CN103216107A - Method for installing concrete light board wall and jacking and fixing device - Google Patents
Method for installing concrete light board wall and jacking and fixing device Download PDFInfo
- Publication number
- CN103216107A CN103216107A CN2013101442334A CN201310144233A CN103216107A CN 103216107 A CN103216107 A CN 103216107A CN 2013101442334 A CN2013101442334 A CN 2013101442334A CN 201310144233 A CN201310144233 A CN 201310144233A CN 103216107 A CN103216107 A CN 103216107A
- Authority
- CN
- China
- Prior art keywords
- wallboard
- board wall
- rod
- adjusting screw
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The invention discloses a method for installing a concrete light board wall. The method comprises the following steps: (1) a jacking and fixing device is prepared; (2) jacking gum is arranged on the upper end face of a wall board and the jacking and fixing device is sleeved on the lower end face of the wall board; (3) the lower end face of the wall board is jacked away from the floor surface by a wooden wedge and the position of the wall board is arranged in place; (4) jacking and fixing are conducted on the wall board arranged in place by means of screwing out adjusting screws so that the wall board is installed in place; (5) an upper corner connector is connected with a split joint corner portion of the wall board and the ceiling structural board; (6) a bonding sizing agent is arranged on the split joint face at one side of the wall board; and (7) the steps of (2), (3), (4), (5) and (6) are repeated, the wall boards are installed and fixed in place so that the board wall is formed. The invention further discloses the jacking and fixing device conducting the method. According to the method for installing the concrete light board wall and the jacking and fixing device, stability and safe reliability of the board wall are obviously improved, construction operation and cross construction are convenient and integrity and sound isolation effect of the board wall are effectively guaranteed.
Description
Technical field
The present invention relates to construction engineering technical field, be specifically related to a kind of method that the concrete light board wall is installed, and the top fixing apparatus of this method of enforcement.
Background technology
Body of wall is the requisite ingredient of building construction, has the construction of being convenient to, material saving, low, a work efficiency advantages of higher of pollution so that wallboard is wall constructed.Yet, owing to construct the prior art of wallboard,, but still mainly with the fixing wallboard of seat slurry mode, and often have influence on the globality and the soundproof effect of board wall though be furnished with angle sign indicating number and reinforcing bar drawknot.
Therefore, press for release and can guarantee the globality of board wall and the job practices of soundproof effect, and supporting efficient construction equipment.
Summary of the invention
In order to solve the problems of the technologies described above, the invention provides a kind of method that the concrete light board wall is installed, this both had been convenient to construction greatly wallboard had been installed and fixed the formation board wall, had also ensured the globality and the soundproof effect of board wall; The present invention also provides a kind of top fixing apparatus of implementing this method.
The technical scheme that the present invention is adopted for achieving the above object is:
A kind of method that the concrete light board wall is installed is characterized in that, may further comprise the steps:
(1) preparation is used in the foundation bottom of wallboard wallboard being made the fixing top fixing apparatus of roof pressure, and this top fixing apparatus is made up of base, adjusting screw(rod) and nut;
(2) the upper surface cover that withstands on the smallpox structural slab at wallboard is loaded onto 1~3 top glue, loads onto the described top of 1~2 cover fixing apparatus at wallboard towards the lower surface of terrace structural slab cover;
(3) push up liftoff level ground face in the lower surface of wallboard with timber wedge,, make the foundation position of wallboard form 2~8 centimetres of high slits, the position of wallboard is provided with puts in place the corresponding position of the vertical roof pressure of wallboard at the smallpox structural slab;
(4) by screwing out described adjusting screw(rod) roof pressure at the terrace structural slab, to the smallpox structural slab, the wallboard that setting is put in place is made roof pressure and is fixed, and takes out the timber wedge of roof pressure in the wallboard lower surface again with the upper surface roof pressure of wallboard, and wallboard is in place;
(5) side of an other wallboard and the splicing angular position between the smallpox structural slab on the wallboard that is in place will splice, angle sign indicating number in the connection is anchored at wallboard on the smallpox structural slab;
(6) Mosaic face that will splice a side of an other wallboard of the described wallboard in step (5) is provided with binding paste;
(7) repeat that wallboard is installed in above-mentioned steps (2), (3), (4), (5), (6) and fix in position and form board wall;
(8) in the corresponding hole of described board wall wallboard and in the slit, board wall foundation position pre-buried on cable pipe network and water supply network, with concrete that the slit between board wall and terrace structure filling is closely knit again;
(9) inject the PU gap filler in the splicing seams between described board wall and smallpox structural slab, go into the elastic sealant compatible with wall finiss in described board wall two outsides and smallpox structural slab splicing seams position pointing;
(10) at the wallboard and the wallboard of described board wall, and splicing place of the wallboard of board wall and the agent structure of corresponding body of wall, solid envelope made with toughness binding material and fabric strip.
As a further improvement on the present invention, described adjusting screw(rod) runs through and is arranged on the base, and described nut is screwed in the adjusting screw(rod).
As a further improvement on the present invention, be provided with the eyelet that cooperates with described top fixing apparatus bottom the described wallboard.
As a further improvement on the present invention, described angle sign indicating number is fixed with crab-bolt or iron nail.
As a further improvement on the present invention, the foundation position of every block of wallboard in described board wall except position, door and window hole all is provided with the top fixing apparatus, in facility roof pressure mode wallboard is fixed on the board wall.
A kind of top fixing apparatus of implementing said method is characterized in that it is made up of base, adjusting screw(rod) and nut, and described adjusting screw(rod) runs through and is arranged on the base, and described nut is screwed in the adjusting screw(rod).
As a further improvement on the present invention, described base is cylinder, and be provided with one section Embedded Division that is no less than 3 centimeter length, this Embedded Division is provided with a centre bore that runs through, in described centre bore, be equipped with the adjusting screw(rod) that matches with described centre bore, described nut is arranged on the lower surface of base, and is screwed in the described adjusting screw(rod); Described adjusting screw(rod) is provided with spacing plane, the centre bore of described base is provided with the spacing plane that is complementary with described spacing plane, when the described nut of twisting, described base is subjected to the spacing plane of described adjusting screw(rod), with the spacing plane restriction in the described centre hole of base, only the axial line along adjusting screw(rod) moves up and down.
Described wallboard bottom is provided with the eyelet that cooperates with described top fixing apparatus Embedded Division, behind the eyelet close-fitting of the Embedded Division of described top fixing apparatus and wallboard bottom, regulate in the process of the solid wallboard in described adjusting screw(rod) top, the base of described top fixing apparatus is only done moving of upper and lower translation along the axial line of adjusting screw(rod), and base can not occur rotating with respect to the terrace structure.
Beneficial effect of the present invention: the present invention regulates the gap of wallboard apart from terrace structural slab and smallpox structural slab by in the wallboard bottom top fixing apparatus being set by the top fixing apparatus; Various power supply pipe networks and water supply network are convenient to install in the gap of wallboard and terrace structural slab, and fill fixedly wallboard with concrete, and increase the intensity of carrying wallboard; The PU gap filler is filled in the gap of wallboard and smallpox structural slab, guarantees the soundproof effect of the board wall that forms, and is carried and insert the elastic sealant compatible with wall finiss, is convenient to the processing of the operations such as follow-up japanning of board wall; Between wallboard and the wallboard, perhaps make solid envelope with toughness binding material and fabric strip between wallboard and body of wall mechanism plate, and wallboard and smallpox structural slab increase the bulk strength of board wall with angle sign indicating number anchoring, guaranteed the construction quality of board wall.
The method of installation concrete light board wall of the present invention has promptly made things convenient for the construction of board wall, promotes the efficiency of construction of board wall, under the prerequisite of construction quality that guarantees board wall and soundproof effect, has also made things convenient for the laying of various pipe networks, the carrying out of various board wall follow-up works.
The necessary device that top provided by the invention fixing apparatus is implemented as the inventive method is fixed on the wallboard bottom, can guarantee that wallboard fixes, pass through adjusting nut, adjusting screw(rod) is slided up and down in the centre bore of base, thereby regulated the height of wallboard, the wallboard top is affixed under the smallpox structural slab; Adjusting screw(rod) and base are equipped with spacing plane, prevent that base and adjusting screw(rod) from relatively rotating, thereby guarantee the safety and the quality of the wallboard of installation; Nut is arranged on the lower surface of base, makes things convenient for the workman with instruments such as spanners nut to be adjusted.
Below in conjunction with the accompanying drawing and the specific embodiment, the present invention is further described.
Description of drawings
Fig. 1 is a slab-wall structure schematic diagram of the present invention;
Fig. 2 is a top of the present invention fixing apparatus structural representation;
Fig. 3 is another visual angle structural representation of top of the present invention fixing apparatus;
Among the figure:
1. top fixing apparatus 11. bases 12. adjusting screw(rod)s
13. the spacing plane of 15. adjusting screw(rod)s, nut 14. lower surfaces
16. the spacing plane of base 17. top glue, 18. pipe networks
2. 22. wallboard lower surfaces, wallboard 21. wallboard upper surfaces
23. eyelet.
The specific embodiment
Embodiment, referring to Fig. 1 to Fig. 3, the method for installation concrete light board wall provided by the invention may further comprise the steps:
(1) preparation is used in the foundation bottom of wallboard 2 wallboard 2 being made the fixing top fixing apparatus 1 of roof pressure, this top fixing apparatus 1 is made up of base 11, adjusting screw(rod) 12 and nut 13, described adjusting screw(rod) 12 runs through and is arranged on the base 11, and described nut 13 is screwed in the adjusting screw(rod) 12;
(2) upper surface 21 cover that withstands on the smallpox structural slab at wallboard 2 is loaded onto 1~3 top glue 17, loads onto the described top of 1~2 cover fixing apparatus 1 at wallboard towards the lower surface of terrace structural slab 22 covers; Described wallboard bottom is provided with the eyelet 23 that cooperates with described top fixing apparatus 1, and described base 11 is embedded in the eyelet 23 and fixes.
(3) push up liftoff level ground face at the lower surface of wallboard 2 22 usefulness timber wedges, at the corresponding position of smallpox structural slab, make the foundation position of wallboard 2 form 2~8 centimetres of high slits wallboard 2 vertical roof pressures, the position of wallboard 2 is provided with puts in place;
(4) by screwing out described adjusting screw(rod) 12 roof pressures at the terrace structural slab, to the smallpox structural slab, the wallboard 2 that setting is put in place is made roof pressure and is fixed, and takes out the timber wedge of roof pressure in wallboard lower surface 22 again with upper surface 21 roof pressures of wallboard, and wallboard is in place;
(5) will splice a side of an other wallboard 2 and the splicing angular position between the smallpox structural slab at the wallboard 2 that is in place, and connect with crab-bolt or iron nail and go up the angle sign indicating number, wallboard 2 will be anchored on the smallpox structural slab;
(6) Mosaic face that will splice a side of an other wallboard 2 of the described wallboard 2 in step (5) is provided with binding paste;
(7) repeat that wallboard 2 is installed in above-mentioned steps (2), (3), (4), (5), (6) and fix in position and form board wall;
(8) in the corresponding hole of described board wall wallboard 2 and in the slit, board wall foundation position pre-buried on cable pipe network 18 and water supply network 18, with concrete the slit between board wall and the terrace structure is filled closely knitly again, increase the intensity and the raising soundproof effect of board wall;
(9) inject the PU gap filler in the splicing seams between described board wall and smallpox structural slab, go into the elastic sealant compatible, improve the soundproof effect of board wall with wall finiss in described board wall two outsides and smallpox structural slab splicing seams position pointing;
(10) at the wallboard 2 and wallboard 2 of described board wall, and splicing place of the wallboard 2 of board wall and the agent structure of corresponding body of wall, make solid envelope with toughness binding material and fabric strip, the intensity of enhancing board wall and improve its soundproof effect.
In the method for installation concrete light board wall of the present invention, the foundation position of the every block of wallboard 2 in described board wall except position, door and window hole all is provided with top fixing apparatus 1, in facility roof pressure mode wallboard 2 is fixed on the board wall.
The top fixing apparatus of enforcement said method provided by the invention, it is made up of base 11, adjusting screw(rod) 12 and nut 13, and described adjusting screw(rod) 12 runs through and is arranged on the base 11, and described nut 13 is screwed in the adjusting screw(rod) 12.
Described base 11 is cylinder, and be provided with one section long Embedded Division that is no less than 3 centimetres, this Embedded Division is provided with a centre bore that runs through, in described centre bore, be equipped with the adjusting screw(rod) 12 that matches with described centre bore, described nut 13 is arranged on the lower surface 14 of base 11, and is screwed in the described adjusting screw(rod) 12; Described adjusting screw(rod) 12 is provided with spacing plane 15, the centre bore of described base 11 is provided with the spacing plane 16 that is complementary with described spacing plane, when the described nut of twisting, described base 11 is subjected to the spacing plane 15 of described adjusting screw(rod) 12, with spacing plane 16 constraints in the described centre hole of base, only the axial line along adjusting screw(rod) 13 moves up and down, and guarantees the reliability that top fixing apparatus 1 combines with wallboard 2.
Described wallboard 2 bottoms are provided with the eyelet 23 that cooperates with described top fixing apparatus Embedded Division, behind eyelet 23 close-fittings of the Embedded Division of described top fixing apparatus 1 and wallboard 2 bottoms, regulate in the process of the solid wallboard in described adjusting screw(rod) 12 tops, the base 11 of described top fixing apparatus is only done moving of upper and lower translation along the axial line of adjusting screw(rod) 12, base 11 can not occur rotating with respect to the terrace structure, promptly guarantee wallboard 2 in pushing up solid process, wallboard 2 can not occur rotating with respect to the terrace structure.
The present invention is not limited to above-mentioned embodiment, adopts or approximation method and device identical with the above embodiment of the present invention, and obtain other be used to install the method and the top fixing apparatus of concrete light board wall, all within protection scope of the present invention.
Claims (9)
1. the method that the concrete light board wall is installed is characterized in that, may further comprise the steps:
(1) preparation is used in the foundation bottom of wallboard wallboard being made the fixing top fixing apparatus of roof pressure, and this top fixing apparatus is made up of base, adjusting screw(rod) and nut;
(2) load onto top glue in the upper surface that wallboard withstands on the smallpox structural slab, at wallboard towards the above top fixing apparatus of the lower surface of terrace structural slab suit;
(3) push up liftoff level ground face in the lower surface of wallboard with timber wedge,, make the foundation position of wallboard form 2~8 centimetres of high slits, the position of wallboard is provided with puts in place the corresponding position of the vertical roof pressure of wallboard at the smallpox structural slab;
(4) by screwing out described adjusting screw(rod) roof pressure at the terrace structural slab, to the smallpox structural slab, the wallboard that setting is put in place is made roof pressure and is fixed, and takes out the timber wedge of roof pressure in the wallboard lower surface again with the upper surface roof pressure of wallboard, and wallboard is in place;
(5) side of an other wallboard and the splicing angular position between the smallpox structural slab on the wallboard that is in place will splice, angle sign indicating number in the connection is anchored at wallboard on the smallpox structural slab;
(6) Mosaic face that will splice a side of an other wallboard of the described wallboard in step (5) is provided with binding paste;
(7) repeat that wallboard is installed in above-mentioned steps (2), (3), (4), (5), (6) and fix in position and form board wall.
2. the method for installation concrete light board wall according to claim 1 is characterized in that it is further comprising the steps of,
(8) in the corresponding hole of described board wall wallboard and in the slit, board wall foundation position pre-buried on cable pipe network and water supply network, with concrete that the slit between board wall and terrace structure filling is closely knit again;
(9) inject the PU gap filler in the splicing seams between described board wall and smallpox structural slab, go into the elastic sealant compatible with wall finiss in described board wall two outsides and smallpox structural slab splicing seams position pointing;
(10) at the wallboard and the wallboard of described board wall, and splicing place of the wallboard of board wall and the agent structure of corresponding body of wall, solid envelope made with toughness binding material and fabric strip.
3. the method for installation concrete light board wall according to claim 1 is characterized in that, described step (1) specifically also comprises following content, and described adjusting screw(rod) runs through and is arranged on the base, and described nut is screwed in the adjusting screw(rod).
4. the method for installation concrete light board wall according to claim 1 is characterized in that, described step (2) specifically also comprises following content, and described wallboard bottom is provided with the eyelet that cooperates with described top fixing apparatus.
5. the method for installation concrete light board wall according to claim 1 is characterized in that, described step (5) specifically also comprises following content, and described angle sign indicating number is fixed with crab-bolt or iron nail.
6. according to the method for the described installation concrete light of one of claim 1-5 board wall, it is characterized in that, the foundation position of every block of wallboard in described board wall except position, door and window hole all is provided with the top fixing apparatus, in facility roof pressure mode wallboard is fixed on the board wall.
7. a top fixing apparatus of implementing one of claim 1-6 described method is characterized in that it is made up of base, adjusting screw(rod) and nut, and described adjusting screw(rod) runs through and is arranged on the base, and described nut is screwed in the adjusting screw(rod).
8. top according to claim 7 fixing apparatus, it is characterized in that, described base is cylinder, and be provided with one section Embedded Division that is no less than 3 centimeter length, this Embedded Division is provided with a centre bore that runs through, be equipped with the adjusting screw(rod) that matches with described centre bore in described centre bore, described nut is arranged on the lower surface of base, and is screwed in the described adjusting screw(rod); Described adjusting screw(rod) is provided with spacing plane, the centre bore of described base is provided with the spacing plane that is complementary with described spacing plane, when the described nut of twisting, described base is subjected to the spacing plane of described adjusting screw(rod), with the spacing plane restriction in the described centre hole of base, only the axial line along adjusting screw(rod) moves up and down.
9. top according to claim 8 fixing apparatus, it is characterized in that, described wallboard bottom is provided with the eyelet that cooperates with described top fixing apparatus Embedded Division, behind the eyelet close-fitting of the Embedded Division of described top fixing apparatus and wallboard bottom, regulate in the process of the solid wallboard in described adjusting screw(rod) top, the base of described top fixing apparatus is along the axial line upper and lower translation of adjusting screw(rod).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310144233.4A CN103216107B (en) | 2013-04-23 | 2013-04-23 | A kind of method installing concrete light board wall and top are fixedly mounted with and put |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310144233.4A CN103216107B (en) | 2013-04-23 | 2013-04-23 | A kind of method installing concrete light board wall and top are fixedly mounted with and put |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103216107A true CN103216107A (en) | 2013-07-24 |
CN103216107B CN103216107B (en) | 2016-06-15 |
Family
ID=48814227
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310144233.4A Active CN103216107B (en) | 2013-04-23 | 2013-04-23 | A kind of method installing concrete light board wall and top are fixedly mounted with and put |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103216107B (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103266696A (en) * | 2013-04-15 | 2013-08-28 | 浙江海天建设集团有限公司 | Connecting process for composite partition, steel column and crossbeam |
CN104032961A (en) * | 2014-03-21 | 2014-09-10 | 东莞市彩丽建筑维护技术有限公司 | Method for assembling concrete prefabricated wallboards and special mechanical device therefor |
CN104213713A (en) * | 2014-08-05 | 2014-12-17 | 马鞍山十七冶工程科技有限责任公司 | Method for mounting self-heat-insulation light-weight interior wallboards and shear wallboards simultaneously |
CN104594643A (en) * | 2014-12-29 | 2015-05-06 | 东莞市彩丽建筑维护技术有限公司 | Method and special device for splicing concrete wall plate |
CN104863372A (en) * | 2015-06-03 | 2015-08-26 | 东莞市彩丽建筑维护技术有限公司 | Method for locking cement wall partition board and sleeving-clamping type abutting and fixing device |
CN104895339A (en) * | 2015-06-15 | 2015-09-09 | 东莞市彩丽建筑维护技术有限公司 | Convenient method and device for splicing cement board wall |
CN107100296A (en) * | 2017-06-09 | 2017-08-29 | 南通承悦装饰集团有限公司 | A kind of integrated inner partition plate of framework spinning bolt-type and its installation method |
CN108049570A (en) * | 2018-02-07 | 2018-05-18 | 郑州玛纳房屋装备有限公司 | A kind of assembled wall board module for being suitable for assembled various web face wall body |
CN110700602A (en) * | 2019-10-18 | 2020-01-17 | 甘肃建投科技研发有限公司 | Assembled interior wall location jacking device |
CN113653223A (en) * | 2021-09-22 | 2021-11-16 | 中铁二十二局集团第五工程有限公司 | Mounting method of ALC light partition board |
CN115075468A (en) * | 2022-04-27 | 2022-09-20 | 浙江金迪新材科技有限公司 | Prefabricated composite wallboard, connecting piece, corner connecting piece, materials and combination method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1246042A (en) * | 1968-03-08 | 1971-09-15 | Marcel Louis Joseph Yvroud | A wall panel |
FR2581679A1 (en) * | 1985-05-10 | 1986-11-14 | Louis Andre | Modular element for constructing a partition |
CN2101064U (en) * | 1991-07-12 | 1992-04-08 | 北京市建筑轻钢结构厂 | Quick installation folsable separating wall |
JPH04169630A (en) * | 1990-11-01 | 1992-06-17 | Naka Ind Ltd | Wall construction using wall panel |
CN2228502Y (en) * | 1995-03-10 | 1996-06-05 | 任华国 | Light insulation wall plate |
CN102505862A (en) * | 2011-11-03 | 2012-06-20 | 中山建华墙体材料有限公司 | Installing process of lightweight internal partition wallboards |
-
2013
- 2013-04-23 CN CN201310144233.4A patent/CN103216107B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1246042A (en) * | 1968-03-08 | 1971-09-15 | Marcel Louis Joseph Yvroud | A wall panel |
FR2581679A1 (en) * | 1985-05-10 | 1986-11-14 | Louis Andre | Modular element for constructing a partition |
JPH04169630A (en) * | 1990-11-01 | 1992-06-17 | Naka Ind Ltd | Wall construction using wall panel |
CN2101064U (en) * | 1991-07-12 | 1992-04-08 | 北京市建筑轻钢结构厂 | Quick installation folsable separating wall |
CN2228502Y (en) * | 1995-03-10 | 1996-06-05 | 任华国 | Light insulation wall plate |
CN102505862A (en) * | 2011-11-03 | 2012-06-20 | 中山建华墙体材料有限公司 | Installing process of lightweight internal partition wallboards |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103266696B (en) * | 2013-04-15 | 2015-02-25 | 浙江海天建设集团有限公司 | Connecting process for composite partition, steel column and crossbeam |
CN103266696A (en) * | 2013-04-15 | 2013-08-28 | 浙江海天建设集团有限公司 | Connecting process for composite partition, steel column and crossbeam |
CN104032961A (en) * | 2014-03-21 | 2014-09-10 | 东莞市彩丽建筑维护技术有限公司 | Method for assembling concrete prefabricated wallboards and special mechanical device therefor |
CN104213713B (en) * | 2014-08-05 | 2016-04-06 | 马鞍山十七冶工程科技有限责任公司 | A kind of method that self-insulating light inner wall panel and shear wall slab are installed simultaneously |
CN104213713A (en) * | 2014-08-05 | 2014-12-17 | 马鞍山十七冶工程科技有限责任公司 | Method for mounting self-heat-insulation light-weight interior wallboards and shear wallboards simultaneously |
CN104594643A (en) * | 2014-12-29 | 2015-05-06 | 东莞市彩丽建筑维护技术有限公司 | Method and special device for splicing concrete wall plate |
CN104863372A (en) * | 2015-06-03 | 2015-08-26 | 东莞市彩丽建筑维护技术有限公司 | Method for locking cement wall partition board and sleeving-clamping type abutting and fixing device |
CN104895339A (en) * | 2015-06-15 | 2015-09-09 | 东莞市彩丽建筑维护技术有限公司 | Convenient method and device for splicing cement board wall |
CN107100296A (en) * | 2017-06-09 | 2017-08-29 | 南通承悦装饰集团有限公司 | A kind of integrated inner partition plate of framework spinning bolt-type and its installation method |
CN108049570A (en) * | 2018-02-07 | 2018-05-18 | 郑州玛纳房屋装备有限公司 | A kind of assembled wall board module for being suitable for assembled various web face wall body |
CN108049570B (en) * | 2018-02-07 | 2024-03-29 | 郑州玛纳房屋装备有限公司 | Combined wallboard module suitable for assembling various breadth walls |
CN110700602A (en) * | 2019-10-18 | 2020-01-17 | 甘肃建投科技研发有限公司 | Assembled interior wall location jacking device |
CN113653223A (en) * | 2021-09-22 | 2021-11-16 | 中铁二十二局集团第五工程有限公司 | Mounting method of ALC light partition board |
CN113653223B (en) * | 2021-09-22 | 2022-09-06 | 中铁二十二局集团第五工程有限公司 | Mounting method of ALC light partition board |
CN115075468A (en) * | 2022-04-27 | 2022-09-20 | 浙江金迪新材科技有限公司 | Prefabricated composite wallboard, connecting piece, corner connecting piece, materials and combination method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN103216107B (en) | 2016-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103216107A (en) | Method for installing concrete light board wall and jacking and fixing device | |
CN101476361B (en) | Inner partition plate system and its construction method | |
CN205296798U (en) | Pre -buried fixing device of builder's jack shaped steel | |
CN203977782U (en) | A kind of wooden facing mounting structure | |
CN103074949A (en) | Construction method for environment-friendly light energy-saving wallboard | |
CN202611142U (en) | Hanging and connecting device for glass balustrade board | |
CN203878995U (en) | Side wall stair formwork | |
CN105064391A (en) | Assembly type device foundation | |
CN103510716B (en) | Installation and construction method of concrete prefabricated wall panel and lifting shifting device | |
CN204059661U (en) | A kind of ALC body of wall assembly | |
CN103362313B (en) | The assemble method of modularized combination type heat insulating curtain wall panel | |
CN103343577B (en) | The shear wall water-stopping method of removable docking screw rod | |
CN106284999A (en) | Assembled architecture haydite concrete batten of internal partition mounting process | |
CN105442868A (en) | Adjustable steel-structure reticulated shell spliced scaffold | |
CN203361360U (en) | Deformable joint structure of concrete trestle step and floor | |
CN215670972U (en) | Detachable pre-buried bolt anchor structure of shaped steel of encorbelmenting | |
CN201334739Y (en) | Internal partition wall board system | |
CN201424797Y (en) | Wood keel overhead wooden floor mounting base layer | |
CN104314104A (en) | Setting method for deformation joint obliquely crossed with underground box culvert | |
CN203795854U (en) | Preformed hole formwork fixing device for bare concrete floor | |
CN103526830A (en) | Method and structure of deformable connection between concrete trestle step and floor | |
CN204570684U (en) | A kind of anchor head of Recyclable anchor rope is fixed and guiding device | |
CN203361484U (en) | Deformable joint structure of concrete roof and metal plate roof | |
CN216476340U (en) | Superposed beam lower part reinforcing system | |
CN103352517B (en) | The deformable connected structure of concrete roof and sheet-metal roofing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |