CN104213713A - Method for mounting self-heat-insulation light-weight interior wallboards and shear wallboards simultaneously - Google Patents
Method for mounting self-heat-insulation light-weight interior wallboards and shear wallboards simultaneously Download PDFInfo
- Publication number
- CN104213713A CN104213713A CN201410379758.0A CN201410379758A CN104213713A CN 104213713 A CN104213713 A CN 104213713A CN 201410379758 A CN201410379758 A CN 201410379758A CN 104213713 A CN104213713 A CN 104213713A
- Authority
- CN
- China
- Prior art keywords
- self
- wall panel
- insulating light
- light inner
- heat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses a method for mounting self-heat-insulation light-weight interior wallboards and shear wallboards simultaneously, and belongs to the technical field of building construction. According to the method, the shear wallboards are mounted while the self-heat-insulation light-weight interior wallboards are mounted. The method mainly comprises the following steps: firstly, hoisting the self-heat-insulation light-weight interior wallboards, and determining the height and the cutting position of each self-heat-insulation light-weight interior wallboard according to the floor height so as to cut the self-heat-insulation light-weight interior wallboards; secondly, setting up a simple beam, and then mounting the self-heat-insulation light-weight interior wallboards; thirdly, correcting the wall surface flatness of each self-heat-insulation light-weight interior wallboard; finally, filling special adhesive mortar between the self-heat-insulation light-weight interior wallboards and floors, connecting the self-heat-insulation light-weight interior wallboards with an upper beam plate, performing mortar closing, laying glass fiber nets among the self-heat-insulation light-weight interior wallboards, and plastering the adhesive mortar. The method has the technical characteristics of high work efficiency, firmness in mounting and the like.
Description
Technical field
The invention belongs to technical field of building construction, be specifically related to a kind of method that self-insulating light inner wall panel and shear wall slab are installed simultaneously.
Background technology
The installation of existing self-insulating light inner wall panel is all after agent structure is built up, install again and fill inner wall panel, mounting process is relatively complicated, install loaded down with trivial details, between wallboard or between wallboard and agent structure, be connected firmly not, safety can not be guaranteed, and work efficiency is low, in the situation that installing space is narrow especially, installation effectiveness is lower.
Summary of the invention
The present invention is directed to the technical problem existing in existing self-insulating light inner wall panel mounting technique, a kind of method that provides self-insulating light inner wall panel and shear wall slab simultaneously to install.
The method that a kind of self-insulating light inner wall panel provided by the present invention and shear wall slab are installed simultaneously, the method is when shear wall slab is installed, to carry out the installation of self-insulating light inner wall panel, its concrete steps are as follows:
(1) lifting of self-insulating light inner wall panel: utilize shear wall installation lifting appliance to carry out self-insulating light inner wall panel and vertically allocate and transport, 10 standard self-insulating light inner wall panels of each lifting, the binding of employing Special belt, self-insulating light inner wall panel lower end stress point cushioning rubber is fast, and protection self-insulating light inner wall panel is not subject to local failure;
(2) adopt infrared ray gradienter to carry out unwrapping wire, determine self-insulating light inner wall panel height and cutting position according to floor height, carry out the cutting process of self-insulating light inner wall panel;
(3) build simple and easy beam: first hole at bottom floor, by expansion bolt, H shape steel tube is fixed on floor, H shape steel tube bottom is welded with chassis, chassis is provided with 3 holes, and H shape steel tube upper end is welded with top bar, and top bar is provided with 2 holes, then angle steel is fixed on the top bar of H shape steel tube by screw, then the Adjustable bracing bar that will stretch is fixed on angle steel, is screwed connection strap and angle steel, completes simple and easy beam and builds;
(4) self-insulating light inner wall panel is installed: hold up first self-insulating light inner wall panel, below first self-insulating light inner wall panel, squeeze into 4 timber wedge location levellings, timber wedge makes to hold out against between first self-insulating light inner wall panel and angle steel, first self-insulating light inner wall panel lower end side installed right angle code, fix by ail gun nailing, then smear special adhesive mortar at tongue-and-groove place; Then second self-insulating light inner wall panel holded up, tenon is aimed to tongue-and-groove and slowly squeeze out mortar, locate levellings and right angle code is installed with 4 timber wedges again, repeat to install always, until whole self-insulating light inner wall panel installs, then proofread and correct the degree of plainness for wall surface of self-insulating light inner wall panel, finally between self-insulating light inner wall panel and floor, tamp special adhesive mortar;
(5) connect self-insulating light inner wall panel and top beam slab: the top of self-insulating light inner wall panel is far from the reserved certain distance of top beam slab, after the installation of self-insulating light inner wall panel, top beam slab starts construction, the reserved bar dowel in beam slab lower end is aimed at self-insulating light inner wall panel upper end preformed hole, lift, then place block rubber on self-insulating light inner wall panel top, self-insulating light inner wall panel and beam slab are held out against, then remove simple and easy beam, between self-insulating light inner wall panel top and beam slab, tamp special adhesive mortar, comprise self-insulating light inner wall panel preformed hole, finally carry out mortar closing in, between self-insulating light inner wall panel, lay glass fiber net, smear adhesive mortar,
(6) after self-insulating light inner wall panel installs, 24h is interiorly must not collide, must not carry out next process, should take safeguard procedures to self-insulating light inner wall panel partition wall, in 7 days, must not bear any lateral action power, the material that construction ladder, engineering are used must not support, push up presses or leans on self-insulating light inner wall panel, after 3 days, self-insulating light inner wall panel bottom connects mortar strength and reaches 5MPa and withdraw from timber wedge when above, with tamping in the cavity that connection mortar leaves timber wedge.
The inventive method have work efficiency fast, the technical characterstics such as firm are installed.
Brief description of the drawings
Fig. 1: be that self-insulating light inner wall panel is installed main TV structure schematic diagram;
Fig. 2: be that self-insulating light inner wall panel is installed left TV structure schematic diagram;
Fig. 3: be that self-insulating light inner wall panel is installed plan structure schematic diagram;
Fig. 4: be vertical support shelf structure schematic diagram;
Fig. 5: be self-insulating light inner wall panel installation fitting structural representation.
Detailed description of the invention
The method that a kind of self-insulating light inner wall panel provided by the present invention and shear wall slab are installed simultaneously, the method concrete steps are:
Preparation of construction → self-insulating light inner wall panel lifts → locates that unwrapping wire → (steel pipe is fixed on lower floor's platform to build simple and easy beam, on steel pipe, be supported with angle steel, flexible Adjustable bracing bar is fixed again on angle steel in side, steel pipe support place) → first self-insulating light inner wall panel installation, squeeze into timber wedge levelling below ... repeat to install all wallboard → schools of self-insulating light inner wall panel plate → tamp in all self-insulating light inner wall panels lower end mortar → top beam slab and start construction, the reserved bar dowel in beam slab lower end is aimed at preformed hole lift → self-insulating light inner wall panel top, self-insulating light inner wall panel upper end and is placed the simple and easy beam of block rubber → remove → tamp the closing in of mortar (comprising self-insulating light inner wall panel preformed hole) → mortar (to spread glass fiber net between self-insulating light inner wall panel between self-insulating light inner wall panel upper end and top beam slab, smear adhesive mortar) complete → directly finishing of → wall body.
1, preparation of construction:
(1) material is prepared: dry self-insulating light inner wall panel and supporting door plate, glass fiber mesh or 0.8 thick gauze wire cloth.
(2) construction tool: angle steel, steel pipe (or H shaped steel), screw, nut, U-shaped card article, infrared level gauge, with the crow bar of horizontal angle bar, electric saw and plastering plate, putty knife, plaster ground, timber wedge, expansion bolt etc.;
(3) operation is prepared: after lower floor's platform construction completes, sheet material and other material are possessed to Qi Dengyong, according to drawing requirement, unwrapping wire on floor, marks the partition wall position line, door position etc.Installed surface bonded part is cleaned out.It is whole that projection picks chipping.Prepare special adhesive mortar stand-by.
2, self-insulating light inner wall panel lifting: utilize shear wall installation lifting appliance to carry out self-insulating light inner wall panel and vertically allocate and transport; 10 standard self-insulating light inner wall panels of each lifting; the binding of employing Special belt; lower end self-insulating light inner wall panel stress point cushioning rubber is fast, and protection self-insulating light inner wall panel is not subject to local failure.Use flat bogie to carry out floor levels transport.
3, adopt infrared ray gradienter to carry out unwrapping wire, determine wallboard height and cutting position according to floor height, carry out the cutting of self-insulating light inner wall panel.
4, simple and easy beam is built: the boring of first bottom floor, by expansion bolt, steel pipe (H shaped steel) is fixed on floor and (bottom steel pipe, is welded with chassis, on chassis, there are 3 holes, upper end is welded with top bar, top bar has 2 holes), then angle steel is fixed on the top bar of steel pipe by screw, then flexible Adjustable bracing bar is fixed again on angle steel in side, steel pipe support place, be screwed connection strap and angle steel upper end, simple and easy like this beam has been built, and can carry out the installation of self-insulating light inner wall panel.
5, self-insulating light inner wall panel is installed:
First self-insulating light inner wall panel holded up, squeeze into 4 timber wedge location levellings (timber wedge makes to hold out against between self-insulating light inner wall panel and angle steel) below, self-insulating light inner wall panel lower end side is installed right angle code (fixing by ail gun nailing), then smears special adhesive mortar at tongue-and-groove place; Second self-insulating light inner wall panel holded up, tenon is aimed to tongue-and-groove and slowly squeeze out mortar, again 4 timber wedges are located to levellings and right angle code is installed, repeat to install always, until whole self-insulating light inner wall panel installs, then proofread and correct the degree of plainness for wall surface of self-insulating light inner wall panel, finally between self-insulating light inner wall panel and floor, tamp special adhesive mortar.
6, self-insulating light inner wall panel is connected with top beam slab: self-insulating light inner wall panel top is far from the reserved certain distance of top beam slab, after the installation of self-insulating light inner wall panel, top beam slab starts construction, the reserved bar dowel in beam slab lower end is aimed at self-insulating light inner wall panel upper end preformed hole and is lifted, then place block rubber on self-insulating light inner wall panel top, self-insulating light inner wall panel and beam slab are held out against, then remove simple and easy beam, between self-insulating light inner wall panel top and beam slab, tamp special adhesive mortar (comprising self-insulating light inner wall panel preformed hole), finally carry out mortar closing in and (between self-insulating light inner wall panel, spread glass fiber net, smear adhesive mortar).
7,, after self-insulating light inner wall panel installs, 24h is interiorly must not collide, must not carry out next process.Should take safeguard procedures to wallboard partition wall, must not bear any lateral action power in 7d, the material that construction ladder, engineering are used etc. must not support, push up presses or leans on body of wall.After 3d, self-insulating light inner wall panel bottom connects mortar strength and reaches 5MPa and withdraw from timber wedge when above, tamps with the cavity that connection mortar leaves timber wedge, and part self-insulating light inner wall panel can be coated putty.
Claims (1)
1.
the method that self-insulating light inner wall panel and shear wall slab are installed simultaneously, the method is when shear wall slab is installed, to carry out the installation of self-insulating light inner wall panel, the method concrete steps are as follows:
(1) lifting of self-insulating light inner wall panel: utilize shear wall installation lifting appliance to carry out self-insulating light inner wall panel and vertically allocate and transport, 10 standard self-insulating light inner wall panels of each lifting, the binding of employing Special belt, in the lower end of described self-insulating light inner wall panel, stress point cushioning rubber is fast;
(2) adopt infrared ray gradienter to carry out unwrapping wire, determine from described heat-insulating light inner wall panel height and cutting position according to floor height, described self-insulating light inner wall panel is carried out to cutting process;
(3) build simple and easy beam: first hole at bottom floor, by expansion bolt, H shape steel tube is fixed on floor, described H shape steel tube bottom is welded with chassis, described chassis is provided with 3 holes, and described H shape steel tube upper end is welded with top bar, and described top bar is provided with 2 holes, then by screw, angle steel is fixed on the bar of described top, then the Adjustable bracing bar that will stretch is fixed on described angle steel, is screwed connection strap and described angle steel, completes simple and easy beam and builds;
(4) self-insulating light inner wall panel is installed: hold up first self-insulating light inner wall panel, below described first self-insulating light inner wall panel, squeeze into 4 timber wedge location levellings, timber wedge makes to hold out against between described first self-insulating light inner wall panel and angle steel, described first self-insulating light inner wall panel lower end side installed right angle code, fix by ail gun nailing, then smear special adhesive mortar at tongue-and-groove place; Then second self-insulating light inner wall panel holded up, tenon is aimed to tongue-and-groove and slowly squeeze out mortar, locate levellings and right angle code is installed with 4 timber wedges again, repeat to install always, until whole self-insulating light inner wall panel installs, then proofread and correct the degree of plainness for wall surface of described self-insulating light inner wall panel, finally between described self-insulating light inner wall panel and floor, tamp special adhesive mortar;
(5) connect described self-insulating light inner wall panel and top beam slab: the top of described self-insulating light inner wall panel is far from the reserved certain distance of top beam slab, after the installation of described self-insulating light inner wall panel, top beam slab starts construction, the reserved bar dowel in beam slab lower end is aimed at described self-insulating light inner wall panel upper end preformed hole, lift, then place block rubber on described self-insulating light inner wall panel top, described self-insulating light inner wall panel and beam slab are held out against, then remove simple and easy beam, between described self-insulating light inner wall panel top and beam slab, tamp special adhesive mortar, comprise preformed hole special adhesive mortar in described self-insulating light inner wall panel upper end is tamped, finally carry out mortar closing in, between described self-insulating light inner wall panel, lay glass fiber net, smear adhesive mortar,
(6) after described self-insulating light inner wall panel installs, 24h is interiorly must not collide, must not carry out next process, should take safeguard procedures to described self-insulating light inner wall panel partition wall, in 7 days, must not bear any lateral action power, the material that construction ladder, engineering are used must not support, push up presses or leans on self-insulating light inner wall panel, after 3 days, described self-insulating light inner wall panel bottom connects mortar strength and reaches 5MPa and withdraw from timber wedge when above, with tamping in the cavity that connection mortar leaves timber wedge.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410379758.0A CN104213713B (en) | 2014-08-05 | 2014-08-05 | A kind of method that self-insulating light inner wall panel and shear wall slab are installed simultaneously |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410379758.0A CN104213713B (en) | 2014-08-05 | 2014-08-05 | A kind of method that self-insulating light inner wall panel and shear wall slab are installed simultaneously |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104213713A true CN104213713A (en) | 2014-12-17 |
CN104213713B CN104213713B (en) | 2016-04-06 |
Family
ID=52095594
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410379758.0A Active CN104213713B (en) | 2014-08-05 | 2014-08-05 | A kind of method that self-insulating light inner wall panel and shear wall slab are installed simultaneously |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104213713B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107268837A (en) * | 2017-08-07 | 2017-10-20 | 北京天基新材料股份有限公司 | A kind of swollen stone walling plate of assembled and combinations thereof installation method |
CN107461209A (en) * | 2017-07-31 | 2017-12-12 | 中国建筑第六工程局有限公司 | The construction method of mid-board top reserved steel bar in a kind of Tunnel Engineering |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58218558A (en) * | 1982-06-15 | 1983-12-19 | ナショナル住宅産業株式会社 | Construction of wall panel |
JP2002356854A (en) * | 2001-06-01 | 2002-12-13 | Itogumi Construction Co Ltd | Method for building concrete wall using floor slab of building |
CN102251699A (en) * | 2011-05-13 | 2011-11-23 | 北京华美科博科技发展有限公司 | Residential building system with cast-in-situ beam columns and prefabricated sandwich concrete wall panels and construction method |
CN102505862A (en) * | 2011-11-03 | 2012-06-20 | 中山建华墙体材料有限公司 | Installing process of lightweight internal partition wallboards |
CN102777045A (en) * | 2012-08-09 | 2012-11-14 | 龙信建设集团有限公司 | Construction method for assembling light energy-saving composite wallboards on separation wall |
CN103216107A (en) * | 2013-04-23 | 2013-07-24 | 东莞市彩丽建筑维护技术有限公司 | Method for installing concrete light board wall and jacking and fixing device |
-
2014
- 2014-08-05 CN CN201410379758.0A patent/CN104213713B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58218558A (en) * | 1982-06-15 | 1983-12-19 | ナショナル住宅産業株式会社 | Construction of wall panel |
JP2002356854A (en) * | 2001-06-01 | 2002-12-13 | Itogumi Construction Co Ltd | Method for building concrete wall using floor slab of building |
CN102251699A (en) * | 2011-05-13 | 2011-11-23 | 北京华美科博科技发展有限公司 | Residential building system with cast-in-situ beam columns and prefabricated sandwich concrete wall panels and construction method |
CN102505862A (en) * | 2011-11-03 | 2012-06-20 | 中山建华墙体材料有限公司 | Installing process of lightweight internal partition wallboards |
CN102777045A (en) * | 2012-08-09 | 2012-11-14 | 龙信建设集团有限公司 | Construction method for assembling light energy-saving composite wallboards on separation wall |
CN103216107A (en) * | 2013-04-23 | 2013-07-24 | 东莞市彩丽建筑维护技术有限公司 | Method for installing concrete light board wall and jacking and fixing device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107461209A (en) * | 2017-07-31 | 2017-12-12 | 中国建筑第六工程局有限公司 | The construction method of mid-board top reserved steel bar in a kind of Tunnel Engineering |
CN107268837A (en) * | 2017-08-07 | 2017-10-20 | 北京天基新材料股份有限公司 | A kind of swollen stone walling plate of assembled and combinations thereof installation method |
Also Published As
Publication number | Publication date |
---|---|
CN104213713B (en) | 2016-04-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104878766A (en) | Long side slope protection concrete continuous rapid pouring and form-drawing system and construction method | |
CN103741846A (en) | Construction method for concrete shear wall | |
CN103835505A (en) | Outer wall compound heat preservation board construction method | |
CN111576890A (en) | Construction method of assembled ALC partition wall | |
CN104213713B (en) | A kind of method that self-insulating light inner wall panel and shear wall slab are installed simultaneously | |
CN111576680A (en) | Method for mounting light steel concrete combined external wall panel | |
CN103074949A (en) | Construction method for environment-friendly light energy-saving wallboard | |
CN104499614A (en) | Wall heat-preservation integration point hanging system and mounting method thereof | |
CN107747367A (en) | A kind of autoclaved lightweight sand aerated concrete(AAC)Sheet material construction method | |
CN204418434U (en) | A kind of outer wall heat insulating device | |
CN204690763U (en) | Long side slope protection concrete continuous fast pouring drawing-die system | |
US20100037538A1 (en) | Temporary adjustable support brace | |
CN101886470B (en) | Construction method of exposed concrete ribbed beams | |
KR102089751B1 (en) | Assembly type wall and floor structure of ocher room | |
CN215331591U (en) | Integral hoisting operation device for composite insulation board | |
CN102251671B (en) | Exterior heat insulation on-site construction process of exterior wall based on foaming cement material | |
CN204876399U (en) | Collection hoist and mount are positioned integrative prefabricated staircase | |
CN111576681A (en) | FS composite heat-preservation construction integrated technology construction process | |
CN104453252A (en) | Method for mounting and constructing sand aerated inner partition wall board | |
CN211666280U (en) | Assembled building wallboard bottom cementer | |
CN205046709U (en) | Prefabricated partition wall component of light gauge steel sand air entrainment board | |
CN111206737A (en) | Wall connecting piece of plug-in type low-carbon heat-preservation energy-saving plate | |
CN110259035A (en) | A kind of floor leveling system | |
CN220644715U (en) | Install masonry structure of hanging blue brick dry wall | |
CN218323344U (en) | Evaporate and press quick connecting device of lightweight concrete slab inner partition wall and roof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |