CN107060211A - A kind of reinforced concrete sandwich formula tubing string, superposed type core pipe post and its construction method - Google Patents

A kind of reinforced concrete sandwich formula tubing string, superposed type core pipe post and its construction method Download PDF

Info

Publication number
CN107060211A
CN107060211A CN201710315709.4A CN201710315709A CN107060211A CN 107060211 A CN107060211 A CN 107060211A CN 201710315709 A CN201710315709 A CN 201710315709A CN 107060211 A CN107060211 A CN 107060211A
Authority
CN
China
Prior art keywords
tubing string
concrete
prefabricated
steel reinforcement
stirrup
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710315709.4A
Other languages
Chinese (zh)
Inventor
姚攀峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710315709.4A priority Critical patent/CN107060211A/en
Publication of CN107060211A publication Critical patent/CN107060211A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

A kind of reinforced concrete sandwich formula tubing string, superposed type core pipe post and its construction method, superposed type tubing string include outside prefabricated tubing string and by external mold of prefabricated tubing string, the cast-in-place stem that is poured in inside prefabricated tubing string, prefabricated tubing string and cast-in-place stem are contour, prefabricated tubing string is reinforced column, including tubing string steel reinforcement cage and tubing string concrete, tubing string steel reinforcement cage includes tubing string and indulges muscle, tubing string stirrup, and the cast-in-place stem includes core column concrete.Superposed type core pipe post also includes default stem steel reinforcement cage in core column concrete in addition to including superposed type tubing string.Superposed type tubing string of the present invention and superposed type core pipe columns bearing capacity are high, and section is small, add effective net area, and fire protecting performance more preferably, is greatly improved the shock resistance of structure, shortens the duration, improves construction quality, be conducive to industrialized construction.

Description

A kind of reinforced concrete sandwich formula tubing string, superposed type core pipe post and its construction method
Technical field
The present invention relates to a kind of box-like tubing string of aliasing, superposed type core pipe post and its making and construction method.
Background technology
Building industrialization is the emphasis of nation-building development, and the main flow structure of current building industrialization is cast-in-place concrete knot Structure post, good integrity of constructing, cost is relatively low, economical and practical, with good durability and fire resistance, but construction quality Control difficulty is larger, construction period is longer, and tensile strength is low, and anti-seismic performance is poor, and ductility is poor under geological process, easily occurs Brittle break.
China is the country that earthquake more than one occurs simultaneously, earthquake disaster be cause China resident injures and deaths disaster most from Right disaster, casualties that wherein megaseisms disaster is caused, property loss are the main losses in earthquake disaster.Wenchuan earthquake is caused About 8.7 ten thousand people are dead or missing, and about 37.5 ten thousand people are injured, due to the limit such as current economic condition, technical merit, division management System, earthquake reply is main in the practice of antidetonation concentrates building structure seismic resistance field, and it is far from that this, which is used to tackle megaseisms disaster, No more.
Big shake even megaseisms can be successfully managed by how finding one kind, and realize industrialized production in building industrialization, it is green Color, fire protecting performance are good, good anti-seismic performance novel reinforced concrete post faces important problem as engineering.
The content of the invention
It is an object of the invention to provide a kind of reinforced concrete sandwich formula tubing string, superposed type core pipe post and its construction method, Solve the technology of traditional cast-in-place concrete structure poor seismic behavior, engineering time length and traditional steel structure fire-resistant difference Problem.
To achieve the above object, the present invention is adopted the following technical scheme that:
A kind of reinforced concrete sandwich formula tubing string, including two sections of post sections being at least vertically connected with, post section are connected with other components End is connecting node area, every section of post section include outside prefabricated tubing string and by external mold of prefabricated tubing string, be poured in prefabricated tubing string Internal cast-in-place stem,
The prefabricated tubing string is reinforced column, including tubing string steel reinforcement cage and tubing string concrete, the tubing string steel reinforcement cage include Tubing string indulges muscle and tubing string stirrup, and the tubing string indulges muscle and tubing string concrete is stretched out in connecting node area, and the tubing string stirrup includes one The combination of round stirrup, spiral bar more than individual or both,
The cast-in-place stem includes core column concrete and the local strengthening steel reinforcement cage being centrally positioned in core column concrete, the office Portion's stiffener cage stretches out core column concrete in connecting node area,
Connecting node area split between two sections of post sections, the tubing string for stretching out connecting node area indulges muscle and local stiffener cage difference Correspondence is connected as one, and node district inserts is perfused with the space between connecting node area, the node district inserts is mixed The combination of solidifying soil, grouting material or both.
The intensity of the tubing string concrete is not less than the intensity of core column concrete.
The stirrup of the local strengthening steel reinforcement cage includes the combination of more than one round stirrup, spiral bar or both.
The tubing string external wall cross-section of the prefabricated tubing string is shaped as circular or polygon, the pipe string internal wall of the prefabricated tubing string Shape of cross section is circular or polygon, and pipe string internal wall is provided with its surface of protrusion, the shearing resistance of spaced armored concrete Key, the shear key is projection or fin, including with tubing string concrete together prefabricated shear key concrete or feather plucking pipe The inwall of post concrete is formed.
The shear key also includes the shear key reinforcing bar being integrated with tubing string steel reinforcement cage colligation, the shear key reinforcing bar parcel In shear key concrete.
The connecting node area is also banded with the node beam steel cage of preprocessing, and the node beam steel cage includes laterally wearing Cross local strengthening steel reinforcement cage node beam longitudinal reinforcement and colligation the both ends of node beam longitudinal reinforcement node beam stirrup.
The tubing string indulges muscle and arranges within one week that the tubing string stirrup includes outer wall stirrup and inwall stirrup along along tubing string outer wall, The outer wall stirrup arranges along tubing string outer wall one week, the inwall stirrup along pipe string internal wall one week, avoid the region of cast-in-place stem Arrangement, the inwall stirrup is indulged muscle colligation with tubing string and is integrated.
The built-in fitting being formed by connecting by orthogonal anchor leg and anchor slab is embedded with the shaft of the prefabricated tubing string, it is described Anchor leg is embedded in tubing string concrete.
The tubing string is connected as the sleeve grouting connection of reinforcing bar between indulging muscle, welds or overlap, the local strengthening reinforcing bar Sleeve grouting connection, welding or the overlap joint of reinforcing bar are connected as between cage.
A kind of reinforced concrete sandwich formula core pipe post, including two sections of post sections being at least vertically connected with, post section and other components The end of connection is connecting node area, every section of post section include outside prefabricated tubing string and by external mold of prefabricated tubing string, be poured in it is pre- Cast-in-place stem inside tubulation post,
The prefabricated tubing string is reinforced column, including tubing string steel reinforcement cage and tubing string concrete, the tubing string steel reinforcement cage include Tubing string indulges muscle and tubing string stirrup, and the tubing string indulges muscle and tubing string concrete is stretched out in connecting node area, and the tubing string stirrup includes one The combination of round stirrup, spiral bar more than individual or both,
The cast-in-place stem includes core column concrete and along shaft elongated setting placed in the middle and mixed in connecting node area stretching stem The stem steel reinforcement cage of soil is coagulated, the stem steel reinforcement cage includes stem and indulges muscle and stem stirrup,
Connecting node area split between two sections of post sections, the vertical muscle of tubing string and stem steel reinforcement cage for stretching out connecting node area is corresponded to respectively Connect as one, be perfused with node district inserts in the space between connecting node area, the node district inserts be concrete, The combination of grouting material or both.
The intensity not less than core column concrete of the tubing string concrete.
The stem stirrup includes the combination of more than one round stirrup, spiral bar or both.
The tubing string external wall cross-section of the prefabricated tubing string is shaped as circular or polygon, the pipe string internal wall of the prefabricated tubing string Shape of cross section is circular or polygon, and pipe string internal wall is provided with its surface of protrusion, the shearing resistance of spaced armored concrete Key, the shear key is projection or fin, including the shear key reinforcing bar that is integrated with tubing string steel reinforcement cage colligation and mixed with tubing string Solidifying soil together prefabricated shear key concrete.
The connecting node area is also banded with the node beam steel cage of preprocessing, and the node beam steel cage includes laterally wearing Cross stem steel reinforcement cage node beam longitudinal reinforcement and colligation the both ends of node beam longitudinal reinforcement node beam stirrup.
The tubing string indulges muscle and arranges within one week that the tubing string stirrup includes outer wall stirrup and inwall stirrup along along tubing string outer wall, The outer wall stirrup arranges along tubing string outer wall one week, the inwall stirrup along pipe string internal wall one week, avoid the region of cast-in-place stem Arrangement, the inwall stirrup is indulged muscle colligation with tubing string and is integrated.
The built-in fitting being formed by connecting by orthogonal anchor leg and anchor slab is embedded with the shaft of the prefabricated tubing string, it is described Anchor leg is embedded in tubing string concrete.
The tubing string indulge muscle between be connected as reinforcing bar sleeve grouting connection, welding or overlap, the stem steel reinforcement cage it Between be connected as reinforcing bar sleeve grouting connection, welding or overlap.
A kind of construction method of reinforced concrete sandwich formula tubing string, construction procedure is as follows:
Step one, the template of prefabricated tubing string is installed in factory;
Step 2, colligation tubing string steel reinforcement cage, tubing string steel reinforcement cage is inserted in template;
Step 3, pours tubing string concrete in template and curing concrete to design strength forms prefabricated tubing string;
Step 4, in factory process local strengthening steel reinforcement cage, is then put into prefabricated tubing string in factory by local strengthening steel reinforcement cage Precalculated position and fixation;Or prefabricated tubing string is transported to behind scene, local strengthening steel reinforcement cage is made at the scene, and at the scene by office Portion's stiffener cage is put into precalculated position and the fixation of prefabricated tubing string;
Step 5, prefabricated tubing string is lifted to precalculated position;
Step 6, indulges muscle by the tubing string of two neighbouring post sections and local stiffener cage corresponds to the company of being fixed respectively Connect;
Step 7, supplement template is installed in step 6 on the outside of the connecting node area of adjacent pillars section;
Step 8, using prefabricated tubing string and supplement template as the node between external mold formed by integrally casting core column concrete and connecting node area Area's inserts, and conserve to design strength formation reinforced concrete sandwich formula tubing string;
Step 9, removes supplement template.
With the integral colligation shear key reinforcing bar of tubing string steel reinforcement cage in the step 2, then in step 3 with tubing string concrete Shear key concrete formation shear key is together poured, or the inwall of feather plucking tubing string concrete forms shear key in step 2.
A kind of construction method of reinforced concrete sandwich formula core pipe post, construction procedure is as follows:
Step one, the template of prefabricated tubing string is installed in factory;
Step 2, colligation tubing string steel reinforcement cage, tubing string steel reinforcement cage is inserted in template;
Step 3, pours tubing string concrete in template and curing concrete to design strength forms prefabricated tubing string;
Step 4, in factory process stem steel reinforcement cage, is then put into the precalculated position of prefabricated tubing string simultaneously in work by stem steel reinforcement cage It is fixed;Or prefabricated tubing string is transported to behind scene, stem steel reinforcement cage is made at the scene, and stem steel reinforcement cage is then put into prefabricated pipe The precalculated position of post and fixation;
Step 5, prefabricated tubing string is lifted to precalculated position;
Step 6, indulges muscle by the tubing string of two neighbouring post sections and the vertical muscle of stem corresponds to be fixedly connected respectively;
Step 7, supplement template is installed in step 7 on the outside of the connecting node area of adjacent pillars section;
Step 8, using prefabricated tubing string and supplement template as the node between external mold formed by integrally casting core column concrete and connecting node area Area's inserts, maintenance to design strength formation reinforced concrete sandwich formula core pipe post;
Step 9, removes supplement template.
With the integral colligation shear key reinforcing bar of tubing string steel reinforcement cage in the step 2, then in step 3 with tubing string concrete Shear key concrete formation shear key is together poured, or the inwall of feather plucking tubing string concrete forms shear key in step 2.
Compared with prior art the invention has the characteristics that and beneficial effect.
The superposed type tubing string and superposed type core pipe post of the present invention designs pole by the overlapping of prefabricated and cast-in-place two parts shaft The big shock resistance for improving structure, in column section stress maximum region into cast-in-place stem, compared to existing concrete column Form section is small, adds effective net area, the significantly more efficient column section that improves is by force efficiency.
Easy to connect, most work post between the superposed type tubing string and superposed type core pipe post and other components of the present invention Construction is completed by method for prefabricating, is installed, is directly poured in prefabricated tubing string without carrying out large-scale column template again at the scene Cast-in-place stem, shortens the duration, improves construction quality, is conducive to industrialized construction.
The tubing string stirrup of the superposed type tubing string of the present invention is set to tie hoop or round stirrup, while superposed type tubing string exists Node region is provided with local strengthening steel reinforcement cage, and the shear resistance of the weak part connected to two column ends is carried out targetedly Strengthen.The superposed type core pipe post of the present invention is the twin columns overlapping on the basis of superposed type tubing string, and spiral shell is set in cast-in-place stem Revolve and be also provided with shear key inside the stem stirrup of stirrup or round stirrup, prefabricated tubing string, enhance cast-in-place stem and prefabricated pipe Bond stress between post, further enhances columns bearing capacity, improves column section by force efficiency.
Brief description of the drawings
The present invention will be further described in detail below in conjunction with the accompanying drawings.
Fig. 1 is the vertical structure schematic diagram of superposed type tubing string post section embodiment one in the present invention.
Fig. 2 is the vertical structure schematic diagram of superposed type tubing string post section embodiment two in the present invention.
Fig. 3 is the vertical structure schematic diagram of superposed type tubing string post section embodiment three in the present invention.
Fig. 4 is the vertical structure schematic diagram of superposed type tubing string post section example IV in the present invention.
Fig. 5 is the vertical structure schematic diagram of the superposed type tubing string by taking embodiment two as an example.
Fig. 6 is Fig. 5 the first cross-sectional view.
Fig. 7 is Fig. 5 second of cross-sectional view.
Fig. 8 is the vertical structure schematic diagram of superposed type core pipe post post section embodiment one in the present invention.
Fig. 9 is the vertical structure schematic diagram of superposed type core pipe post post section embodiment two in the present invention.
Figure 10 is the vertical structure schematic diagram of superposed type core pipe post post section embodiment three in the present invention.
Figure 11 is the vertical structure schematic diagram of superposed type core pipe post post section example IV in the present invention.
Figure 12 is the vertical structure schematic diagram of the superposed type core pipe post by taking embodiment two as an example.
Figure 13 is Figure 12 the first cross-sectional view.
Figure 14 is Figure 12 second of cross-sectional view.
Figure 15 is the structural representation that supplement template position is installed in Fig. 5 construction procedure.
Figure 16 is the structural representation that supplement template position is installed in Figure 12 construction procedure.
Reference:The prefabricated tubing strings of 1-, 1.1- tubing strings indulge muscle, 1.2- tubing strings stirrup, 1.2a- outer walls stirrup, 1.2b- inwalls stirrup, 1.3- tubing strings concrete, 1a- tubing strings outer wall, 1b- pipe string internal walls, the cast-in-place stems of 2-, 2.1- cores Post concrete, 2.2- stems indulge muscle, 2.3- stems stirrup, 2.4- local strengthenings steel reinforcement cage, 3- shear keies, 3.1- shearing resistances Key concrete, 3.2- shear keies reinforcing bar, 4- node beam steels cage, 4.1- node beams longitudinal reinforcement, 4.2- nodes beam stirrup, 5- built-in fittings, 5.1- anchor slabs, 5.2- anchors leg, 6- supplements template, 7- node district inserts.
Embodiment
A kind of reinforced concrete sandwich formula tubing string, including two sections of post sections being at least vertically connected with, post section connect with other components The end connect is connecting node area.
Embodiment one is shown in Figure 1, and every section of post section includes the prefabricated tubing string 1 of outside and is external mold with prefabricated tubing string 1, fills Note the cast-in-place stem 2 inside prefabricated tubing string.
The prefabricated tubing string 1 is reinforced column, including tubing string steel reinforcement cage and tubing string concrete 1.3, tubing string steel reinforcement cage It is wrapped in tubing string concrete 1.3, the tubing string steel reinforcement cage includes tubing string and indulges muscle 1.1 and tubing string stirrup 1.2, and the tubing string indulges muscle 1.1 stretch out tubing string concrete 1.3 in connecting node area, the tubing string stirrup 1.2 include more than one round stirrup, spiral bar or The combination of both persons, the intensity of the tubing string concrete 1.3 is not less than the intensity 2.1 of core column concrete, the core column concrete For concrete or regeneration concrete.
The cast-in-place stem 2 includes core column concrete 2.1 and the local strengthening steel being centrally positioned in core column concrete 2.1 Muscle cage 2.4, the local strengthening steel reinforcement cage 2.4 stretches out core column concrete 2.1, the local strengthening steel reinforcement cage in connecting node area 2.4 are centrally placed in the top or bottom of cast-in-place stem 2 or while set.It is setting simultaneously in the present embodiment.
The stirrup of the local strengthening steel reinforcement cage includes the combination of more than one spiral bar, round stirrup or both.
Embodiment two is shown in Figure 2, and unlike embodiment one, in order to strengthen the combination of priority two parts concrete Power, can be described anti-on the pipe string internal wall 1b provided with its surface, the shear key 3 of spaced armored concrete is protruded Key is cut for projection or fin, including with the together prefabricated shear key concrete 3.1 of tubing string concrete 1.3.In other embodiments In can also be formed for the inwall of feather plucking tubing string concrete 1.3.
The shear key can also include the shear key reinforcing bar 3.2 being integrated with tubing string steel reinforcement cage colligation, the shear key Reinforcing bar 3.2 is wrapped in shear key concrete 3.1.Example is spaced rectangular cam in figure, avoids local strengthening reinforcing bar The region of cage 2.4 is set, including the shear key reinforcing bar 3.2 that is integrated with tubing string steel reinforcement cage colligation and with tubing string concrete 1.3 1 With prefabricated shear key concrete 3.1.
Embodiment three is shown in Figure 3, and unlike embodiment two, in order to be connected with beam, the local strengthening The node beam steel cage 4 of preprocessing is banded with the position of steel reinforcement cage 2.4, the node beam steel cage includes being horizontally through part The node beam stirrup of the node beam longitudinal reinforcement 4.1 of stiffener cage 2.4 and colligation at the both ends of node beam longitudinal reinforcement 4.1 4.2。
Example IV is shown in Figure 4, described pre- from unlike embodiment two, being connected for convenience with other components Be embedded with the built-in fitting 5 being formed by connecting by orthogonal anchor leg 5.2 and anchor slab 5.1 on the shaft of tubulation post, the anchor slab with Tubing string outer wall is concordant, and the anchor leg is embedded in tubing string concrete.
Shown in Figure 5, this reinforced concrete sandwich formula tubing string is vertically connected with by taking embodiment two as an example, including at least Two sections of post sections, the connecting node area split between two sections of post sections, the tubing string for stretching out connecting node area indulges muscle 1.1 and local strengthening Steel reinforcement cage 2.4, which is connected respectively, to be integrated, and node district inserts 7, the section are perfused with the space between connecting node area Point area's inserts 7 is the combination of concrete, grouting material or both.It is provided with space in the present embodiment between connecting node area With the concrete of the formed by integrally casting of core column concrete 2.1.
Referring to shown in Fig. 6-Fig. 7, the tubing string outer wall 1a shape of cross sections of the prefabricated tubing string are polygon or circle, described The pipe string internal wall 1b shape of cross sections of prefabricated tubing string are polygon or circle, and two posts are coaxial to be set.
The tubing string is indulged muscle and arranged along 1.1 along tubing string outer wall 1a mono- week, the tubing string stirrup include outer wall stirrup 1.2a with Inwall stirrup 1.2b, the outer wall stirrup 1.2a arrange along tubing string outer wall 1a mono- week, and the inwall stirrup 1.2b is along pipe string internal wall 1b mono- week, the region arrangement for avoiding cast-in-place stem 2, the inwall stirrup 1.2b indulge the colligation of muscle 1.1 with tubing string and are integrated.Referring to figure Shown in 6, the first cross section tubing string outer wall 1a shape of cross sections are square, and pipe string internal wall 1b shape of cross sections are square.Due to Tubing string outer wall 1a and pipe string internal wall 1b shape of cross sections are square, therefore outer wall stirrup 1.2a is square, inwall stirrup 1.2b The cross stirrup for being designed to be made up of two rectangles, the short side of rectangle and tubing string are indulged the colligation of muscle 1.1 and are integrated.Referring to Fig. 7 Shown, second of cross section tubing string outer wall 1a shape of cross section is circle, and pipe string internal wall 1b shape of cross sections are circle.Therefore it is outer Armlet muscle 1.2a is circle, and inwall stirrup 1.2b is also designed to circle, and it is one that inwall stirrup 1.2b indulges the colligation of muscle 1.1 with tubing string Body.
The construction method of this reinforced concrete sandwich formula tubing strings of Fig. 5, construction procedure is as follows:
Step one, the template of prefabricated tubing string 1 is installed in factory;
Step 2, colligation tubing string steel reinforcement cage, tubing string steel reinforcement cage is inserted in template;
Step 3, pours tubing string concrete 1.3 in template and curing concrete to design strength forms prefabricated tubing string;
Local strengthening steel reinforcement cage 2.4, in factory process local strengthening steel reinforcement cage 2.4, is then put into prefabricated by step 4 in factory The precalculated position of tubing string and fixation;Or prefabricated tubing string is transported to behind scene, local strengthening steel reinforcement cage 2.4 is made at the scene, and Local strengthening steel reinforcement cage 2.4 is put into precalculated position and the fixation of prefabricated tubing string at the scene;
Step 5, prefabricated tubing string is lifted to precalculated position;
Step 6, indulges muscle 1.1 by the tubing string of two neighbouring post sections and local stiffener cage 2.4 corresponds to consolidated respectively Fixed connection;
Step 7, installs supplement template 6 in step 6 on the outside of the connecting node area of adjacent pillars section;
Step 8, it is shown in Figure 15, if the intensity of tubing string concrete and the strength difference of core column concrete are smaller, and have compared with Strong sidewise restraint, with prefabricated tubing string 1 and supplement template 6 be external mold formed by integrally casting core column concrete 2.1 and connecting node area it Between node district inserts 7, and conserve to design strength formation reinforced concrete sandwich formula tubing string;
Step 9, removes supplement template.
A kind of reinforced concrete sandwich formula core pipe post, including two sections of post sections being at least vertically connected with, post section and other components The end of connection is connecting node area.
Embodiment one is shown in Figure 8, and every section of post section includes the prefabricated tubing string 1 of outside and is external mold with prefabricated tubing string 1, fills Note the cast-in-place stem 2 inside prefabricated tubing string.
The prefabricated tubing string 1 is reinforced column, including tubing string steel reinforcement cage and tubing string concrete 1.3, the tubing string steel Muscle cage includes tubing string and indulges muscle 1.1 and tubing string stirrup 1.2, and the tubing string indulges muscle 1.1 and stretches out tubing string concrete in connecting node area 1.3, the tubing string stirrup 1.2 includes the combination of more than one round stirrup, spiral bar or both, the tubing string concrete 1.3 intensity 2.1 more than core column concrete.The core column concrete is concrete or regeneration concrete.The stem stirrup 2.3 include the combination of more than one round stirrup, spiral bar or both.
The cast-in-place stem 2 and including core column concrete 2.1 and along shaft elongated setting placed in the middle stretched in connecting node area Go out the stem steel reinforcement cage of core column concrete 2.1, the stem steel reinforcement cage includes stem and indulges muscle 2.2 and stem stirrup 2.3.
Embodiment two is shown in Figure 9, and unlike embodiment one, in order to strengthen the combination of priority two parts concrete Power, can be described anti-on the pipe string internal wall 1b provided with its surface, the shear key 3 of spaced armored concrete is protruded Key is cut for projection or fin, including with the together prefabricated shear key concrete 3.1, or in other realities of tubing string concrete 1.3 The inwall for applying feather plucking tubing string concrete 1.3 in example is formed.
The shear key also includes the shear key reinforcing bar 3.2 being integrated with tubing string steel reinforcement cage colligation, the shear key reinforcing bar 3.2 are wrapped in shear key concrete 3.1.Example is spaced rectangular cam in figure, avoids local strengthening steel reinforcement cage 2.4 Region set, including the shear key reinforcing bar 3.2 that is integrated with tubing string steel reinforcement cage colligation and together prefabricated with tubing string concrete 1.3 Shear key concrete 3.1.
Embodiment three is shown in Figure 10, and unlike embodiment two, in order to be connected with beam, the end of the post section The node beam steel cage 4 of preprocessing is banded with portion position, the node beam steel cage includes being horizontally through stem steel reinforcement cage The node beam stirrup 4.2 of node beam longitudinal reinforcement 4.1 and colligation at the both ends of node beam longitudinal reinforcement 4.1.
Example IV is shown in Figure 11, described pre- from unlike embodiment two, being connected for convenience with other components Be embedded with the built-in fitting 5 being formed by connecting by orthogonal anchor leg 5.2 and anchor slab 5.1 on the shaft of tubulation post, the anchor slab with Tubing string outer wall is concordant, and the anchor leg is embedded in tubing string concrete.
Shown in Figure 12, this reinforced concrete sandwich formula tube core post connects up and down by taking embodiment two as an example, including at least Connecting node area split between the two sections of post sections connect, two sections of post sections, the tubing string for stretching out connecting node area indulges muscle 1.1 and stem steel The vertical muscle 2.2 of the stem of muscle cage, which is connected respectively, to be integrated, and the node district inserts 7 is concrete, grouting material or both Combination.Provided with the concrete with the formed by integrally casting of core column concrete 2.1 in space in the present embodiment between connecting node area.
Referring to shown in Figure 13-Figure 14, the tubing string outer wall 1a shape of cross sections of the prefabricated tubing string are polygon or circle, institute The pipe string internal wall 1b shape of cross sections for stating prefabricated tubing string are polygon or circle, and two posts are coaxial to be set.
The tubing string is indulged muscle and arranged along 1.1 along tubing string outer wall 1a mono- week, the tubing string stirrup include outer wall stirrup 1.2a with Inwall stirrup 1.2b, the outer wall stirrup 1.2a arrange along tubing string outer wall 1a mono- week, and the inwall stirrup 1.2b is along pipe string internal wall 1b mono- week, the region arrangement for avoiding cast-in-place stem 2, the inwall stirrup 1.2b indulge the colligation of muscle 1.1 with tubing string and are integrated.
Shown in Figure 13, the first cross section tubing string outer wall 1a shape of cross sections are square, pipe string internal wall 1b cross sections It is shaped as square.Because tubing string outer wall 1a and pipe string internal wall 1b shape of cross sections are square, therefore outer wall stirrup 1.2a is side Shape, the inwall stirrup 1.2b cross stirrup for being designed to be made up of two rectangles, short side and the tubing string of rectangle indulge the colligation of muscle 1.1 It is integrated.Shown in Figure 14, second of cross section tubing string outer wall 1a shape of cross section is circle, pipe string internal wall 1b cross sections shape Shape is circle.Therefore outer wall stirrup 1.2a is circle, and inwall stirrup 1.2b is also designed to circle, and inwall stirrup 1.2b is indulged with tubing string The colligation of muscle 1.1 is integrated.
The construction method of this reinforced concrete sandwich formula tube core posts of Figure 12, construction procedure is as follows:
Step one, the template of prefabricated tubing string 1 is installed in factory;
Step 2, colligation tubing string steel reinforcement cage, tubing string steel reinforcement cage is inserted in template;
Step 3, pours tubing string concrete 1.3 in template and curing concrete to design strength forms prefabricated tubing string;
Step 4, in factory process stem steel reinforcement cage, is then put into the precalculated position of prefabricated tubing string simultaneously in work by stem steel reinforcement cage It is fixed;Or prefabricated tubing string is transported to behind scene, stem steel reinforcement cage is made at the scene, and stem steel reinforcement cage is then put into prefabricated pipe The precalculated position of post and fixation;
Step 5, prefabricated tubing string is lifted to precalculated position;
Step 6, indulges muscle 1.1 by the tubing string of two neighbouring post sections and stem indulges muscle 2.2 and corresponds to the company of being fixed respectively Connect;
Step 7, installs supplement template 6 in step 7 on the outside of the connecting node area of adjacent pillars section;
Step 8, it is shown in Figure 16, if the intensity of tubing string concrete and the strength difference of core column concrete are smaller, and have compared with Strong sidewise restraint, with prefabricated tubing string 1 and supplement template 6 be external mold formed by integrally casting core column concrete 2.1 and connecting node area it Between node district inserts 7, maintenance to design strength formation reinforced concrete sandwich formula core pipe post;
Step 9, removes supplement template.
It is then mixed with tubing string in step 3 with the integral colligation shear key reinforcing bar 3.2 of tubing string steel reinforcement cage in the step 2 Solidifying soil 1.3 together pours the formation shear key of shear key concrete 3.1, or in step 2 in feather plucking tubing string concrete 1.3 Wall formation shear key.The stem steel reinforcement cage can link together with pre-production and with tubing string steel reinforcement cage in step 2, so Whole Transporting, to job site, saves step 5 and step 6 in step 4 afterwards.

Claims (21)

1. a kind of reinforced concrete sandwich formula tubing string, including two sections of post sections being at least vertically connected with, post section are connected with other components End be connecting node area, it is characterised in that:Every section of post section includes outside prefabricated tubing string(1)With with prefabricated tubing string(1)For External mold, the cast-in-place stem being poured in inside prefabricated tubing string(2),
The prefabricated tubing string(1)For reinforced column, including tubing string steel reinforcement cage and tubing string concrete(1.3), the tubing string steel Muscle cage includes tubing string and indulges muscle(1.1)With tubing string stirrup(1.2), the tubing string indulges muscle(1.1)Tubing string is stretched out in connecting node area to mix Solidifying soil(1.3), the tubing string stirrup(1.2)Include the combination of more than one round stirrup, spiral bar or both,
The cast-in-place stem(2)Including core column concrete(2.1)Be centrally positioned in core column concrete(2.1)Interior local strengthening Steel reinforcement cage(2.4), the local strengthening steel reinforcement cage(2.4)Core column concrete is stretched out in connecting node area(2.1),
Connecting node area split between two sections of post sections, the tubing string for stretching out connecting node area indulges muscle(1.1)With local stiffener Cage(2.4)It is connected respectively and is integrated, node district inserts is perfused with the space between connecting node area(7), the section Point area's inserts(7)For the combination of concrete, grouting material or both.
2. reinforced concrete sandwich formula tubing string according to claim 1, it is characterised in that:The tubing string concrete(1.3) Intensity be not less than core column concrete intensity(2.1).
3. reinforced concrete sandwich formula tubing string according to claim 1, it is characterised in that:The local strengthening steel reinforcement cage (2.4)Stirrup include the combination of more than one round stirrup, spiral bar or both.
4. reinforced concrete sandwich formula tubing string according to claim 1, it is characterised in that:Outside the tubing string of the prefabricated tubing string Wall(1a)Shape of cross section is circular or polygon, the pipe string internal wall of the prefabricated tubing string(1b)Shape of cross section is circular or many Side shape, pipe string internal wall(1b)Provided with its surface of protrusion, the shear key of spaced armored concrete(3), the shear key For projection or fin, including with tubing string concrete(1.3)Together prefabricated shear key concrete(3.1)Or feather plucking tubing string is mixed Solidifying soil(1.3)Inwall formed.
5. reinforced concrete sandwich formula tubing string according to claim 4, it is characterised in that:The shear key also includes and pipe The shear key reinforcing bar that post steel reinforcement cage colligation is integrated(3.2), the shear key reinforcing bar(3.2)It is wrapped in shear key concrete (3.1)It is interior.
6. reinforced concrete sandwich formula tubing string according to claim 1, it is characterised in that:The connecting node area also colligation There is the node beam steel cage of preprocessing(4), the node beam steel cage is including being horizontally through local strengthening steel reinforcement cage(2.4)Section Point beam longitudinal reinforcement(4.1)With colligation in node beam longitudinal reinforcement(4.1)Both ends node beam stirrup(4.2).
7. the reinforced concrete sandwich formula tubing string according to claim 1-6 any one, it is characterised in that:The tubing string is indulged Muscle edge(1.1)Along tubing string outer wall(1a)Arrange within one week, the tubing string stirrup includes outer wall stirrup(1.2a)With inwall stirrup (1.2b), the outer wall stirrup(1.2a)Along tubing string outer wall(1a)Arrange within one week, the inwall stirrup(1.2b)Along pipe string internal wall (1b)One week, avoid cast-in-place stem(2)Region arrangement, the inwall stirrup(1.2b)Muscle is indulged with tubing string(1.1)Colligation is one Body.
8. reinforced concrete sandwich formula tubing string according to claim 1, it is characterised in that:On the shaft of the prefabricated tubing string It is embedded with by orthogonal anchor leg(5.2)And anchor slab(5.1)The built-in fitting being formed by connecting(5), the anchor leg is embedded in tubing string In concrete.
9. reinforced concrete sandwich formula tubing string according to claim 1, it is characterised in that:The tubing string indulges muscle(1.1)It Between be connected as reinforcing bar sleeve grouting connection, welding or overlap, the local strengthening steel reinforcement cage(2.4)Between be connected as reinforcing bar Sleeve grouting connection, welding are overlapped.
10. a kind of reinforced concrete sandwich formula core pipe post, including two sections of post sections being at least vertically connected with, post section connect with other components The end connect is connecting node area, it is characterised in that:Every section of post section includes outside prefabricated tubing string(1)With with prefabricated tubing string(1) For external mold, the cast-in-place stem being poured in inside prefabricated tubing string(2),
The prefabricated tubing string(1)For reinforced column, including tubing string steel reinforcement cage and tubing string concrete(1.3), the tubing string steel Muscle cage includes tubing string and indulges muscle(1.1)With tubing string stirrup(1.2), the tubing string indulges muscle(1.1)Tubing string is stretched out in connecting node area to mix Solidifying soil(1.3), the tubing string stirrup(1.2)Include the combination of more than one round stirrup, spiral bar or both,
The cast-in-place stem(2)Including core column concrete(2.1)Elongated set and stretched in connecting node area with along shaft is placed in the middle Go out core column concrete(2.1)Stem steel reinforcement cage, the stem steel reinforcement cage include stem indulge muscle(2.2)With stem stirrup(2.3),
Connecting node area split between two sections of post sections, the tubing string for stretching out connecting node area indulges muscle(1.1)With stem steel reinforcement cage point It Dui Ying not connect as one, node district inserts is perfused with the space between connecting node area(7), the node district inserts (7)For the combination of concrete, grouting material or both.
11. reinforced concrete sandwich formula core pipe post according to claim 10, it is characterised in that:The tubing string concrete (1.3)The intensity not less than core column concrete(2.1).
12. reinforced concrete sandwich formula core pipe post according to claim 10, it is characterised in that:The stem stirrup(2.3) Include the combination of more than one round stirrup, spiral bar or both.
13. reinforced concrete sandwich formula core pipe post according to claim 10, it is characterised in that:The pipe of the prefabricated tubing string Column outer wall(1a)Shape of cross section is circular or polygon, the pipe string internal wall of the prefabricated tubing string(1b)Shape of cross section is circle Or polygon, pipe string internal wall(1b)Provided with its surface of protrusion, the shear key of spaced armored concrete, the shear key For projection or fin, including the shear key reinforcing bar being integrated with tubing string steel reinforcement cage colligation(3.2)With with tubing string concrete(1.3) Together prefabricated shear key concrete(3.1).
14. reinforced concrete sandwich formula core pipe post according to claim 10, it is characterised in that:The connecting node area is also It is banded with the node beam steel cage of preprocessing(4), node beam of the node beam steel cage including being horizontally through stem steel reinforcement cage Longitudinal reinforcement(4.1)With colligation in node beam longitudinal reinforcement(4.1)Both ends node beam stirrup(4.2).
15. the reinforced concrete sandwich formula core pipe post according to claim 10-14 any one, it is characterised in that:It is described Tubing string indulges muscle edge(1.1)Along tubing string outer wall(1a)Arrange within one week, the tubing string stirrup includes outer wall stirrup(1.2a)With interior armlet Muscle(1.2b), the outer wall stirrup(1.2a)Along tubing string outer wall(1a)Arrange within one week, the inwall stirrup(1.2b)Along along tubing string Wall(1b)One week, avoid cast-in-place stem(2)Region arrangement, the inwall stirrup(1.2b)Muscle is indulged with tubing string(1.1)Colligation is One.
16. reinforced concrete sandwich formula core pipe post according to claim 10, it is characterised in that:The post of the prefabricated tubing string It is embedded with it by orthogonal anchor leg(5.2)And anchor slab(5.1)The built-in fitting being formed by connecting(5), the anchor leg is embedded in In tubing string concrete.
17. reinforced concrete sandwich formula core pipe post according to claim 10, it is characterised in that:The tubing string indulges muscle (1.1)Between be connected as the sleeve grouting connection of reinforcing bar, welding or overlap, the set of reinforcing bar is connected as between the stem steel reinforcement cage Cylinder grouting connection, welding are overlapped.
18. a kind of construction method of the reinforced concrete sandwich formula tubing string according to claim 1-9 any one, its feature exists In construction procedure is as follows:
Step one, prefabricated tubing string is installed in factory(1)Template;
Step 2, colligation tubing string steel reinforcement cage, tubing string steel reinforcement cage is inserted in template;
Step 3, pours tubing string concrete in template(1.3)And curing concrete to design strength forms prefabricated tubing string;
Step 4, in factory process local strengthening steel reinforcement cage(2.4), then in factory by local strengthening steel reinforcement cage(2.4)It is put into The precalculated position of prefabricated tubing string and fixation;Or prefabricated tubing string is transported to behind scene, local strengthening steel reinforcement cage is made at the scene (2.4), and at the scene by local strengthening steel reinforcement cage(2.4)It is put into precalculated position and the fixation of prefabricated tubing string;
Step 5, prefabricated tubing string is lifted to precalculated position;
Step 6, muscle is indulged by the tubing string of two neighbouring post sections(1.1)With local stiffener cage(2.4)Correspond to respectively into Row is fixedly connected;
Step 7, supplement template is installed in step 6 on the outside of the connecting node area of adjacent pillars section(6);
Step 8, with prefabricated tubing string(1)With supplement template(6)For external mold formed by integrally casting core column concrete(2.1)And connecting node Node district inserts between area(7), and conserve to design strength formation reinforced concrete sandwich formula tubing string;
Step 9, removes supplement template.
19. the construction method of reinforced concrete sandwich formula tubing string according to claim 18, it is characterised in that:The step 2 In with the integral colligation shear key reinforcing bar of tubing string steel reinforcement cage(3.2), then in step 3 with tubing string concrete(1.3)Together pour Shear key concrete(3.1)Form shear key, or the feather plucking tubing string concrete in step 2(1.3)Inwall formation shearing resistance Key.
20. a kind of construction method of the reinforced concrete sandwich formula core pipe post according to claim 10-17 any one, it is special Levy and be, construction procedure is as follows:
Step one, prefabricated tubing string is installed in factory(1)Template;
Step 2, colligation tubing string steel reinforcement cage, tubing string steel reinforcement cage is inserted in template;
Step 3, pours tubing string concrete in template(1.3)And curing concrete to design strength forms prefabricated tubing string;
Step 4, in factory process stem steel reinforcement cage, is then put into the precalculated position of prefabricated tubing string simultaneously in work by stem steel reinforcement cage It is fixed;Or prefabricated tubing string is transported to behind scene, stem steel reinforcement cage is made at the scene, and stem steel reinforcement cage is then put into prefabricated pipe The precalculated position of post and fixation;
Step 5, prefabricated tubing string is lifted to precalculated position;
Step 6, muscle is indulged by the tubing string of two neighbouring post sections(1.1)Muscle is indulged with stem(2.2)Correspond to and consolidated respectively Fixed connection;
Step 7, supplement template is installed in step 7 on the outside of the connecting node area of adjacent pillars section(6);
Step 8, with prefabricated tubing string(1)With supplement template(6)For external mold formed by integrally casting core column concrete(2.1)And connecting node Node district inserts between area(7), maintenance to design strength formation reinforced concrete sandwich formula core pipe post;
Step 9, removes supplement template.
21. the construction method of reinforced concrete sandwich formula tubing string according to claim 20, it is characterised in that:The step 2 In with the integral colligation shear key reinforcing bar of tubing string steel reinforcement cage(3.2), then in step 3 with tubing string concrete(1.3)Together pour Shear key concrete(3.1)Form shear key, or the feather plucking tubing string concrete in step 2(1.3)Inwall formation shearing resistance Key.
CN201710315709.4A 2017-05-08 2017-05-08 A kind of reinforced concrete sandwich formula tubing string, superposed type core pipe post and its construction method Pending CN107060211A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710315709.4A CN107060211A (en) 2017-05-08 2017-05-08 A kind of reinforced concrete sandwich formula tubing string, superposed type core pipe post and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710315709.4A CN107060211A (en) 2017-05-08 2017-05-08 A kind of reinforced concrete sandwich formula tubing string, superposed type core pipe post and its construction method

Publications (1)

Publication Number Publication Date
CN107060211A true CN107060211A (en) 2017-08-18

Family

ID=59597075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710315709.4A Pending CN107060211A (en) 2017-05-08 2017-05-08 A kind of reinforced concrete sandwich formula tubing string, superposed type core pipe post and its construction method

Country Status (1)

Country Link
CN (1) CN107060211A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107605102A (en) * 2017-10-12 2018-01-19 贺州学院 One kind fire prevention thermal insulation assembly concrete rod structure and its production technology
CN107740517A (en) * 2017-10-12 2018-02-27 贺州学院 A kind of fireproof heat insulating assembly concrete curtain wall structure and its production technology
CN112854604A (en) * 2021-03-05 2021-05-28 西安建筑科技大学 High-strength concrete superposed column with crossed double-spiral hoop reinforcement steel and construction method
CN113216516A (en) * 2021-03-05 2021-08-06 西安建筑科技大学 Superposed column with ultra-short stud and double-layer high-strength spiral stirrup and construction method
CN113982109A (en) * 2021-12-29 2022-01-28 中铁建设集团有限公司 Unequal-strength beam column joint based on steel plate hoop constrained concrete superposed short column
CN114016605A (en) * 2021-12-29 2022-02-08 中铁建设集团有限公司 Unequal-strength beam column joint based on ring rib constraint concrete superposed short column
CN114232813A (en) * 2021-12-29 2022-03-25 中铁建设集团有限公司 Unequal-strength wall beam joint based on ring rib constraint concrete superposed short column
CN114232812A (en) * 2021-12-29 2022-03-25 中铁建设集团有限公司 Unequal strength wall beam joint based on steel plate hoop constrained concrete superposed short column
US20230139840A1 (en) * 2021-10-29 2023-05-04 Zhengzhou University FRP Composite Spiral Stirrup Confined Concrete Column And Compression Design Method Thereof
CN116517191A (en) * 2023-06-29 2023-08-01 长春工程学院 Mixed reinforced precast concrete column with spiral stirrup core column and its assembly method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201722786U (en) * 2010-07-02 2011-01-26 长安大学 Compound steel tube concrete outer steel tube-disconnection ring beam node
CN102102423A (en) * 2011-03-09 2011-06-22 湖南大学 Sleeve reinforced concrete column
CN103422620A (en) * 2013-08-27 2013-12-04 陕西建科兴业钢结构有限公司 Prefabricated hollow steel-reinforced concrete column and splicing structure and splicing method thereof
WO2014199402A1 (en) * 2013-06-10 2014-12-18 Borghi Lapo A pillar for the realisation of a structural anti-seismic node and such a structural anti-seismlfc node
CN204357001U (en) * 2014-12-22 2015-05-27 西安建筑科技大学 A kind of prefabrication and assembly construction profile steel concrete column skeleton
CN105064529A (en) * 2015-09-01 2015-11-18 湖南大学 Prefabricated and assembled large-board shear wall structure with concealed bracings

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201722786U (en) * 2010-07-02 2011-01-26 长安大学 Compound steel tube concrete outer steel tube-disconnection ring beam node
CN102102423A (en) * 2011-03-09 2011-06-22 湖南大学 Sleeve reinforced concrete column
WO2014199402A1 (en) * 2013-06-10 2014-12-18 Borghi Lapo A pillar for the realisation of a structural anti-seismic node and such a structural anti-seismlfc node
CN103422620A (en) * 2013-08-27 2013-12-04 陕西建科兴业钢结构有限公司 Prefabricated hollow steel-reinforced concrete column and splicing structure and splicing method thereof
CN204357001U (en) * 2014-12-22 2015-05-27 西安建筑科技大学 A kind of prefabrication and assembly construction profile steel concrete column skeleton
CN105064529A (en) * 2015-09-01 2015-11-18 湖南大学 Prefabricated and assembled large-board shear wall structure with concealed bracings

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107605102A (en) * 2017-10-12 2018-01-19 贺州学院 One kind fire prevention thermal insulation assembly concrete rod structure and its production technology
CN107740517A (en) * 2017-10-12 2018-02-27 贺州学院 A kind of fireproof heat insulating assembly concrete curtain wall structure and its production technology
CN112854604A (en) * 2021-03-05 2021-05-28 西安建筑科技大学 High-strength concrete superposed column with crossed double-spiral hoop reinforcement steel and construction method
CN113216516A (en) * 2021-03-05 2021-08-06 西安建筑科技大学 Superposed column with ultra-short stud and double-layer high-strength spiral stirrup and construction method
US20230139840A1 (en) * 2021-10-29 2023-05-04 Zhengzhou University FRP Composite Spiral Stirrup Confined Concrete Column And Compression Design Method Thereof
CN113982109A (en) * 2021-12-29 2022-01-28 中铁建设集团有限公司 Unequal-strength beam column joint based on steel plate hoop constrained concrete superposed short column
CN114016605A (en) * 2021-12-29 2022-02-08 中铁建设集团有限公司 Unequal-strength beam column joint based on ring rib constraint concrete superposed short column
CN114232813A (en) * 2021-12-29 2022-03-25 中铁建设集团有限公司 Unequal-strength wall beam joint based on ring rib constraint concrete superposed short column
CN114232812A (en) * 2021-12-29 2022-03-25 中铁建设集团有限公司 Unequal strength wall beam joint based on steel plate hoop constrained concrete superposed short column
CN116517191A (en) * 2023-06-29 2023-08-01 长春工程学院 Mixed reinforced precast concrete column with spiral stirrup core column and its assembly method
CN116517191B (en) * 2023-06-29 2023-10-10 长春工程学院 Mixed reinforcement precast concrete column with spiral stirrup core column and assembly method thereof

Similar Documents

Publication Publication Date Title
CN107060211A (en) A kind of reinforced concrete sandwich formula tubing string, superposed type core pipe post and its construction method
CN107060067A (en) A kind of superposed type prefabricated reinforced concrete structure system and its construction method
CN106149873B (en) Prefabricated assembled concrete frame construction and preparation method thereof
CN105780935B (en) Prefabricated assembled steel tube confinement energy consumption connecting node and construction method
CN105863111B (en) The steel frame construction of embedded precast concrete shear wall bending resistance simultaneously
CN206015877U (en) Prefabricated assembled concrete frame construction
CN208486364U (en) Frame structure system
CN108797791B (en) A kind of assembly method of upper and lower self-heat conserving external wall and floor
CN207032666U (en) A kind of reinforced concrete sandwich formula tubing string and superposed type core pipe post
CN102619286B (en) Connecting joint of steel pipe concrete column and profile steel concrete beam
CN203440948U (en) Precast concrete double-plate shear wall with built-in diagonal bracing
CN205637144U (en) Double entry circular steel tube confined concrete post and concrete beam node structure
CN106032701B (en) A kind of self-balancing monoblock type template assembly structure of reinforced column
CN106088412A (en) L-type steel beam column
CN207032466U (en) A kind of superposed type prefabricated reinforced concrete structure system
CN105863048B (en) A kind of connecting structure of prefabricated frame support structure bean column node
CN105625573B (en) The bean column node of intensity presstressed reinforcing steel and regular reinforcement sleeve connection in beam bottom
CN208105473U (en) A kind of assembly node of upper and lower self-heat conserving external wall and floor
CN100353016C (en) Square section concrete short pillar hiden with 'slant strength nucleocenter beam' and mfg. method thereof
CN105951986B (en) A kind of the mid-side node connection structure and its method of prefabricated integral frame column beam
CN106032702B (en) A kind of self-balancing monoblock type template assembly structure of reinforced beam
CN208105474U (en) A kind of assembly node of upper and lower interior wall and floor
CN208633272U (en) A prefabricated steel tubular concrete ring beam connection structure
CN213837352U (en) Integral stirrup of integration of concrete column
CN209179319U (en) The connecting joint structure of Liang Yuliang

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170818