CN102619286B - Connecting joint of steel pipe concrete column and profile steel concrete beam - Google Patents

Connecting joint of steel pipe concrete column and profile steel concrete beam Download PDF

Info

Publication number
CN102619286B
CN102619286B CN201210125511.7A CN201210125511A CN102619286B CN 102619286 B CN102619286 B CN 102619286B CN 201210125511 A CN201210125511 A CN 201210125511A CN 102619286 B CN102619286 B CN 102619286B
Authority
CN
China
Prior art keywords
steel
concrete
steel pipe
column
ring flat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210125511.7A
Other languages
Chinese (zh)
Other versions
CN102619286A (en
Inventor
左菊林
李大浪
李涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Ruim Engineering Technology Ltd By Share Ltd
Original Assignee
China Nerin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nerin Engineering Co Ltd filed Critical China Nerin Engineering Co Ltd
Priority to CN201210125511.7A priority Critical patent/CN102619286B/en
Publication of CN102619286A publication Critical patent/CN102619286A/en
Application granted granted Critical
Publication of CN102619286B publication Critical patent/CN102619286B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本发明公开了一种钢管混凝土柱与型钢混凝土梁的连接节点,钢管混凝土柱的柱内钢管与型钢混凝土梁的翼缘相交处设置一对直径不同的大、小环板,所述两块环板水平、上下位置错开,所述小环板与型钢混凝土梁中的钢梁翼缘焊接,所述大环板与型钢混凝土梁的梁内纵筋焊接,所述环板之间设置有钢管将大、小环板焊接连为整体,所述钢管混凝土柱的柱内钢管与连接两个环板的钢管之间通过竖向加劲肋连接形成整体。本发明的钢管混凝土柱与型钢混凝土梁的连接节点的优点在于:1、不用在钢管砼柱中钢管开大量钢筋孔;2、避免了钢管开孔造成的型钢混凝土柱截面的损伤,3、便于混凝土的施工浇捣。

The invention discloses a connection node between a steel pipe concrete column and a steel concrete beam. A pair of large and small ring plates with different diameters are arranged at the intersection of the steel pipe in the column of the steel pipe concrete column and the flange of the steel concrete beam. The horizontal and vertical positions of the slabs are staggered, the small ring slab is welded to the steel beam flange in the steel concrete beam, the large ring slab is welded to the inner longitudinal reinforcement of the steel concrete beam, and steel pipes are arranged between the ring slabs to connect the large, The small ring plate is welded and connected as a whole, and the steel pipe in the column of the concrete filled steel pipe column and the steel pipe connecting the two ring plates are connected by vertical stiffeners to form a whole. The advantages of the connection node between the steel pipe concrete column and the steel concrete beam of the present invention are: 1, there is no need to open a large number of steel holes in the steel pipe in the steel pipe concrete column; Construction pouring of concrete.

Description

一种钢管混凝土柱与型钢混凝土梁的连接节点A connection node between steel pipe concrete column and steel concrete beam

技术领域 technical field

本发明涉及一种建筑结构节点形式,尤其涉及在型钢混凝土组合结构中的梁柱节点。 The invention relates to a building structure node form, in particular to a beam-column node in a steel-concrete composite structure.

背景技术 Background technique

目前,型钢混凝土柱(内部型钢为钢管)与型钢混凝土梁节点做法为:钢管砼柱中钢管在型钢梁上翼缘处设置一块环板,型钢梁中钢梁翼缘与环板焊接,型钢梁中钢筋部分穿型钢,部分弯折绕过钢管。这种节点形式施工单位须在加工厂或现场对钢管开好穿钢筋孔洞,部分梁钢筋要事先进行弯弧,施工现场往往因钢筋太多导致钢筋相碰无法施工,同时对型钢混凝土柱中的钢管开孔造成了对柱截面的损伤,且施工周期长。 At present, the joint method between the steel concrete column (the inner steel pipe is steel pipe) and the steel concrete beam is as follows: the steel pipe in the steel pipe concrete column is provided with a ring plate at the upper flange of the steel beam, the flange of the steel beam in the steel beam is welded to the ring plate, and the steel bar in the steel beam Through section steel, partly bent around the steel pipe. The construction unit of this kind of joint form must open holes for the steel pipes to pass through the steel bars in the processing plant or on site. The opening of the steel pipe caused damage to the column section, and the construction period was long.

发明内容 Contents of the invention

本发明的目的在于提供一种新型的钢管混凝土柱与型钢混凝土梁连接节点,该节点的主要特点是可以节省现场和加工厂的施工工作量,缩短施工周期,减少人工费,降低造价。 The purpose of the present invention is to provide a new type of connection node between concrete filled steel pipe column and steel concrete beam. The main features of this node are that it can save the construction workload of the site and the processing plant, shorten the construction period, reduce labor costs and reduce the cost.

本发明通过以下技术方案实现的:一种钢管混凝土柱与型钢混凝土梁的连接节点,其特征在于:钢管混凝土柱的柱内钢管与型钢混凝土梁的翼缘相交处设置一对直径不同的大、小环板,所述两块环板水平、上下位置错开,所述小环板与型钢混凝土梁中的钢梁翼缘焊接,所述大环板与型钢混凝土梁的梁内纵筋焊接,所述环板之间设置有钢管将大、小环板焊接连为整体,所述钢管混凝土柱的柱内钢管与连接两个环板的钢管之间通过竖向加劲肋连接形成整体。 The present invention is realized through the following technical scheme: a connection node between a steel pipe concrete column and a steel concrete beam, which is characterized in that a pair of large, The small ring plate, the two ring plates are horizontally and vertically staggered, the small ring plate is welded to the steel beam flange in the steel concrete beam, the large ring plate is welded to the internal longitudinal reinforcement of the steel concrete beam, and the ring Steel pipes are arranged between the plates to weld the large and small ring plates into a whole, and the steel pipes in the column of the CFST column and the steel pipes connecting the two ring plates are connected by vertical stiffeners to form a whole.

进一步地,为保证混凝土浇捣密实,所述小环板上开有混凝土浇灌孔。 Further, in order to ensure that the concrete is poured and compacted, the small ring plate is provided with concrete pouring holes.

本发明的积极效果在于:1、缩短现场施工工期。原传统节点做法需要在圆钢管上开大量的孔,开孔如果在加工厂施工,现场钢筋实际位置又常常和理论有差异,往往无法保证和现场需要一致;开孔如果在现场施工,开孔难度很大,因为:1)、弧形面上钻孔定位困难,2)、每根钢筋需要开两个贯通孔,两孔要求对齐,现场施工困难。本发明不需要在钢管上开孔。可以缩短工期。2、安全性能好,避免了钢管开孔造成的型钢混凝土柱截面的损伤,梁的纵向钢筋与加强环板焊接,施工简单,焊接安全可靠,保证了梁的纵向钢筋锚固。3、结构经济效果明显,增加了钢环板和外围钢管,减少了钢筋长度,总材料费用未有大的增加。减少了大量的钢管柱开孔和穿钢筋工作。节省了大量现场和加工厂的施工工作量,缩短施工周期,减少人工费,从而降低造价。 The positive effects of the present invention are as follows: 1. Shorten the on-site construction period. The original traditional joint method needs to open a large number of holes on the round steel pipe. If the hole is constructed in a processing plant, the actual position of the on-site reinforcement is often different from the theory, and it is often impossible to ensure that it is consistent with the site requirements; if the hole is constructed on site, the hole It is very difficult because: 1) It is difficult to locate the drilling holes on the arc surface, 2) Two through holes need to be opened for each steel bar, and the two holes need to be aligned, which makes the on-site construction difficult. The present invention does not require holes to be drilled on the steel pipe. The construction period can be shortened. 2. The safety performance is good, avoiding the damage of the steel concrete column section caused by the opening of the steel pipe, the longitudinal steel bar of the beam is welded with the reinforced ring plate, the construction is simple, the welding is safe and reliable, and the longitudinal steel bar of the beam is guaranteed to be anchored. 3. The economic effect of the structure is obvious, the steel ring plate and the peripheral steel pipe are increased, the length of the steel bar is reduced, and the total material cost does not increase greatly. A large number of steel pipe column drilling and steel bar penetration work are reduced. It saves a lot of construction work on site and in the processing plant, shortens the construction period, reduces labor costs, and thus reduces the cost.

附图说明 Description of drawings

图1为本发明的钢管混凝土柱与型钢混凝土梁连接节点的示意图; Fig. 1 is the schematic diagram of the connection node of steel pipe concrete column and steel concrete beam of the present invention;

图2为图1中A-A部的剖视图; Fig. 2 is the sectional view of A-A part in Fig. 1;

图3为图1中B-B部的剖视图; Fig. 3 is the sectional view of B-B part in Fig. 1;

图中的标号名称依次为:1、柱内钢管  2、小环板  3、大环板   4、钢管 5、加劲肋  6、钢梁翼缘  7、梁内纵筋  8、灌浆孔 9、型钢混凝土梁  10、钢管混凝土柱。 The labels and names in the figure are: 1. Steel pipe in column 2. Small ring plate 3. Large ring plate 4. Steel pipe 5. Stiffener 6. Steel beam flange 7. Longitudinal reinforcement inside beam 8. Grouting hole 9. Steel concrete beam 10 , Steel tube concrete columns.

具体实施方式 Detailed ways

下面结合附图详细说明本发明的实施方式: Embodiments of the present invention are described in detail below in conjunction with accompanying drawings:

一种钢管混凝土柱与型钢混凝土梁的连接节点,钢管混凝土柱10的柱内钢管1与型钢混凝土梁9中的钢梁翼缘6相交处设置一对直径不同的大、小环板3、2,所述两块环板2、3水平、上下位置错开,为避免在钢管混凝土柱10内的柱内钢管1上开大量钢筋孔造成型钢混凝土柱10的截面受损伤,所述小环板2与型钢混凝土梁9中的钢梁翼缘6焊接,所述大环板3与型钢混凝土梁9中的梁内纵筋7焊接,所述环板2、3之间设置有钢管4将大、小环板3、2焊接连为整体,为进一步加固,所述钢管混凝土柱10的柱内钢管1与连接两个环板2、3的钢管4之间通过竖向加劲肋5连接形成整体,使得整个节点、钢管、环板形成一个受力整体。为保证混凝土的浇灌密实,小环板2上开有混凝土浇灌孔8。 A connection node between a steel pipe concrete column and a steel concrete beam. A pair of large and small ring plates 3 and 2 with different diameters are arranged at the intersection of the inner steel pipe 1 of the steel pipe concrete column 10 and the steel beam flange 6 in the steel concrete beam 9. The two ring plates 2 and 3 are horizontally and vertically staggered. In order to avoid damage to the section of the steel concrete column 10 caused by opening a large number of steel holes on the steel pipe 1 in the steel pipe concrete column 10, the small ring plate 2 and the steel The steel beam flange 6 in the concrete beam 9 is welded, the large ring plate 3 is welded with the beam internal longitudinal reinforcement 7 in the steel concrete beam 9, and a steel pipe 4 is arranged between the ring plates 2 and 3 to connect the large and small ring plates 3 , 2 welded as a whole, for further reinforcement, the steel pipe 1 in the column of the concrete filled steel pipe column 10 and the steel pipe 4 connecting the two ring plates 2, 3 are connected to form a whole through vertical stiffeners 5, so that the whole node, The steel pipe and the ring plate form a stressed whole. In order to ensure that the pouring of concrete is compact, there are concrete pouring holes 8 on the small ring plate 2 .

下面是本发明的制作及安装方式: Below is the making and installation mode of the present invention:

本发明的具体实施应由有相应施工资质的建筑钢结构和土建施工、安装单位完成,具体实施主要分工厂加工制作和现场安装两阶段。 The specific implementation of the present invention should be completed by building steel structure and civil engineering construction and installation units with corresponding construction qualifications. The specific implementation is mainly divided into two stages: factory processing and on-site installation.

钢管混凝土柱10中的柱内钢管1与小环板2在加工厂焊接完成,并同时在小环板2上开好灌浆孔8,大环板3与钢管4的焊接也在加工厂完成。现场安装钢管混凝土柱10的柱内钢管1与型钢混凝土梁9内的型钢梁,现场完成对柱内钢管1上的小环板2与钢梁翼缘6的焊接,再将己与大环板3焊成整体的钢管4同柱内钢管1上的小环板2焊接好,然后再焊接柱内钢管1与连接两个环板2、3的钢管4之间的竖向加劲板5,最后完成型钢混凝土梁9的梁内纵筋7与大环板3焊接,现场浇灌混凝土振捣密实。 The steel pipe 1 and the small ring plate 2 in the steel tube concrete column 10 are welded in the processing plant, and the grouting hole 8 is opened on the small ring plate 2 at the same time, and the welding of the large ring plate 3 and the steel pipe 4 is also completed in the processing plant. Install the steel pipe 1 in the steel pipe concrete column 10 and the shaped steel beam in the steel concrete beam 9 on site, complete the welding of the small ring plate 2 on the steel pipe 1 in the column and the flange 6 of the steel beam on site, and then connect the steel pipe 1 with the big ring plate 3 The steel pipe 4 welded as a whole is welded with the small ring plate 2 on the steel pipe 1 in the column, and then the vertical stiffening plate 5 between the steel pipe 1 in the column and the steel pipe 4 connecting the two ring plates 2 and 3 is welded, and finally the The inner longitudinal reinforcement 7 of the steel concrete beam 9 is welded with the large ring plate 3, and the concrete poured on site is vibrated and compacted.

以上内容是结合具体的优选实施方式对本发明所作的进一步详细说明,不能认定本发明的具体实施只局限于这些说明。对于本发明所属技术领域的普通技术人员来说,在不脱离本发明构思的前提下做出若干等同替代或明显变型,而且性能或用途相同,则应当视为属于本发明由所提交的权利要求书确定的保护范围。 The above content is a further detailed description of the present invention in conjunction with specific preferred embodiments, and it cannot be assumed that the specific implementation of the present invention is limited to these descriptions. For those of ordinary skill in the technical field to which the present invention belongs, several equivalent substitutions or obvious modifications can be made without departing from the concept of the present invention, and the performance or use is the same, then it should be regarded as belonging to the present invention by the submitted claims The scope of protection determined by the book.

Claims (2)

1. the connecting node of a kind of steel core concrete column and girder with rolled steel section en cased in concrete, it is characterised in that:The steel pipe large and small ring flat-plate different from edge of a wing intersection a pair of diameters of setting of girder with rolled steel section en cased in concrete in the post of steel core concrete column, two pieces of ring flat-plate levels, upper-lower positions stagger, the small ring flat-plate is welded with the steel beam flange in girder with rolled steel section en cased in concrete, muscle welding is indulged in the beam of the big ring flat-plate and girder with rolled steel section en cased in concrete, steel pipe is provided between the ring flat-plate welding of large and small ring flat-plate is linked as in entirety, the post of the steel core concrete column to connect to form entirety by vertical ribbed stiffener between steel pipe and the steel pipe for connecting two ring flat-plates.
2. the connecting node of a kind of steel core concrete column according to claim 1 and girder with rolled steel section en cased in concrete, it is characterised in that:Concrete casting hole is provided with the small ring flat-plate.
CN201210125511.7A 2012-04-26 2012-04-26 Connecting joint of steel pipe concrete column and profile steel concrete beam Active CN102619286B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210125511.7A CN102619286B (en) 2012-04-26 2012-04-26 Connecting joint of steel pipe concrete column and profile steel concrete beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210125511.7A CN102619286B (en) 2012-04-26 2012-04-26 Connecting joint of steel pipe concrete column and profile steel concrete beam

Publications (2)

Publication Number Publication Date
CN102619286A CN102619286A (en) 2012-08-01
CN102619286B true CN102619286B (en) 2014-04-09

Family

ID=46559469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210125511.7A Active CN102619286B (en) 2012-04-26 2012-04-26 Connecting joint of steel pipe concrete column and profile steel concrete beam

Country Status (1)

Country Link
CN (1) CN102619286B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103541426B (en) * 2013-11-04 2015-12-09 上海理工大学 Construction methods of buildings and their node structures
CN105625565B (en) * 2016-03-16 2017-09-22 清华大学 The bean column node of composite and concrete combined structure
CN105926779A (en) * 2016-06-14 2016-09-07 沈阳建筑大学 Hollow steel pipe concrete composite column and steel beam connecting joint
CN106917450A (en) * 2017-04-25 2017-07-04 中铁建工集团有限公司 Connections with stiffening ring structure in segmentation that what steel core concrete column was connected with girder steel punch
CN111691309B (en) * 2020-07-07 2021-11-05 中交(临沂)建筑科技有限公司 Method for connecting bridge pier and cross beam of bridge
CN115772946B (en) * 2022-12-06 2026-04-10 长沙市轨道交通建设有限责任公司 A method and structure for fabricating reinforced concrete column-ring slab joints
CN115839132A (en) * 2022-12-14 2023-03-24 福建工程学院 Hollow interlayer steel tube confined concrete columns, concrete beam joints and building structures

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101063319A (en) * 2007-03-27 2007-10-31 广东省建筑设计研究院 Node component used for connecting steel tube concrete column with building roof beam
CN201991083U (en) * 2011-01-19 2011-09-28 天津市建筑设计院 Beam column node of composite structural system of steel and concrete
CN202610984U (en) * 2012-04-26 2012-12-19 中国瑞林工程技术有限公司 Connecting joint between steel pipe concrete column and steel reinforce concrete girder

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3456479B2 (en) * 2001-03-30 2003-10-14 Jfeスチール株式会社 Concrete filled circular steel tubular column
KR101076581B1 (en) * 2009-12-02 2011-10-24 서울시립대학교 산학협력단 Joint structure for hollow core concrete filled tube column and H shaped beam and construction method therefor

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101063319A (en) * 2007-03-27 2007-10-31 广东省建筑设计研究院 Node component used for connecting steel tube concrete column with building roof beam
CN201991083U (en) * 2011-01-19 2011-09-28 天津市建筑设计院 Beam column node of composite structural system of steel and concrete
CN202610984U (en) * 2012-04-26 2012-12-19 中国瑞林工程技术有限公司 Connecting joint between steel pipe concrete column and steel reinforce concrete girder

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开2001-303665A 2001.10.31

Also Published As

Publication number Publication date
CN102619286A (en) 2012-08-01

Similar Documents

Publication Publication Date Title
CN102619286B (en) Connecting joint of steel pipe concrete column and profile steel concrete beam
CN206667470U (en) A kind of end plate assembled channel-section steel for recovering function punches beam column node connection device
CN107143034A (en) A kind of assembly concrete frame structure beam column rigid connection node
CN107060140A (en) A kind of prefabricated assembled double steel pipe concrete shear force wall and its assembly method
CN105256917A (en) Prestressed shear wall and vertical joint combining-connecting structure and construction method thereof
CN106948489A (en) Assembled reinforced concrete column-shaped steel concrete beam node
CN103758275B (en) A kind of periphery establishes the armored concrete slab of shearing resistance muscle chan frame
CN106368348B (en) A kind of superposed type compound shear wall with two benches stress characteristic
CN205894313U (en) Prefabricated assembled steel pipe retrains frame node entirely
CN108775084B (en) Steel-concrete composite prefabricated beam and prefabricated column connection structure and construction method
CN105133731B (en) A kind of assembled steel performance
CN106567458A (en) Assembly type steel-concrete combined beam column frame structure system
CN106284655A (en) Precast concrete beam stud connects node and method of attachment in succession
CN108678185A (en) A kind of complete prefabricated detachable assembling type beam-column connection
CN106638951A (en) Novel assembly type concrete beam column joint and construction method thereof
CN107882179A (en) Modular prefabricated steel-concrete combined frame structure
CN107355008B (en) Prefabricated connection structure and method for newly added concrete filled steel tubular column and existing structure
CN106759858B (en) A kind of connecting node and preparation method of H profile steel beam and rectangular steel-tube concrete column
CN103924676B (en) Prestressing force connects beams of concrete concrete-filled circular steel tube column node
CN103306376A (en) Assembled concrete-filled steel tube composite-column-steel reinforced concrete beam node
CN106320165A (en) Prefabricated concrete-filled steel tube overlapped pier
CN103924679A (en) Prestressed concrete beam and circular steel pipe concrete column combined joint connected with regular rebars
CN103924741B (en) Band cross constraint batten plate box-shaped reinforcing bar confined concrete models and the practice
CN206829416U (en) A kind of prefabricated assembled double steel pipe concrete shear force wall
CN109339289A (en) An assembled concrete-filled steel tube frame shear wall structure and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 330031 No. 888, Qian Hu Road, Hongjiao Island, Nanchang, Jiangxi.

Patentee after: China ruim engineering technology Limited by Share Ltd

Address before: 330063 No. 888, Qian Hu Road, Hongjiao Island, Nanchang, Jiangxi.

Patentee before: China Nerin Engineering Co., Ltd.

CP03 Change of name, title or address