 中国建筑第二工程局有限公司 Novel concrete hollow partition board installation and construction method
CN107090924A (en) * 2017-06-26 2017-08-25 江苏沪宁钢机股份有限公司 A kind of special-shaped exterior wall of assembled and its construction technology
CN107558633A (en) * 2017-09-09 2018-01-09 中国二十二冶集团有限公司 It is provided with the installation method of the prefabricated panel with distribution box
CN108612228A (en) * 2016-12-13 2018-10-02 广西矿建集团有限公司 Prestressed assembly precast light partition plate and its installation method
CN112211322A (en) * 2020-10-19 2021-01-12 上海宝冶集团南京建筑有限公司 Mounting construction method of autoclaved ceramsite reinforced concrete light wall board
CN112942636A (en) * 2021-02-06 2021-06-11 重庆市臻成建材有限公司 Wall installation method capable of realizing rapid construction
CN113404080A (en) * 2021-07-26 2021-09-17 中冶建工集团有限公司 Method for fixing base steel column of bearing platform cup opening
CN114182850A (en) * 2021-12-23 2022-03-15 浙江至方建设有限公司 Installation and construction method of concrete prefabricated wall panel

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20302562U1 (en) * 2003-02-18 2003-04-30 SWS Gesellschaft für Glasbaubeschläge mbH, 51545 Waldbröl Clamping device for fastening plates, in particular glass plates
CN2622272Y (en) * 2003-01-14 2004-06-30 有利华建筑预制件(深圳)有限公司 Combination type partition wall made of glass
CN1970914A (en) * 2006-12-13 2007-05-30 北京城建集团有限责任公司 Steel structure assisted layered installation and construction method for superhigh PRC partition plate
CN201021512Y (en) * 2007-02-02 2008-02-13 中国林业科学研究院木材工业研究所 External wall body structure for wooden building
CN201254698Y (en) * 2008-08-13 2009-06-10 罗菁 Improved structure for sound absorption wall
US7610731B1 (en) * 2005-01-10 2009-11-03 Comc, Llc Snap together floor structure
CN101586370A (en) * 2008-05-19 2009-11-25 王建荣 Construction method of ceramsite light wallboard
CN201605684U (en) * 2009-12-28 2010-10-13 华刘勇 Novel wall and ceiling sound vibration absorption device
CN101974975A (en) * 2010-08-17 2011-02-16 龙信建设集团有限公司 Method for constructing ash concrete hollow partition plate
CN201933632U (en) * 2011-01-19 2011-08-17 韩晶晶 Soundproof wall

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2622272Y (en) * 2003-01-14 2004-06-30 有利华建筑预制件(深圳)有限公司 Combination type partition wall made of glass
DE20302562U1 (en) * 2003-02-18 2003-04-30 SWS Gesellschaft für Glasbaubeschläge mbH, 51545 Waldbröl Clamping device for fastening plates, in particular glass plates
US7610731B1 (en) * 2005-01-10 2009-11-03 Comc, Llc Snap together floor structure
CN1970914A (en) * 2006-12-13 2007-05-30 北京城建集团有限责任公司 Steel structure assisted layered installation and construction method for superhigh PRC partition plate
CN201021512Y (en) * 2007-02-02 2008-02-13 中国林业科学研究院木材工业研究所 External wall body structure for wooden building
CN101586370A (en) * 2008-05-19 2009-11-25 王建荣 Construction method of ceramsite light wallboard
CN201254698Y (en) * 2008-08-13 2009-06-10 罗菁 Improved structure for sound absorption wall
CN201605684U (en) * 2009-12-28 2010-10-13 华刘勇 Novel wall and ceiling sound vibration absorption device
CN101974975A (en) * 2010-08-17 2011-02-16 龙信建设集团有限公司 Method for constructing ash concrete hollow partition plate
CN201933632U (en) * 2011-01-19 2011-08-17 韩晶晶 Soundproof wall

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102777042A (en) * 2012-07-27 2012-11-14 中山建华墙体材料有限公司 Installation technology of connecting board type inner separation wall
CN102777041A (en) * 2012-07-27 2012-11-14 中山建华墙体材料有限公司 Installation technology of inner separation wall body
CN102777040A (en) * 2012-07-27 2012-11-14 中山建华墙体材料有限公司 Installation process of stagger-joint dual-wallboard inner partition wall and dual-wallboard inner partition
CN102777045A (en) * 2012-08-09 2012-11-14 龙信建设集团有限公司 Construction method for assembling light energy-saving composite wallboards on separation wall
CN103015621A (en) * 2013-01-06 2013-04-03 江苏建华新型墙材有限公司 Wall board with double rows of square holes
CN103046668A (en) * 2013-01-06 2013-04-17 江苏建华新型墙材有限公司 Wall spliced by wallboards
CN103216107A (en) * 2013-04-23 2013-07-24 东莞市彩丽建筑维护技术有限公司 Method for installing concrete light board wall and jacking and fixing device
CN103216107B (en) * 2013-04-23 2016-06-15 东莞市彩丽建筑维护技术有限公司 A kind of method installing concrete light board wall and top are fixedly mounted with and put
CN103526863A (en) * 2013-11-01 2014-01-22 桂林永福龙港绿色环保建材有限公司 Mounting process capable of effectively avoiding vertical cracking of internal wall strip plates
CN103981984A (en) * 2013-11-01 2014-08-13 桂林永福龙港绿色环保建材有限公司 Anti-corrosion damping fixing bolt capable of effectively preventing vertical cracking of inner wall strip board
CN103526863B (en) * 2013-11-01 2016-08-31 桂林永福龙港绿色环保建材有限公司 One can effectively prevent the vertical cracking of mounting process of light internal wall batten
CN104213713B (en) * 2014-08-05 2016-04-06 马鞍山十七冶工程科技有限责任公司 A kind of method that self-insulating light inner wall panel and shear wall slab are installed simultaneously
CN104213713A (en) * 2014-08-05 2014-12-17 马鞍山十七冶工程科技有限责任公司 Method for mounting self-heat-insulation light-weight interior wallboards and shear wallboards simultaneously
CN105155857A (en) * 2015-08-11 2015-12-16 孟凡林 Construction and installation method of architectural engineering partition wall boards
CN105155857B (en) * 2015-08-11 2017-04-05 孟凡林 A kind of construction installation method of architectural engineering partition plate
CN105155767A (en) * 2015-09-17 2015-12-16 华夏 Light interior partition wall board and walling method for wall body
CN106245921A (en) * 2016-07-28 2016-12-21 中国建筑第二工程局有限公司 Novel concrete hollow partition board installation and construction method
CN106245921B (en) * 2016-07-28 2019-04-09 中国建筑第二工程局有限公司 Installation and construction method of concrete hollow partition board
CN108612228A (en) * 2016-12-13 2018-10-02 广西矿建集团有限公司 Prestressed assembly precast light partition plate and its installation method
CN107090924B (en) * 2017-06-26 2022-09-20 江苏沪宁钢机股份有限公司 Assembled special-shaped outer wall and construction process thereof
CN107090924A (en) * 2017-06-26 2017-08-25 江苏沪宁钢机股份有限公司 A kind of special-shaped exterior wall of assembled and its construction technology
CN107558633A (en) * 2017-09-09 2018-01-09 中国二十二冶集团有限公司 It is provided with the installation method of the prefabricated panel with distribution box
CN112211322A (en) * 2020-10-19 2021-01-12 上海宝冶集团南京建筑有限公司 Mounting construction method of autoclaved ceramsite reinforced concrete light wall board
CN112942636A (en) * 2021-02-06 2021-06-11 重庆市臻成建材有限公司 Wall installation method capable of realizing rapid construction
CN113404080A (en) * 2021-07-26 2021-09-17 中冶建工集团有限公司 Method for fixing base steel column of bearing platform cup opening
CN114182850A (en) * 2021-12-23 2022-03-15 浙江至方建设有限公司 Installation and construction method of concrete prefabricated wall panel

Also Published As

Publication number Publication date
CN102505862B (en) 2014-03-05

Similar Documents

Publication Publication Date Title
CN102505862B (en) Installing process of lightweight internal partition wallboards
CN102777041A (en) Installation technology of inner separation wall body
CN102296816A (en) Factorial construction method for component of total prefabricated assembly integral type shear wall structure system
CN102777040A (en) Installation process of stagger-joint dual-wallboard inner partition wall and dual-wallboard inner partition
CN102704684A (en) Construction method for high-strength shaping combined template of plank frame of shear wall
CN202144665U (en) Regeneration building mould plate
CN102777042A (en) Installation technology of connecting board type inner separation wall
CN104278632A (en) Bridge main tower creeping formwork and manufacturing method thereof
CN117449216A (en) Bridge lower beam construction method
CN105804396B (en) A kind of non-type, template system precast stair bench and construction can be had enough to meet the need
CN218521787U (en) Simple prefabricated pipe pile core filling auxiliary device
CN103243912A (en) Multilayer no-board frame structure constructing method
CN113266148A (en) Installation method of large-section beam template
JP7003008B2 (en) Layered panel floor slab bridge construction method
CN109707152B (en) Aluminum alloy formwork system and construction method thereof
CN113216620A (en) Aluminum mould and wood pattern splicing and reinforcing device
CN110894740B (en) Operation method for building indoor wall
Mizutani et al. Construction of a 300-meter vertical city: Abeno Harukas
CN202064480U (en) Outer separating wall built with lightweight concrete separating plates
US678728A (en) Framework for buildings.
CN204552073U (en) Concreting titanium alloy metope template
CN219565110U (en) Simple ALC plate conveying device
CN211622341U (en) Assembled modularization stair structure
JP2024087973A (en) Exterior wall construction system
CN208596493U (en) Cranked slab stairs design of coupler scaffold entity teaching mode

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230904

Address after: 212400 No.1-3, Lingang industrial concentration area, Xiashu Town, Jurong City, Zhenjiang City, Jiangsu Province

Patentee after: JIANGSU JIANHUA NEW WALL MATERIAL Co.,Ltd.

Address before: No. 15-1 Baigang 1st Street, Yaotiao Village, Torch Development Zone, Zhongshan City, Guangdong Province, 528437

Patentee before: ZHONGSHAN JIANHUA WALL MATERIALS Co.,Ltd.