CN104213713B - A kind of method that self-insulating light inner wall panel and shear wall slab are installed simultaneously - Google Patents
A kind of method that self-insulating light inner wall panel and shear wall slab are installed simultaneously Download PDFInfo
- Publication number
- CN104213713B CN104213713B CN201410379758.0A CN201410379758A CN104213713B CN 104213713 B CN104213713 B CN 104213713B CN 201410379758 A CN201410379758 A CN 201410379758A CN 104213713 B CN104213713 B CN 104213713B
- Authority
- CN
- China
- Prior art keywords
- wall panel
- self
- insulating light
- light inner
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
<b> the present invention discloses a kind of method that self-insulating light inner wall panel and shear wall slab are installed simultaneously, belongs to technical field of building construction.The inventive method is shear wall slab is installed while, carry out the installation of self-insulating light inner wall panel, this mounting method is mainly: the lifting first carrying out self-insulating light inner wall panel, according to floor height determination self-insulating light inner wall panel height and cutting position, carry out the cutting process of self-insulating light inner wall panel; Build the installation that then simple and easy beam carries out self-insulating light inner wall panel; Then correct the degree of plainness for wall surface of self-insulating light inner wall panel, finally between self-insulating light inner wall panel and floor, tamp special adhesive mortar; Carry out laying glass fiber net between mortar closing in, self-insulating light inner wall panel, smearing adhesive mortar after connecting self-insulating light inner wall panel and top beam slab.The inventive method have work efficiency fast, the technical characterstics such as firm are installed.</b>
Description
Technical field:
The invention belongs to technical field of building construction, be specifically related to a kind of method that self-insulating light inner wall panel and shear wall slab are installed simultaneously.
Background technology:
The installation of existing self-insulating light inner wall panel is all after agent structure is built up, install again and fill inner wall panel, mounting process is relatively complicated, install loaded down with trivial details, be connected firm not between wallboard or between wallboard with agent structure, safety can not be guaranteed, and work efficiency is low, when special installing space is narrow, installation effectiveness is lower.
Summary of the invention:
The present invention is directed to the technical problem existed in existing self-insulating light inner wall panel mounting technique, a kind of method that self-insulating light inner wall panel and shear wall slab are installed simultaneously is provided.
The method that a kind of self-insulating light inner wall panel provided by the present invention and shear wall slab are installed simultaneously, the method is shear wall slab is installed while, carry out the installation of self-insulating light inner wall panel, and its concrete steps are as follows:
(1) lifting of self-insulating light inner wall panel: utilize shear wall installation lifting appliance to carry out self-insulating light inner wall panel and vertically allocate and transport, each lifting 10 pieces of standard self-insulating light inner wall panels, employing Special belt bundlees, self-insulating light inner wall panel lower end stress point cushioning block rubber, protection self-insulating light inner wall panel is not by local failure;
(2) adopt infrared ray gradienter to carry out unwrapping wire, according to floor height determination self-insulating light inner wall panel height and cutting position, carry out the cutting process of self-insulating light inner wall panel;
(3) simple and easy beam is built: first hole at bottom floor, by expansion bolt, H profile steel pipe is fixed on floor, chassis is welded with bottom H profile steel pipe, chassis is provided with 3 holes, and H profile steel pipe upper end is welded with top bar, and top bar is provided with 2 holes, then by screw, angle steel is fixed on the top bar of H profile steel pipe, then flexible Adjustable bracing bar is fixed on angle steel, is screwed connection strap and angle steel, complete simple and easy beam and build;
(4) self-insulating light inner wall panel is installed: hold up first piece of self-insulating light inner wall panel, 4 pieces of timber wedge location are squeezed into levelling below first piece of self-insulating light inner wall panel, timber wedge makes to hold out against between first piece of self-insulating light inner wall panel and angle steel, first piece of self-insulating light inner wall panel lower end side installs right angle code, fixed by ail gun nailing, then smear special adhesive mortar at tongue-and-groove place; Then second piece of self-insulating light inner wall panel is holded up, tenon is aimed at tongue-and-groove and slowly squeezes out mortar, locate levelling with 4 pieces of timber wedges again and right angle code is installed, repeat to install always, until whole self-insulating light inner wall panel installs, then correct the degree of plainness for wall surface of self-insulating light inner wall panel, finally between self-insulating light inner wall panel and floor, tamp special adhesive mortar;
(5) self-insulating light inner wall panel and top beam slab is connected: certain distance is reserved far from top beam slab in the top of self-insulating light inner wall panel, after the installation of self-insulating light inner wall panel, top beam slab starts construction, beam slab lower end is reserved bar dowel and is aimed at self-insulating light inner wall panel upper end preformed hole, lift, then block rubber is placed on self-insulating light inner wall panel top, self-insulating light inner wall panel and beam slab are held out against, then simple and easy beam is removed, special adhesive mortar is tamped between self-insulating light inner wall panel top and beam slab, comprise self-insulating light inner wall panel preformed hole, finally carry out mortar closing in, glass fiber net is laid between self-insulating light inner wall panel, smear adhesive mortar,
(6) after self-insulating light inner wall panel installs, must not collide within 24h, must not next process be carried out, safeguard procedures should be taked to self-insulating light inner wall panel partition wall, any lateral force must not be born in 7 days, the material of construction ladder, engineering must not support, pushes up pressure or lean against on self-insulating light inner wall panel, connecting bottom self-insulating light inner wall panel after 3 days when mortar strength reaches more than 5MPa and withdraw from timber wedge, tamping with connecting the cavity that timber wedge stays by mortar.
The inventive method have work efficiency fast, the technical characterstics such as firm are installed.
Accompanying drawing illustrates:
Fig. 1: be that self-insulating light inner wall panel installs main TV structure schematic diagram;
Fig. 2: be that self-insulating light inner wall panel installs left TV structure schematic diagram;
Fig. 3: be that self-insulating light inner wall panel installs plan structure schematic diagram;
Fig. 4: be vertical support shelf structure schematic diagram;
Fig. 5: the structural representation being self-insulating light inner wall panel installation fitting connection strap;
Fig. 6: be the perspective view of self-insulating light inner wall panel installation fitting block rubber, front view and left view.
In figure: 1: beam/floor; 2: inner wall panel; 3: steel pipe; 4: angle steel; 5: reserved bar dowel; 6:U type card article; 7: wallboard preformed hole; 8: right angle code; 9: timber wedge; 10: flexible Adjustable bracing bar; 11: connection strap; 12: top bar; 13: chassis; 14: wallboard.
Detailed description of the invention:
The method that a kind of self-insulating light inner wall panel provided by the present invention and shear wall slab are installed simultaneously, the method concrete steps are:
Preparation of construction → self-insulating light inner wall panel lifting → line setting → (steel pipe is fixed on lower floor's platform to build simple and easy beam, steel pipe is supported with angle steel, flexible Adjustable bracing bar is fixed again on angle steel in side, steel pipe support place) → first piece of self-insulating light inner wall panel installation, squeeze into timber wedge below and levelling ... repeat to install self-insulating light inner wall panel all wallboards → school plate → tamp mortar → top beam slab in all self-insulating light inner wall panel lower ends and start construction, beam slab lower end reserves bar dowel and aims at self-insulating light inner wall panel upper end preformed hole and carry out lifting → and self-insulating light inner wall panel top places the simple and easy beam of block rubber → remove → tamp mortar (comprising self-insulating light inner wall panel preformed hole) → mortar to close up and (spread glass fiber net between self-insulating light inner wall panel between self-insulating light inner wall panel upper end and top beam slab, smear adhesive mortar) → wall body completes → directly fits up.
1, preparation of construction:
(1) material prepares: dry self-insulating light inner wall panel and supporting door plate, glass fiber mesh or 0.8 thick gauze wire cloth.
(2) construction tool: angle steel, steel pipe (or H profile steel), screw, nut, U-shaped card article, infrared water level, with the crow bar of horizontal angle bar, electric saw and plastering plate, putty knife, plaster ground, timber wedge, expansion bolt etc.;
(3) operation prepares: after lower floor's platform construction completes, sheet material and other material are possessed Qi Dengyong, according to drawing requirement, unwrapping wire on floor, marks the partition wall position line, door position etc.Installed surface bonded part is cleaned out.It is whole that projection picks chipping.Prepare special adhesive mortar stand-by.
2, self-insulating light inner wall panel lifting: utilize shear wall installation lifting appliance to carry out self-insulating light inner wall panel and vertically allocate and transport; each lifting 10 pieces of standard self-insulating light inner wall panels; employing Special belt bundlees; lower end self-insulating light inner wall panel stress point cushioning rubber is fast, and protection self-insulating light inner wall panel is not by local failure.Flat bogie is used to carry out floor levels transport.
3, adopt infrared ray gradienter to carry out unwrapping wire, according to floor height determination wall-plate level and cutting position, carry out the cutting of self-insulating light inner wall panel.
4, simple and easy beam is built: first bottom floor is holed, by expansion bolt steel pipe (H profile steel) is fixed on floor and (bottom steel pipe, is welded with chassis, chassis there are 3 holes, upper end is welded with top bar, top bar has 2 holes), then by screw, angle steel is fixed on the top bar of steel pipe, then flexible Adjustable bracing bar is fixed again on angle steel in side, steel pipe support place, be screwed connection strap and angle steel upper end, simple and easy like this beam has been built, and can carry out the installation of self-insulating light inner wall panel.
5, self-insulating light inner wall panel is installed:
First piece of self-insulating light inner wall panel is holded up, squeeze into 4 pieces of timber wedges location levelling (timber wedge makes to hold out against between self-insulating light inner wall panel and angle steel) below, self-insulating light inner wall panel lower end side installs right angle code (being fixed by ail gun nailing), then smears special adhesive mortar at tongue-and-groove place; Second piece of self-insulating light inner wall panel is holded up, tenon is aimed at tongue-and-groove and slowly squeezes out mortar, again 4 pieces of timber wedges are located levelling and right angle code is installed, repeat to install always, until whole self-insulating light inner wall panel installs, then correct the degree of plainness for wall surface of self-insulating light inner wall panel, finally between self-insulating light inner wall panel and floor, tamp special adhesive mortar.
6, the connection of self-insulating light inner wall panel and top beam slab: self-insulating light inner wall panel top is far from the reserved certain distance of top beam slab, after the installation of self-insulating light inner wall panel, top beam slab starts construction, beam slab lower end is reserved bar dowel aligning self-insulating light inner wall panel upper end preformed hole and is lifted, then block rubber is placed on self-insulating light inner wall panel top, self-insulating light inner wall panel and beam slab are held out against, then simple and easy beam is removed, special adhesive mortar (comprising self-insulating light inner wall panel preformed hole) is tamped between self-insulating light inner wall panel top and beam slab, finally carry out mortar closing in and (between self-insulating light inner wall panel, spread glass fiber net, smear adhesive mortar).
7, after self-insulating light inner wall panel installs, must not collide within 24h, must not next process be carried out.Should take safeguard procedures to wallboard partition wall, must not bear any lateral force in 7d, the material etc. of construction ladder, engineering must not support, pushes up pressure or lean against on body of wall.Connect bottom self-insulating light inner wall panel after 3d when mortar strength reaches more than 5MPa and withdraw from timber wedge, tamp with connecting the cavity that timber wedge stays by mortar, part self-insulating light inner wall panel can coat putty.
Claims (1)
1. a self-insulating light inner wall panel and shear wall slab method of simultaneously installing, the method is shear wall slab is installed while, carry out the installation of self-insulating light inner wall panel, and the method concrete steps are as follows:
(1) lifting of self-insulating light inner wall panel: utilize shear wall installation lifting appliance to carry out self-insulating light inner wall panel and vertically allocate and transport, each lifting 10 pieces of standard self-insulating light inner wall panels, employing Special belt bundlees, at the lower end stress point cushioning block rubber of described self-insulating light inner wall panel;
(2) adopt infrared ray gradienter to carry out unwrapping wire, determine described self-insulating light inner wall panel height and cutting position according to floor height, cutting process is carried out to described self-insulating light inner wall panel;
(3) simple and easy beam is built: first hole at bottom floor, by expansion bolt, H profile steel pipe is fixed on floor, chassis is welded with bottom described H profile steel pipe, described chassis is provided with 3 holes, and described H profile steel pipe upper end is welded with top bar, and described top bar is provided with 2 holes, then by screw, angle steel is fixed on the bar of described top, then flexible Adjustable bracing bar is fixed on described angle steel, is screwed connection strap and described angle steel, complete simple and easy beam and build;
(4) self-insulating light inner wall panel is installed: hold up first piece of self-insulating light inner wall panel, 4 pieces of timber wedge location are squeezed into levelling below described first piece of self-insulating light inner wall panel, timber wedge makes to hold out against between described first piece of self-insulating light inner wall panel and angle steel, described first piece of self-insulating light inner wall panel lower end side installs right angle code, fixed by ail gun nailing, then smear special adhesive mortar at tongue-and-groove place; Then second piece of self-insulating light inner wall panel is holded up, tenon is aimed at tongue-and-groove and slowly squeezes out mortar, locate levelling with 4 pieces of timber wedges again and right angle code is installed, repeat to install always, until whole self-insulating light inner wall panel installs, then correct the degree of plainness for wall surface of described self-insulating light inner wall panel, finally between described self-insulating light inner wall panel and floor, tamp special adhesive mortar;
(5) described self-insulating light inner wall panel and top beam slab is connected: certain distance is reserved far from top beam slab in the top of described self-insulating light inner wall panel, after the installation of described self-insulating light inner wall panel, top beam slab starts construction, beam slab lower end is reserved bar dowel and is aimed at described self-insulating light inner wall panel upper end preformed hole, lift, then block rubber is placed on described self-insulating light inner wall panel top, described self-insulating light inner wall panel and beam slab are held out against, then simple and easy beam is removed, special adhesive mortar is tamped between described self-insulating light inner wall panel top and beam slab, comprise and the special adhesive mortar of described self-insulating light inner wall panel upper end preformed hole is tamped, finally carry out mortar closing in, glass fiber net is laid between described self-insulating light inner wall panel, smear adhesive mortar,
(6) after described self-insulating light inner wall panel installs, must not collide within 24h, must not next process be carried out, safeguard procedures should be taked to described self-insulating light inner wall panel partition wall, any lateral force must not be born in 7 days, the material of construction ladder, engineering must not support, pushes up pressure or lean against on self-insulating light inner wall panel, connecting when mortar strength reaches more than 5MPa bottom described self-insulating light inner wall panel after 3 days and withdraw from timber wedge, tamping with connecting the cavity that timber wedge stays by mortar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410379758.0A CN104213713B (en) | 2014-08-05 | 2014-08-05 | A kind of method that self-insulating light inner wall panel and shear wall slab are installed simultaneously |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410379758.0A CN104213713B (en) | 2014-08-05 | 2014-08-05 | A kind of method that self-insulating light inner wall panel and shear wall slab are installed simultaneously |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104213713A CN104213713A (en) | 2014-12-17 |
CN104213713B true CN104213713B (en) | 2016-04-06 |
Family
ID=52095594
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410379758.0A Active CN104213713B (en) | 2014-08-05 | 2014-08-05 | A kind of method that self-insulating light inner wall panel and shear wall slab are installed simultaneously |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104213713B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107461209B (en) * | 2017-07-31 | 2019-04-09 | 中建桥梁有限公司 | In a kind of Tunnel Engineering at the top of mid-board reserved steel bar construction method |
CN107268837B (en) * | 2017-08-07 | 2023-05-19 | 北京天基新材料股份有限公司 | Assembled expanded stone wallboard and combined installation method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58218558A (en) * | 1982-06-15 | 1983-12-19 | ナショナル住宅産業株式会社 | Construction of wall panel |
JP2002356854A (en) * | 2001-06-01 | 2002-12-13 | Itogumi Construction Co Ltd | Method for building concrete wall using floor slab of building |
CN102251699A (en) * | 2011-05-13 | 2011-11-23 | 北京华美科博科技发展有限公司 | Residential building system with cast-in-situ beam columns and prefabricated sandwich concrete wall panels and construction method |
CN102505862A (en) * | 2011-11-03 | 2012-06-20 | 中山建华墙体材料有限公司 | Installing process of lightweight internal partition wallboards |
CN102777045A (en) * | 2012-08-09 | 2012-11-14 | 龙信建设集团有限公司 | Construction method for assembling light energy-saving composite wallboards on separation wall |
CN103216107A (en) * | 2013-04-23 | 2013-07-24 | 东莞市彩丽建筑维护技术有限公司 | Method for installing concrete light board wall and jacking and fixing device |
-
2014
- 2014-08-05 CN CN201410379758.0A patent/CN104213713B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58218558A (en) * | 1982-06-15 | 1983-12-19 | ナショナル住宅産業株式会社 | Construction of wall panel |
JP2002356854A (en) * | 2001-06-01 | 2002-12-13 | Itogumi Construction Co Ltd | Method for building concrete wall using floor slab of building |
CN102251699A (en) * | 2011-05-13 | 2011-11-23 | 北京华美科博科技发展有限公司 | Residential building system with cast-in-situ beam columns and prefabricated sandwich concrete wall panels and construction method |
CN102505862A (en) * | 2011-11-03 | 2012-06-20 | 中山建华墙体材料有限公司 | Installing process of lightweight internal partition wallboards |
CN102777045A (en) * | 2012-08-09 | 2012-11-14 | 龙信建设集团有限公司 | Construction method for assembling light energy-saving composite wallboards on separation wall |
CN103216107A (en) * | 2013-04-23 | 2013-07-24 | 东莞市彩丽建筑维护技术有限公司 | Method for installing concrete light board wall and jacking and fixing device |
Also Published As
Publication number | Publication date |
---|---|
CN104213713A (en) | 2014-12-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8919727B2 (en) | Elevated floor and ceiling slab formwork system | |
CN104878766A (en) | Long side slope protection concrete continuous rapid pouring and form-drawing system and construction method | |
KR101611595B1 (en) | Rail-type installation structure of aluminum composite panels | |
CN104213713B (en) | A kind of method that self-insulating light inner wall panel and shear wall slab are installed simultaneously | |
CN203961238U (en) | Bolt anchor slab adjustable tool formula builder's jack | |
CN103074949A (en) | Construction method for environment-friendly light energy-saving wallboard | |
CN104499614A (en) | Wall heat-preservation integration point hanging system and mounting method thereof | |
CN107747367A (en) | A kind of autoclaved lightweight sand aerated concrete(AAC)Sheet material construction method | |
CN204690763U (en) | Long side slope protection concrete continuous fast pouring drawing-die system | |
CN204645343U (en) | Prefabricated assembled concrete out-hung panel fastening devices | |
US20100037538A1 (en) | Temporary adjustable support brace | |
CN101886470B (en) | Construction method of exposed concrete ribbed beams | |
CN104563515A (en) | Template bracing structure for ultrahigh shear wall and construction method thereof | |
CN211229239U (en) | Assembled scissors type antidetonation stair | |
CN102251671B (en) | Exterior heat insulation on-site construction process of exterior wall based on foaming cement material | |
CN204876399U (en) | Collection hoist and mount are positioned integrative prefabricated staircase | |
CN204940845U (en) | A kind of with the formwork reinforcement system of steel generation wood | |
CN202731295U (en) | Subsided frame template | |
CN203613826U (en) | Mobile house | |
CN111576681A (en) | FS composite heat-preservation construction integrated technology construction process | |
CN220644715U (en) | Install masonry structure of hanging blue brick dry wall | |
CN205742663U (en) | A kind of element type bright frame glass curtain wall system | |
CN111206737A (en) | Wall connecting piece of plug-in type low-carbon heat-preservation energy-saving plate | |
RU2597650C1 (en) | Formwork shield frame | |
CN204826220U (en) | Location built -in fitting with U type groove |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |