CN107060152A - Attachment means and method between a kind of prefabricated internal partition wall of transformer station and floor - Google Patents

Attachment means and method between a kind of prefabricated internal partition wall of transformer station and floor Download PDF

Info

Publication number
CN107060152A
CN107060152A CN201710256423.3A CN201710256423A CN107060152A CN 107060152 A CN107060152 A CN 107060152A CN 201710256423 A CN201710256423 A CN 201710256423A CN 107060152 A CN107060152 A CN 107060152A
Authority
CN
China
Prior art keywords
floor
internal partition
partition wall
tank
connecting component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710256423.3A
Other languages
Chinese (zh)
Other versions
CN107060152B (en
Inventor
徐佳康
王昌丽
曹炜
杨健
沙斌
王斐亮
贾大东
蒋晓冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
Original Assignee
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Co Ltd filed Critical State Grid Shanghai Electric Power Co Ltd
Priority to CN201710256423.3A priority Critical patent/CN107060152B/en
Publication of CN107060152A publication Critical patent/CN107060152A/en
Application granted granted Critical
Publication of CN107060152B publication Critical patent/CN107060152B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/82Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building
    • E04B2/821Connections between two opposed surfaces (i.e. floor and ceiling) by means of a device offering a restraining force acting in the plane of the partition

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to the attachment means between a kind of prefabricated internal partition wall of transformer station and floor, connection for internal partition wall (1) and upper strata floor (9) and lower floor's floor (3), device includes tank-type connecting component (4), wall screw (5) and floor crab-bolt (6), tank-type connecting component (4) is across internal partition wall (1) both sides, wall screw (5) is horizontal through tank-type connecting component (4) two-arm and internal partition wall (1) wall, tank-type connecting component (4) two-arm is fixedly connected with internal partition wall (1), floor crab-bolt (6) passes vertically through tank-type connecting component (4) bottom or top and stretches into floor, tank-type connecting component (4) bottom or top are fixedly connected with floor.Compared with prior art, the present invention by wall screw, tank-type connecting component, floor crab-bolt formation connected mode, by the load of the horizontal direction suffered by internal partition wall pass to above and below flooring, it is ensured that stability of the wall under horizontal loads.

Description

Attachment means and method between a kind of prefabricated internal partition wall of transformer station and floor
Technical field
The present invention relates to a kind of assembled steel reinforced concrete inner wall connector, more particularly, to a kind of transformer station it is prefabricated in every Attachment means and method between wall and floor.
Background technology
Prefabricated assembled concrete structure is prefabricated in the factory using component, and the mode of on-site consolidation is constructed.With tradition Cast-in-place concrete structure, which is compared, has the characteristics of component quality is good, efficiency of construction is high, cost controllability is good, environmental pollution is small, is Building industry realizes the advanced method of construction of modernization upgrading.
In prefabricated assembled concrete frame construction system, wallboard and load of floor are undertaken by frame structure, and are passed to Basis and ground.Wall in frame structure belongs to non-bearing wall body, general to use masonry or light material wall, in main body Constructed after the completion of structure.The shortcoming of both walls is:
1) masonry wall needs manually to be built by laying bricks or stones, constructs relatively complicated, and with the increase of human cost, cost can be entered The increase of one step;
2) makings material sound insulation of wall effect is poor, and can not bear the load of horizontal direction, it is impossible to according to requirements The facilities such as equipment box are installed, especially for 110kV assembleds transformer station, it is necessary to arrange a number of hook on interior wall.
Therefore, in order to make indoor partition that there is certain bearing capacity while the high efficiency of assembled construction is ensured, Partition wall preferably uses mechanical property and sound insulation property all relatively good armored concrete concrete panels.
Reinforced concrete wall panel is produced by prefabricated mode, for ensure its connection security and construction it is easy Property, it is desirable to provide a kind of existing sufficient intensity, facilitate the connected mode of installing/dismounting again, to be matched in this novel wall.
The content of the invention
Installed it is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide one kind is safe efficient The prefabricated internal partition wall of transformer station and floor between attachment means and method.
The purpose of the present invention can be achieved through the following technical solutions:
Attachment means between a kind of prefabricated internal partition wall of transformer station and floor, for internal partition wall and upper strata floor and lower floor The connection of plate, described device includes tank-type connecting component, wall screw and floor crab-bolt, and described tank-type connecting component is across internal partition wall Both sides, described wall screw is horizontal through tank-type connecting component two-arm and internal partition wall wall, by tank-type connecting component two-arm and internal partition wall It is fixedly connected, described floor crab-bolt passes vertically through tank-type connecting component bottom or top and stretches into floor, by tank-type connecting component bottom Portion or top are fixedly connected with floor.Internal partition wall wallboard top surface is slotted with bottom surface, so that the floor crab-bolt end protruded from floor Portion can enter.
Described wall screw is embedded in internal partition wall, and described tank-type connecting component two-arm, which is provided with, to be used to install wall screw Strip gab.
Described strip gab is vertical direction.
Described strip gab bottom is the arc matched with wall screw.
Edge angle at the top of described strip gab is fillet.
Described wall screw two ends are connected with tank-type connecting component two-arm by nut and pad.
A kind of method that attachment means using between the described prefabricated internal partition wall of transformer station and floor are attached, including Following steps:
Pre-buried floor crab-bolt in S1, lower floor's floor, described floor crab-bolt is vertical with lower floor floor;
S2, pours lower floor's floor;
S3, by tank-type connecting component and floor anchor bolts;
S4, mortar bed, covering tank-type connecting component bottom are laid in the upper surface of lower floor's floor;
S5, lifts internal partition wall wallboard, the wall screw of internal partition wall bottom is aligned with the tank-type connecting component in lower floor floor, institute The wall screw stated is embedded in internal partition wall wallboard in advance;
S6, the wall screw of internal partition wall bottom is fixedly connected with the tank-type connecting component in lower floor floor;
S7, upper strata floor slab bottoms install tank-type connecting component;
S8, internal partition wall panel tops laying mortar bed;
S9, lifts upper strata floor, the wall screw at the top of internal partition wall is aligned with the tank-type connecting component in the floor of upper strata;
S10, the wall screw at the top of internal partition wall is fixedly connected with the tank-type connecting component in the floor of upper strata.
Compared with prior art, the present invention has advantages below:
(1) connected mode formed by wall screw, tank-type connecting component, floor crab-bolt, by the level suffered by internal partition wall The load in direction pass to above and below flooring, it is ensured that stability of the wall under horizontal loads.
(2) wall screw is embedded in internal partition wall, and tank-type connecting component two-arm is provided with the strip gab for being used for installing wall screw, It is easy to the in-site installation of tank-type connecting component.
(3) strip gab is vertical direction, it is ensured that wallboard is fixed in the horizontal direction, and in the vertical direction can be with It is a certain degree of to slide, meet the not heavy mechanical characteristic of internal partition wall.
(4) strip gab bottom is the arc matched with wall screw, it is ensured that wall screw
(5) edge angle at the top of strip gab is fillet, is easy to wallboard to install pre-buried crab-bolt when lifting and positions.
(6) crab-bolt nut is divided into backing plate and is connected with tank-type connecting component within the walls, it is ensured that the power of crab-bolt is evenly distributed on groove profile company On fitting.
(7) cast-in fixing bolt when floor slab construction and wallboard are produced, to scene after tank-type connecting component is installed, both ensure that construction Conveniency, avoid the connector of evagination to be damaged in transport, hoisting process again.
(8) mortar bed is laid in the upper surface of lower floor's floor, covering tank-type connecting component bottom can with mortar bed joint filling Ensure smooth and metope the perpendicularity in bottom surface, and the deadweight of internal partition wall wall is delivered to downstairs by way of bottom surface is shelved Plate, rather than tank-type connecting component is transmitted to by the shearing resistance effect of crab-bolt is transmitted to lower floor again, further increase the steady of internal partition wall It is qualitative.
Brief description of the drawings
Fig. 1 is the decomposition texture schematic diagram of the present embodiment attachment means;
Fig. 2 is the present embodiment attachment means in the schematic view of the mounting position of internal partition wall and lower floor's floor;
Fig. 3 is the present embodiment attachment means in the schematic view of the mounting position of upper strata floor and lower floor's floor;
Reference:
1 is internal partition wall;2 be mortar bed;3 be lower floor's floor;4 be tank-type connecting component;5 be wall screw;6 be building Plate crab-bolt;7 be nut;8 be pad;9 be upper strata floor.
Embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention Premised on implemented, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to Following embodiments.
Embodiment
As shown in Figures 1 to 3, the attachment means between a kind of prefabricated internal partition wall of transformer station and floor, for internal partition wall 1 with The connection of floor plate 9 and lower floor's floor 3, device include tank-type connecting component 4, wall screw 5 and floor crab-bolt 6, tank-type connecting component 4 across In the both sides of internal partition wall 1, wall screw 5 connects horizontal through the two-arm of tank-type connecting component 4 and the wall of internal partition wall 1, the two ends of wall screw 5 with groove profile The two-arm of tank-type connecting component 4 is fixedly connected, wall screw 5 by the two-arm of fitting 4 by nut 7 and the firm connection of pad 8 with internal partition wall 1 It is embedded in internal partition wall 1, the two-arm of tank-type connecting component 4 is provided with the strip gab for being used for installing wall screw 5, and strip gab is vertical Direction, strip gab bottom is that the edge angle at the top of the arc matched with wall screw 5, strip gab is fillet, during installation, wallboard It is directly placed into opening, after degree of gravity vertical forwall surface adjustment is finished, backing plate 8 and nut 7 is installed in order;Floor crab-bolt 6 is worn vertically Cross the bottom of tank-type connecting component 4 or top and stretch into floor, the bottom of tank-type connecting component 4 or top are fixedly connected with floor.
The floor of prefabricated assembled concrete structure can be using the folded of complete fabricated floor or assembled integral Close floor.Monolithic wallboard is attached by the attachment means positioned at corner with upper and lower floor plate or beam.Attachment means are all logical Cross bolt to be attached so that site operation is safe efficient.
The method that attachment means between a kind of prefabricated internal partition wall of use transformer station and floor are attached, including following step Suddenly:
Pre-buried floor crab-bolt 6 in S1, lower floor's floor 3, floor crab-bolt 6 is vertical with lower floor floor 3;
S2, pours lower floor's floor 3;
S3, tank-type connecting component 4 is connected with floor crab-bolt 6;
S4, mortar bed 2, covering tank-type connecting component 4 bottom are laid in the upper surface of lower floor's floor 3;
S5, lifts the wallboard of internal partition wall 1, makes the wall screw 5 and 4 pairs of tank-type connecting component in lower floor's floor 3 of the bottom of internal partition wall 1 Standard, wall screw 5 is embedded in the wallboard of internal partition wall 1 in advance;
S6, the wall screw 5 of the bottom of internal partition wall 1 is fixedly connected with the tank-type connecting component 4 in lower floor floor 3;
S7, the bottom of upper strata floor 9 is installed by tank-type connecting component 4;
S8, the panel tops of internal partition wall 1 laying mortar bed 2;
S9, lifts upper strata floor 9, makes the wall screw 5 and 4 pairs of tank-type connecting component in upper strata floor 9 at the top of internal partition wall 1 It is accurate;
S10, the wall screw 5 at the top of internal partition wall 1 is fixedly connected with the tank-type connecting component 4 in upper strata floor 9.

Claims (7)

1. the attachment means between a kind of prefabricated internal partition wall of transformer station and floor, for internal partition wall (1) and upper strata floor (9) and under The connection of floor plate (3), it is characterised in that described device includes tank-type connecting component (4), wall screw (5) and floor crab-bolt (6), described tank-type connecting component (4) is across internal partition wall (1) both sides, and described wall screw (5) is horizontal through tank-type connecting component (4) Two-arm and internal partition wall (1) wall, tank-type connecting component (4) two-arm is fixedly connected with internal partition wall (1), described floor crab-bolt (6) Pass vertically through tank-type connecting component (4) bottom or top and stretch into floor, tank-type connecting component (4) bottom or top are fixed with floor Connection.
2. the attachment means between the prefabricated internal partition wall of a kind of transformer station according to claim 1 and floor, it is characterised in that Described wall screw (5) is embedded in internal partition wall (1), and described tank-type connecting component (4) two-arm, which is provided with, to be used to install wall screw (5) strip gab.
3. the attachment means between the prefabricated internal partition wall of a kind of transformer station according to claim 2 and floor, it is characterised in that Described strip gab is vertical direction.
4. the attachment means between the prefabricated internal partition wall of a kind of transformer station according to claim 3 and floor, it is characterised in that Described strip gab bottom is the arc matched with wall screw (5).
5. the attachment means between the prefabricated internal partition wall of a kind of transformer station according to claim 3 and floor, it is characterised in that Edge angle at the top of described strip gab is fillet.
6. the attachment means between the prefabricated internal partition wall of a kind of transformer station according to claim 1 and floor, it is characterised in that Described wall screw (5) two ends are connected with tank-type connecting component (4) two-arm by nut (7) and pad (8).
7. the attachment means between a kind of prefabricated internal partition wall of transformer station and floor using as described in claim 2~6 is any are entered The method of row connection, it is characterised in that comprise the following steps:
Pre-buried floor crab-bolt (6) in S1, lower floor's floor (3), described floor crab-bolt (6) is vertical with lower floor's floor (3);
S2, pours lower floor's floor (3);
S3, tank-type connecting component (4) is connected with floor crab-bolt (6);
S4, in the upper surface laying mortar bed (2) of lower floor's floor (3), covers tank-type connecting component (4) bottom;
S5, lifts internal partition wall (1) wallboard, the wall screw (5) of internal partition wall (1) bottom is connected with the groove profile in lower floor's floor (3) Part (4) is aligned, and described wall screw (5) is embedded in internal partition wall (1) wallboard in advance;
S6, the wall screw (5) of internal partition wall (1) bottom is fixedly connected with the tank-type connecting component (4) in lower floor's floor (3);
S7, upper strata floor (9) bottom is installed by tank-type connecting component (4);
S8, internal partition wall (1) panel tops laying mortar bed (2);
S9, lifting upper strata floor (9) makes the wall screw (5) at the top of internal partition wall (1) and the tank-type connecting component in upper strata floor (9) (4) it is aligned;
S10, the wall screw (5) at the top of internal partition wall (1) is fixedly connected with the tank-type connecting component (4) in upper strata floor (9).
CN201710256423.3A 2017-04-19 2017-04-19 Attachment device and method between a kind of prefabricated internal partition wall of substation and floor Active CN107060152B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710256423.3A CN107060152B (en) 2017-04-19 2017-04-19 Attachment device and method between a kind of prefabricated internal partition wall of substation and floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710256423.3A CN107060152B (en) 2017-04-19 2017-04-19 Attachment device and method between a kind of prefabricated internal partition wall of substation and floor

Publications (2)

Publication Number Publication Date
CN107060152A true CN107060152A (en) 2017-08-18
CN107060152B CN107060152B (en) 2019-07-12

Family

ID=59599953

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710256423.3A Active CN107060152B (en) 2017-04-19 2017-04-19 Attachment device and method between a kind of prefabricated internal partition wall of substation and floor

Country Status (1)

Country Link
CN (1) CN107060152B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642184A (en) * 2017-08-30 2018-01-30 河北建筑工程学院 A kind of prefabricated partition wall connecting structure and its construction method
CN111608291A (en) * 2020-05-22 2020-09-01 雷香梅 Energy-conserving building cavity wall body is stabilized to modularization and location structure thereof
CN111827478A (en) * 2020-07-24 2020-10-27 中建科工集团有限公司 Steel structure and mounting method thereof
CN111980217A (en) * 2020-08-04 2020-11-24 萧云建设股份有限公司 Laminated concrete member and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3305983A (en) * 1962-06-16 1967-02-28 Holzaepfel Kg Moebel Christian Room divider
DE19705539A1 (en) * 1997-02-14 1998-08-20 Kakuk Stefan Installation- and holder profile for walls
DE20006011U1 (en) * 2000-03-31 2000-06-29 Lechner Helmut Device for attaching U-profiles to ceiling or wall of a room
CN103015572A (en) * 2013-01-06 2013-04-03 河南天丰节能板材科技股份有限公司 Connecting method for wall body and floor slab and special connecting structure as well as quick-assembled house
CN204850526U (en) * 2015-07-24 2015-12-09 安徽富煌钢构股份有限公司 Existing floor adds connection structure of layer with various steel composite sheet of polystyrene

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3305983A (en) * 1962-06-16 1967-02-28 Holzaepfel Kg Moebel Christian Room divider
DE19705539A1 (en) * 1997-02-14 1998-08-20 Kakuk Stefan Installation- and holder profile for walls
DE20006011U1 (en) * 2000-03-31 2000-06-29 Lechner Helmut Device for attaching U-profiles to ceiling or wall of a room
CN103015572A (en) * 2013-01-06 2013-04-03 河南天丰节能板材科技股份有限公司 Connecting method for wall body and floor slab and special connecting structure as well as quick-assembled house
CN204850526U (en) * 2015-07-24 2015-12-09 安徽富煌钢构股份有限公司 Existing floor adds connection structure of layer with various steel composite sheet of polystyrene

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642184A (en) * 2017-08-30 2018-01-30 河北建筑工程学院 A kind of prefabricated partition wall connecting structure and its construction method
CN107642184B (en) * 2017-08-30 2023-09-26 河北建筑工程学院 Prefabricated partition wall connection structure and construction method thereof
CN111608291A (en) * 2020-05-22 2020-09-01 雷香梅 Energy-conserving building cavity wall body is stabilized to modularization and location structure thereof
CN111827478A (en) * 2020-07-24 2020-10-27 中建科工集团有限公司 Steel structure and mounting method thereof
CN111980217A (en) * 2020-08-04 2020-11-24 萧云建设股份有限公司 Laminated concrete member and construction method thereof
CN111980217B (en) * 2020-08-04 2021-11-05 萧云建设股份有限公司 Laminated concrete member and construction method thereof

Also Published As

Publication number Publication date
CN107060152B (en) 2019-07-12

Similar Documents

Publication Publication Date Title
CN103374986B (en) A kind of multifunction combined light weight concrete construction curtain wall and preparation method thereof
CN107060152B (en) Attachment device and method between a kind of prefabricated internal partition wall of substation and floor
CN103821229B (en) Rapid assembly type integrated house and installation method
WO2017031627A1 (en) Assembled building structure, wallboard installation hanger, and assembled building construction method
CN105178433A (en) Precast concrete shear wall structure and construction method thereof
CN112196159B (en) Glass curtain wall construction structure and construction method thereof
JP4847153B2 (en) Roof repair structure and construction method of flat roof building
CN104261232A (en) Lifting device attaching to special-shaped section and mounting method of lifting device
CN203769069U (en) Rapidly-assembled integrated house
WO2018174825A1 (en) Pre-fabricated pre-finished volumetric construction of a building
CN210562276U (en) Integrated foundation structure of assembled transformer substation
CN108894509B (en) Steel structure assembly type house prefabricated sandwich heat-insulation external wall panel construction method without external frame
CN104499625A (en) Profiled steel sheet and composite floor
CN218374567U (en) Can fix a position ALC wallboard reinforced structure that can exempt from to plaster
CN106436746A (en) Prefabricated box-type substation cement foundation
CN110761416B (en) Connecting structure of prefabricated caisson
CN204753895U (en) Combination wall body of single prefabricated wall section
CN211899232U (en) External hanging wallboard of prestressed steel pipe truss and wall manufactured and installed by using same
CN203546945U (en) Wallboard and shear wall with post-cast strip at floor position composed of wallboard
CN112761245A (en) Assembled reinforced concrete building main body structure and installation construction method thereof
KR20210068283A (en) Structural Systems and Methods for Floor Structural Work in Elevator Machine Room of Apartment Housing
CN206360430U (en) A kind of low-loss and energy-saving is without mechanically operated parking building
CN221073338U (en) Prefabricated concrete flue structure capable of effectively dispersing load for high-rise building
CN215889209U (en) Modular concrete elevator shaft way with balcony
CN214364034U (en) Assembled reinforced concrete building major structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant