CN105220771B - A kind of wet seam connection method of prefabricated fair-faced post - Google Patents

A kind of wet seam connection method of prefabricated fair-faced post Download PDF

Info

Publication number
CN105220771B
CN105220771B CN201510602223.XA CN201510602223A CN105220771B CN 105220771 B CN105220771 B CN 105220771B CN 201510602223 A CN201510602223 A CN 201510602223A CN 105220771 B CN105220771 B CN 105220771B
Authority
CN
China
Prior art keywords
faced
post
base
prefabricated fair
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510602223.XA
Other languages
Chinese (zh)
Other versions
CN105220771A (en
Inventor
陈辉
王冬冬
徐天中
王勇
周波
张峰山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
Municipal Environmental Protection Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
CRECSHANGHAI CIVIL ENGINEERING GROUP NO2 ENGINEERING Co Ltd
Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRECSHANGHAI CIVIL ENGINEERING GROUP NO2 ENGINEERING Co Ltd, Shanghai Civil Engineering Co Ltd of CREC filed Critical CRECSHANGHAI CIVIL ENGINEERING GROUP NO2 ENGINEERING Co Ltd
Priority to CN201510602223.XA priority Critical patent/CN105220771B/en
Publication of CN105220771A publication Critical patent/CN105220771A/en
Application granted granted Critical
Publication of CN105220771B publication Critical patent/CN105220771B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a kind of prefabricated fair-faced wet seam connection method of post, it is characterised in that the connection method comprises the following steps:In the soleplate pre-buried base and complete pour;The base is an I-steel, and bolt fixing device is welded on the I-steel flange plate, and the prefabricated fair-faced post bottom alignment is installed on the base and fixed temporarily by the bolt fixing device;The prefabricated fair-faced post bottom is welded and fixed with the base top, the bolt fixing device is cut off afterwards.It is an advantage of the invention that attachment structure is simple, it is easy to construction, connecting node intensity is high, and high accuracy install positioning of the prefabricated fair-faced post on bottom plate can be realized.

Description

A kind of wet seam connection method of prefabricated fair-faced post
Technical field
The invention belongs to technical field of building construction, and in particular to a kind of prefabricated fair-faced wet seam connection method of post.
Background technology
Basement structure is common in skyscraper or subway subway concourse, including bottom plate, on turn over beam, clean water column, top plate etc. knot Structure.As shown in Figure 1, 2, clean water column stitches construction technology, Joining Technology master with connection method conventional between bottom plate using stem grafting It is divided into following two steps:
(1)Prefabricated fair-faced post 3 is installed on bottom plate 2;
(2)Turned on above bottom plate and be reserved with space between beam 1 and prefabricated fair-faced post 3, beam 1 is turned over and prefabricated clear upper Casting concrete is constituted and is fixedly connected between water column 3.
The conventional Joining Technology is operationally more convenient, but the bonding strength between bottom plate and prefabricated fair-faced post is difficult to protect Card, easily occurs the accident that prefabricated fair-faced post topples.
The content of the invention
According to the deficiencies of the prior art described above, It is an object of the present invention to provide a kind of prefabricated fair-faced wet seam connection of post Method, the connection method is realized to prefabricated fair-faced by pre-buried I-shaped steel base in the soleplate and by bolt fixing device The interim fixation of post, is easy to prefabricated fair-faced post with being welded and fixed between I-shaped steel base, is connected with the high intensity for realizing node.
The object of the invention is realized and completed by following technical scheme:
A kind of wet seam connection method of prefabricated fair-faced post, it is characterised in that the connection method comprises the following steps:The bottom of at In plate pre-buried base and complete pour;The base is an I-steel, and bolt is welded on the I-steel flange plate and is consolidated Determine device, the prefabricated fair-faced post bottom alignment is installed on the base and carried out by the bolt fixing device It is interim fixed;The prefabricated fair-faced post bottom is welded and fixed with the base top, the bolt is cut off afterwards Fixing device.
The installation steps of the bolt fixing device are:Respectively it is respectively welded sideways laterally in the flange plate of the base The otic placode of extension, and protruded from welding on each otic placode on the connecting plate of the otic placode top surface, the connecting plate with spiral shell Keyhole;The prefabricated fair-faced post is an I-steel, and epitaxial lateral overgrowth is respectively respectively welded sideways in the flange plate of the prefabricated fair-faced post The otic placode with bolt hole;The prefabricated fair-faced post bottom is correspondingly arranged on the base, and by by bolt-through Bolt hole on the prefabricated fair-faced post and the connecting plate is so that the prefabricated fair-faced post faces with composition between the base When fix.
It is described to be the step of be welded and fixed:The prefabricated fair-faced post is an I-steel, by the edge of a wing of the prefabricated fair-faced post Plate bottom surface is carried out after the welding between groove butt welding, the flange plate to be done with the edge of a wing plate top surface of the base, in institute State the inner side repair welding liner plate of flange plate seam.
Some joint bars are embedded with the bottom plate, after the prefabricated fair-faced post to be done is with the welding between the base, By some joint bars respectively through extruding sleeve with cage bar end progress extruding connection corresponding in the prefabricated fair-faced post.
It is an advantage of the invention that attachment structure is simple, it is easy to construction, connecting node intensity is high, and can realize prefabricated fair-faced High accuracy install positioning of the post on bottom plate.
Brief description of the drawings
Fig. 1 is clean water column in the prior art with the connection diagram I between bottom plate;
Fig. 2 is clean water column in the prior art with the connection diagram II between bottom plate;
Fig. 3 is the bolt fixing device schematic diagram in the present invention between prefabricated fair-faced post and base;
Fig. 4 is the welding schematic diagram in the present invention between prefabricated fair-faced post and base;
The schematic diagram that Fig. 5 is connected for cage bar in prefabricated fair-faced post in the present invention with joint bar in bottom plate.
Embodiment
The feature and other correlated characteristics of the present invention are described in further detail by embodiment below in conjunction with accompanying drawing, with It is easy to the understanding of technical staff of the same trade:
Mark 1-12 is respectively in such as Fig. 1-5, figure:On turn over beam 1, bottom plate 2, prefabricated fair-faced post 3, concrete 4, base 5, ear Plate 6, connecting plate 7, bolt 8, liner plate 9, cage bar 10, extruding sleeve 11, joint bar 12.
Embodiment:As shown in Fig. 3,4,5, the present embodiment is specifically related to a kind of wet seam connection method of prefabricated fair-faced post, should Connection method is used to prefabricated fair-faced post 3 being connected and fixed on bottom plate 2, specifically includes following steps:
(1)Before bottom plate 2 is poured, pre-buried in the inner to set base 5 and some joint bars 10, base 5 is specially a work Word steel, I-steel bottom surface is fixed in bottom plate 2 through end plate, I-steel top surface is higher by the top surface certain distance of bottom plate 2;Some joint bars 10 are embedded in bottom plate 2 and are set along the outer ring of base 5 in advance, and the upper end of joint bar 10 is higher by the top surface certain distance of bottom plate 2;It is to be done After the setting of base 5 and joint bar 10, casting concrete completes to apply in structure base slab 2, and turns over beam in setting on a base plate 2 1 reinforcing bar and its template;
(2)Bolt fixing device is installed on base 5, i.e.,:
In base 5(I-steel)Four sides of flange plate otic placode 6 is respectively welded, with the flange plate in spreading base 5, ear Plate 6 is flush with edge of a wing plate top surface;Connecting plate 7 is symmetrical arranged in the upper end of each otic placode 6 afterwards and protrudes from the bottom to constitute The clamping position groove of 5 top surfaces of seat on explanation, each connecting plate 7, it is necessary to offer bolt hole;
In prefabricated fair-faced post 3(I-steel)Otic placode 6 is equally respectively welded in four sides of flange plate of bottom, prefabricated with spreading Bolt hole is offered on flange plate in clean water column 3, each otic placode 6, the position of bolt hole is with institute on connecting plate 7 in said base 5 The bolt hole position opened up is corresponding;
(3)The contraposition of otic placode 6 in the prefabricated fair-faced movement of post 3 to bottom plate 2, making the prefabricated fair-faced bottom of post 3 be welded is embedded In the clamping position groove being made up of on base 5 connecting plate 7, in prefabricated fair-faced post 3 after completing to install positioning, by bolt 8 sequentially pass through bolt hole in the prefabricated fair-faced bottom otic placode 6 of post 3 and the top connecting plate 7 of base 7, so that prefabricated fair-faced post 3 is realized Being connected temporarily on base 5;
(4)After the interim fixation of prefabricated fair-faced post 3 to be done, by the wing of the flange plate bottom surface of prefabricated fair-faced post 3 with base 5 Listrium top surface carries out groove butt welding and forms first-order weld;The interim connection released afterwards between prefabricated fair-faced post 3 and base 5 is consolidated Determine and cut off the otic placode 6 on base 5 and the otic placode 6 of the bottom of prefabricated fair-faced post 3;Welded in base 5 and the prefabricated fair-faced flange plate of post 3 Inner side repair welding liner plate 9 at seam, further to improve weld strength between the two, is realized between prefabricated fair-faced post 3 and base 5 Be permanently fixed connection;
(5)Before prefabricated fair-faced post 3 is installed in place, extruding sleeve 11 is set on each joint bar 12 in advance, to be welded complete Cheng Hou, by some joint bars 12 being embedded in advance in bottom plate 2 respectively through extruding sleeve 11 with cage bar 10 corresponding in prefabricated fair-faced post 3 Bottom carry out extruding connection, crushing strength is up to 25MPA;
(6)Turned over upper in beam 1 and prefabricated fair-faced post 3 is with casting concrete at the connecting node between bottom plate 2, complete pre- The wet seam connection construction of clean water column 3 processed on a base plate 2.
In the present embodiment, the bolt fixing device being arranged on base is not influenceing the situation of agent structure intensity Under, realize and the bolt of prefabricated fair-faced post is fixedly connected, and prefabricated fair-faced post can be enable by clamping position groove thereon Enough precise positionings are installed, and can effectively control the perpendicularity of prefabricated fair-faced post, it is to avoid occur the situation of arranged in dislocation;In addition, prefabricated Intensity is welded to connect higher than the conventional connected mode such as bolt between clean water column and pre-buried base.

Claims (3)

1. a kind of wet seam connection method of prefabricated fair-faced post, it is characterised in that the connection method comprises the following steps:In bottom plate In pre-buried base and complete pour;The base is an I-steel, and bolt is welded on the I-steel flange plate and is fixed Device, the prefabricated fair-faced post bottom alignment is installed on the base and faced by the bolt fixing device When fix;The prefabricated fair-faced post bottom is welded and fixed with the base top, the bolt is cut off afterwards and is consolidated Determine device, the installation steps of the bolt fixing device are:Respectively it is respectively welded sideways laterally in the flange plate of the base The otic placode of extension, and protruded from welding on each otic placode on the connecting plate of the otic placode top surface, the connecting plate with spiral shell Keyhole;The prefabricated fair-faced post is an I-steel, and epitaxial lateral overgrowth is respectively respectively welded sideways in the flange plate of the prefabricated fair-faced post The otic placode with bolt hole;The prefabricated fair-faced post bottom is correspondingly arranged on the base, and by by bolt-through Bolt hole on the prefabricated fair-faced post and the connecting plate is so that the prefabricated fair-faced post faces with composition between the base When fix.
2. a kind of prefabricated fair-faced wet seam connection method of post according to claim 1, it is characterised in that described to be welded and fixed The step of be:The prefabricated fair-faced post is an I-steel, by the wing of the flange plate bottom surface of the prefabricated fair-faced post with the base Listrium top surface is carried out after the welding between groove butt welding, the flange plate to be done, is mended in the inner side of the flange plate seam Weld liner plate.
3. a kind of prefabricated fair-faced wet seam connection method of post according to claim 1, it is characterised in that pre- in the bottom plate Some joint bars are embedded with, after the prefabricated fair-faced post to be done is with the welding between the base, some joint bars are passed through respectively Extrude sleeve and carry out extruding connection with cage bar end corresponding in the prefabricated fair-faced post.
CN201510602223.XA 2015-09-21 2015-09-21 A kind of wet seam connection method of prefabricated fair-faced post Active CN105220771B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510602223.XA CN105220771B (en) 2015-09-21 2015-09-21 A kind of wet seam connection method of prefabricated fair-faced post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510602223.XA CN105220771B (en) 2015-09-21 2015-09-21 A kind of wet seam connection method of prefabricated fair-faced post

Publications (2)

Publication Number Publication Date
CN105220771A CN105220771A (en) 2016-01-06
CN105220771B true CN105220771B (en) 2017-10-10

Family

ID=54990003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510602223.XA Active CN105220771B (en) 2015-09-21 2015-09-21 A kind of wet seam connection method of prefabricated fair-faced post

Country Status (1)

Country Link
CN (1) CN105220771B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112323635A (en) * 2020-10-28 2021-02-05 中铁大桥局集团有限公司 Construction method for cast-in-place wet joint and bridge structure

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2545252Y (en) * 2002-06-28 2003-04-16 王双其 Collison fence for bridge
CN101864825B (en) * 2010-06-30 2012-01-04 广东省基础工程公司 Reinforced concrete prefabricated column positioning device and construction method thereof
CN102061746B (en) * 2010-11-26 2012-06-27 宝业集团浙江建设产业研究院有限公司 Steel structure assembled embedded part and construction method thereof
CN103266696B (en) * 2013-04-15 2015-02-25 浙江海天建设集团有限公司 Connecting process for composite partition, steel column and crossbeam
CN103266695B (en) * 2013-04-15 2015-04-22 浙江海天建设集团有限公司 Connecting structure for composite partition and steel column
CN203247603U (en) * 2013-05-29 2013-10-23 中国建筑第二工程局有限公司 High-position foundation bolt positioning device

Also Published As

Publication number Publication date
CN105220771A (en) 2016-01-06

Similar Documents

Publication Publication Date Title
CN204753844U (en) Circular steel tube concrete column sleeve connected node
CN104120647B (en) It is suitable for section assembling concrete frame bridge pier system and the construction method of rapid construction
CN106049691B (en) A kind of fully-prefabricated assembled steel tube confinement frame joint
CN107299683B (en) Compound concrete-filled tubular column assembled docks node and connection method
CN106284655B (en) Precast concrete beam stud connects connecting node and connection method
CN206815666U (en) A kind of connecting node of multilayer wallboard and wallboard and floor
CN109372129A (en) The novel full assembly concrete frame joint of one kind and its construction method
CN205857530U (en) Joint bar positioner
CN104131704A (en) Steel pipe column concrete lateral pouring method and steel pipe column structure used in method
CN108005401A (en) A kind of support and change method of the column of existing frame structure base isolation reinforcement
CN105275087B (en) The attachment structure of prefabricated assembled concrete beam column
CN208844417U (en) A kind of outer precast construction for pier column and its outer prefabricated interior cast-in-place pier column
KR101995496B1 (en) the rigid connection structure between the upper precast concrete column and the lower precast concrete column and the rigid connection structure of the precast concrete girder using the same
CN106320537A (en) Prefabricated concrete-filled square steel tube column and steel girder connecting joint
CN104294920B (en) The node component of a kind of U-shaped steel-concrete combination beam and special-shaped steel pipe concrete post and preparation method
CN107090908A (en) A kind of new vertical prefabricated components joint connecting method
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
CN204804057U (en) Beam column connecting device of prefabricated frame
CN206957185U (en) External corner shear wall set buries screw rod and fixes suspension scaffold shaped steel connector
CN203701436U (en) Lap joint structure of vertical reinforcements and steel sleeve of assembled wall
CN103437493A (en) Connecting node of prefabricated reinforced concrete beam and construction method of connecting node
CN205662838U (en) Prestressing force joint construction of pier is assembled to prefabricated segment
CN107355008A (en) A kind of prefabricated attachment structure and method of newly-increased steel core concrete column and existing structure
CN105220771B (en) A kind of wet seam connection method of prefabricated fair-faced post
CN104196023B (en) A kind of using method of the concrete precast pipe pile pile top of band mechanical connecting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 200436, Zhabei District, Shanghai River Road, three, 272, 278, 10

Co-patentee after: China Railway Shanghai Engineering Bureau Group Municipal Environmental Protection Engineering Co.,Ltd.

Patentee after: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC

Address before: 200436, Zhabei District, Shanghai River Road, three, 272, 278, 10

Co-patentee before: NO 2 ENGINEERING Co.,Ltd. SHANGHAI CIVIL ENGINEERING CO LTD OF CREC

Patentee before: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC