CN107642184A - A kind of prefabricated partition wall connecting structure and its construction method - Google Patents

A kind of prefabricated partition wall connecting structure and its construction method Download PDF

Info

Publication number
CN107642184A
CN107642184A CN201710763739.1A CN201710763739A CN107642184A CN 107642184 A CN107642184 A CN 107642184A CN 201710763739 A CN201710763739 A CN 201710763739A CN 107642184 A CN107642184 A CN 107642184A
Authority
CN
China
Prior art keywords
partition wall
horizontal member
plate body
prefabricated
buried
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710763739.1A
Other languages
Chinese (zh)
Other versions
CN107642184B (en
Inventor
麻建锁
李瑞丰
蔡焕琴
李雪娜
王丽楠
李明宇
程岚
郭腾
强亚林
张敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xia Jianhong
Original Assignee
Hebei University of Architecture
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei University of Architecture filed Critical Hebei University of Architecture
Priority to CN201710763739.1A priority Critical patent/CN107642184B/en
Publication of CN107642184A publication Critical patent/CN107642184A/en
Application granted granted Critical
Publication of CN107642184B publication Critical patent/CN107642184B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

A kind of prefabricated partition wall connecting structure and its construction method, connecting structure include prefabricated partition wall, vertical member, pass through upper strata horizontal member and lower floor's horizontal member.Top connection component includes the partition wall top positioning link being embedded in wall and the pre-buried positioning link of upper strata horizontal member being embedded in the horizontal member of upper strata, the top of prefabricated partition wall before and after bolt by being detachably connected, bottom connection component includes the partition wall lower rotational connector being embedded in wall and the pre-buried bearing connection of lower floor's horizontal member being embedded in lower floor's horizontal member, and the bottom of prefabricated partition wall before and after bearing by being rotatably connected.Construction method includes making built-in fitting, makes the steps such as partition wall, connection partition wall, filling filler.Of the invention to use different connecting structure up and down, guarantee wallboard installation site reasonable in design quick and precisely positions, and meets prefabricated component requirement at this stage, and construction is simple is quick, ensures that wallboard is connected with floor and reliably meets functional requirement.

Description

A kind of prefabricated partition wall connecting structure and its construction method
Technical field
The present invention relates to a kind of wall connecting construction and its construction method, the connecting structure of particularly a kind of prefabricated partition wall and Its construction method.
Background technology
In building structure, partition wall is the vertical member for being made exclusively for separating the interior space, can make architecture indoor more Add attractive in appearance.Partition wall primarily serves segmentation effect, and its thickness is thin need not to have weight capacity, therefore partition wall is typically direct Act on floor, also directly act on a small quantity on beam.Traditional residential house type construction technology still based on building by laying bricks or stones, is worked as simultaneously In the assembled architecture of preceding implementation, partition wall Joining Technology is also complex, there is that efficiency of construction is relatively low, and installation site is forbidden, and tears open Dress inconvenience, is unfavorable for the problems such as partition wall recycles.
The content of the invention
It is an object of the invention to provide a kind of prefabricated partition wall connecting structure and its construction method, to solve existing partition wall It is complex to there is Joining Technology, efficiency of construction is relatively low, and installation site is forbidden, and dismounting inconvenience, is unfavorable for partition wall and recycles Technical problem.
The problem of framework, shear wall, brick are mixed at this stage, assembled architecture partition wall speed of application is slow, efficiency is low so that every Disconnected wall installation is quick, simple in construction, easy for construction, easy to install, is easy to disassemble.
To achieve the above object, the present invention adopts the following technical scheme that:
A kind of prefabricated partition wall connecting structure, including prefabricated partition wall, with prefabricated partition wall at left and right sides of be connected vertical member, By the upper strata horizontal member that be connected on the upside of top connection component and prefabricated partition wall and by bottom connection component and it is prefabricated every Lower floor's horizontal member of connection on the downside of disconnected wall,
The clipped corner of top two of the prefabricated partition wall forms upper cut-out, and the cut-off of parallel surface of wall is provided with upper cut-out Wall top positioning link, the clipped corner of bottom two of the prefabricated partition wall form lower cut-out, are provided with lower cut-out vertical The partition wall lower rotational connector of surface of wall,
It is pre-buried fixed that the downside surface of the upper strata horizontal member is provided with downwardly projecting and vertical lower side surface upper strata horizontal member Position connector, the set location of the pre-buried positioning link of upper strata horizontal member are relative with partition wall top positioning link Should, partition wall top positioning link and upper strata horizontal member pre-buried be located by connecting parallel with partition wall top positioning link Part forms top connection component, makes the top of prefabricated partition wall by being detachably connected before and after bolt,
The uper side surface of lower floor's horizontal member is provided with the protruding upward and pre-buried axle of vertical lower side surface lower floor horizontal member Connector is held, the set location of the pre-buried bearing connection of lower floor's horizontal member is relative with partition wall lower rotational connector Should, it is parallel with partition wall lower rotational connector, partition wall lower rotational connector connects with the lower floor pre-buried bearing of horizontal member Part forms bottom connection component, makes the bottom of prefabricated partition wall by being rotatably connected before and after bearing,
The inserts on levelling surface is filled with the upper cut-out and lower cut-out;
Gap filling between the prefabricated partition wall and vertical member, upper strata horizontal member and lower floor's horizontal member has sealing Material.
Partition wall top positioning link is embedded in prefabricated partition wall, and partition wall top positioning link includes dew Go out upper cut-out, the first plate body in the middle part of notch depth, the side table of the side edge surface of first plate body with wall Face is concordant, and partition wall top positioning link is also included positioned at the middle part side of the first plate body, the connection spiral shell of vertical first plate body Bar, the length of the connecting screw are defined by the surface no more than prefabricated partition wall.
The pre-buried positioning link of upper strata horizontal member is embedded in the horizontal member of upper strata, including the protrusion horizontal structure in upper strata Second plate body on part surface, bolt hole is provided with the middle part of second plate body.
Second plate body, which is stretched into upper cut-out, fitting is arranged on the first plate body has the side of connecting screw, described The size of bolt hole and connecting screw is adapted, and connecting screw is fastened through bolt hole and by nut.
The partition wall lower rotational connector is embedded in prefabricated partition wall, and partition wall lower rotational connector includes dew Go out lower cut-out horizontal plane, the 3rd plate body in the middle part of notch depth, the front and rear surfaces of the 3rd plate body are compared to wall Front and rear surfaces are inside contracted, and the bottom side surface of the 3rd plate body is inside contracted compared to the bottom side surface of wall, and the bottom of the 3rd plate body is provided with Vertical bar shaped blind hole.
The pre-buried bearing connection of lower floor's horizontal member is embedded in lower floor's horizontal member, including the horizontal structure of protrusion lower floor Part surface, two piece of the 4th plate body for forming clamping plate, the 4th plate body are connected with horizontal bearing rod between middle part.
The thickness of the distance between described 4th plate body and the 3rd plate body is adapted, and two piece of the 4th plate body is respectively protruding into bottom Otch is interior, the left and right sides of the 3rd plate body, and the size of the bar shaped blind hole and bearing rod is adapted, and the cecum of bar shaped blind hole is stuck in On bearing rod.
The thickness of wall body of the prefabricated partition wall is 100mm-120mm, between the surrounding and surrounding member of prefabricated partition wall Retain 5mm-10mm installation gap;
The upper cut-out and lower cut-out are right angle cuts, notch depth 60mm-80mm,
The width of first plate body is 60mm-80mm, is highly 70mm-90mm, thickness 8mm-12mm,
The diameter of the connecting screw compares the narrow 2mm-4mm of diameter of bolt hole,
The thickness of 3rd plate body is 15mm-25mm, and the 3rd plate body is 6mm-10mm compared to the distance that inside contracts of wall.
A kind of construction method of prefabricated partition wall connecting structure, including following construction procedure:
Step 1, the installation site of prefabricated partition wall is designed, pre-buried upper strata horizontal member is pre-buried on the horizontal member of upper strata in advance Positioning link, the pre-buried pre-buried bearing connection of lower floor's horizontal member on lower floor's horizontal member;
Step 2, make prefabricated partition wall:First make partition wall top positioning link and partition wall lower rotational connector; Then in the pre-buried partition wall top positioning link in wall top, in the pre-buried partition wall lower rotational connector in wall bottom, four Upper cut-out and lower cut-out are formed at angle respectively, partition wall top positioning link exposes upper cut-out, and partition wall bottom turns Follower link exposes lower cut-out;
Step 3, prefabricated partition wall is lain low and is placed on lower floor's horizontal member, partition wall lower rotational connector is docked into lower floor The pre-buried bearing connection of horizontal member,
Step 4, prefabricated partition wall is boosted upwards, partition wall lower rotational connector is in the pre-buried bearing connection of lower floor's horizontal member Front and rear rotation on part, the bottom of prefabricated partition wall is set to rotate up to partition wall top positioning link before and after occurring horizontal with upper strata The pre-buried positioning link of component docks temporarily;
Step 5, between fixed top positioning link and the pre-buried positioning link of upper strata horizontal member, the top of wall is fixed;
Step 6, inserts is filled in upper cut-out and lower cut-out, in prefabricated partition wall and vertical member, upper strata level Gap filling sealing material between component and lower floor's horizontal member, complete installation.
In the step 5, to entering between partition wall lower rotational connector and the pre-buried bearing connection of lower floor's horizontal member Row welding.
Compared with prior art the invention has the characteristics that and beneficial effect:
The prefabricated partition wall connecting structure of the present invention uses the predetermined level component and partition plate being used cooperatively, up and down using different Connecting structure, it is reasonable in design;Connecting structure is attached using pre-buried keeper, ensures that wallboard installation site is quickly accurate It is determined that position;All connecting structure are connected using dry type, easy disassembly, and beneficial to recycling for partition wall, satisfaction fills at this stage With the requirement of formula prefabricated components;Construction method is fast using positioning bottom, connection top, the working procedure for connecting bottom, construction is simple Speed, improve construction quality and efficiency;Avoid it is a large amount of at this stage it is cumbersome build work by laying bricks or stones, while ensure that wallboard is connected with floor can Lean on, meet functional requirement;The prefabricated partition wall of the present invention has the economic value that large-scale popularization uses, and can install partition wall Technique Popularizing is in each structure.
Brief description of the drawings
The present invention will be further described in detail below in conjunction with the accompanying drawings.
Fig. 1 is the structural representation of prefabricated partition wall.
Fig. 2 is mplifying structure schematic diagram at A in Fig. 1.
Fig. 3 is mplifying structure schematic diagram at B in Fig. 1.
Fig. 4 is the structural representation of upper strata horizontal member.
Fig. 5 is the structural representation of lower floor's horizontal member.
Fig. 6 is mplifying structure schematic diagram at C in Fig. 5.
Fig. 7 is the scheme of installation of prefabricated partition wall and upper strata horizontal member.
Fig. 8 is the scheme of installation of prefabricated partition wall and lower floor's horizontal member.
Fig. 9 is that Fig. 7 installs schematic diagram.
Figure 10 is that Fig. 8 installs schematic diagram.
Figure 11 is the structural representation of connecting structure of the present invention.
Reference:1- upper stratas horizontal member, 2- lower floors horizontal member, 3- partition walls top positioning link, 31- First plate body, 32- connecting screws, 4- partition wall lower rotationals connector, the plate bodys of 41- the 3rd, 42- bar shapeds blind hole, on 5- The pre-buried bearing connection of the pre-buried positioning link of layer horizontal member, the plate bodys of 51- second, 52- bolts hole, 6- lower floors horizontal member Part, the plate bodys of 61- the 4th, 62- bearing rods, 7- nuts, the prefabricated partition walls of 8-, 81- upper cut-outs, 82- lower cut-outs, 9- vertical members.
Embodiment
Embodiment is shown in Figure 11, a kind of prefabricated partition wall connecting structure, including prefabricated partition wall 8 and prefabricated cut-off The vertical member 9 of connection, the upper strata horizontal member being connected by top connection component with the prefabricated upside of partition wall 8 at left and right sides of wall 1 and lower floor's horizontal member 2 for being connected by bottom connection component with the downside of prefabricated partition wall 8.
In the present embodiment, set two pieces of prefabricated partition wall horizontal alignment, upper strata horizontal member 1 and lower floor's horizontal member 2 It is floor, it can be beam to have in other embodiments.Vertical member 9 is the load bearing wall of both sides.The material of prefabricated partition wall 8 can For light materials such as lightweight concrete, plasterboard, wooden partition walls.
Referring to shown in Fig. 1-2, the clipped corner of top two of the prefabricated partition wall 8 forms upper cut-out 81, upper cut-out 81 The interior partition wall top positioning link 3 provided with parallel surface of wall.Partition wall top positioning link 3 is embedded in prefabricated In partition wall 8, partition wall top positioning link 3 includes exposing upper cut-out 81, the first plate body in the middle part of notch depth 31, the side edge surface of first plate body is concordant with the side edge surface of wall, and partition wall top positioning link 3 also includes position In the middle part side of the first plate body 31, the connecting screw 32 of vertical first plate body 31, the length of the connecting screw 32 is not to surpass The surface for crossing prefabricated partition wall 8 is defined.
Shown in Figure 4, the downside surface of the upper strata horizontal member 1 is provided with downwardly projecting and vertical lower side surface upper The layer pre-buried positioning link 5 of horizontal member, in the set location and partition wall of the pre-buried positioning link 5 of upper strata horizontal member Portion's positioning link 3 is corresponding, parallel with partition wall top positioning link 3, partition wall top positioning link 3 and upper water The flat pre-buried positioning link 5 of component forms top connection component, makes the top of prefabricated partition wall by detachably connecting before and after bolt Connect.
Referring to shown in Fig. 7 and Fig. 9, the pre-buried positioning link 5 of upper strata horizontal member is embedded in upper strata horizontal member 1 It is interior, include the second plate body 51 of the protrusion horizontal component surface in upper strata, bolt hole 52 is provided with the middle part of second plate body.Described Two plate bodys 51, which are stretched into upper cut-out 81, fitting is arranged on the first plate body 31 has the side of connecting screw 32, the bolt hole 52 are adapted with the size of connecting screw 32, and connecting screw 32 is fastened through bolt hole 52 and by nut 7.
Referring to shown in Fig. 1 and Fig. 3, the clipped corner of bottom two of the prefabricated partition wall forms lower cut-out 82, lower cut-out The partition wall lower rotational connector 4 of vertical wall surface is provided with 82.The partition wall lower rotational connector 4 is embedded in pre- In partition wall 8 processed, partition wall lower rotational connector 4 includes exposing lower cut-out horizontal plane, the in the middle part of notch depth Three plate bodys 41, the front and rear surfaces of the 3rd plate body are inside contracted compared to the front and rear surfaces of wall, and the bottom side surface of the 3rd plate body is compared The bottom side surface of wall inside contracts, and the bottom of the 3rd plate body 41 is provided with vertical bar shaped blind hole 42.Inside contract is to ensure that the later stage connects Seam prevents the measure got rusty when filling up.
Referring to shown in Fig. 5-6, the uper side surface of lower floor's horizontal member 2 is provided with protruding upward and vertical lower side surface The pre-buried bearing connection 6 of lower floor's horizontal member, the set location and partition wall of the pre-buried bearing connection 6 of lower floor's horizontal member Lower rotational connector 4 is corresponding, parallel with partition wall lower rotational connector 4, partition wall lower rotational connector 4 and lower floor The pre-buried bearing connection 6 of horizontal member forms bottom connection component, the bottom of prefabricated partition wall is passed through before and after bearing rotatably Connection.
Referring to shown in Fig. 8 and Figure 10, the pre-buried bearing connection 6 of lower floor's horizontal member is embedded in lower floor's horizontal member 2 It is interior, including protrude the surface of lower floor's horizontal member 2, form two piece of the 4th plate body 61 of clamping plate, the 4th plate body is connected between middle part Horizontal bearing rod 62.The thickness of the distance between described 4th plate body 61 and the 3rd plate body 41 is adapted, two piece of the 4th plate body 61 are respectively protruding into lower cut-out 82, the left and right sides of the 3rd plate body 41, the bar shaped blind hole 42 and the size phase of bearing rod 62 Adapt to, the cecum of bar shaped blind hole 42 is stuck on bearing rod 62.
The inserts on levelling surface is filled with the upper cut-out 81 and lower cut-out 82.Inserts is generally cement Mortar.
Gap between the prefabricated partition wall 8 and vertical member 9, upper strata horizontal member 1 and lower floor's horizontal member 2 is filled out Filled with sealing material.Sealing material is generally cement mortar or building adhesive.
The thickness of wall body of the prefabricated partition wall 8 is 100mm-120mm, between the surrounding and surrounding member of prefabricated partition wall 5mm-10mm installation gap is retained, facilitates wall to rotate with installing into.
The upper cut-out 81 and lower cut-out 82 are right angle cuts, notch depth 60mm-80mm,
The width of first plate body 31 is 60mm-80mm, is highly 70mm-90mm, thickness 8mm-12mm,
The diameter of the connecting screw 32 compare bolt hole 52 the narrow 2mm-4mm of diameter, the bolt hole can be circular hole or Bar hole.
The thickness of 3rd plate body 61 is 15mm-25mm, and the 3rd plate body 61 is 6mm- compared to the distance that inside contracts of wall 10mm。
It can specifically be set in the present embodiment, the thickness of wall body of prefabricated partition wall 8 is 100mm, the surrounding of prefabricated partition wall Retaining 5mm installation gap between surrounding member, the notch depth of upper cut-out 81 and lower cut-out 82 is 60mm, described The width of one plate body 31 is 60mm, is highly 80mm, thickness 8mm.The diameter of the connecting screw 32 is compared to bolt hole 52 The narrow 2mm of diameter, the bolt hole are bar hole.The pre-buried position of 3rd plate body is that the center position on kerf width direction is 30mm, the thickness of the 3rd plate body is 20mm, and the distance that inside contracts compared to wall is 10mm.
The construction method of this prefabricated partition wall connecting structure, including following construction procedure:
Step 1, the installation site of prefabricated partition wall 8 is designed, pre-buried upper strata horizontal member is pre- on upper strata horizontal member 1 in advance Positioning link 5 is buried, the pre-buried pre-buried bearing connection 6 of lower floor's horizontal member on lower floor's horizontal member 2.
Step 2, make prefabricated partition wall:First make partition wall top positioning link 3 and partition wall lower rotational connects Fitting 4;Then in the pre-buried partition wall top positioning link 3 in wall top, in wall bottom, pre-buried partition wall lower rotational connects Fitting 4, upper cut-out 81 and lower cut-out 82 is formed respectively at corner, partition wall top positioning link 3 exposes upper cut-out 81, partition wall lower rotational connector 4 exposes lower cut-out 82.
Step 3, prefabricated partition wall 8 is lain low and is placed on lower floor's horizontal member 2, partition wall lower rotational connector 4 is right The pre-buried bearing connection 6 of lower floor's horizontal member is connect, it is interior, the 3rd plate body 41 that two piece of the 4th plate body 61 is respectively protruding into lower cut-out 82 The left and right sides, the cecum clamping bearing rod 62 of bar shaped blind hole 42;
Step 4, boosts prefabricated partition wall 8 upwards, and partition wall lower rotational connector 4 connects in the pre-buried bearing of lower floor's horizontal member Front and rear rotation on fitting, the bottom of prefabricated partition wall is set to rotate up to partition wall top positioning link 3 and upper strata before and after occurring The pre-buried positioning link 5 of horizontal member docks temporarily, i.e., the connecting screw of partition wall top positioning link is horizontal through upper strata The bolt hole of the pre-buried positioning link of component.
Step 5, between fixed top positioning link 3 and the pre-buried positioning link 5 of upper strata horizontal member, in connection spiral shell Nut is screwed on bar, the top of wall is fixed.
Step 6, inserts is filled in upper cut-out and lower cut-out, in prefabricated partition wall and vertical member, upper strata Gap filling sealing material between horizontal member and lower floor's horizontal member, complete installation.
, can also be to partition wall lower rotational connector 4 and lower floor in order to ensure the stability of connection in the step 5 Welded between the pre-buried bearing connection 6 of horizontal member.

Claims (10)

1. a kind of prefabricated partition wall connecting structure, including prefabricated partition wall(8), with prefabricated partition wall at left and right sides of be connected it is vertical Component(9), pass through top connection component and prefabricated partition wall(8)The upper strata horizontal member of upside connection(1)Connect with by bottom Connected components and prefabricated partition wall(8)Lower floor's horizontal member of downside connection(2), it is characterised in that:
The prefabricated partition wall(8)Top two clipped corner form upper cut-out(81), upper cut-out(81)It is interior to be provided with parallel walls The partition wall top positioning link in body surface face(3), the clipped corner formation lower cut-out of bottom two of the prefabricated partition wall(82), Lower cut-out(82)The interior partition wall lower rotational connector provided with vertical wall surface(4),
The upper strata horizontal member(1)Downside surface be provided with downwardly projecting and vertical lower side surface upper strata horizontal member it is pre-buried Positioning link(5), the pre-buried positioning link of upper strata horizontal member(5)Set location be located by connecting with partition wall top Part(3)Corresponding and partition wall top positioning link(3)It is parallel, partition wall top positioning link(3)With the horizontal structure in upper strata The pre-buried positioning link of part(5)Top connection component is formed, makes the top of prefabricated partition wall by being detachably connected before and after bolt,
Lower floor's horizontal member(2)Uper side surface be provided with protruding upward and vertical lower side surface lower floor horizontal member it is pre-buried Bearing connection(6), the pre-buried bearing connection of lower floor's horizontal member(6)Set location be connected with partition wall lower rotational Part(4)Corresponding and partition wall lower rotational connector(4)It is parallel, partition wall lower rotational connector(4)With the horizontal structure of lower floor The pre-buried bearing connection of part(6)Bottom connection component is formed, makes the bottom of prefabricated partition wall by being rotatably connected before and after bearing,
The upper cut-out(81)And lower cut-out(82)Inside it is filled with the inserts on levelling surface;
The prefabricated partition wall(8)With vertical member(9), upper strata horizontal member(1)And lower floor's horizontal member(2)Between seam Gap is filled with sealing material.
2. prefabricated partition wall connecting structure according to claim 1, it is characterised in that:The partition wall top is located by connecting Part(3)It is embedded in prefabricated partition wall(8)It is interior, partition wall top positioning link(3)Including exposing upper cut-out(81), positioned at cutting The first plate body in the middle part of mouth depth(31), the side edge surface of first plate body is concordant with the side edge surface of wall, partition wall Top positioning link(3)Also include being located at the first plate body(31)Middle part side, vertical first plate body(31)Connecting screw (32), the connecting screw(32)Length with no more than prefabricated partition wall(8)Surface be defined.
3. prefabricated partition wall connecting structure according to claim 1 or 2, it is characterised in that:The upper strata horizontal member is pre- Bury positioning link(5)It is embedded in upper strata horizontal member(1)It is interior, include the second plate body of the protrusion horizontal component surface in upper strata (51), bolt hole is provided with the middle part of second plate body(52).
4. prefabricated partition wall connecting structure according to claim 3, it is characterised in that:Second plate body(51)Stretch into Portion's otch(81)Interior, fitting is arranged on the first plate body(31)With connecting screw(32)Side, the bolt hole(52)With connecting Connect screw rod(32)Size be adapted, connecting screw(32)Through bolt hole(52)And pass through nut(7)Fastening.
5. the prefabricated partition wall connecting structure according to claim 1,2 or 4 any one, it is characterised in that:The cut-off Wall lower rotational connector(4)It is embedded in prefabricated partition wall(8)It is interior, partition wall lower rotational connector(4)Including exposing bottom Otch horizontal plane, the 3rd plate body in the middle part of notch depth(41), the front and rear surfaces of the 3rd plate body are compared to before wall Surface inside contracts afterwards, and the bottom side surface of the 3rd plate body inside contracts compared to the bottom side surface of wall, the 3rd plate body(41)Bottom open There is vertical bar shaped blind hole(42).
6. prefabricated partition wall connecting structure according to claim 5, it is characterised in that:The pre-buried axle of lower floor's horizontal member Hold connector(6)It is embedded in lower floor's horizontal member(2)It is interior, including protrusion lower floor horizontal member(2)Surface, form clamping plate two pieces 4th plate body(61), in the middle part of the 4th plate body between be connected with horizontal bearing rod(62).
7. prefabricated partition wall connecting structure according to claim 6, it is characterised in that:4th plate body(61)Between Distance and the 3rd plate body(41)Thickness be adapted, two piece of the 4th plate body(61)It is respectively protruding into lower cut-out(82)Interior, the 3rd plate Body(41)The left and right sides, the bar shaped blind hole(42)With bearing rod(62)Size be adapted, bar shaped blind hole(42)Cecum It is stuck in bearing rod(62)On.
8. prefabricated partition wall connecting structure according to claim 7, it is characterised in that:
The prefabricated partition wall(8)Thickness of wall body be 100mm-120mm, deposited between the surrounding and surrounding member of prefabricated partition wall Stay 5mm-10mm installation gap;
The upper cut-out(81)And lower cut-out(82)It is right angle cuts, notch depth 60mm-80mm,
First plate body(31)Width be 60mm-80mm, be highly 70mm-90mm, thickness 8mm-12mm,
The connecting screw(32)Diameter compare bolt hole(52)The narrow 2mm-4mm of diameter,
3rd plate body(61)Thickness be 15mm-25mm, the 3rd plate body(61)The distance that inside contracts compared to wall is 6mm- 10mm。
9. a kind of construction method of prefabricated partition wall connecting structure according to claim 1-8 any one, its feature exist In, including following construction procedure:
Step 1, design prefabricated partition wall(8)Installation site, in advance in upper strata horizontal member(1)The upper pre-buried horizontal structure in upper strata The pre-buried positioning link of part(5), in lower floor's horizontal member(2)The upper pre-buried pre-buried bearing connection of lower floor's horizontal member(6);
Step 2, make prefabricated partition wall:First make partition wall top positioning link(3)And partition wall lower rotational connection Part(4);Then in the pre-buried partition wall top positioning link in wall top(3), in the pre-buried partition wall lower rotational in wall bottom Connector(4), upper cut-out is formed respectively at corner(81)And lower cut-out(82), partition wall top positioning link(3)Dew Go out upper cut-out(81), partition wall lower rotational connector(4)Expose lower cut-out(82);
Step 3, by prefabricated partition wall(8)Lie low and be placed on lower floor's horizontal member(2)On, by partition wall lower rotational connector(4) Dock the pre-buried bearing connection of lower floor's horizontal member(6),
Step 4, prefabricated partition wall is boosted upwards(8), partition wall lower rotational connector(4)In the pre-buried axle of lower floor's horizontal member Front and rear rotation on connector is held, the bottom of prefabricated partition wall is rotated up to partition wall top positioning link before and after occurring(3) With the pre-buried positioning link of upper strata horizontal member(5)Interim docking;
Step 5, fixed top positioning link(3)With the pre-buried positioning link of upper strata horizontal member(5)Between, wall it is upper Portion is fixed;
Step 6, inserts is filled in upper cut-out and lower cut-out, in prefabricated partition wall and vertical member, upper strata level Gap filling sealing material between component and lower floor's horizontal member, complete installation.
10. the construction method of prefabricated partition wall connecting structure according to claim 9, it is characterised in that:The step 5 In, to partition wall lower rotational connector(4)With the pre-buried bearing connection of lower floor's horizontal member(6)Between welded.
CN201710763739.1A 2017-08-30 2017-08-30 Prefabricated partition wall connection structure and construction method thereof Active CN107642184B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710763739.1A CN107642184B (en) 2017-08-30 2017-08-30 Prefabricated partition wall connection structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710763739.1A CN107642184B (en) 2017-08-30 2017-08-30 Prefabricated partition wall connection structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN107642184A true CN107642184A (en) 2018-01-30
CN107642184B CN107642184B (en) 2023-09-26

Family

ID=61110871

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710763739.1A Active CN107642184B (en) 2017-08-30 2017-08-30 Prefabricated partition wall connection structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN107642184B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110284629A (en) * 2019-04-12 2019-09-27 深圳全景空间工业有限公司 A kind of partition wall and its installation method
CN110284628A (en) * 2019-04-12 2019-09-27 深圳全景空间工业有限公司 A kind of house fast layout system and method
CN111576672A (en) * 2020-05-29 2020-08-25 中国十七冶集团有限公司 Connecting mechanism for connecting ALC light partition wall and PC component and using method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013060700A (en) * 2011-09-12 2013-04-04 Haseko Corp Fitting structure of partition board
CN104563288A (en) * 2014-10-30 2015-04-29 徐曼 Reinforced concrete frame gridding slab prefabricated energy-saving house
CN107060152A (en) * 2017-04-19 2017-08-18 国网上海市电力公司 Attachment means and method between a kind of prefabricated internal partition wall of transformer station and floor
CN107060150A (en) * 2017-05-31 2017-08-18 河北建筑工程学院 A kind of precast assembly integral frame filled wall system and its construction method
CN207553363U (en) * 2017-08-30 2018-06-29 河北建筑工程学院 A kind of prefabricated partition wall connecting structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013060700A (en) * 2011-09-12 2013-04-04 Haseko Corp Fitting structure of partition board
CN104563288A (en) * 2014-10-30 2015-04-29 徐曼 Reinforced concrete frame gridding slab prefabricated energy-saving house
CN107060152A (en) * 2017-04-19 2017-08-18 国网上海市电力公司 Attachment means and method between a kind of prefabricated internal partition wall of transformer station and floor
CN107060150A (en) * 2017-05-31 2017-08-18 河北建筑工程学院 A kind of precast assembly integral frame filled wall system and its construction method
CN207553363U (en) * 2017-08-30 2018-06-29 河北建筑工程学院 A kind of prefabricated partition wall connecting structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110284629A (en) * 2019-04-12 2019-09-27 深圳全景空间工业有限公司 A kind of partition wall and its installation method
CN110284628A (en) * 2019-04-12 2019-09-27 深圳全景空间工业有限公司 A kind of house fast layout system and method
CN111576672A (en) * 2020-05-29 2020-08-25 中国十七冶集团有限公司 Connecting mechanism for connecting ALC light partition wall and PC component and using method

Also Published As

Publication number Publication date
CN107642184B (en) 2023-09-26

Similar Documents

Publication Publication Date Title
CN104652830B (en) The construction method that a kind of Prefabricated construction panel and prefabricated panel are built
CN103603470B (en) A kind of stone material dry suspending facing of column structure and construction method thereof
CN107642184A (en) A kind of prefabricated partition wall connecting structure and its construction method
CN104032888A (en) Integrally prefabricated multifunctional composite external wall panel and industrial building external wall
CN109322425A (en) A kind of plug-in connection system of combined wall board and preparation method thereof
CN108385872A (en) A kind of assembling type partition wall and its construction method
CN206873673U (en) A kind of assembling type steel structure out-hung panel node
CN106088578A (en) Non-dismantling formwork, foam concrete self-heat conserving composite wall body structure and construction method
CN103388367A (en) Waterproof structure for connection joint between precast wall body and wallboard building block as well as construction method
CN209369174U (en) A kind of column welding structure and weld mold
CN109235654B (en) A kind of connection method of modular architectural
CN209369044U (en) It is a kind of to use the welded modular architectural of interior lining panel
CN109514019B (en) A kind of column welding method based on interior lining panel
CN207553363U (en) A kind of prefabricated partition wall connecting structure
CN106193474A (en) The light-weight metal binding structure of cornice and construction method thereof
CN204001309U (en) A kind of syndeton of Multi-function light concrete curtain wall
CN106284742A (en) Half column frame antidetonation faced wall and manufacture method
CN204001289U (en) There is the light steel keel partition that carries the arm of encorbelmenting
CN109235904B (en) A kind of building block unit assembly mold
CN209243934U (en) A kind of regulating system for the assembling of building block unit
CN109469209A (en) A kind of modular architectural
CN109469210A (en) A kind of foundation level adjusting support connection device
CN205918058U (en) GRC subassembly
CN1122129C (en) Construction method of indoor decoration with light wall board
CN203947671U (en) Integral prefabricated multi-functional compound external wall panel and industrialized building exterior wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240226

Address after: 518000, Building 15, A-2602, CITIC Hongshuwan Flower City, No. 8 Baishi Second Road, Nanshan District, Shenzhen, Guangdong Province

Patentee after: Xia Jianhong

Country or region after: China

Address before: No. 13 Chaoyang Street, Zhangjiakou, Hebei, Hebei

Patentee before: HEBEI University OF ARCHITECTURE