CN102251671B - Exterior heat insulation on-site construction process of exterior wall based on foaming cement material - Google Patents
Exterior heat insulation on-site construction process of exterior wall based on foaming cement material Download PDFInfo
- Publication number
- CN102251671B CN102251671B CN 201110073033 CN201110073033A CN102251671B CN 102251671 B CN102251671 B CN 102251671B CN 201110073033 CN201110073033 CN 201110073033 CN 201110073033 A CN201110073033 A CN 201110073033A CN 102251671 B CN102251671 B CN 102251671B
- Authority
- CN
- China
- Prior art keywords
- mould
- site construction
- external wall
- wall outer
- cement mortar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Building Environments (AREA)
Abstract
The invention relates to an exterior heat insulation on-site construction process of an exterior wall based on a foaming cement material, a long strip-shaped slot type first mold is manufactured and a flat plate is taken as a second mold; the bottom surface is taken as a base surface, line hanging and square scribing are performed on an exterior wall body according to requirements of horizontal transverse distribution and vertical positioning of the first mold: in each unit square, holes are punched above and below a preset position of the first mold respectively and metal bolts are planted with the help of a reinforcing and bar-planting material; the first mold is buckled and pressed on the end surface of the exterior wall body, compression is performed with the help of a compression steel plate and positioning is performed with the help of a locking nut; foaming cement-based slurry is poured into the first mold and the first mold is detached after hardening; the second mold is positioned between the end surfaces of adjacent two heat insulation inner core cushion blocks which are arranged at the upper part and the lower part with the help of the locking nut and the metal bolt; the foaming cement-based slurry is re-poured into a space formed among the second mold and the two heat insulation inner core cushion blocks, and the second mold is detached after hardening; and polymer cement mortar is plastered on a heat insulation core layer and a waterproof surface layer is formed after hardening.
Description
Technical field
The invention belongs to the technical field that External Wall in the floor construction body process adds lagging casing, relate to a kind of external wall outer insulation site construction technology based on ultra-light foaming cement material.
Background technology
The technical task of putting on " warming coat " to construction wall is scintillating the building trade personage's.Increasing building adopts and carries out the thermal-insulating waterproof construction, and the employing heat preservation plate material that has is in the mode that exterior wall pastes, the form that the employing that has is directly smeared at exterior wall, and the present invention mainly is for on-the-spot technique of constructing on exterior wall.Because the good heat insulating of foamed cement material, and reach the fireproof effect, therefore adopting foamed cement material is an extraordinary behave as heat preservation core layer, but traditional foam cement mostly is greatly following form to the casting method in the body of wall: 1, the two sides is masonry, the middle cavity that forms, pouring foaming cement in the cavity; 2, template has been propped up on the two sides, forms cavity in the template, pouring foaming cement in the cavity; 3, the one side formed body of wall, formwork supporting plate body of wall outside, to formation cavity in pouring foaming cement.More than three kinds of forms all need to rely on ground or scaffold support, must scaffold erecting first during construction.It is loaded down with trivial details to construct, and efficient is lower, especially needs to remove scaffold after exterior wall forms, and uses afterwards the difficulty of formwork supporting plate larger, and construction is inconvenient.Therefore be badly in need of and study the problem of insulation and waterproof site operation.
Summary of the invention
The invention provides a kind of external wall outer insulation site construction technology based on ultra-light foaming cement material, solve the large technical barrier of formwork supporting plate difficulty in the prior art, a kind of mould and whole work progress of new-type pouring foaming cement material have been designed, need not the support of ground or scaffold, both reduce the difficulty of formwork supporting plate, saved the working time, implanted again stressed bolt, heat insulation system firmly is connected with side fascia, has realized killing two birds with one stone.
The present invention realizes that the technical scheme that goal of the invention adopts is, based on the external wall outer insulation metope site construction technology of foamed cement material, is included in the processing step of directly making heat preservation core layer and waterproof layer on the exterior wall, and concrete steps are:
A, make the first mould of strip grooved and with flat board as the second mould, for subsequent use;
B, take ground as basal plane, on exterior wall according to the first die horizontal cross direction profiles, vertical location require form the unit grid in the hanging wire side of drawing;
C, in each unit grid, respectively in the punching of the above and below of the first mould pre-determined bit, and by reinforcing bar planting material implanted metal bolt;
D, the first mould is withheld on the exterior wall end face, compressed by compressing steel plate, and position by locking nut;
E, in the first mould pouring foaming cement based slurry, form the heat insulation inner core cushion block after the sclerosis, and remove the first mould;
F, the second mould is positioned between the end face of upper and lower adjacent two heat insulation inner core cushion blocks by locking nut and metal bolts;
G, in the space that forms between the second mould and two the heat insulation inner core cushion blocks pouring foaming cement based slurry again, after the sclerosis and heat insulation inner core cushion block and metal bolts shape all-in-one-piece heat preservation core layer structure, and remove the second mould;
H, smear the compression polymer cement mortar in heat preservation core layer, form waterproof layer after the sclerosis;
I, along continuous straight runs extension arrange the first mould, re-cover execution in step c-h until reach the border of design and construction;
J, established insulation layer are that the bottom surface re-covers the b-i step heat insulation inner core pad is extended upward until reach the height of design.
The bolt of some is implanted in the present invention's perforate on outer wall body, fixes two kinds of templates with it, and bolt is connected with wire lath in the anti-cracking waterproof surface layer, the main stress point that carries as heat insulation system.Take on ground as basal plane, two kinds of masterplates are adopted interval cross bearing mode, at first positioned at intervals the first template as pedestal, is positioned at cast foam cement well on the interval with the second template overlap joint again, and final cast forms heat preservation core layer.Need not to set up scaffold, greatly increase work efficiency.The metal bolts of utilize implanting, and postorder cement nail or the expansion bolt squeezed into have been strengthened the support force of insulation and waterproof construction greatly.
The present invention is described in detail below in conjunction with accompanying drawing.
Description of drawings
Structural representation when Fig. 1 is location the first mould.
Fig. 2 be among Fig. 1 A-A to sectional view.
Fig. 3 is the structural representation when removing the first mould, location the second mould.
Fig. 4 be among Fig. 3 B-B to sectional view.
Fig. 5 is the sectional view of external wall outer insulation wader facing after whole construction is finished.
Embodiment when Fig. 6 is reinforcing rib employing expansion bolt.
Fig. 7 is directly as the embodiment of architectural surface by the fast gravity die cement mortar of colored, water-repellent.
Fig. 8 is the waterproof construction embodiment that waterproof layer is comprised of three strata compound cement mortar.
In the accompanying drawing, the 1st, exterior wall, 2-1 are the first moulds, 2-2 is the second mould, and 2-3 compresses steel plate, and 3-1 reinforces the bar planting material, 3-2 is metal bolts, and 3-3 is locking nut, and 3-4 is metal sheet roof covering, the 4th, heat preservation core layer, 4-1 is the heat insulation inner core cushion block, the 5th, waterproof layer, the 6th, metal truss, the 7th, architectural surface, 8-1 are cement nails, 8-2 is expansion bolt, the 9th, and the fast gravity die cement mortar of colored, water-repellent.
The specific embodiment
Based on the external wall outer insulation metope site construction technology of foamed cement material, be included in the processing step of directly making heat preservation core layer and waterproof layer on the exterior wall 1, concrete steps are:
A, make the first mould 2-1 of strip grooved and with flat board as the 3rd mould 2-2, for subsequent use;
B, take ground as basal plane, on exterior wall 1 according to the first mould 2-1 horizontal cross distribute, vertical location require form the unit grid in the hanging wire side of drawing;
C, in each unit grid, respectively in the punching of the above and below of the first mould 2-1 pre-determined bit, and by reinforcing bar planting material 3-1 implanted metal bolt 3-2;
D, the first mould 2-1 is withheld on exterior wall 1 end face, compress by compressing steel plate 2-3, and position by locking nut 3-3;
E, in the first mould 2-1 pouring foaming cement based slurry, form heat insulation inner core cushion block 4-1 after the sclerosis, and remove the first mould 2-1;
F, the second mould 2-2 is positioned between the end face of upper and lower adjacent two heat insulation inner core cushion blocks by locking nut 3-3 and metal bolts 3-2;
G, in the space that forms between the second mould 2-2 and two the heat insulation inner core cushion block 4-1 pouring foaming cement based slurry again, after the sclerosis and heat insulation inner core cushion block 4-1 and metal bolts 3-2 shape all-in-one-piece heat preservation core layer 4 structures, and remove the second mould 2-2;
H, smear the compression polymer cement mortar in heat preservation core layer 4, form waterproof layer 5 after the sclerosis;
I, along continuous straight runs extension arrange the first mould, re-cover execution in step c-h until reach the border of design and construction;
J, established insulation layer are that the bottom surface re-covers the b-i step heat insulation inner core pad is extended upward until reach the height of design.
Before step b, increase step b0: blade coating one layer of polymeric cement mortar on exterior wall 1.
Described step h smears when smearing the compression polymer cement mortar and presses 2 to 3 strata compound cement mortar, and lays between the two layers of polymers cement mortar and strengthen braced structures.
Described reinforcement braced structures is metal truss 6 or glass mat or organic or inorganic net sheet.
Described step also comprises: k, make architectural surfaces 7 at waterproof layer 5.
After laying last one deck reinforcement braced structures, squeeze into reinforcing rib, use again polymer cement mortar floating.
Described reinforcing rib is reinforcement bar or cement nail 8-1 or expansion bolt 8-2.
Before step h, expose the termination weld metal thin plate 3-4 of the metal bolts 3-2 of heat preservation core layer 4, smear again the compression polymer cement mortar.
The material of described architectural surface 7 is the fast gravity die polymer cement mortar of waterproof or the fast gravity die polymer cement mortar 9 of colored, water-repellent or ceramic tile.
Described reinforcing bar planting material 3-1 is grouting material or organic structure glue.
Described organic structure glue is epoxy resin structural adhesive or phenolic resins class formation glue or polyacrylate structure glue or polyurethanes structure glue.
Described polymer cement mortar is the fast gravity die polymer cement mortar of waterproof or polymer cement waterproof paint or waterproof anti-crack mortar.
Described b step reserves the shrinkage joint between the unit grid that forms when the hanging wire side of drawing, fill a kind of in mineral wool, rock wool, the glass wool in removing the backward expanded joint structure of the second mould 2-2.
Described compression steel plate 2-3 is angle steel or square steel or i iron or U-steel.
Construction technology of the present invention is constructed according to following operation in the specific implementation, referring to Fig. 1 to Fig. 4:
1), make two mould 2-1,2-2 of exterior wall, compress steel plate 2-3, metal bolts 3-2, locking nut 3-3, for subsequent use;
2), the artificial fast gravity die polymer cement mortar of blade coating one deck waterproof on exterior wall 1;
3), take on ground as basal plane, at the body of wall side of drawing hanging wire, according to body of wall from left to right direction by the length of template with highly rule, be divided into several piece, the first mould 2-1 and the second mould 2-2 intersect and install, and intend the first mould 2-1 is installed on the lower side perforate on the wall segment of short transverse outside the both sides at exterior wall, pour into and reinforce bar planting material 3-1, insert metal bolts 3-2;
4), the first mould 2-1 is against on the wall by scribing position, will compresses steel plate 2-3 and pass metal bolts 3-2, the jack panel 3-3 that is locked gives fastening, has propped up successively other the first moulds;
5), cast ultra-light foamed cement base heat insulating material slurry forms heat insulation inner core cushion block 4-1 in the first good mould 2-1 to propping up, and is used for being used as the backing plate of the second mould 2-2;
6), remove the first mould 2-1 after the good foam cement base heat insulating material sclerosis to be cast;
7), the second mould 2-2 is placed on the heat insulation inner core cushion block 4-1 after the form removal, metal bolts 3-2 passes the second mould 2-2 both sides prepared screw-bolt hole, and is fastening with locking nut 3-3;
8), in the second good mould 2-2, pour into a mould ultra-light foamed cement base heat insulating material, with heat insulation inner core cushion block 4-1 formation integrative-structure;
9), form removal after the sclerosis of foam cement base heat insulating material;
10), the foam cement base heat insulating material after sclerosis is smeared and is pressed the fast gravity die polymer cement mortar of waterproof, the formation waterproof layer.
Below just finished the work progress of cast-in-site foaming cement thermal insulation sandwich layer 2.Waterproof layer referring to Fig. 5 to Fig. 8, is divided into following four kinds of embodiment and tells about respectively when Specific construction:
Referring to Fig. 5, when being reinforcing rib structure with cement nail 8-1,
11), the foam cement base heat insulating material after sclerosis is smeared and is pressed the fast gravity die polymer cement mortar of waterproof;
12), need to be at the fast gravity die polymer cement mortar of waterproof layer nail cement nail 8-1, a little higher than polymer cement mortar layer of the head of a nail by carrying; Metal bolts 3-2 is higher than the polymer mortar layer segment to be cut away;
13), lay wire lath on the polymer cement mortar layer, and with on metal truss 6 colligations or the welding hand head of a nail;
14), metal bolts 3-2 be higher than the polymer mortar layer segment cut away, at the larger metal sheet roof covering 3-4 of metal bolts 3-2 welding one, compress metal truss 6;
15), smear and press second time polymer cement mortar, formation waterproof layer 5;
16), do architectural surface 7 after second time polymer cement mortar sclerosis.
Referring to Fig. 6, when doing reinforcing rib structure with expansion bolt 8-2,
21), the foam cement base heat insulating material after sclerosis is smeared and is pressed the fast gravity die polymer cement mortar of waterproof;
22), lay metal truss 6 on the polymer cement mortar layer, and with metal truss 6 colligations or be welded on the head of a nail;
23), smear second time polymer cement mortar of pressure;
24), need to install expansion bolt 8-2 at second time polymer cement mortar layer by carrying, with nut compressing metal truss 6;
25), metal bolts 3-2 be higher than the polymer mortar layer segment cut away, one larger metal sheet roof covering 3-4 compresses metal truss 6 in metal bolts 3-2 welding;
26), smear the 3rd time polymer cement mortar of pressure;
27), do architectural surface 7 after the 3rd time polymer cement mortar sclerosis.
Referring to Fig. 7, when with the fast gravity die polymer cement mortar 9 of colored, water-repellent during directly as architectural surface,
31), the foam cement base heat insulating material after sclerosis is smeared and is pressed the fast gravity die polymer cement mortar of waterproof;
32), need to be at the fast gravity die polymer cement mortar of waterproof layer nail cement nail 8-1, a little higher than polymer cement mortar layer of the head of a nail by carrying;
33), lay metal truss 6 on the polymer cement mortar layer, and with metal truss 6 colligations or be welded on the head of a nail;
34), metal bolts 3-2 be higher than the polymer mortar layer segment cut away, one larger metal sheet roof covering 3-4 compresses metal truss 6 in metal bolts 3-2 welding;
35), smear the fast gravity die polymer cement mortar 9 of pressure colored, water-repellent directly as architectural surface 7.
Referring to Fig. 8, smear when pressing when waterproof layer 5 minutes 3 step,
41), the foam cement base heat insulating material after sclerosis is smeared and is pressed the fast gravity die polymer cement mortar of waterproof;
42), need to be at the fast gravity die polymer cement mortar of waterproof layer nail cement nail 8-1, a little higher than polymer cement mortar layer of the head of a nail by carrying;
43), lay wire lath 10 on the polymer cement mortar layer, and with the colligation of first layer metal rack or be welded on the cement nail 8-1;
44), smear second time polymer cement mortar of pressure;
45), lay the second layer metal net at second time polymer cement mortar, with its colligation or be welded on the cement nail 8-1;
46), metal bolts 3-2 be higher than the polymer mortar layer segment cut away, one larger metal sheet roof covering 3-4 compresses metal truss 6 in metal bolts 3-2 welding;
47), smear the 3rd time polymer cement mortar of pressure;
48), do decorative layer 7 after the 3rd time polymer cement mortar sclerosis.
Claims (15)
1. based on the external wall outer insulation metope site construction technology of foamed cement material, be included in the upper processing step of directly making heat preservation core layer and waterproof layer of exterior wall (1), it is characterized in that: concrete steps are:
A, make first mould (2-1) of strip grooved and with flat board as the second mould (2-2), for subsequent use;
B, take ground as basal plane, exterior wall (1) upper according to the first mould (2-1) horizontal cross distribute, vertical location require form the unit grid in the hanging wire side of drawing;
C, in each unit grid, respectively in the punching of the above and below of the first mould (2-1) pre-determined bit, and by reinforcing bar planting material (3-1) implanted metal bolt (3-2);
D, the first mould (2-1) is withheld on exterior wall (1) end face, compressed by compressing steel plate (2-3), and position by locking nut (3-3);
E, to the interior pouring foaming cement based of the first mould (2-1) slurry, form heat insulation inner core cushion block (4-1) after the sclerosis, and remove the first mould (2-1);
F, the second mould (2-2) is positioned between the end face of upper and lower adjacent two heat insulation inner core cushion blocks by locking nut (3-3) and metal bolts (3-2);
G, in the space that forms between the second mould (2-2) and two the heat insulation inner core cushion blocks (4-1) pouring foaming cement based slurry again, sclerosis rear and heat insulation inner core cushion block (4-1) and metal bolts (3-2) shape all-in-one-piece heat preservation core layer (4) structure, and remove the second mould (2-2);
H, smear the compression polymer cement mortar in heat preservation core layer (4), form waterproof layer (5) after the sclerosis;
I, along continuous straight runs extension arrange the first mould, re-cover execution in step c-h until reach the border of design and construction;
J, established insulation layer are that the bottom surface re-covers the b-i step heat insulation inner core pad is extended upward until reach the height of design.
2. the external wall outer insulation site construction technology based on foamed cement material according to claim 1 is characterized in that: increase step b0 before step b: in the upper blade coating one layer of polymeric cement mortar of exterior wall (1).
3. the external wall outer insulation site construction technology based on foamed cement material according to claim 1 is characterized in that: increase step b0 before step b: in the upper blade coating one layer of polymeric cement mortar of exterior wall (1).
4. the external wall outer insulation site construction technology based on foamed cement material according to claim 1, it is characterized in that: described step h, when smearing the compression polymer cement mortar, smear and press 2 to 3 strata compound cement mortar, and between the two layers of polymers cement mortar, lay and strengthen braced structures.
5. the external wall outer insulation site construction technology based on foamed cement material according to claim 3, it is characterized in that: described reinforcement braced structures is metal truss (6) or glass mat or organic or inorganic net sheet.
6. the external wall outer insulation site construction technology based on foamed cement material according to claim 1, it is characterized in that: described step also comprises: k, make architectural surface (7) at waterproof layer (5).
7. the external wall outer insulation site construction technology based on foamed cement material according to claim 3 is characterized in that: squeeze into reinforcing rib after laying last one deck reinforcement braced structures, use polymer cement mortar floating again.
8. the external wall outer insulation site construction technology based on foamed cement material according to claim 6, it is characterized in that: described reinforcing rib is reinforcement bar or cement nail (8-1) or expansion bolt (8-2).
9. the external wall outer insulation site construction technology based on foamed cement material according to claim 1, it is characterized in that: before step h, expose the termination weld metal thin plate (3-4) of the metal bolts (3-2) of heat preservation core layer (4), smear again the compression polymer cement mortar.
10. the external wall outer insulation site construction technology based on foamed cement material according to claim 5, it is characterized in that: the material of described architectural surface (7) is the fast gravity die polymer cement mortar of waterproof or the fast gravity die polymer cement mortar of colored, water-repellent (9) or ceramic tile.
11. the external wall outer insulation site construction technology based on foamed cement material according to claim 1 is characterized in that: described reinforcing bar planting material (3-1) is grouting material or organic structure glue.
12. the external wall outer insulation site construction technology based on foamed cement material according to claim 10 is characterized in that: described organic structure glue is epoxy resin structural adhesive or phenolic resins class formation glue or polyacrylate structure glue or polyurethanes structure glue.
13. according to claim 1 and 2 or 3 described external wall outer insulation site construction technologies based on foamed cement material, it is characterized in that: described polymer cement mortar is the fast gravity die polymer cement mortar of waterproof or polymer cement waterproof paint or waterproof anti-crack mortar.
14. the external wall outer insulation site construction technology based on foamed cement material according to claim 1, it is characterized in that: described b step is when the hanging wire side of drawing, between the unit grid that forms, reserve the shrinkage joint, in removing the backward expanded joint structure of the second mould (2-2), fill a kind of in mineral wool, rock wool, the glass wool.
15. the external wall outer insulation site construction technology based on foamed cement material according to claim 1 is characterized in that: described compression steel plate (2-3) is angle steel or square steel or i iron or U-steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110073033 CN102251671B (en) | 2011-03-25 | 2011-03-25 | Exterior heat insulation on-site construction process of exterior wall based on foaming cement material |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110073033 CN102251671B (en) | 2011-03-25 | 2011-03-25 | Exterior heat insulation on-site construction process of exterior wall based on foaming cement material |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102251671A CN102251671A (en) | 2011-11-23 |
CN102251671B true CN102251671B (en) | 2013-03-20 |
Family
ID=44979211
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110073033 Active CN102251671B (en) | 2011-03-25 | 2011-03-25 | Exterior heat insulation on-site construction process of exterior wall based on foaming cement material |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102251671B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103883133B (en) * | 2014-04-15 | 2016-03-02 | 北京卧龙农林科技有限公司 | The insulation reforming technology of loam brick body of wall |
CN204059979U (en) * | 2014-08-14 | 2014-12-31 | 侯铁山 | Pouring truck in a kind of cement foamed exterior-wall heat insulation construction |
CN105926834A (en) * | 2016-05-27 | 2016-09-07 | 王春明 | Heat insulating building board |
CN112267673A (en) * | 2020-10-31 | 2021-01-26 | 江苏天利成建筑科技有限公司 | Aluminum template connecting and fixing mechanism for civil engineering |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201301558Y (en) * | 2008-10-22 | 2009-09-02 | 宁夏电力建设工程公司 | Bracket steel pipe cement mortar grouting device |
CN101560798A (en) * | 2009-06-02 | 2009-10-21 | 周宏坤 | Cast-in-place light solid composite wall body of light steel truss structure and construction method thereof |
CN101871237A (en) * | 2010-06-22 | 2010-10-27 | 林淑芬 | Exterior wall insulated structure and building method thereof |
CN102251662A (en) * | 2011-02-28 | 2011-11-23 | 唐山北极熊建材有限公司 | Cast-in-place process for ultra light foamed cement-based bearing heat insulation wallboard |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01287355A (en) * | 1988-05-13 | 1989-11-20 | Shimizu Corp | Precast steel tubular concrete column structure and its construction |
-
2011
- 2011-03-25 CN CN 201110073033 patent/CN102251671B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201301558Y (en) * | 2008-10-22 | 2009-09-02 | 宁夏电力建设工程公司 | Bracket steel pipe cement mortar grouting device |
CN101560798A (en) * | 2009-06-02 | 2009-10-21 | 周宏坤 | Cast-in-place light solid composite wall body of light steel truss structure and construction method thereof |
CN101871237A (en) * | 2010-06-22 | 2010-10-27 | 林淑芬 | Exterior wall insulated structure and building method thereof |
CN102251662A (en) * | 2011-02-28 | 2011-11-23 | 唐山北极熊建材有限公司 | Cast-in-place process for ultra light foamed cement-based bearing heat insulation wallboard |
Non-Patent Citations (1)
Title |
---|
JP平1-287355A 1989.11.20 |
Also Published As
Publication number | Publication date |
---|---|
CN102251671A (en) | 2011-11-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203795663U (en) | Composite shear wall with self-heat-preservation function | |
CN204152000U (en) | A kind of inorganic compounding insulation construction for in-situ concrete wall | |
CN103276916B (en) | A kind of building method of sealing light weight concrete construction board wall wall hole and filling plate | |
CN206956959U (en) | Light composite heat insulation outer wall plate | |
CN104947846B (en) | A kind of prefabricated integral frame light filling lining and preparation method thereof | |
CN207017445U (en) | A kind of connecting structure of girder steel and retaining wall | |
CN204491984U (en) | Stone facing precast wall panel and external wall system | |
CN112459291A (en) | Prefabricated heat insulation structure integrated wall structure and construction process thereof | |
CN203429831U (en) | Split-free composite heat insulation template for pouring concrete | |
CN206752740U (en) | A kind of combined type cavity EPS modules | |
CN102251671B (en) | Exterior heat insulation on-site construction process of exterior wall based on foaming cement material | |
CN203430021U (en) | Split-free polyurethane composite heat insulation template for pouring concrete | |
CN203066305U (en) | External mold built-in compound insulation board and cast-in-place concrete integrated wall structure | |
CN104695662A (en) | Stone facing prefabricated external wall plate as well as production method and external wall system thereof | |
CN204418434U (en) | A kind of outer wall heat insulating device | |
CN103603474B (en) | A kind of ultrathin stone decorative finish heat-insulation system and preparation method thereof | |
CN104110082B (en) | The built-in composite insulation boards Cast-in-place concrete integration wall body structure of external mold and manufacture method thereof | |
CN111206694A (en) | External wall heat insulation structure and construction process thereof | |
CN207633745U (en) | Concreting is with exempting to tear compound heat preservation die plate open | |
CN202152508U (en) | Light composite wallboard | |
CN206957042U (en) | Light composite heat insulation outer wall plate and particular manufacturing craft | |
CN206916990U (en) | Assembled cast-in-place concrete sandwiched thermal-insulating wall steel skeleton template system and connector | |
CN201660975U (en) | Insulation system with built-in large mold | |
CN107386556A (en) | Light composite heat insulation outer wall plate | |
CN101469559A (en) | Composite heat insulating walling and mounting method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |