CN103266696B - Connecting process for composite partition, steel column and crossbeam - Google Patents

Connecting process for composite partition, steel column and crossbeam Download PDF

Info

Publication number
CN103266696B
CN103266696B CN201310130965.8A CN201310130965A CN103266696B CN 103266696 B CN103266696 B CN 103266696B CN 201310130965 A CN201310130965 A CN 201310130965A CN 103266696 B CN103266696 B CN 103266696B
Authority
CN
China
Prior art keywords
crossbeam
steel column
link slot
steel
partition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310130965.8A
Other languages
Chinese (zh)
Other versions
CN103266696A (en
Inventor
回中兴
孟青
徐晓军
吴海龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haitian Construction Group Co ltd
Original Assignee
Zhejiang Haitian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Haitian Construction Group Co Ltd filed Critical Zhejiang Haitian Construction Group Co Ltd
Priority to CN201310130965.8A priority Critical patent/CN103266696B/en
Publication of CN103266696A publication Critical patent/CN103266696A/en
Application granted granted Critical
Publication of CN103266696B publication Critical patent/CN103266696B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a connecting process for a composite partition, a steel column and a crossbeam. The connecting process comprises the following steps: firstly, mounting connecting steel plates at upper and lower ends of the steel column to a concrete top plate and a concrete base plate by using expansion bolts, and mounting crossbeam connecting steel plates to a structural wall space and cylinder by using expansion bolts; secondly, fixing the steel column and the steel column connecting steel plates in a welding manner and mounting the composite partition below the crossbeam; and finally, fixing the crossbeam and the crossbeam connecting steel plates in a welding manner and mounting the composite partition above the crossbeam. The connecting process successfully solves the problem that the composite partition, the steel column and the crossbeam are easily loosened and cracked.

Description

Composite partition steel column and crossbeam Joining Technology
Technical field
The present invention relates to a kind of composite partition steel column and crossbeam Joining Technology.
Background technology
For general partition wall, height and width numerical value little, without the need to setting up steel structure beam and steel column, if but the height of partition wall and width numerical value larger, steel column and crossbeam should be set up, in prior art composite partition with usually adopts cement mortar to fill between steel column and crossbeam to be connected, easily to occur problem that is loosening and that ftracture.
Summary of the invention
Technical problem to be solved by this invention is just to provide a kind of steel column and crossbeam Joining Technology, solves the problem easily occurring between composite partition and steel column and crossbeam loosening and ftractureing.
For solving the problems of the technologies described above, the present invention adopts following technical scheme: composite partition steel column and crossbeam Joining Technology, composite partition is by some groups being saved partition board and lower joint partition board is spliced, steel column is provided with between two groups of partition boards that wherein left and right is adjacent, crossbeam is provided with between two groups of neighbouring partition boards, it is characterized in that: described steel column and crossbeam are i iron, distance between the protuberance of steel column both sides is greater than the distance between the protuberance of crossbeam both sides, and composite partition steel column and crossbeam Joining Technology comprise the steps:
First, the junction steel plate expansion bolt at upper and lower for steel column two ends is arranged on concrete roof and concrete floor, crossbeam junction steel plate expansion bolt is arranged on structure metope, cylinder simultaneously;
Then, steel column and steel column junction steel plate are welded and fixed and the composite partition below crossbeam is installed;
Finally, crossbeam and steel column and crossbeam junction steel plate are welded and fixed and install the composite partition above crossbeam;
Wherein, beam-end is fixedly welded on steel column inner fovea part side, filling concrete mortar in the gap between steel column and composite partition; The protuberance of the upper and lower both sides of crossbeam is embedded in composite partition, filling concrete mortar in the gap between crossbeam and composite partition.
As preferably, described upper joint partition board bottom is provided with link slot, the corresponding described upper link slot in described lower joint partition board top is provided with lower link slot, all be equipped with steel plate in described upper link slot and lower link slot, be provided with connecting pin in described upper link slot, described connecting pin is provided with forward sawtooth, steel pin plate is provided with in described lower link slot, be provided with cotter way in described steel pin plate, in described cotter way, be provided with reverse sawtooth, between described two ends, steel pin plate left and right and lower link slot left and right sides wall, be provided with spring.
As preferably, the Joining Technology of upper joint partition board and lower joint partition board comprises the steps:
First, offer groove in upper joint partition board bottom and lower joint partition board top and in groove, lay steel plate and form link slot and lower link slot;
Then, in upper link slot, arrange connecting pin, in connecting pin and upper link slot, Plate Welding is fixed, and arranges steel pin plate, mounting spring between steel pin plate and lower link slot left and right sides wall in lower link slot;
Finally, upper joint partition board and lower joint partition board are stitched together, and connecting pin and steel pin plate fastening by being connected of forward and reverse sawtooth.
As preferably, described forward sawtooth is knuckle-tooth, the described reverse sawtooth side of being tooth.
As preferably, described lower link slot width is greater than link slot width.
As preferably, described steel column i iron external surface smears one deck Building Adhesive, and described composite partition corresponding i iron left and right sides protuberance is provided with dovetail groove.
In the present invention, steel column is i-beam structure, wherein be embedded in composite partition at i iron left and right sides protuberance, filling concrete mortar in gap between i iron and composite partition, so successfully solves the problem easily occurring between composite partition and steel column loosening and ftractureing.
Meanwhile crossbeam and steel column are welded and fixed, and the protuberance of the upper and lower both sides of crossbeam is embedded in composite partition, filling concrete mortar in gap between crossbeam and composite partition, so successfully solves the problem easily occurring between composite partition and crossbeam loosening and ftractureing.
In addition, present invention uses the mechanical seamless theory of engagement and connect upper joint partition board and lower joint partition board, namely inserting with the zigzag connecting pin of band is embedded in the link slot of partition board termination, connecting pin be hidden in link slot with flexible fastening by spring of the steel pin plate of reverse saw flute profile, both are engaged each other, thus two sections of partition boards are linked to be entirety, it can not only reliably transmission of pressure, can also bear moment of flexure, shearing and pulling force, this structure successfully solves the construction difficult problem of slab-joint cracking.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the invention will be further described:
Fig. 1 is composite partition and i iron steel column syndeton schematic diagram;
Fig. 2 is composite partition and beam connecting structure schematic diagram;
Fig. 3 is crossbeam and steel column syndeton top view;
Fig. 4 is crossbeam and steel column syndeton lateral view;
Fig. 5 is upper joint partition board and lower joint partition board syndeton schematic diagram.
Detailed description of the invention
As shown in Figures 1 to 5, composite partition 1 is spliced with lower joint partition board 11 by some groups being saved partition board 10, and upper joint partition board 10 is first spliced into one piece of partition board with lower joint partition board 11, and then splices with other partition boards organized.Be provided with steel column 24 between two groups of partition boards that wherein left and right is adjacent, between two groups of neighbouring partition boards, be provided with crossbeam 25.
As shown in Figures 1 to 4, described crossbeam and steel column are i iron, distance between the protuberance of steel column both sides is greater than the distance between the protuberance of crossbeam both sides, beam-end is fixedly welded on steel column inner fovea part side, the protuberance of the upper and lower both sides of described crossbeam is embedded in composite partition, filling concrete mortar 203 in the gap between crossbeam and composite partition.Steel column i iron left and right sides protuberance is embedded in composite partition, filling concrete mortar 203 in gap between i iron and composite partition, described i iron external surface smears one deck Building Adhesive 242, and described composite partition 1 corresponding i iron left and right sides protuberance is provided with dovetail groove.
Composite partition steel column and crossbeam Joining Technology comprise the steps:
First, the junction steel plate expansion bolt at upper and lower for steel column two ends is arranged on concrete roof and concrete floor, crossbeam junction steel plate expansion bolt is arranged on structure metope, cylinder simultaneously,
Then, steel column and steel column junction steel plate are welded and fixed and the composite partition below crossbeam is installed;
Finally, crossbeam and steel column and crossbeam junction steel plate are welded and fixed and install the composite partition above crossbeam;
Wherein, beam-end is fixedly welded on steel column inner fovea part side, filling concrete mortar in the gap between steel column and composite partition; The protuberance of the upper and lower both sides of crossbeam is embedded in composite partition, filling concrete mortar in the gap between crossbeam and composite partition.
Fig. 5 shows the syndeton of joint partition board and lower joint partition board, described upper joint partition board 10 bottom is provided with connecting pin 102, described lower joint partition board 11 top is provided with steel pin plate 112, described connecting pin 102 is provided with forward sawtooth 103, cotter way is provided with in described steel pin plate 112, be provided with reverse sawtooth 113 in described cotter way, described connecting pin 102 and steel pin plate 112 fastening as a whole by being connected of forward and reverse sawtooth.Described upper joint partition board 10 top is provided with link slot 101, and be equipped with steel plate in described upper link slot, described connecting pin 102 is fixed in link slot.Described lower joint partition board 11 bottom is provided with lower link slot 111, and be equipped with steel plate in described lower link slot, described steel pin plate 112 is located in lower link slot, is provided with spring 114 between described two ends, steel pin plate left and right and lower link slot left and right sides wall.Described forward sawtooth is knuckle-tooth, the described reverse sawtooth side of being tooth.
The Joining Technology of upper joint partition board and lower joint partition board comprises the steps:
First, offer groove in upper joint partition board bottom and lower joint partition board top and in groove, lay steel plate and form link slot and lower link slot;
Then, in upper link slot, arrange connecting pin, in connecting pin and upper link slot, Plate Welding is fixed, and arranges steel pin plate, mounting spring between steel pin plate and lower link slot left and right sides wall in lower link slot;
Finally, upper joint partition board and lower joint partition board are stitched together, and connecting pin and steel pin plate fastening by being connected of forward and reverse sawtooth.
The present invention employs the mechanical seamless theory of engagement and is connected between upper joint partition board with lower joint partition board, namely inserting with the zigzag connecting pin of band is embedded in the lower link slot of lower joint partition board termination, connecting pin be hidden in lower link slot with flexible fastening by spring of the steel pin plate of reverse saw flute profile, both are engaged each other, thus two sections of partition boards are linked to be entirety, it can not only reliably transmission of pressure, can also bear moment of flexure, shearing and pulling force, this structure successfully solves the construction difficult problem of slab-joint cracking.
In addition, this partition board comprise plant fiber-cement panel and be located at partition board inner chamber that plant fiber-cement panel surrounds in fibrous concrete.Be provided with dividing plate in described partition board inner chamber, partition board inner chamber is divided into several holes by described dividing plate, and described fibrous concrete is filled in hole.The shape of described hole is regular hexagon, and described hole is arranged in cellular.Be provided with interface channel between described hole, in described interface channel, be embedded with bar planting.
The present invention improves the core material of partition wall on the basis of traditional partition board, be provided with fibrous concrete as core body synthetic materials, in addition, owing to being provided with diaphragm structure further, the performance requirements such as satisfied sound insulation, insulation, fire prevention, waterproof, environmental protection make partition wall have tension, compressive property further, also improves anti-seismic performance.

Claims (6)

1. composite partition steel column and crossbeam Joining Technology, composite partition (1) is spliced with lower joint partition board (11) by some groups being saved partition board (10), steel column (24) is provided with between two groups of partition boards that wherein left and right is adjacent, crossbeam (25) is provided with between two groups of neighbouring partition boards, it is characterized in that: described steel column and crossbeam are i iron, distance between the protuberance of steel column both sides is greater than the distance between the protuberance of crossbeam both sides, and composite partition steel column and crossbeam Joining Technology comprise the steps:
First, the junction steel plate expansion bolt at upper and lower for steel column two ends is arranged on concrete roof and concrete floor, crossbeam junction steel plate expansion bolt is arranged on structure metope, cylinder simultaneously;
Then, steel column and steel column junction steel plate are welded and fixed and the composite partition below crossbeam is installed;
Finally, crossbeam and steel column and crossbeam junction steel plate are welded and fixed and install the composite partition above crossbeam;
Wherein, beam-end is fixedly welded on steel column inner fovea part side, filling concrete mortar (203) in the gap between steel column and composite partition; The protuberance of the upper and lower both sides of crossbeam is embedded in composite partition, filling concrete mortar (203) in the gap between crossbeam and composite partition.
2. composite partition steel column according to claim 1 and crossbeam Joining Technology, it is characterized in that: described upper joint partition board bottom is provided with link slot (101), the corresponding described upper link slot (101) in described lower joint partition board (11) top is provided with lower link slot (111), all steel plate is equipped with in described upper link slot and lower link slot, connecting pin is provided with in described upper link slot, described connecting pin is provided with forward sawtooth (103), steel pin plate (112) is provided with in described lower link slot, cotter way is provided with in described steel pin plate, reverse sawtooth (113) is provided with in described cotter way, spring (114) is provided with between described two ends, steel pin plate left and right and lower link slot left and right sides wall.
3. composite partition steel column according to claim 2 and crossbeam Joining Technology, is characterized in that: the Joining Technology above saving partition board and lower joint partition board comprises the steps:
First, offer groove in upper joint partition board bottom and lower joint partition board top and in groove, lay steel plate and form link slot and lower link slot;
Then, in upper link slot, arrange connecting pin, in connecting pin and upper link slot, Plate Welding is fixed, and arranges steel pin plate, mounting spring between steel pin plate and lower link slot left and right sides wall in lower link slot;
Finally, upper joint partition board and lower joint partition board are stitched together, and connecting pin and steel pin plate fastening by being connected of forward and reverse sawtooth.
4. composite partition steel column according to claim 3 and crossbeam Joining Technology, is characterized in that: described forward sawtooth is knuckle-tooth, the described reverse sawtooth side of being tooth.
5. composite partition steel column according to claim 4 and crossbeam Joining Technology, is characterized in that: described lower link slot width is greater than link slot width.
6. composite partition steel column according to claim 1 and crossbeam Joining Technology, it is characterized in that: described steel column i iron external surface smears one deck Building Adhesive (242), described composite partition corresponding i iron left and right sides protuberance is provided with dovetail groove.
CN201310130965.8A 2013-04-15 2013-04-15 Connecting process for composite partition, steel column and crossbeam Active CN103266696B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310130965.8A CN103266696B (en) 2013-04-15 2013-04-15 Connecting process for composite partition, steel column and crossbeam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310130965.8A CN103266696B (en) 2013-04-15 2013-04-15 Connecting process for composite partition, steel column and crossbeam

Publications (2)

Publication Number Publication Date
CN103266696A CN103266696A (en) 2013-08-28
CN103266696B true CN103266696B (en) 2015-02-25

Family

ID=49010350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310130965.8A Active CN103266696B (en) 2013-04-15 2013-04-15 Connecting process for composite partition, steel column and crossbeam

Country Status (1)

Country Link
CN (1) CN103266696B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105220771B (en) * 2015-09-21 2017-10-10 中铁上海工程局集团有限公司 A kind of wet seam connection method of prefabricated fair-faced post

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2218213Y (en) * 1994-04-18 1996-01-24 王义福 Linkager of partition wall
CN2415073Y (en) * 2000-03-15 2001-01-17 林保财 Partition panel without need of scarf strip
JP2001107496A (en) * 1999-10-12 2001-04-17 Sekisui Chem Co Ltd Partition panel mounting structure and method
CN201232269Y (en) * 2008-06-24 2009-05-06 古罗阿梅 Improvement structure of light partition wall
CN202031203U (en) * 2011-01-19 2011-11-09 潍坊绿城低碳建筑科技有限公司 Plate-assembling type enveloping and filling system
CN102777042A (en) * 2012-07-27 2012-11-14 中山建华墙体材料有限公司 Installation technology of connecting board type inner separation wall
CN103216107A (en) * 2013-04-23 2013-07-24 东莞市彩丽建筑维护技术有限公司 Method for installing concrete light board wall and jacking and fixing device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2218213Y (en) * 1994-04-18 1996-01-24 王义福 Linkager of partition wall
JP2001107496A (en) * 1999-10-12 2001-04-17 Sekisui Chem Co Ltd Partition panel mounting structure and method
CN2415073Y (en) * 2000-03-15 2001-01-17 林保财 Partition panel without need of scarf strip
CN201232269Y (en) * 2008-06-24 2009-05-06 古罗阿梅 Improvement structure of light partition wall
CN202031203U (en) * 2011-01-19 2011-11-09 潍坊绿城低碳建筑科技有限公司 Plate-assembling type enveloping and filling system
CN102777042A (en) * 2012-07-27 2012-11-14 中山建华墙体材料有限公司 Installation technology of connecting board type inner separation wall
CN103216107A (en) * 2013-04-23 2013-07-24 东莞市彩丽建筑维护技术有限公司 Method for installing concrete light board wall and jacking and fixing device

Also Published As

Publication number Publication date
CN103266696A (en) 2013-08-28

Similar Documents

Publication Publication Date Title
CN205604545U (en) Connecting piece in exterior wall cladding antidetonation
KR101310039B1 (en) Corrugated steel web box girder bridge, and continuous support structure thereof
CN203145250U (en) Integrally assembled composite partition wall seamless mounting structure
CN108360710B (en) Assembled damping wall body of building structure
CN103015572A (en) Connecting method for wall body and floor slab and special connecting structure as well as quick-assembled house
CN203145249U (en) Integrally assembled composite partition wall
CN103266692B (en) Top and bottom mounting structure for composite partition
CN103437493B (en) Connecting node of prefabricated reinforced concrete beam and construction method of connecting node
CN211690922U (en) High-performance autoclaved aerated concrete integrated plate outer wall structure for prefabricated building
CN103266699B (en) Seamless mounting method for integral assembled composite partition walls
CN103266696B (en) Connecting process for composite partition, steel column and crossbeam
CN203145244U (en) Widening and heighten structure of composite partition wall
CN103266691B (en) Widened and heightened structure for compound partition wall
CN103266693B (en) Integral assembly type composite partition wall seamless mounting structure
CN102900191A (en) Lap joint bar type prestressed two-way laminated plate and construction method
CN103266695B (en) Connecting structure for composite partition and steel column
CN107355027B (en) Section steel concrete shear wall assembly type space modularized structural system and construction method
CN103266694B (en) Connecting structure for composite partition and structural wall and cylinder
CN203160461U (en) Connecting structure of composite partition walls and cross beam
CN203145251U (en) Connecting structure of composite partition wall and structural wall face and post face
CN203145252U (en) Composite partition wall-steel post connecting structure
CN104989010A (en) Connecting method for bamboo wood prefabricated wallboards
CN203160462U (en) Top and bottom installation structure of composite partition wall
CN207295738U (en) A kind of novel fabricated antinode beam anchor bolt frame structure
CN210134455U (en) Integral utility tunnel of environment-friendly prefabricated assembly

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 55, Wu Ning Xi Road, Dongyang City, Jinhua, Zhejiang

Patentee after: HAITIAN CONSTRUCTION GROUP Co.,Ltd.

Address before: No. 55, Wu Ning Xi Road, Dongyang City, Jinhua, Zhejiang

Patentee before: ZHEJIANG HAITIAN CONSTRUCTION GROUP Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Composite partition wall steel column and beam connection technology

Granted publication date: 20150225

Pledgee: Dongyang Branch of China Construction Bank Co.,Ltd.

Pledgor: HAITIAN CONSTRUCTION GROUP Co.,Ltd.

Registration number: Y2024980019617