CN103015572A - Connecting method for wall body and floor slab and special connecting structure as well as quick-assembled house - Google Patents
Connecting method for wall body and floor slab and special connecting structure as well as quick-assembled house Download PDFInfo
- Publication number
- CN103015572A CN103015572A CN2013100032898A CN201310003289A CN103015572A CN 103015572 A CN103015572 A CN 103015572A CN 2013100032898 A CN2013100032898 A CN 2013100032898A CN 201310003289 A CN201310003289 A CN 201310003289A CN 103015572 A CN103015572 A CN 103015572A
- Authority
- CN
- China
- Prior art keywords
- wallboard
- floor
- securing member
- fitting
- built
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention discloses a connecting method for a wall body and a floor slab and a special connecting structure as well as a quick-assembled house, wherein an embedded part is embedded in the floor slab of the quick-assembled house; a locating insert is arranged at the bottom of a wallboard; a locating groove extending in a length direction of the wall body is formed in the locating insert; and the locating insert is fixed on the embedded part through a first tightening piece and fixed on the wallboard through a second tightening piece; during using, the bottom of the wallboard is firstly inserted in a mounting groove of the locating insert and then the wallboard is fixedly connected with the locating insert through the second tightening piece, so that the wallboard is fixed on the embedded part embedded in the floor slab through the locating insert; moreover, the wallboard can be fixed on the floor slab, so as to achieve the mounting and locating of the wallboard; therefore, the connecting structure between the wall body and the floor slab is simplified and the building construction efficiency is increased.
Description
Technical field
The present invention relates to ready-package house technical field, relate in particular to the method for attachment of a kind of body of wall and floor, also relate to simultaneously the syndeton of described method of attachment special use.
Background technology
At present, being connected between existing body of wall and the floor all adopts masonry structure or inner deposited and outer hung structure to connect, so that the building construction process duplication of labour in whole house is more, long construction period, the time-consuming material that takes.For example application number is that the Chinese utility model patent of 201120376375.X discloses a kind of newly-increased body of wall and original floor connection structure, this syndeton is included in the collar tie beam of newly-increased body of wall and the setting of original floor junction, ring beam reinforcing steel bar in the collar tie beam penetrates in original floor by boring, and make collar tie beam and original floor be cross structure, behind concreting, collar tie beam and floor become integral body, this syndeton still belongs to masonry structure, therefore appoints the right problem that wastes time and energy that exists in building construction process.
Summary of the invention
The purpose of this invention is to provide the method for attachment of a kind of body of wall and floor, be intended to solve in the prior art problem of the time-consuming expense material of syndeton between the body of wall and floor in the building construction process, the ready-package house that the syndeton of described method of attachment special use also is provided simultaneously and has used described syndeton.
In order to realize above purpose, the technical solution adopted in the present invention is:
The technical scheme of the method for attachment of body of wall of the present invention and floor is as follows:
The method of attachment of body of wall and floor may further comprise the steps: step 1 in cast template arranges the pouring position be in floor and the built-in fitting corresponding with the wallboard installation site, and is embedded in built-in fitting in the floor by fluid concrete; Step 2 is placed the location inserts corresponding with the built-in fitting position at the upper surface of floor, and will locate inserts by the first securing member and be fixed on the built-in fitting, and described location inserts is provided with along the U-shaped locating slot of wallboard length direction extension to be installed; Step 3 is inserted into the bottom of adaptive wallboard in the described locating slot, and by the second securing member on the groove sidewall that is located in described locating slot wallboard is fixed on the inserts of location.
The wallboard that the wallboard that definition is mounted in floor top is top wall panel, be mounted in the floor below is bottom wall panel, top wall panel is connected with floor according to described step 1, two, three, bottom wall panel is connected with floor according to the following steps before the step 1: at first, top in bottom wall panel is fixedly connected with inserts by the 3rd securing member, and described connection inserting part is provided be used to the link slot that is inserted into the inverted U wallboard top, that extend along the bottom wall panel length direction; Then, the connector that protrudes upward from the top of bottom wall panel by the 4th securing member fixed top on the external surface of connection inserting part, described connector have a row and spaced apart along the length direction of bottom wall panel; Then, the top of connector is fixed on the built-in fitting in the described step 1 by the 5th securing member, and described cast template is laid between bottom wall panel and the built-in fitting in the parallel plane plane, end face place with wallboard.
The technical scheme of the syndeton of body of wall of the present invention and floor is as follows:
The syndeton of body of wall and floor, comprise be used to being embedded in built-in fitting in the floor, being used for being installed in the location inserts of floor top, built-in fitting is fixedly connected with by the first securing member with the location inserts, and is provided with for the U-shaped locating slot that inserts for the bottom of wallboard and for the second securing member that is fixedly connected with wallboard at the location inserts.
Described the first securing member is sunk screw, and the bar section of the first securing member passes the positional punch offered on the bottom land wall of described locating slot, is threaded on the built-in fitting, and the head of the first securing member cooperates along block with the upper end hole of described positional punch.
Described the second securing member is self-tapping screw, passes in the connection perforation that the bar section of the second connection inserting part offers from the groove sidewall of described locating slot and head cooperates along block with the described outer stomidium of boring a hole that is connected.
Also comprise connection inserting part, the connector of bridge joint between connection inserting part and described built-in fitting be used to the top that is fixed on wallboard, described connection inserting part is provided with for the link slot of the inverted U that inserts for the top of wallboard, be used for being fixed in the 3rd securing member at the top of wallboard, described connector is intervally arranged by a row and along the bearing of trend of link slot, the lower end of connector is fixed on the connection inserting part by the 4th securing member, the upper end of connector from the upside of connection inserting part stretch out, extension is fixed on the built-in fitting by the 5th securing member.
Described connector is the Z-shaped connector, and described row's connector arranges along the bearing of trend interleaved of described link slot, and the up and down side of connector is fitted in respectively on the bottom surface of the end face of connection inserting part and built-in fitting.
Described connection inserting part and/or location inserts are that the cross section is U-shaped section bar.
Described built-in fitting is the square steel section bar.
The technical scheme in ready-package of the present invention house is as follows:
The ready-package house, comprise the wallboard that connects on floor and the floor, in floor, be embedded with the built-in fitting that is in the wallboard installed position, between floor and wallboard, be equiped with the location inserts that extends along the length direction of wallboard, the location inserts is provided with the locating slot that inserts and extend along the length direction of wallboard for the bottom of wallboard, and the location inserts is fixed on the pre-buried inserts by the first securing member, and the location inserts is fixedly connected with by the second securing member with wallboard.
Described wallboard comprises compound plate body, the bottom of compound plate body is provided with the location embedded component that is fixedly connected with the second securing member, the location embedded component is that the cross section is U-shaped section bar, and the location embedded component has hot melt adhesion at the surface layer of wallboard and the both sides sidewall between the sandwich of layers and the diapire that is in the tongue and groove position of wallboard.
There are at least two floors in described ready-package house, and the wallboard that defines above being in adjacent two floors is top wall panel, the wallboard that is in the below is bottom wall panel, the floor that is between adjacent two floors is middle floor, described built-in fitting is embedded in the middle floor, described location inserts is in the bottom of top wall panel, top in bottom wall panel is fixedly connected with connection inserting part by the 3rd securing member, offer on the connection inserting part for the top of bottom wall panel and insert, and the link slot that extends along the length direction of bottom wall panel, bridge joint has the connector that a row is intervally arranged along the bottom wall panel length direction between connection inserting part and built-in fitting, the lower end of connector is fixed on the connection inserting part by the 4th securing member, and stretch out from the upside of connection inserting part the upper end of connector, extension is fixedly connected with built-in fitting by the 5th connection inserting part.
The top of compound plate body is provided with the 3rd securing member is fixedly connected with and is connected embedded component, connecting embedded component is that the cross section is U-shaped section bar, connects embedded component and has hot melt adhesion at the surface layer of wallboard and the both sides sidewall between the sandwich of layers and the diapire that is in the tongue and groove position of wallboard.
The present invention is embedded with built-in fitting in floor, be fixed with the location inserts in the bottom of wallboard, be provided with the locating slot that extends along the length direction of body of wall at the location inserts, and will locate inserts by the first securing member and be fixed on the built-in fitting, to locate inserts by the second securing member is fixed on the wallboard, in use, bottom with wallboard is inserted in the mounting groove of locating on the inserts first, realize being fixedly connected with between wallboard and the location inserts by the second securing member afterwards, so that wallboard is fixed on the built-in fitting pre-buried in the floor by the location inserts, and wallboard can be fixed on the floor, realize installation and the location of wallboard, simplify the syndeton between body of wall and floor, improved the efficient of building operations, solved in the prior art problem of the syndeton time-consuming expense material between the body of wall and floor in the building construction process.
Description of drawings
Fig. 1 is the structural representation of embodiments of the invention;
Fig. 2 removes the at the middle and upper levels structural representation behind the body of wall of Fig. 1;
Fig. 3 is the syndeton schematic diagram of lower floor's body of wall and connection inserting part among Fig. 1;
Fig. 4 is the structural representation of lower floor's body of wall among Fig. 3.
The specific embodiment
The embodiment in ready-package of the present invention house: as shown in Figures 1 to 4, there are two floors in this ready-package house and comprise top wall panel 1, floor 2 and the bottom wall panel 3 that sets gradually from top to bottom, the concrete floor 2 that forms for concreting of floor 2 wherein, top wall panel 1 is made of upper strata composite plate 14 and the location embedded component 7 that is inlaid in upper strata composite plate 14 bottoms, bottom wall panel 3 is made of with the connection embedded component 9 that is connected lower floor's composite plate 8 tops lower floor's composite plate 8, and upper and lower layer wallboard 1,3 is fixedly connected with floor 2 by syndeton.And syndeton comprises built-in fitting 4, the location inserts 5 that is inlaid in top wall panel 1 bottom, the connection inserting part 6 that is inlaid in bottom wall panel 3 tops, the connector 11 of bridge joint between connection inserting part 6 and built-in fitting 4 that is embedded in the floor 2, and wherein built-in fitting 4 be length direction along the square steel section bar of upper and lower layer wallboard 1,3 metope direction extension; Location inserts 5 and connection inserting part 6 are the section bar with U-shaped cross section, and location inserts 5 is provided with U-shaped locating slot, and connection inserting part 6 is provided with the link slot of inverted U; Embedded component is that the cross section is U-shaped section bar, and embedded component has hot melt adhesion at the surface layer of wallboard and the both sides sidewall between the sandwich of layers and the diapire that is in the tongue and groove position of wallboard; Location embedded component 7 and connect embedded component 9 and be the cross section and be U-shaped section bar and all have hot melt adhesion at the surface layer of wallboard and the both sides sidewall between the sandwich of layers and the diapire that is in the tongue and groove position of wallboard; Connector 11 is the member of Z-shaped structure for the cross section, and the up and down side of connector 11 is fitted in respectively on the bottom surface of the end face of connection inserting part and built-in fitting 4, and connector 11 has a row and arranges along the length direction interleaved of lower floor's composite plate 8.
Be fixedly connected with by the first securing member 10 with location inserts 5 at built-in fitting 4, location inserts 5 is fixedly connected with, is fixed on the top wall panel 1 will locate inserts 5 by the second securing member 15 by the second securing member 15 with location embedded component 7, connect embedded component 9 and connection inserting part 6 by the 3rd securing member 16 be fixedly connected with, by the 3rd securing member 16 connection inserting part 6 is fixed on the bottom wall panel, connection inserting part 6 is fixedly connected with by the 4th securing member 12 with the lower end of connector 11, and the upper end of connector 11 is fixedly connected with built-in fitting 4 by the 5th securing member 13.Wherein the first securing member 10 is sunk screw, and the bar section of the first securing member 10 passes the positional punch offered on the bottom land wall of described locating slot, is threaded on the built-in fitting, and the head of the first securing member 10 cooperates along block with the upper end hole of described positional punch; The 4th securing member 12 and the 5th securing member 13 are common trip bolt; The second securing member 15 and the 3rd securing member 16 are self-tapping screw.
The syndeton of present embodiment is implemented according to following method of attachment:
1), be fixedly connected with inserts 6 at the top of bottom wall panel 3 by the 3rd securing member 16, described connection inserting part 6 is provided be used to the link slot that is inserted into inverted U bottom wall panel 3 tops, that extend along the wallboard length direction;
2), the connector that protrudes upward from the top of bottom wall panel 3 by the 4th securing member 12 fixed top on the external surface of connection inserting part 6, described connector have a row and spaced apart along the length direction of bottom wall panel 3;
3), pass through fixedly built-in fitting 4 of the 5th securing member 13 at the top of connector 11;
4), between bottom wall panel 3 and built-in fitting 4 with in the parallel plane plane, end face place of wallboard, lay cast template, so that built-in fitting 4 is in the interior position corresponding with top wall panel 1 installation site of the pouring position of floor 2, and by fluid concrete built-in fitting 4 is embedded in the floor 2;
5), place the location inserts 5 corresponding with built-in fitting 4 positions at the upper surface of floor 2, and will locate inserts 5 by the first securing member 10 and be fixed on the built-in fitting 4, described location inserts 5 is provided with along the U-shaped locating slot of wallboard length direction extension to be installed;
6), the bottom of top wall panel 1 is inserted in the described locating slot, and by the second securing member 15 on the groove sidewall that is located in described locating slot wallboard is fixed on the inserts 5 of location.
In use, the location inserts with locate embedded component and be combined with, be fixedly connected with the bottom of top wall panel and be integral, connection inserting part be connected embedded component and be combined with, be fixedly connected with the top of bottom wall panel and be integral, and be connected with connection inserting part Pork-pieces composite plate is connected to form a wallboard that connects each other by the location inserts, greatly improve the stability of house architectural structure and resisted the intensity of various external force.Connection inserting part encases the top of bottom wall panel, and the location inserts encases the bottom of top wall panel, has reduced the probability of the stressed rear destruction in wallboard end.The lower end of built-in fitting 4 links to each other with connector 11 by connection inserting part 6 with bottom wall panel 3, and built-in fitting 4 has been played good drawknot fixation.Connector 11 self cross section is Z-shaped, can fully contact with concrete, has improved and concrete bond stress, has greatly improved thus the power that sockets to built-in fitting 4.Built-in fitting 4 links to each other by location inserts 5 with the bottom of top wall panel 1 again, thereby has improved again to a great extent the uplift resistance of top wall panel 1, has increased the resistance to overturning of building wall board structure.Each inserts, connector 11 and built-in fitting 44 all adopt the environmental protection and energy saving material in the present embodiment in addition, need not wet trade during construction, so energy-saving and environmental protection; Mounting method is simple grafting and self threading pin and rivet etc. are connected and fixed, and required erecting tools is few, and mounting process is simple, labour intensity is low, and speed of application is fast, saving human and material resources that can be a large amount of, shorten greatly construction period, thereby save building costs, increase economic efficiency.
In the above-described embodiments, described each inserts is the section bar with U-shaped cross section, and to reach convenient fixing effect with wrapping up wallboard top and bottom, in other embodiments, each inserts also can be channel-section steel or i iron or the reeded section bar of other tools.
In the above-described embodiments, on, bottom wall panel consists of by composite plate and embedded component, the location inserts is fixedly connected with locating between the embedded component by the second securing member, realization location inserts is fixedly connected with top wall panel, connection inserting part is fixedly connected with being connected between embedded component by the 3rd securing member, the realization connection inserting part is fixedly connected with bottom wall panel, thereby improve location inserts and top wall panel, the reliability that is connected between connection inserting part and the bottom wall panel, in other embodiments, on, bottom wall panel also can be plank, the sheet material of the mono-materials such as cystosepiment, corresponding location inserts can directly be fixedly connected on the top wall panel by the second securing member, and connection inserting part also can directly be fixedly connected on the bottom wall panel by the 3rd securing member, and second, three securing members can be the self-tapping screws described in above-described embodiment, also can be bolts, other securing members such as rivet.
In the above-described embodiments, built-in fitting is the square steel section bar, and to improve the connection reliability between built-in fitting and location inserts and the connection inserting part, in other embodiments, built-in fitting also can be other section bars such as I-shaped steel section, sheet sheet material, floor support plate.
In the above-described embodiments, the ready-package house has two-layer, the corresponding top wall panel that above floor, is equipped with, below bottom wall panel is installed, the syndeton correspondence of described body of wall and floor is arranged on the upper of adjacent two layers, the link position place of bottom wall panel and floor, in other embodiments, the syndeton of body of wall and floor also can only be applied on the bottom floor, being connected of the floor of wallboard and position, floor, connection inserting part will reach the annex that is used for connecting on the built-in fitting in above-described embodiment and described syndeton will not comprise, corresponding connection method of attachment will not comprise 1 in the above-mentioned method of attachment) to 3) step, namely corresponding method of attachment is as follows:
Step 1 in cast template arranges the pouring position be in floor and the built-in fitting corresponding with the wallboard installation site, and is embedded in built-in fitting in the floor by fluid concrete;
The syndeton of body of wall of the present invention and floor, as shown in Figures 1 to 4, in the present embodiment in the concrete structure of syndeton and above-described embodiment the concrete structure of syndeton identical, therefore repeat no more.
The method of attachment of body of wall of the present invention and floor, in the present embodiment in the concrete steps of method of attachment and above-described embodiment the concrete steps of method of attachment identical, therefore repeat no more.
Claims (13)
1. the method for attachment of body of wall and floor, it is characterized in that, may further comprise the steps: step 1 in cast template arranges the pouring position be in floor and the built-in fitting corresponding with the wallboard installation site, and is embedded in built-in fitting in the floor by fluid concrete; Step 2 is placed the location inserts corresponding with the built-in fitting position at the upper surface of floor, and will locate inserts by the first securing member and be fixed on the built-in fitting, and described location inserts is provided with along the U-shaped locating slot of wallboard length direction extension to be installed; Step 3 is inserted into the bottom of adaptive wallboard in the described locating slot, and by the second securing member on the groove sidewall that is located in described locating slot wallboard is fixed on the inserts of location.
2. the method for attachment of body of wall according to claim 1 and floor, it is characterized in that, the wallboard that the wallboard that definition is mounted in floor top is top wall panel, be mounted in the floor below is bottom wall panel, top wall panel is connected with floor according to described step 1, two, three, bottom wall panel is connected with floor according to the following steps before the step 1: at first, top in bottom wall panel is fixedly connected with inserts by the 3rd securing member, and described connection inserting part is provided be used to the link slot that is inserted into the inverted U wallboard top, that extend along the bottom wall panel length direction; Then, the connector that protrudes upward from the top of bottom wall panel by the 4th securing member fixed top on the external surface of connection inserting part, described connector have a row and spaced apart along the length direction of bottom wall panel; Then, the top of connector is fixed on the built-in fitting in the described step 1 by the 5th securing member, and described cast template is laid between bottom wall panel and the built-in fitting in the parallel plane plane, end face place with wallboard.
3. the syndeton of body of wall and floor, it is characterized in that, comprise be used to being embedded in built-in fitting in the floor, being used for being installed in the location inserts of floor top, built-in fitting is fixedly connected with by the first securing member with the location inserts, and is provided with for the U-shaped locating slot that inserts for the bottom of wallboard and for the second securing member that is fixedly connected with wallboard at the location inserts.
4. the syndeton of body of wall according to claim 3 and floor, it is characterized in that, described the first securing member is sunk screw, the bar section of the first securing member passes the positional punch offered on the bottom land wall of described locating slot, is threaded on the built-in fitting, and the head of the first securing member cooperates along block with the upper end hole of described positional punch.
5. the syndeton of body of wall according to claim 3 and floor, it is characterized in that, described the second securing member is self-tapping screw, passes in the connection perforation that the bar section of the second connection inserting part offers from the groove sidewall of described locating slot and head cooperates along block with the described outer stomidium of boring a hole that is connected.
6. according to claim 3 or the syndeton of 4 or 5 described bodies of wall and floor, it is characterized in that, also comprise the connection inserting part be used to the top that is fixed on wallboard, the connector of bridge joint between connection inserting part and described built-in fitting, described connection inserting part is provided with the link slot for the inverted U that inserts for the top of wallboard, the 3rd securing member for the top that is fixed in wallboard, described connector is by a row, and be intervally arranged along the bearing of trend of link slot, the lower end of connector is fixed on the connection inserting part by the 4th securing member, and stretch out from the upside of connection inserting part the upper end of connector, extension is fixed on the built-in fitting by the 5th securing member.
7. the syndeton of body of wall according to claim 6 and floor, it is characterized in that, described connector is the Z-shaped connector, and described row's connector is arranged along the bearing of trend interleaved of described link slot, and the up and down side of connector is fitted in respectively on the bottom surface of the end face of connection inserting part and built-in fitting.
8. the syndeton of body of wall according to claim 6 and floor is characterized in that, described connection inserting part and/or location inserts are that the cross section is U-shaped section bar.
9. the syndeton of body of wall according to claim 6 and floor is characterized in that, described built-in fitting is the square steel section bar.
10. ready-package house, comprise the wallboard that connects on floor and the floor, it is characterized in that, in floor, be embedded with the built-in fitting that is in the wallboard installed position, between floor and wallboard, be equiped with the location inserts that extends along the length direction of wallboard, the location inserts is provided with the locating slot that inserts and extend along the length direction of wallboard for the bottom of wallboard, and the location inserts is fixed on the pre-buried inserts by the first securing member, and the location inserts is fixedly connected with by the second securing member with wallboard.
11. ready-package according to claim 10 house, it is characterized in that, described wallboard comprises compound plate body, the bottom of compound plate body is provided with the location embedded component that is fixedly connected with the second securing member, the location embedded component is that the cross section is U-shaped section bar, and the location embedded component has hot melt adhesion at the surface layer of wallboard and the both sides sidewall between the sandwich of layers and the diapire that is in the tongue and groove position of wallboard.
12. according to claim 10 or 11 described ready-package houses, it is characterized in that, there are at least two floors in described ready-package house, and the wallboard that defines above being in adjacent two floors is top wall panel, the wallboard that is in the below is bottom wall panel, the floor that is between adjacent two floors is middle floor, described built-in fitting is embedded in the middle floor, described location inserts is in the bottom of top wall panel, top in bottom wall panel is fixedly connected with connection inserting part by the 3rd securing member, offer on the connection inserting part for the top of bottom wall panel and insert, and the link slot that extends along the length direction of bottom wall panel, bridge joint has the connector that a row is intervally arranged along the bottom wall panel length direction between connection inserting part and built-in fitting, the lower end of connector is fixed on the connection inserting part by the 4th securing member, and stretch out from the upside of connection inserting part the upper end of connector, extension is fixedly connected with built-in fitting by the 5th connection inserting part.
13. ready-package according to claim 12 house, it is characterized in that, the top of compound plate body is provided with the 3rd securing member is fixedly connected with and is connected embedded component, connecting embedded component is that the cross section is U-shaped section bar, connects embedded component and has hot melt adhesion at the surface layer of wallboard and the both sides sidewall between the sandwich of layers and the diapire that is in the tongue and groove position of wallboard.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310003289.8A CN103015572B (en) | 2013-01-06 | 2013-01-06 | The method of attachment of body of wall and floor and special syndeton thereof and ready-package house |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310003289.8A CN103015572B (en) | 2013-01-06 | 2013-01-06 | The method of attachment of body of wall and floor and special syndeton thereof and ready-package house |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103015572A true CN103015572A (en) | 2013-04-03 |
CN103015572B CN103015572B (en) | 2015-11-04 |
Family
ID=47964629
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310003289.8A Active CN103015572B (en) | 2013-01-06 | 2013-01-06 | The method of attachment of body of wall and floor and special syndeton thereof and ready-package house |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103015572B (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103643763A (en) * | 2013-11-13 | 2014-03-19 | 河南亚鹰钢结构幕墙工程有限公司 | Foam concrete panel, rabbet connecting piece and wallboard externally hung structure |
CN104989149A (en) * | 2015-07-17 | 2015-10-21 | 张道庆 | Civil building basement combat-ready conversion system and building method of system |
CN105275114A (en) * | 2014-09-30 | 2016-01-27 | 中建四局第三建筑工程有限公司 | Prefabricated plate connecting floor construction method and structure |
CN105350708A (en) * | 2015-10-30 | 2016-02-24 | 北京矿建建设集团有限公司 | Fly ash cement honeycomb composite wallboard building |
CN105350681A (en) * | 2015-10-30 | 2016-02-24 | 北京矿建建设集团有限公司 | Flyash cement honeycomb composite wallboard building fixed on the ground |
CN106149922A (en) * | 2015-04-10 | 2016-11-23 | 北新集团建材股份有限公司 | A kind of dismantled and assembled stealthy partition wall system and assembly and disassembly methods thereof |
CN106703205A (en) * | 2016-12-07 | 2017-05-24 | 成都绿迪科技有限公司 | Prefabricated house and wall surface connection structure |
CN107060152A (en) * | 2017-04-19 | 2017-08-18 | 国网上海市电力公司 | Attachment means and method between a kind of prefabricated internal partition wall of transformer station and floor |
CN107435392A (en) * | 2016-05-25 | 2017-12-05 | 北新集团建材股份有限公司 | A kind of combined partition |
CN109339294A (en) * | 2018-11-05 | 2019-02-15 | 王工 | Light partition wall |
CN109469198A (en) * | 2018-11-02 | 2019-03-15 | 中冶建筑研究总院有限公司 | Assembling type outer wall plate installation system and its quick fixation structure part used |
CN109914587A (en) * | 2019-03-25 | 2019-06-21 | 中厦建设有限公司 | A kind of cross-connecting structure of prefabricated floor and wallboard |
CN115045416A (en) * | 2022-06-28 | 2022-09-13 | 中建五局华东建设有限公司 | Assembly type steel structure building masonry wall top connecting piece and using method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003147862A (en) * | 2001-11-13 | 2003-05-21 | Ube House Kk | Precast reinforced concrete wall member and wall building construction |
CN201535018U (en) * | 2009-07-03 | 2010-07-28 | 浙江杭萧钢构股份有限公司 | Elastic junction on one side of H-shaped steel girder wrapper sheet flushed with light wall body |
CN201826414U (en) * | 2010-10-09 | 2011-05-11 | 北京诚栋国际营地集成房屋有限公司 | Modular disassembly and assembly partition wall |
CN102296835A (en) * | 2011-07-19 | 2011-12-28 | 北京华丽联合高科技有限公司 | Reinforced concrete building rapidly assembled by prefabricated composite light slabs |
CN102535650A (en) * | 2012-01-12 | 2012-07-04 | 云南昆钢钢结构有限公司 | Device for connecting composite wallboard and floor slab |
CN202467494U (en) * | 2011-11-01 | 2012-10-03 | 长沙远大住宅工业有限公司 | Full bridge-cut-off bay window |
-
2013
- 2013-01-06 CN CN201310003289.8A patent/CN103015572B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003147862A (en) * | 2001-11-13 | 2003-05-21 | Ube House Kk | Precast reinforced concrete wall member and wall building construction |
CN201535018U (en) * | 2009-07-03 | 2010-07-28 | 浙江杭萧钢构股份有限公司 | Elastic junction on one side of H-shaped steel girder wrapper sheet flushed with light wall body |
CN201826414U (en) * | 2010-10-09 | 2011-05-11 | 北京诚栋国际营地集成房屋有限公司 | Modular disassembly and assembly partition wall |
CN102296835A (en) * | 2011-07-19 | 2011-12-28 | 北京华丽联合高科技有限公司 | Reinforced concrete building rapidly assembled by prefabricated composite light slabs |
CN202467494U (en) * | 2011-11-01 | 2012-10-03 | 长沙远大住宅工业有限公司 | Full bridge-cut-off bay window |
CN102535650A (en) * | 2012-01-12 | 2012-07-04 | 云南昆钢钢结构有限公司 | Device for connecting composite wallboard and floor slab |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103643763A (en) * | 2013-11-13 | 2014-03-19 | 河南亚鹰钢结构幕墙工程有限公司 | Foam concrete panel, rabbet connecting piece and wallboard externally hung structure |
CN105275114A (en) * | 2014-09-30 | 2016-01-27 | 中建四局第三建筑工程有限公司 | Prefabricated plate connecting floor construction method and structure |
CN106149922A (en) * | 2015-04-10 | 2016-11-23 | 北新集团建材股份有限公司 | A kind of dismantled and assembled stealthy partition wall system and assembly and disassembly methods thereof |
CN104989149A (en) * | 2015-07-17 | 2015-10-21 | 张道庆 | Civil building basement combat-ready conversion system and building method of system |
CN105350708A (en) * | 2015-10-30 | 2016-02-24 | 北京矿建建设集团有限公司 | Fly ash cement honeycomb composite wallboard building |
CN105350681A (en) * | 2015-10-30 | 2016-02-24 | 北京矿建建设集团有限公司 | Flyash cement honeycomb composite wallboard building fixed on the ground |
CN105350681B (en) * | 2015-10-30 | 2019-03-01 | 北京矿建建设集团有限公司 | The pulverized fuel ash cement honeycomb composite panel building fixed on the ground |
CN107435392A (en) * | 2016-05-25 | 2017-12-05 | 北新集团建材股份有限公司 | A kind of combined partition |
CN106703205A (en) * | 2016-12-07 | 2017-05-24 | 成都绿迪科技有限公司 | Prefabricated house and wall surface connection structure |
CN107060152A (en) * | 2017-04-19 | 2017-08-18 | 国网上海市电力公司 | Attachment means and method between a kind of prefabricated internal partition wall of transformer station and floor |
CN107060152B (en) * | 2017-04-19 | 2019-07-12 | 国网上海市电力公司 | Attachment device and method between a kind of prefabricated internal partition wall of substation and floor |
CN109469198A (en) * | 2018-11-02 | 2019-03-15 | 中冶建筑研究总院有限公司 | Assembling type outer wall plate installation system and its quick fixation structure part used |
CN109339294A (en) * | 2018-11-05 | 2019-02-15 | 王工 | Light partition wall |
CN109914587A (en) * | 2019-03-25 | 2019-06-21 | 中厦建设有限公司 | A kind of cross-connecting structure of prefabricated floor and wallboard |
CN109914587B (en) * | 2019-03-25 | 2020-08-18 | 中厦建设有限公司 | Cross connection structure of assembled prefabricated floor and wallboard |
CN115045416A (en) * | 2022-06-28 | 2022-09-13 | 中建五局华东建设有限公司 | Assembly type steel structure building masonry wall top connecting piece and using method thereof |
CN115045416B (en) * | 2022-06-28 | 2023-12-01 | 中建五局华东建设有限公司 | Assembled steel structure building masonry wall top connecting piece and use method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN103015572B (en) | 2015-11-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103015572B (en) | The method of attachment of body of wall and floor and special syndeton thereof and ready-package house | |
CN107299699B (en) | Assembled cavity shear wall horizontal joint Alveolus type dry type connection structure | |
CN203834739U (en) | End steel board connection, positioning and assembly type shear wall structure | |
CN204023778U (en) | The connected node of prefabricated assembled concrete beam column | |
CN105239720A (en) | Prefabricated assembled steel-concrete composite beam connected by adopting high-strength bolt | |
CN102995756B (en) | Concrete-filled rectangular steel tube column-box girder full-bolt connection node and construction method | |
CN205242848U (en) | Adopt prefabricated assembled steel - concrete combination beam of high strength bolt connection | |
CN207211444U (en) | A kind of mounting clip pieces coordinated with groove and tognue type Light trabses | |
CN205242629U (en) | Novel house that can peg graft and assemble | |
CN103924710A (en) | Steel plate welding node structure of low-layer assembly type composite wall house | |
CN104947684A (en) | Soil nailing wall supporting construction method based on assembly type recoverable process | |
CN211690922U (en) | High-performance autoclaved aerated concrete integrated plate outer wall structure for prefabricated building | |
CN210216720U (en) | Connection structure of assembled beam column node | |
CN203145250U (en) | Integrally assembled composite partition wall seamless mounting structure | |
CN115807561B (en) | Connection reinforcing structure of hollow decorative flower wall of ultra-high shale clear water brick and construction method thereof | |
CN204676533U (en) | A kind of soil-nail wall support system based on the recyclable technique of assembling | |
CN216475700U (en) | Connecting piece based on assembled composite wall | |
CN202039483U (en) | Supporting and connecting member of composite wallboard | |
CN103031893B (en) | Method for connecting wall body and floor slab, special connecting structure thereof and prefabricated house | |
CN203729464U (en) | Decorative thermal insulation composite wall | |
CN102587677A (en) | Construction method for mounting sand autoclaved aerated side fascias at openings of doors and windows in steel structures | |
CN103266699B (en) | Seamless mounting method for integral assembled composite partition walls | |
CN205063023U (en) | A light steel frame and peripheral watch box system for integrated house of passive form | |
CN204225392U (en) | Lightgage steel joist balcony balustrade mounting structure for building | |
CN211898905U (en) | Connection node structure of assembled beam column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 453000 No. 1625, Xinyi street, development zone, Xinxiang City, Henan Province Patentee after: Lvfeng Energy Saving Technology Co.,Ltd. Address before: 453000 No. 369, new street, Xinxiang Development Zone, Henan, China Patentee before: HENAN TIANFON ENERGY-SAVING PANEL SCIENCE AND TECHNOLOGY Co.,Ltd. |
|
CP03 | Change of name, title or address |