CN103603470B - A kind of stone material dry suspending facing of column structure and construction method thereof - Google Patents

A kind of stone material dry suspending facing of column structure and construction method thereof Download PDF

Info

Publication number
CN103603470B
CN103603470B CN201310422805.0A CN201310422805A CN103603470B CN 103603470 B CN103603470 B CN 103603470B CN 201310422805 A CN201310422805 A CN 201310422805A CN 103603470 B CN103603470 B CN 103603470B
Authority
CN
China
Prior art keywords
bending component
facing
stone material
stone
cladding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310422805.0A
Other languages
Chinese (zh)
Other versions
CN103603470A (en
Inventor
管勇美
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Kelida Building and Decoration Co Ltd
Original Assignee
Suzhou Kelida Building and Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Kelida Building and Decoration Co Ltd filed Critical Suzhou Kelida Building and Decoration Co Ltd
Priority to CN201310422805.0A priority Critical patent/CN103603470B/en
Publication of CN103603470A publication Critical patent/CN103603470A/en
Application granted granted Critical
Publication of CN103603470B publication Critical patent/CN103603470B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of stone material dry suspending facing and construction method thereof of column structure, comprise: agent structure, cylinder facing and cage construction, agent structure and cylinder facing link together by described cage construction, described cylinder facing is spliced into two absolute semi-circular structure by strip stone material, pack again, be transported to scene, cage construction is fixed on agent structure, and cylinder facing mounts in cage construction, and in-site installation is that pure assembling bolt is installed.By the way, the present invention can improve raw-material volume recovery and namely reduce raw material loss, reach the object of green construction, reduce the on-the-spot seam of stone surface, improve the surface quality of cylinder facing, have compressed the construction period, avoid finish coat outward appearance radian and the common quality defect such as to have some setbacks, realize back court and be processed as main modernization fitting-out work.

Description

A kind of stone material dry suspending facing of column structure and construction method thereof
Technical field
The present invention relates to building field, particularly relate to a kind of stone material dry suspending facing and construction method thereof of column structure.
Background technology
Dry-hang stone is a kind of construction technology of external wall, this technique utilizes corrosion resistant bolt and corrosion resistant flexible connecting member, by marble, granite, the ornamental stones such as artificial marble directly hang over the external surface of building structure, reserve the cavity of 40 ~ 50mm between stone material and structure.With the facing that this technique is made, allow to produce appropriate displacement under the effect of wind-force and seismic forces, with absorption portion wind-force and seismic forces, and unlikelyly occur crackle and come off.After wind-force seismic forces disappears, stone material also resets with structure.
Stone material dry suspending method has another name called empty extension method, is a kind of novel construction technology in contemporary facing decoration materials finishing.The method with metal hanger ornamental stone is directly hung on metope or sky is hung on steelframe, does not need stickup of being in the milk again.Its principle establishes main stress point on the body construction, is fixed on building by metal hanger by stone material, forms stone decoration curtain wall.
Traditional stone material dry suspending construction method is: bury post-install underground, welding overhanging component, weld cladding skeleton column, cladding steel frame construction curved arc and with column firm welding, according to on-the-spot real size, ornamental stone is evenly divided into fritter processing, is transported to job site and installs one by one from the bottom to top.There is following shortcoming in existing construction method: steel skeleton construction Site Welding, and power consumption is comparatively large, and contaminated environment; Higher to the quality requirement of steel skeleton construction, easily occur that finish coat outward appearance radian such as to have some setbacks at the common quality defect; Stone material piece more and be difficult to process nature, directly affect appearance effect; Material cost and cost of labor consumption larger; Operation interlocks layer by layer, and the duration is difficult to compression.
Summary of the invention
The technical problem that the present invention mainly solves is to provide a kind of stone material dry suspending facing and construction method thereof of column structure, raw-material volume recovery can be improved and namely reduce raw material loss, reach the object of green construction, the on-the-spot seam of stone surface can be reduced, improve the surface quality of cylinder facing, have compressed the construction period, avoid finish coat outward appearance radian and the common quality defect such as to have some setbacks, realize back court and be processed as main modernization fitting-out work.
For solving the problems of the technologies described above, the technical scheme that the present invention adopts is: the stone material dry suspending facing providing a kind of column structure, comprise: agent structure, cylinder facing and cage construction, the inner side of described cylinder facing is provided with cladding groove, fixed by cage construction between described agent structure and cylinder facing, described cage construction comprises: real core bending component, " C " type bending component, cladding horizontal material and stainless steel dry hanging article, described real core bending component is a pair " L " shape steel plate, long limit and the minor face of described a pair " L " shape steel plate have a pair slotted hole, a pair " L " shape steel plate is symmetrical and one end is secured by bolts in agent structure, the other end of a pair " L " shape steel plate is fixedly connected with " C " type bending component, two minor faces of described " C " type bending component are individually fixed in a pair " L " shape steel plate, the long limit of " C " type bending component is fixedly connected with cladding horizontal material by flat head bolt, described cladding horizontal material is angle steel, cladding horizontal material while be connected with " C " type bending component, another side and the stainless steel dry hanging article of cladding horizontal material are bolted, bolt hole on described cladding horizontal material and stainless steel dry hanging article is slotted hole, described stainless steel dry hanging article inserts in cladding groove.
Preferably, described cylinder facing is spliced by strip stone material, perfusion inserts in the close spelling stowing between strip stone material.
Preferably, the inner side of described close spelling stowing is adhesive with stone material between two parties and strangles.
Preferably, the bolt between described connection agent structure and real core bending component is expansion bolt or chemical bolt or to wearing bolt.
Preferably, the construction method of the stone material dry suspending facing of described a kind of column structure, also comprises following construction sequence:
One, processing stone material
(1), check the size of agent structure, determine the final radius of cylinder facing, molding, send processing factory to process;
(2), according to the mould of facing circular arc or geometry processing dimension, cylinder facing is cut into strip stone material;
(3), pre-splicing: strip stone material is lined up two absolute semi-circular structure by contrast stone material lines successively in advance;
(4), by chamfering in qualified for walkthrough two absolute semi-circular structure sides, front slitless connection is carried out successively, seam gaps reperfusion structure glue and the mixed slurry with batch stone flour;
(5) the cladding groove of some, is evenly had at the medial surface of two absolute semi-circular structure;
(6), arrange stone material between two parties strangle in the inner side of seaming position, stone material is strangled between cylinder facing as gluing;
(7), by spliced two absolute semi-circular structure leave standstill, the polishing of front-facing seam place is to level and smooth with semi-circular arc, and entirety is polished, polishing, and finished product protection, prepares to dispatch from the factory;
Two, assembling is installed
(1), tool member: according to the actual conditions of agent structure, draw out " C " the type bending component and real core bending component that need process, batch reports process plants;
(2), on-the-spot location: according to on-the-spot unwrapping wire, real core bending component located thus determines the position of bolt, squeezing into expansion tube, be screwed into screw rod, rely on the vertical slotted hole adjusting position of real core bending component, guarantee that real core bending component and agent structure install node reliable;
(3), installation component: install real core bending component, distance between its a pair " L " shape steel plate is matched with the frontage dimension of " C " type bending component, with flat head bolt, the minor face of " C " type bending component is fixed in the middle of a pair " L " shape steel plate, cladding horizontal material is fixed on the long limit of " C " type bending component, on cladding horizontal material, bolt stainless steel dry hanging article, completes the installation of cage construction;
(4), cage construction leveling: upper, middle and lower at least arranges the closed circle circular arc of handing over of three circles and leads to line, every root " C " type bending component establishes vertical direct-through line along short transverse, adjust along " C " type bending component and cladding horizontal material by the slotted hole leveling straightening on each component, tightening nuts, point type injecting structure glue, report concealment acceptance, prepares after acceptance(check) to mount stone material;
Three, stone material is mounted
(1) two absolute semi-circular structure stone materials, are opened, stainless steel dry hanging article is inserted in the cladding groove inside strip stone material, the slotted hole of stainless steel dry hanging article is relied on to regulate semi-circular structure stone material, to decorating final finished surface, tightening nuts, first inject the temporary transient fixing stone of a little cloud stone glue in cladding groove, then fill structure glue, safe and reliable to guarantee the stone decoration face length phase;
(2), according to sequence of construction cladding from bottom to up, mount two absolute semi-circular structure stone materials of every one deck successively, until finally all install, complete mounting of stone facing.
The invention has the beneficial effects as follows: the on-the-spot seam of (), minimizing stone surface, improves the surface quality of cylinder facing; (2), field fabrication is adjusted to back court processing site assembling mounting means, improve raw-material volume recovery and namely reduce raw material loss, green construction, energy-conserving and environment-protective, avoid the mass defect that accumulated error causes, evaded different materials distortion difference and easily caused the common faults such as distortion, distortion, crack; (3), latching mechanism replace welded construction, easy construction, cost-saving, it is controlled that quality is adjustable, meets the function of damping to a certain extent; (4), bending component and stone material process simultaneously and synchronously march into the arena, and the reduction of erection time greatly, evaded the phenomenons such as overstocking of materials scene, occupied ground, decreased the unnecessary loss that crossed construction heap putting material causes, meet the industry development trend that assembling is installed.
Accompanying drawing explanation
Fig. 1 is the stone material dry suspending facing of a kind of column structure of the present invention and the structural representation of construction method one preferred embodiment thereof;
Fig. 2 is the close-up schematic view of part A in Fig. 1;
Fig. 3 is the structural representation of described absolute semi-circular structure stone material;
Fig. 4 is the structural representation of described " C " type bending component;
Fig. 5 is the front view of described cladding horizontal material;
Fig. 6 is the top view of described cladding horizontal material;
Fig. 7 is the left view of cladding horizontal material;
Fig. 8 is the front view of real core bending component;
Fig. 9 is the top view of real core bending component;
Figure 10 is the left view of real core bending component.
In accompanying drawing, the mark of each parts is as follows: 1, agent structure, and 2, cylinder facing, 3, strip stone material, 4, close spelling stowing, 5, stone material is strangled, and 6, " C " type bending component, 7, cladding groove, 8, stainless steel dry hanging article, 9, cladding horizontal material, 10, real core bending component, 11, expansion tube, 12, bolt, 13, flat head bolt.
Detailed description of the invention
Below in conjunction with accompanying drawing, preferred embodiment of the present invention is described in detail, can be easier to make advantages and features of the invention be readily appreciated by one skilled in the art, thus more explicit defining is made to protection scope of the present invention.
Refer to Fig. 1, Fig. 2 and Fig. 3, the embodiment of the present invention comprises:
A kind of stone material dry suspending facing of column structure, comprise: agent structure 1, cylinder facing 2 and cage construction, the inner side of described cylinder facing 2 is provided with cladding groove 7, fixed by cage construction between described agent structure 1 and cylinder facing 2, described cage construction comprises: real core bending component 10, " C " type bending component 6, cladding horizontal material 9 and stainless steel dry hanging article 8, described real core bending component 10 is a pair " L " shape steel plate, long limit and the minor face of described a pair " L " shape steel plate have a pair slotted hole, a pair " L " shape steel plate is symmetrical and one end is secured by bolts in agent structure 1, the other end of a pair " L " shape steel plate is fixedly connected with " C " type bending component 6, two minor faces of described " C " type bending component 6 are individually fixed in a pair " L " shape steel plate, the long limit of " C " type bending component 6 is fixedly connected with cladding horizontal material 9 by flat head bolt 13, described cladding horizontal material 9 is angle steel, cladding horizontal material 9 while be connected with " C " type bending component 6, another side and the stainless steel dry hanging article 8 of cladding horizontal material 9 are bolted, described cladding horizontal material 9 is slotted hole with the bolt hole on stainless steel dry hanging article 8, described stainless steel dry hanging article 8 inserts in cladding groove 7, the bending angle of described " L " shape steel plate is determined according to on-site actual situations, cage construction adopts the bolt mode of slotted hole and flat head bolt 13, be convenient to adjustment.
Further; described cylinder facing 2 is spliced by strip stone material 3; perfusion inserts in close spelling stowing between strip stone material 3; strip stone material 3 is spliced into the structure of two absolute semicircles, and the polishing of front-facing seam place is to level and smooth with semi-circular arc, and entirety is polished, polishing; finished product protection; preparation is dispatched from the factory, and cylinder facing 2 can be processed with cage construction simultaneously outside field, shortens the duration.
Further, the inner side of described close spelling stowing 4 is adhesive with stone material between two parties and strangles 5, improves the stability at stowing place, prevents stowing place to be subject to external force and fractures.
Further, the bolt between described connection agent structure 1 and real core bending component 10 is expansion bolt or chemical bolt or to wearing bolt, difficult drop-off, improves the stability that cage construction is connected with agent structure 1.
Further, the construction method of the stone material dry suspending facing of described a kind of column structure, also comprises following construction sequence:
One, processing stone material
(1), check the size of agent structure 1, determine the final radius of cylinder facing 2, molding, send processing factory to process;
(2), according to the mould of facing circular arc or geometry processing dimension, cylinder facing 2 is cut into some strip stone materials 3, and the quantity of described strip stone material 3 is determined according to the size of cladding facing;
(3), pre-splicing: strip stone material 3 is lined up two absolute semi-circular structure by contrast stone material lines successively in advance;
(4), by chamfering in qualified for walkthrough two absolute semi-circular structure sides, front slitless connection is carried out successively, seam gaps reperfusion structure glue and the mixed slurry with batch stone flour;
(5), evenly have the cladding groove 7 of some at the medial surface of two absolute semi-circular structure, the quantity of cladding groove 7 is determined according to the radian of the size of cladding facing and strip stone material;
(6), arrange stone material between two parties strangle 5 in the inner side of seaming position, stone material is strangled between 5 and cylinder facing 2 as gluing;
(7), by spliced two absolute semi-circular structure leave standstill, the polishing of front-facing seam place is to level and smooth with semi-circular arc, and entirety is polished, polishing, and finished product protection, prepares to dispatch from the factory;
Two, assembling is installed
(1), tool member: according to the actual conditions of agent structure 1, draw out " C " type bending component 6 and real core bending component 10 that need process, batch reports process plants;
(2), on-the-spot location: according to on-the-spot unwrapping wire, real core bending component 10 located thus determines the position of bolt, squeezing into expansion tube 11, be screwed into screw rod, rely on the vertical slotted hole adjusting position of real core bending component 10, guarantee that real core bending component 10 and agent structure 1 install node reliable;
(3), installation component: install real core bending component 10, distance between its a pair " L " shape steel plate is matched with the frontage dimension of " C " type bending component 6, with flat head bolt 13, the minor face of " C " type bending component 6 is fastened in the middle of a pair " L " shape steel plate, cladding horizontal material 9 is fixed on the long limit of " C " type bending component 6, bolt stainless steel dry hanging article 8 on cladding horizontal material 9, completes the installation of cage construction;
(4), cage construction leveling: upper, middle and lower at least arranges the closed circle circular arc of handing over of three circles and leads to line, every root " C " type bending component 6 establishes vertical direct-through line along short transverse, adjust along " C " type bending component 6 and cladding horizontal material 9 by the slotted hole leveling straightening on each component, tightening nuts, point type injecting structure glue, report concealment acceptance, prepares after acceptance(check) to mount stone material;
Three, stone material is mounted
(1) two absolute semi-circular structure stone materials, are opened, stainless steel dry hanging article 8 is inserted in the cladding groove 7 inside strip stone material 3, the slotted hole of stainless steel dry hanging article 8 is relied on to regulate semi-circular structure stone material, to decorating final finished surface, tightening nuts, first inject the temporary transient fixing stone of a little cloud stone glue in cladding groove 7, then fill structure glue, safe and reliable to guarantee the stone decoration face length phase;
(2), according to sequence of construction cladding from bottom to up, mount two absolute semi-circular structure stone materials of every one deck successively, until finally all install, complete mounting of stone facing.The foregoing is only embodiments of the invention; not thereby the scope of the claims of the present invention is limited; every utilize manual of the present invention and accompanying drawing content to do equivalent structure or equivalent flow process conversion; or be directly or indirectly used in other relevant technical fields, be all in like manner included in scope of patent protection of the present invention.

Claims (5)

1. the stone material dry suspending facing of a column structure, comprise: agent structure (1), cylinder facing (2) and cage construction, it is characterized in that, the inner side of described cylinder facing (2) is provided with cladding groove (7), fixed by cage construction between described agent structure (1) and cylinder facing (2), described cage construction comprises: real core bending component (10), " C " type bending component (6), cladding horizontal material (9) and stainless steel dry hanging article (8), described real core bending component (10) is a pair " L " shape steel plate, long limit and the minor face of described a pair " L " shape steel plate have a pair slotted hole, a pair " L " shape steel plate is symmetrical and one end is secured by bolts in agent structure (1), the other end of a pair " L " shape steel plate is fixedly connected with " C " type bending component (6), two minor faces of described " C " type bending component (6) are individually fixed in a pair " L " shape steel plate, the long limit of " C " type bending component (6) is fixedly connected with cladding horizontal material (9) by flat head bolt (13), described cladding horizontal material (9) is angle steel, cladding horizontal material (9) while be connected with " C " type bending component (6), another side and the stainless steel dry hanging article (8) of cladding horizontal material (9) are bolted, described cladding horizontal material (9) is slotted hole with the bolt hole on stainless steel dry hanging article (8), described stainless steel dry hanging article (8) is inserted in cladding groove (7).
2. the stone material dry suspending facing of a kind of column structure according to claim 1, it is characterized in that, described cylinder facing (2) is spliced by strip stone material (3), perfusion inserts in the close spelling stowing (4) between strip stone material (3).
3. the stone material dry suspending facing of a kind of column structure according to claim 2, is characterized in that, the inner side of described close spelling stowing (4) is adhesive with stone material between two parties and strangles (5).
4. the stone material dry suspending facing of a kind of column structure according to claim 1, is characterized in that, the bolt between described connection agent structure (1) and real core bending component (10) is expansion bolt or chemical bolt or to wearing bolt.
5. the construction method of the stone material dry suspending facing of a kind of column structure as claimed in claim 1, is characterized in that, also comprises following construction sequence:
One, processing stone material
(1), check the size of agent structure (1), determine the final radius of cylinder facing (2), molding, send processing factory to process;
(2), according to the mould of facing circular arc or geometry processing dimension, cylinder facing (2) is cut into some strip stone materials (3);
(3), pre-splicing: strip stone material (3) is lined up two absolute semi-circular structure by contrast stone material lines successively in advance;
(4), by chamfering in qualified for walkthrough two absolute semi-circular structure sides, front slitless connection is carried out successively, seam gaps reperfusion structure glue and the mixed slurry with batch stone flour;
(5) the cladding groove (7) of some, is evenly had at the medial surface of two absolute semi-circular structure;
(6), stone material be set between two parties in the inner side of seaming position strangle (5), stone material is strangled (5) and between cylinder facing (2) for gluing;
(7), by spliced two absolute semi-circular structure leave standstill, the polishing of front-facing seam place is to level and smooth with semi-circular arc, and entirety is polished, polishing, and finished product protection, prepares to dispatch from the factory;
Two, assembling is installed
(1), tool member: according to the actual conditions of agent structure (1), draw out " C " type bending component (6) and real core bending component (10) that need process, batch reports process plants;
(2), on-the-spot location: according to on-the-spot unwrapping wire, real core bending component (10) is located thus determines the position of bolt, squeeze into expansion tube (11), be screwed into screw rod, rely on the vertical slotted hole adjusting position of real core bending component (10), guarantee that real core bending component (10) and agent structure (1) install node reliable;
(3), installation component: install real core bending component (10), distance between its a pair " L " shape steel plate is matched with the frontage dimension of " C " type bending component (6), with flat head bolt (13), the minor face of " C " type bending component (6) is fastened in the middle of a pair " L " shape steel plate, cladding horizontal material (9) is fixed on the long limit of " C " type bending component (6), at the upper bolt stainless steel dry hanging article (8) of cladding horizontal material (9), complete the installation of cage construction;
(4), cage construction leveling: upper, middle and lower at least arranges the closed circle circular arc of handing over of three circles and leads to line, every root " C " type bending component (6) establishes vertical direct-through line along short transverse, adjust along " C " type bending component (6) and cladding horizontal material (9) by the slotted hole leveling straightening on each component, tightening nuts, point type injecting structure glue, report concealment acceptance, prepares after acceptance(check) to mount stone material;
Three, stone material is mounted
(1) two absolute semi-circular structure stone materials, are opened, stainless steel dry hanging article (8) is inserted in the cladding groove (7) of strip stone material (3) inner side, the slotted hole of stainless steel dry hanging article (8) is relied on to regulate semi-circular structure stone material, to decorating final finished surface, tightening nuts, first inject the temporary transient fixing stone of a little cloud stone glue in cladding groove (7), then fill structure glue, safe and reliable to guarantee the stone decoration face length phase;
(2), according to sequence of construction cladding from bottom to up, mount two absolute semi-circular structure stone materials of every one deck successively, until finally all install, complete mounting of stone facing.
CN201310422805.0A 2013-09-17 2013-09-17 A kind of stone material dry suspending facing of column structure and construction method thereof Active CN103603470B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310422805.0A CN103603470B (en) 2013-09-17 2013-09-17 A kind of stone material dry suspending facing of column structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310422805.0A CN103603470B (en) 2013-09-17 2013-09-17 A kind of stone material dry suspending facing of column structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN103603470A CN103603470A (en) 2014-02-26
CN103603470B true CN103603470B (en) 2015-10-21

Family

ID=50121725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310422805.0A Active CN103603470B (en) 2013-09-17 2013-09-17 A kind of stone material dry suspending facing of column structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN103603470B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631898A (en) * 2015-01-20 2015-05-20 成都格瑞思文化传播有限公司 Dry-hang type marble pillar convenient to build
CN105040951B (en) * 2015-08-27 2017-10-20 苏州金螳螂建筑装饰股份有限公司 Arc GRG mounting structures
CN105781044B (en) * 2016-04-28 2018-09-25 苏州金螳螂建筑装饰股份有限公司 Light transmission cylindrical shell mounting structure
CN107060240A (en) * 2017-04-27 2017-08-18 江苏华宇装饰集团有限公司 Cambered surface stone infrared cuts embedded metal decorative bar dry hanging construction method
CN107965112B (en) * 2017-11-21 2021-03-16 杭州市城市建设基础工程有限公司 Construction process for dry hanging of BAU decorative concrete slab
CN108019008B (en) * 2017-11-30 2023-05-16 中国建筑第八工程局有限公司 Column plate eye-splice type mounting structure and mounting method thereof
CN207846964U (en) * 2018-01-28 2018-09-11 深圳市宝鹰建设集团股份有限公司 Cylinder dry-hang stone hood type attachment device
CN110397231B (en) * 2019-07-22 2024-03-26 苏州金螳螂文化发展股份有限公司 Rectangular stone dry-hanging installation structure based on cylindrical base layer
CN110485671B (en) * 2019-09-09 2024-03-15 苏州美瑞德建筑装饰有限公司 Stone aluminum honeycomb composite wallboard mounting structure and method
CN110725492B (en) * 2019-09-30 2020-10-30 中建七局建筑装饰工程有限公司 Square column wrapped cylinder rooting-free construction process
CN111005519B (en) * 2019-11-29 2021-05-14 江苏苏南建筑安装工程有限公司 Ready-package steel construction
CN111719798A (en) * 2020-06-09 2020-09-29 北京同舟嘉艺装饰工程有限责任公司 Process method for seamless processing of curved surface stone and annular building hall
CN115478640A (en) * 2022-09-27 2022-12-16 深圳市中装建设集团股份有限公司 Super high-rise assembly type building curtain wall mounting structure

Also Published As

Publication number Publication date
CN103603470A (en) 2014-02-26

Similar Documents

Publication Publication Date Title
CN103603470B (en) A kind of stone material dry suspending facing of column structure and construction method thereof
CN103225362B (en) Assembled light steel keel gypsum plate irregularly-shaped suspended ceiling system
CN103758265A (en) Rack type GRC curtain wall with irregular vertical face and mounting method thereof
CN107338887A (en) Only have the connection method of flat out of plane constraint and upper connecting node at the top of out-hung panel
CN101892717A (en) Large autoclaved lightweight aerated concrete slab and installation method thereof
CN109057113A (en) A kind of construction method of large-scale curved GRC plate
CN205046791U (en) Artificial stone plate material connection structure convenient to hang dress
CN202430879U (en) Perforated panel connecting mechanism
CN203626164U (en) Dry-hanging stone veneer of cylindrical structure
CN105569238A (en) Construction method for infusion of AB glue and resin glue for curtain wall stone dry-hanging process
CN101906858B (en) Seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board
CN105201107A (en) Construction method for stacked plate type shear wall of underground garage
CN204456810U (en) A kind of gaily decorated basket pull bar suspension scaffold
CN202299020U (en) A unit pottery pipe decoration curtain wall member
CN107642184A (en) A kind of prefabricated partition wall connecting structure and its construction method
CN204152041U (en) A kind of cornice stone material and aluminium alloy decorative structure
CN104389346B (en) A kind of high-strength light shearing formula assembled building structural system and preparation method thereof
CN203701381U (en) Irregular vertical face rack type GRC curtain wall
CN202214939U (en) Marble closing-in wall facade including embedded part
CN206053052U (en) Curved surface point supported curtain wall support meanss
CN205742854U (en) A kind of prefabricated concrete board mounting structure
CN111894223B (en) Method for separating, externally processing and installing large-area multi-curved-surface artistic ribbon
CN205242736U (en) Cell cube pendant
CN202914109U (en) Integral type lining system of light-section cable tunnel
CN207553363U (en) A kind of prefabricated partition wall connecting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant