CN204456810U - A kind of gaily decorated basket pull bar suspension scaffold - Google Patents
A kind of gaily decorated basket pull bar suspension scaffold Download PDFInfo
- Publication number
- CN204456810U CN204456810U CN201520053313.3U CN201520053313U CN204456810U CN 204456810 U CN204456810 U CN 204456810U CN 201520053313 U CN201520053313 U CN 201520053313U CN 204456810 U CN204456810 U CN 204456810U
- Authority
- CN
- China
- Prior art keywords
- round steel
- pull bar
- steel pull
- rod
- decorated basket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000000725 suspension Substances 0.000 title claims abstract description 13
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 38
- 239000010959 steel Substances 0.000 claims abstract description 38
- 239000000463 material Substances 0.000 abstract description 7
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 abstract 6
- 229910052742 iron Inorganic materials 0.000 abstract 3
- 238000004513 sizing Methods 0.000 abstract 2
- 238000003466 welding Methods 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 9
- 238000005034 decoration Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000009430 construction management Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Landscapes
- Movable Scaffolding (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及建筑领域,尤其涉及一种花篮拉杆悬挑架。 The utility model relates to the construction field, in particular to a flower basket pull rod suspension frame.
背景技术 Background technique
随着高层与超高层建筑的发展,高层建筑外脚手架施工技术越来越受到广泛的重视和研究。悬挑式脚手架是建设部推广的建筑业十大新技术之一,由于具有一次投入少(节省大量的周转材料)、适用范围广、不受层高和场地限制、有利于现场文明施工管理等特点,在高层建筑施工中应用日益广泛。 With the development of high-rise and ultra-high-rise buildings, the construction technology of scaffolding outside high-rise buildings has received more and more attention and research. Cantilevered scaffolding is one of the top ten new technologies in the construction industry promoted by the Ministry of Construction. It has a small investment (saving a lot of turnover materials), a wide range of applications, is not limited by floor height and site, and is conducive to on-site civilized construction management. It is widely used in high-rise building construction.
中国实用新型专利(申请号:200920241525.9,申请日:2009-11-24)公开了螺栓连接型钢悬挑脚手架,悬挑的工字钢放置楼面结构上,固定段长度不应小于悬挑段长度的1.25倍,钢梁的固定端应不少于二个U型锚固螺栓固定,悬挑钢梁的外侧以钢丝绳与上层拉结。该方法需要耗费大量的钢材,外形不美观,且稳定性不好。 Chinese utility model patent (application number: 200920241525.9, application date: 2009-11-24) discloses bolt-connected steel cantilevered scaffolding, the cantilevered I-beam is placed on the floor structure, and the length of the fixed section should not be less than the length of the cantilevered section 1.25 times of that, the fixed end of the steel beam should be fixed by no less than two U-shaped anchor bolts, and the outer side of the cantilevered steel beam is tied with the upper layer by a steel wire rope. This method needs to consume a large amount of steel materials, and the appearance is not beautiful, and the stability is not good.
发明内容 Contents of the invention
为了解决上述的技术问题,本实用新型的目的是提供一种花篮拉杆悬挑架,该悬挑架节省了钢材,外形美观,提高了稳定性。 In order to solve the above-mentioned technical problems, the purpose of this utility model is to provide a suspension frame of a flower basket rod, which saves steel materials, has a beautiful appearance and improves stability.
为了实现上述的目的,本实用新型由于采用了上述的技术方案: In order to achieve the above-mentioned purpose, the utility model has adopted the above-mentioned technical scheme:
一种花篮拉杆悬挑架,该悬挑架包括工字钢、上圆钢拉杆、下圆钢拉杆和定型花篮拉结,所述的工字钢通过预埋高强螺栓悬挑设置在楼面结构框架梁的外侧,外悬挑长度为1.20~1.40m,所述的下圆钢拉杆的下端焊接设有耳板,工字钢外端设置有连接板,耳板通过插销与连接板的外端相连接,连接点距离建筑物1.0~1.20m,所述的上圆钢拉杆的下端通过定型花篮拉结与下圆钢拉杆相连接,上圆钢拉杆的上端设置有耳板,耳板通过预埋高强螺栓与上层楼面框架梁相连接。 A flower basket rod suspension frame, the suspension frame includes an I-beam, an upper round steel rod, a lower round steel rod and a shaped flower basket tie, and the I-beam is suspended on the floor structure through embedded high-strength bolts On the outer side of the frame beam, the length of the outer cantilever is 1.20~1.40m. The lower end of the lower round steel tie rod is welded with an ear plate, and the outer end of the I-beam is provided with a connecting plate. The ear plate is connected to the outer end of the connecting plate through a bolt. The connection point is 1.0~1.20m away from the building, the lower end of the upper round steel tie rod is connected with the lower round steel tie rod through a shaped basket tie, the upper end of the upper round steel tie rod is provided with an ear plate, and the ear plate passes through the pre Buried high-strength bolts are connected to the upper floor frame beams.
作为优选,所述的高强螺栓采用M27-10.9级高强螺栓。 Preferably, the high-strength bolts are M27-10.9 grade high-strength bolts.
作为优选,所述的定型花篮拉结包括花篮螺栓与3个圆钢,花篮螺栓与3个圆钢焊2道角焊缝,每道焊缝,每道焊缝长度45mm,厚度2mm。 Preferably, the shaped turnbuckle tie includes turnbuckle bolts and 3 round bars, and turnbuckle bolts and 3 round bars are welded with 2 fillet welds. Each weld has a length of 45mm and a thickness of 2mm.
本实用新型相对于普通悬挑脚手架的优点有: The advantages of the utility model compared with the common cantilevered scaffolding are as follows:
1、节约一半的型钢材料、装拆方便,主要材料均可重复使用,节约大量成本。 1. Save half of the section steel material, easy to assemble and disassemble, and the main materials can be reused, saving a lot of cost.
2、墙体不留孔洞,不影响砌体施工,有利于外墙防渗。 2. No holes are left in the wall, which does not affect the masonry construction, and is beneficial to the seepage prevention of the outer wall.
3、由于钢梁固定在砼墙梁外侧,基本不影响室内装饰施工,外墙装修施工也一定程度得到改善,为保证质量和工期创造了条件。 3. Since the steel beam is fixed on the outside of the concrete wall beam, it basically does not affect the interior decoration construction, and the exterior wall decoration construction is also improved to a certain extent, creating conditions for ensuring quality and construction period.
4、搭设灵活、尺寸不受限制、适应性强等特点。 4. It has the characteristics of flexible erection, unlimited size and strong adaptability.
花篮拉杆式悬挑脚手架基于普通的悬挑脚手架,将伸入楼层内的型钢部分取消,用高强螺栓将悬挑型钢固定在结构框架梁墙的外侧。节约大量钢材。 The flower basket rod-type cantilevered scaffold is based on the ordinary cantilevered scaffold, which cancels the part of the section steel protruding into the floor, and fixes the cantilever section steel to the outside of the structural frame beam wall with high-strength bolts. Save a lot of steel.
建筑结构施工时,采用M27-10.9级高强螺栓埋设于结构外框架梁。悬挑型钢与连接钢板采用工厂化加工,检验合格后运到现场与高强预埋螺栓连接固定。实现工厂化生产。 During the construction of the building structure, M27-10.9 grade high-strength bolts are used to bury the outer frame beams of the structure. The cantilever section steel and connecting steel plates are factory-processed, and after passing the inspection, they are transported to the site to be connected and fixed with high-strength pre-embedded bolts. Realize factory production.
附图说明 Description of drawings
图1为本实用新型的结构示意图。 Fig. 1 is the structural representation of the utility model.
具体实施方式 Detailed ways
下面结合附图对本实用新型的具体实施方式做一个详细的说明。 Below in conjunction with accompanying drawing, specific embodiment of the present utility model is described in detail.
如图1所示的一种花篮拉杆悬挑架,该悬挑架包括工字钢1、上圆钢拉杆3、下圆钢拉杆2和定型花篮拉结4,所述的工字钢1通过预埋M27-10.9级高强螺栓悬6挑设置在楼面结构框架梁8的外侧,外悬挑长度为1.20~1.40m,所述的下圆钢拉杆2的下端焊接设有耳板7,工字钢1外端设置有连接板10,耳板7通过插销与连接板10的外端相连接,连接点距离建筑物1.0~1.20m,所述的上圆钢拉杆3的下端通过定型花篮拉结4与下圆钢拉杆2相连接,上圆钢拉杆3的上端设置有耳板7,耳板7通过预埋M27-10.9级高强螺栓5与上层楼面框架梁9相连接。所示的定型花篮拉结4包括花篮螺栓与3个圆钢,花篮螺栓与3个圆钢焊2道角焊缝,每道焊缝,每道焊缝长度45mm,厚度2mm。 As shown in Figure 1, a flower basket rod suspension frame, the suspension frame includes an I-beam 1, an upper round steel rod 3, a lower round steel rod 2 and a shaped flower basket tie 4, and the I-beam 1 passes through The pre-embedded M27-10.9 grade high-strength bolts cantilever 6 and are arranged on the outside of the floor structure frame beam 8. The length of the outer cantilever is 1.20~1.40m. The lower end of the lower round steel tie rod 2 is welded with an ear plate 7. The outer end of the beam 1 is provided with a connecting plate 10, the ear plate 7 is connected with the outer end of the connecting plate 10 through a bolt, the connecting point is 1.0-1.20m away from the building, and the lower end of the upper round steel pull rod 3 is pulled by a shaped flower basket. The knot 4 is connected with the lower round steel tie rod 2, and the upper end of the upper round steel tie rod 3 is provided with an ear plate 7, and the ear plate 7 is connected with the upper floor frame beam 9 through the embedded M27-10.9 high-strength bolt 5. The shaped turnbuckle tie 4 shown includes turnbuckle bolts and 3 round bars, and turnbuckle bolts and 3 round bars are welded with 2 fillet welds. Each weld has a length of 45mm and a thickness of 2mm.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520053313.3U CN204456810U (en) | 2015-01-26 | 2015-01-26 | A kind of gaily decorated basket pull bar suspension scaffold |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520053313.3U CN204456810U (en) | 2015-01-26 | 2015-01-26 | A kind of gaily decorated basket pull bar suspension scaffold |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204456810U true CN204456810U (en) | 2015-07-08 |
Family
ID=53663717
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520053313.3U Expired - Lifetime CN204456810U (en) | 2015-01-26 | 2015-01-26 | A kind of gaily decorated basket pull bar suspension scaffold |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204456810U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105804271A (en) * | 2016-04-29 | 2016-07-27 | 云南建工钢结构有限公司 | Self-assembly type residential light combined supporting frame capable of being industrially produced |
| CN107700817A (en) * | 2017-09-25 | 2018-02-16 | 永升建设集团有限公司 | The construction method of overhanging type scaffold |
| CN109853933A (en) * | 2018-12-19 | 2019-06-07 | 中国建筑第四工程局有限公司 | A kind of basket type builder's jack and its construction method |
| CN111472530A (en) * | 2020-05-18 | 2020-07-31 | 威海建设集团股份有限公司 | A flower basket tie rod I-beam cantilever bearing frame for construction engineering and its installation method |
-
2015
- 2015-01-26 CN CN201520053313.3U patent/CN204456810U/en not_active Expired - Lifetime
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105804271A (en) * | 2016-04-29 | 2016-07-27 | 云南建工钢结构有限公司 | Self-assembly type residential light combined supporting frame capable of being industrially produced |
| CN107700817A (en) * | 2017-09-25 | 2018-02-16 | 永升建设集团有限公司 | The construction method of overhanging type scaffold |
| CN109853933A (en) * | 2018-12-19 | 2019-06-07 | 中国建筑第四工程局有限公司 | A kind of basket type builder's jack and its construction method |
| CN111472530A (en) * | 2020-05-18 | 2020-07-31 | 威海建设集团股份有限公司 | A flower basket tie rod I-beam cantilever bearing frame for construction engineering and its installation method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104453197B (en) | High Large Cantilever concrete structural steel shape supports platform | |
| CN202227476U (en) | High-altitude large-span overhung corridor-type reinforced concrete structure | |
| CN204826619U (en) | Mould is hung to superimposed sheet instrument formula | |
| CN205531315U (en) | Detachable reinforced truss floor deck support system | |
| WO2019206194A1 (en) | Prefabricated floor slab, connection structure thereof and construction method therefor | |
| CN203808484U (en) | Integrated cantilevered and attached external scaffolding | |
| WO2016062224A1 (en) | Integrated column-equipped heat insulation wallboard, manufacturing and building processes and corollary equipment thereof | |
| CN206016309U (en) | A kind of overall assembled building system | |
| CN201738583U (en) | Combined supporting and reinforcing system for inclined shear wall template | |
| CN205024882U (en) | Prefabricated assembled shaped steel concrete shear force wall | |
| CN204456810U (en) | A kind of gaily decorated basket pull bar suspension scaffold | |
| CN106567458A (en) | Assembly type steel-concrete combined beam column frame structure system | |
| CN103993666A (en) | Improved supporting system construction method suitable for large overhung outer floating plate roof | |
| CN203546912U (en) | Penetrating rib type node of channel steel connected rectangular concrete filled steel tubular column and steel girder | |
| CN102767282B (en) | Prefabricated high formwork construction method for cantilever beam of oversized special-shaped conversion layer | |
| CN212336672U (en) | I-steel overhanging bearing frame of basket pull rod for constructional engineering | |
| CN103993739B (en) | The construction method of granulation tower spraying layer stiff beam | |
| CN103046462B (en) | Steel box component and steel box-concrete combined U-shaped girder composed of same | |
| CN104652661A (en) | Semirigid frame-external recycled concrete wall panel and fabrication method | |
| CN211548015U (en) | Prefabricated assembled steel-concrete composite beam | |
| CN203462587U (en) | Penetration steel bar type joint of angle steel connection type rectangular concrete-filled steel tube column and steel beam | |
| CN214883827U (en) | A construction hoist cantilevered foundation support system device | |
| CN206319597U (en) | A kind of cantilever steel girder erecting device | |
| CN203640257U (en) | Support of overhanging type scaffold | |
| CN203654710U (en) | Instrumental connecting tube for external wall scaffold shearing wall portion |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20150708 |
|
| CX01 | Expiry of patent term |