CN103758265A - Rack type GRC curtain wall with irregular vertical face and mounting method thereof - Google Patents

Rack type GRC curtain wall with irregular vertical face and mounting method thereof Download PDF

Info

Publication number
CN103758265A
CN103758265A CN201410032630.7A CN201410032630A CN103758265A CN 103758265 A CN103758265 A CN 103758265A CN 201410032630 A CN201410032630 A CN 201410032630A CN 103758265 A CN103758265 A CN 103758265A
Authority
CN
China
Prior art keywords
curtain wall
joist
steelframe
grc
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410032630.7A
Other languages
Chinese (zh)
Other versions
CN103758265B (en
Inventor
刘国福
涂刚要
常登荣
陈玉超
徐飞
刘鑫
杨程远
李新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEFEI CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
HEFEI CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEFEI CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical HEFEI CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN201410032630.7A priority Critical patent/CN103758265B/en
Publication of CN103758265A publication Critical patent/CN103758265A/en
Application granted granted Critical
Publication of CN103758265B publication Critical patent/CN103758265B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides a rack type GRC curtain wall with an irregular vertical face. The rack type GRC curtain wall with the irregular vertical face comprises a wall body and a curtain wall body arranged outside the wall body, a connecting device is arranged between the wall body and the curtain wall body and comprises a connecting piece, a longitudinal primary keel, a transverse secondary keel, a steel frame and a switchover piece, the connecting piece is arranged on an embedded plate on the surface of the wall body, the longitudinal primary keel is connected with the connecting piece, the transverse secondary keel is connected with the primary keel, the steel frame is arranged on the back face of the curtain wall body, and the switchover piece is connected with the secondary keel and the steel frame. A mounting method for the rack type GRC curtain wall with the irregular vertical face comprises the steps of mounting the embedded plate and the connecting piece, mounting the primary keel, mounting the secondary keel, mounting the steel frame on the back face of the GRC curtain wall body and mounting the switchover piece. According to the technical scheme, the connecting device is arranged between the wall body and the curtain wall body, connecting and mounting are fast, independent area mounting can be achieved, the angle, position and mounting depth of a mounted curtain plate can be finely adjusted, and the connecting device is especially suitable for mounting the curtain wall with rack type grains or other grains arranged on the surface.

Description

A kind of irregular facade rack type GRC curtain wall and mounting method thereof
Technical field
The invention belongs to area of maintenance after external wall, relate in particular a kind of fixing irregular facade rack type GRC curtain wall field of installing on external wall.
Background technology
GRC is glass fiber reinforced cement product, as the novel modern architecture plastic material of one, take alkali-resistant glass fibre as main reinforcing material, take sulfate cement or iron aluminic acid cement or portland cement as cementitious material, with sand for gathering materials, the non-bearing side fascia or the non-bearing decorative panel that adopt direct spray technology or premix spray technology to make, in building curtain wall application, play be a splendid legacy, extremely miraculous effect.Its lightweight, high-strength, tough and tensile and sound insulation, fire-retardant, endurance quality, also have flexibly connecting of it and building body, almost can fashion into any shape and surface effect.
In prior art, in order to make, architecture noumenon surface seems to have vision, the artistic feeling on color etc., conventionally building surface is designed to irregular abnormally-structuredly, building surface is divided multiple irregular minor comonomers more, and absolute altitude changes greatly, node is many, moulding is complicated.Exterior wall dried hanging GRC curtain wall area more than 70% is special-shaped sheet material, and GRC admires wall surface and also have the lines of rack-shaped or other shapes, the monolithic GRC sheet material area of its GRC curtain wall is large, Heavy Weight and special-shaped sheet material proportion large, difficulty of construction is large.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of linkage and mounting method thereof of Fast Installation GRC curtain wall, its linkage has installs quick, sizing control accuracy high, this linkage is particularly suitable for large area, irregular, surperficial with other installations that need dock nonplanar curtain wall of lines such as tooth bar seams, in curtain wall is installed, be easy to adjust various setting angles, after installing, curtain wall gap is few.
For solving the problems of the technologies described above, the invention provides a kind of irregular facade rack type GRC curtain wall, comprise body of wall and the curtain wall that is installed on wall outer side, between described body of wall and curtain wall, be provided with linkage, described linkage includes: be installed on the connector on the embedded board of surface of wall, the longitudinal main joist being connected with described connector, the horizontal secondary joist being connected with described main joist, be installed on the steelframe and the adaptor that is connected described secondary joist and described steelframe at the curtain wall back side, the L-shaped structure of described adaptor and comprise two vertical rectangular slab faces, on two vertical panel faces of described adaptor, be provided with mounting hole, on described secondary joist and steelframe, be provided with installing hole, described secondary joist all passes installing hole with adaptor by connecting bolt with steelframe and is fixedly connected with mounting hole.
Preferably, described connector is welded to connect with the embedded board that is arranged at surface of wall, and described embedded board is fixedly connected with body of wall by chemical bolt.
Preferably, described connector comprises two L-shaped junction steel plate opposing parallel settings, form the vertical slot that a width is a bit larger tham main joist width, described main joist is arranged in vertical slot and is fixedly connected with by stainless steel bolt, between described main joist and L shaped junction steel plate connector phase-contact surface, is provided with anticorrosion pad.
Preferably, described secondary joist is the L-shaped structure of cross section, and comprises two vertical rectangular slab faces, and plate face of described secondary joist and main joist are welded to connect.On another plate face, installing hole is set, the installing hole on described secondary joist adopts the on-the-spot boring in mould location or angle steel location, and described installing hole can be that circular hole can be also mounting hole.
Preferably, described in be arranged at the curtain wall back side steelframe be an entirety, described steelframe is by the L-shaped structure of cross section, and comprises that it is an entirety that two vertical rectangular slab faces are welded to connect, described steelframe is by being welded to connect with the connecting angle being embedded in advance in curtain wall.
Preferably, the connecting hole on described steelframe adopts the on-the-spot boring in mould location or angle steel location, and described connecting hole can be that circular hole can be also mounting hole.
A mounting method for irregular facade rack type GRC curtain wall, described mounting method comprises that embedded board and connector are installed, main joist is installed, secondary joist is installed, GRC curtain wall back side steelframe is installed, adaptor is installed.
Preferably, a kind of mounting method of irregular facade rack type GRC curtain wall, described mounting method comprises following operating procedure:
(1) front preparation is installed
First the body of wall of needs being installed to GRC curtain wall carries out acceptance test, and the body of wall entirety that GRC curtain wall is installed is carried out to layout, measurement, draws position line and the primary and secondary keel installation position line of embedded board cross position line, GRC plate;
(2) embedded board and connector are installed
The embedded board cross position line drawing according to upper step, adopts and impacts boring of electric hammer, at the bottom of chemical bolt pipe is inserted into hole, settles embedded board, by connector and embedded board welding;
(3) exterior-wall heat insulation
(4) main joist is installed
Main joist is connected and fixed by bolt and connector, between main joist and connector contact surface, paste anticorrosion pad, utilize bolt that connector, main joist and anticorrosion pad are connected and fixed, main joist is installed and is from bottom to top carried out, first main joist first fixed upper end by suspension member, fixing lower end after adjusting; Second main joist be first main joist upper end of lower end aligned, and retain the shrinkage joint of 15mm, then messenger wire or contraposition mounting rail upper end, up installs according to this;
(5) secondary joist is installed
According to the secondary joist position line drawing, again measurement and positioning and unwrapping wire are carried out in secondary joist installation site, by secondary joist transverse weld on main joist, after secondary joist installation, utilizing mould location or angle steel to be positioned on secondary joist holes, can position location be installed according to curtain wall, bore installing hole on secondary joist, described installing hole can be circular hole or mounting hole that can adjusting position;
(6) GRC curtain wall back side steelframe is installed
At the GRC curtain wall back side, install and be fixedly connected with angle steel, steelframe and connecting angle are welded and fixed, utilize mould to locate or angle steel spitting drill installing hole on steelframe, installing hole can be circular hole or mounting hole that can adjusting position;
(7) GRC curtain wall is installed
Utilize adaptor that GRC curtain wall is connected with secondary joist, profit is with adaptor, the steelframe at secondary joist and the curtain wall back side to be connected and fixed, and curtain wall is installed smooth, curtain wall planar horizontal, vertical, dividing joint is straight, and when GRC plate curtain wall is installed, left and right, upper and lower deviation are not more than 1.5mm;
(8) curtain wall surfacing
The surfacing of curtain wall comprises filleting construction, brushing protective agent;
(9) check and accept
In the installation process of curtain wall, all regulations that relate to and requirement, carry out Site Detection, qualified examination.
Adopt the beneficial effect of technique scheme to be:
A kind of irregular facade rack type GRC curtain wall proposing in technical solution of the present invention and the construction method of installation step of curtain wall, the linkage arranging between body of wall and curtain wall, it is the key of this technology, it is quick that this linkage has connection, simple in structure, the feature of can feasible region installing separately, and in the process of installing, can realize the angle of the curtain wall panel to installing, the degree of depth of position and installation is carried out inching, be particularly suitable for the curtain wall that surface has rack-shaped or other lines, in the process of installing, the lines alignment such as tooth bar are convenient, the phenomenon such as can not be offset.In technical solution of the present invention, the adaptor adopting, mounting hole is set on adaptor, according to what install, need on the steelframe of secondary joist and curtain backboard face, installing hole be set simultaneously, and installing hole adopts on-the-spot mould location or angle steel location drilling, has further realized the accurate positioning control to curtain wall panel verticality, planeness and plate seam etc.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of irregular facade rack type GRC curtain wall of the present invention,
Fig. 2 is the top view of a kind of irregular facade rack type GRC curtain wall in Fig. 1,
Fig. 3 is the scheme of installation of connector 4 in Fig. 1,
Fig. 4 is steelframe 7 structural representations in the curtain wall back side in Fig. 1,
Fig. 5 is secondary joist 6 embodiment mono-structural representations in Fig. 1,
Fig. 6 is secondary joist 6 embodiment bis-structural representations in Fig. 1,
Fig. 7 is secondary joist 6 embodiment tri-structural representations in Fig. 1,
Fig. 8 is secondary joist 6 embodiment tetra-structural representations in Fig. 1,
Fig. 9 is adaptor 8 embodiment mono-structural representations in Fig. 1,
Figure 10 is adaptor 8 embodiment bis-structural representations in Fig. 1,
Figure 11 is adaptor 8 embodiment tri-structural representations in Fig. 1,
Figure 12 is the curtain wall curtain plate schematic diagram that tilts to install at an angle,
Wherein, 1, body of wall, 2, curtain wall, 3, embedded board, 4, connector, 5, main joist, 6, secondary joist, 7, steelframe, 8, adaptor, 9, chemical bolt, 10, connecting angle, 11, anticorrosion pad, 61, installing hole, 71, connecting hole, 81, mounting hole.
The specific embodiment
Below in conjunction with Figure of description, technical scheme of the present invention and structure are described, so that those skilled in the art understand.
As depicted in figs. 1 and 2, a kind of irregular facade rack type GRC curtain wall, comprise body of wall 1 and the curtain wall 2 that is installed on body of wall 1 outside, between described body of wall 1 and curtain wall 2, be provided with linkage, described linkage includes: be installed on the connector 4 on the embedded board 3 on body of wall 1 surface, the longitudinal main joist 5 being connected with connector 4, the horizontal secondary joist 6 being connected with main joist 5, is installed on the steelframe 7 at curtain wall 2 back sides and is connected the adaptor 8 of secondary joist 6 and steelframe 7.
As shown in Fig. 9~11, the L-shaped structure of adaptor 8 and comprise two vertical rectangular slab faces, on two vertical panel faces of described adaptor 8, be provided with mounting hole 81, shown mounting hole 81 can need to be arranged to parallel with adaptor 8 sides or be certain angle state according to the installation of curtain wall.
As depicted in figs. 1 and 2, on secondary joist 6 and steelframe 7, be provided with installing hole 61, secondary joist 6 all passes installing hole 61 with adaptor 8 by connecting bolt with steelframe 7 and is fixedly connected with mounting hole 81.
As shown in Figure 3, connector 4 is welded to connect with the embedded board 3 that is arranged at body of wall 1 surface, embedded board 3 is fixedly connected with body of wall 1 by chemical bolt 9, chemical bolt 9 be mainly by with concrete between bond stress and the acting in conjunction of mechanical snap power carrys out resistance to plucking and bolt itself carrys out shearing resistance.
As shown in Figure 2, connector 4 comprises two L-shaped junction steel plate opposing parallel settings, form the vertical slot that a width is a bit larger tham main joist width, described main joist 5 is arranged in vertical slot and is fixedly connected with by stainless steel bolt, between main joist 5 and L shaped junction steel plate connector phase-contact surface, is provided with anticorrosion pad 11.
As shown in Fig. 5~Fig. 8, secondary joist 6 is the L-shaped structure of cross section, and comprises two vertical rectangular slab faces, and 6 one plate faces of secondary joist and main joist are welded to connect.On another plate face, installing hole 61 is set, installing hole 61 on described secondary joist 6 adopts the on-the-spot boring in mould location or angle steel location, described installing hole 61 can be that circular hole can be also mounting hole, and mounting hole can be according to the needs of installing, be arranged to or in a certain angle state parallel with secondary joist 6 ribs, or circle hole shape installing hole 61 and mounting hole 61 are set on secondary joist 6 simultaneously, make its installation that meets to greatest extent curtain wall panel, adjustment and fixing needs.
As shown in Figure 4, the steelframe 7 that is arranged at curtain wall 2 back sides is an entirety, and described steelframe 7 passes through the L-shaped structure of cross section, and comprises that it is an entirety that two vertical rectangular slab faces are welded to connect, and described steelframe is by being welded to connect with the connecting angle 10 being embedded in advance in curtain wall.Connecting hole 71 on described steelframe 7 adopts the on-the-spot boring in mould location or angle steel location, and described connecting hole 71 can be that circular hole can be also mounting hole.
As described in Figure 12, by mounting hole being set on the steelframe 7 at curtain wall 1 back side, on secondary joist 6, diverse location arranges installing hole or mounting hole is set, and bolt is fixedly connected with mounting hole diverse location on adaptor 8, realizes curtain plate being installed and connected on secondary joist 6 at an angle of curtain wall 2.The installation that has so just effectively realized the irregularly shaped curtain wall in overall appearance is fixed, easy for installation, do not need to change the installation of primary and secondary keel, do not need to change structure, shape and the size of curtain wall back side steelframe, provide cost savings, reduced the work of curtain wall installation.
A mounting method for irregular facade rack type GRC curtain wall, comprises following operating procedure:
(1) front preparation is installed
First the body of wall of needs being installed to GRC curtain wall carries out acceptance test, and the body of wall entirety that GRC curtain wall is installed is carried out to layout, measurement, draws position line and the primary and secondary keel installation position line of embedded board cross position line, GRC plate;
(2) embedded board and connector are installed
The embedded board cross position line drawing according to upper step, adopt and impact boring of electric hammer, at the bottom of chemical bolt pipe is inserted into hole, settle embedded board, when embedded board is installed, should avoid the destruction to construction wall, after embedded board installs, should not deform, embedded board after installing welds connector and embedded board, during connector welding, should adopt balanced welding, in order to avoid because welding the stress deformation producing;
(3) exterior-wall heat insulation
After connector is qualified by inspection, carry out exterior-wall heat insulation construction, GRC curtain wall and structure outer heat preservation construction should be constructed according to design and the special constructure scheme of outer insulation, after construction finishes, carry out an acceptance inspection;
(4) main joist is installed
Main joist is connected and fixed by bolt and connector, between main joist and connector contact surface, paste anticorrosion pad, utilize bolt that connector, main joist and anticorrosion pad are connected and fixed, main joist is installed and is from bottom to top carried out, first main joist first fixed upper end by suspension member, fixing lower end after adjusting; Second main joist be first main joist upper end of lower end aligned, and retain the shrinkage joint of 15mm, then messenger wire or contraposition mounting rail upper end, up installs according to this;
(5) secondary joist is installed
According to the secondary joist position line drawing, again measurement and positioning and unwrapping wire are carried out in secondary joist installation site, by secondary joist transverse weld on main joist, after secondary joist installation, utilizing mould location or angle steel to be positioned on secondary joist holes, can position location be installed according to curtain wall, bore installing hole on secondary joist, described installing hole can be circular hole or mounting hole that can adjusting position;
(6) GRC curtain wall back side steelframe is installed
At the GRC curtain wall back side, install and be fixedly connected with angle steel, steelframe and connecting angle are welded and fixed, utilize mould to locate or angle steel spitting drill installing hole on steelframe, installing hole can be circular hole or mounting hole that can adjusting position;
(7) GRC curtain wall is installed
Utilize adaptor that GRC curtain wall is connected with secondary joist, be to utilize adaptor that the steelframe at secondary joist and the curtain wall back side is connected and fixed, curtain wall is installed smooth, curtain wall planar horizontal, vertical, dividing joint is straight, GRC curtain wall panel and below bear the about 150mm of steelframe thickness, the about 150mm of primary and secondary skeletal frame thickness, for guaranteeing that constructor has installing space on scaffold, so external scaffolding is from answer >=500mm of agent structure exterior wall distance, when GRC plate curtain wall is installed, left and right, upper and lower deviation are not more than 1.5mm;
(8) curtain wall surfacing
The surfacing of curtain wall comprises filleting construction, brushing protective agent;
(9) check and accept
In the installation process of curtain wall, all regulations that relate to and requirement, carry out Site Detection, qualified examination.
Above-mentioned by reference to the accompanying drawings to invention be exemplarily described; obviously specific implementation of the present invention is not subject to the restrictions described above; as long as this non-essential improvement that has adopted method design of the present invention and technical scheme to carry out; or without improving, the design of invention and technical scheme are directly applied to other occasions, all within protection scope of the present invention.

Claims (8)

1. an irregular facade rack type GRC curtain wall, comprise body of wall and the curtain wall that is installed on wall outer side, between described body of wall and curtain wall, be provided with linkage, it is characterized in that, described linkage includes: be installed on the connector on the embedded board of surface of wall, the longitudinal main joist being connected with described connector, the horizontal secondary joist being connected with described main joist, be installed on the steelframe and the adaptor that is connected described secondary joist and described steelframe at the curtain wall back side, the L-shaped structure of described adaptor and comprise two vertical rectangular slab faces, on two vertical panel faces of described adaptor, be provided with mounting hole, on described secondary joist and steelframe, be provided with installing hole, described secondary joist all passes installing hole with adaptor by connecting bolt with steelframe and is fixedly connected with mounting hole.
2. the irregular facade rack type of one according to claim 1 GRC curtain wall, is characterized in that: described connector is welded to connect with the embedded board that is arranged at surface of wall, and described embedded board is fixedly connected with body of wall by chemical bolt.
3. the irregular facade rack type of one according to claim 2 GRC curtain wall, it is characterized in that: described connector comprises two L-shaped junction steel plate opposing parallel settings, form the vertical slot that a width is a bit larger tham main joist width, described main joist is arranged in vertical slot and is fixedly connected with by stainless steel bolt, between described main joist and L shaped junction steel plate connector phase-contact surface, is provided with anticorrosion pad.
4. the irregular facade rack type of one according to claim 1 GRC curtain wall, is characterized in that: described secondary joist is the L-shaped structure of cross section, and comprises two vertical rectangular slab faces, and plate face of described secondary joist and main joist are welded to connect.On another plate face, installing hole is set, the installing hole on described secondary joist adopts the on-the-spot boring in mould location or angle steel location, and described installing hole can be that circular hole can be also mounting hole.
5. the irregular facade rack type of one according to claim 1 GRC curtain wall, it is characterized in that: described in be arranged at the curtain wall back side steelframe be an entirety, described steelframe is by the L-shaped structure of cross section, and comprise that it is an entirety that two vertical rectangular slab faces are welded to connect, described steelframe is by being welded to connect with the connecting angle being embedded in advance in curtain wall.
6. the irregular facade rack type of one according to claim 1 GRC curtain wall, is characterized in that: the connecting hole on described steelframe adopts the on-the-spot boring in mould location or angle steel location, and described connecting hole can be that circular hole can be also mounting hole.
7. a mounting method for irregular facade rack type GRC curtain wall, is characterized in that, described mounting method comprises that embedded board and connector are installed, main joist is installed, secondary joist is installed, GRC curtain wall back side steelframe is installed, adaptor is installed.
8. the mounting method of a kind of irregular facade rack type GRC curtain wall according to claim 7, is characterized in that, described mounting method comprises following operating procedure:
(1) front preparation is installed
First the body of wall of needs being installed to GRC curtain wall carries out acceptance test, and the body of wall entirety that GRC curtain wall is installed is carried out to layout, measurement, draws position line and the primary and secondary keel installation position line of embedded board cross position line, GRC plate;
(2) embedded board and connector are installed
The embedded board cross position line drawing according to upper step, adopts and impacts boring of electric hammer, at the bottom of chemical bolt pipe is inserted into hole, settles embedded board, by connector and embedded board welding;
(3) exterior-wall heat insulation
(4) main joist is installed
Main joist is connected and fixed by bolt and connector, between main joist and connector contact surface, paste anticorrosion pad, utilize bolt that connector, main joist and anticorrosion pad are connected and fixed, main joist is installed and is from bottom to top carried out, first main joist first fixed upper end by suspension member, fixing lower end after adjusting; Second main joist be first main joist upper end of lower end aligned, and retain the shrinkage joint of 15mm, then messenger wire or contraposition mounting rail upper end, up installs according to this;
(5) secondary joist is installed
According to the secondary joist position line drawing, again measurement and positioning and unwrapping wire are carried out in secondary joist installation site, by secondary joist transverse weld on main joist, after secondary joist installation, utilizing mould location or angle steel to be positioned on secondary joist holes, can position location be installed according to curtain wall, bore installing hole on secondary joist, described installing hole can be circular hole or mounting hole that can adjusting position;
(6) GRC curtain wall back side steelframe is installed
At the GRC curtain wall back side, install and be fixedly connected with angle steel, steelframe and connecting angle are welded and fixed, utilize mould to locate or angle steel spitting drill installing hole on steelframe, installing hole can be circular hole or mounting hole that can adjusting position;
(7) GRC curtain wall is installed
Utilizing adaptor that GRC curtain wall is connected with secondary joist, is to utilize adaptor that the steelframe at secondary joist and the curtain wall back side is connected and fixed, and curtain wall is installed smooth, curtain wall planar horizontal, vertical, dividing joint is straight, and when GRC plate curtain wall is installed, left and right, upper and lower deviation are not more than 1.5mm;
(8) curtain wall surfacing
The surfacing of curtain wall comprises filleting construction, brushing protective agent;
(9) check and accept
In the installation process of curtain wall, all regulations that relate to and requirement, carry out Site Detection, qualified examination.
CN201410032630.7A 2014-01-22 2014-01-22 A kind of irregular facade rack type GRC curtain wall and installation method thereof Active CN103758265B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410032630.7A CN103758265B (en) 2014-01-22 2014-01-22 A kind of irregular facade rack type GRC curtain wall and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410032630.7A CN103758265B (en) 2014-01-22 2014-01-22 A kind of irregular facade rack type GRC curtain wall and installation method thereof

Publications (2)

Publication Number Publication Date
CN103758265A true CN103758265A (en) 2014-04-30
CN103758265B CN103758265B (en) 2016-10-26

Family

ID=50525574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410032630.7A Active CN103758265B (en) 2014-01-22 2014-01-22 A kind of irregular facade rack type GRC curtain wall and installation method thereof

Country Status (1)

Country Link
CN (1) CN103758265B (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924786A (en) * 2014-05-05 2014-07-16 北京市第三建筑工程有限公司 Installation support for large-span out-extended GRC plates and lifting construction method
CN104153465A (en) * 2014-08-27 2014-11-19 中建八局第三建设有限公司 Connecting structure of heavy-load GRC curtain wall system and all-steel main structure
CN104358374A (en) * 2014-11-04 2015-02-18 中建三局东方装饰设计工程有限公司 Wall-face dry-hanging system of large metal aluminum sheet
CN106906970A (en) * 2017-04-27 2017-06-30 中国建筑第八工程局有限公司 The mounting structure and installation method of cylindric stone curtain wall
CN107762017A (en) * 2016-08-15 2018-03-06 中国二十冶集团有限公司 The connection method of curtain skeleton and the pre-buried anchor slab of major structure of construction
CN108560772A (en) * 2018-06-15 2018-09-21 浙江绿筑集成科技有限公司 The assembling type outer wall system of standardized connections and the application connector
CN108691377A (en) * 2017-04-05 2018-10-23 通州建总集团有限公司 A kind of exterior wall dried hanging GRC plate faces spraying lacquer construction method
CN110984446A (en) * 2019-12-17 2020-04-10 天邑昊建筑装饰工程有限公司 Efficient curtain wall installation method
CN111305501A (en) * 2020-03-04 2020-06-19 中国十七冶集团有限公司 Flatness and verticality control technology for large-scale outer wall dry-hanging stone
CN111962859A (en) * 2020-07-22 2020-11-20 晟通科技集团有限公司 Combination C groove and template combination
CN112012381A (en) * 2020-09-14 2020-12-01 中建三局集团有限公司 Anodic aluminum oxide plate curtain wall mounting node and mounting method thereof
CN113062563A (en) * 2021-03-24 2021-07-02 中国五冶集团有限公司 Method for quickly installing special-shaped GRP structure
CN114197710A (en) * 2021-11-15 2022-03-18 中建八局第二建设有限公司 Large-plate open-type embossed plate GRC curtain wall and high-precision construction method
CN114635521A (en) * 2022-04-25 2022-06-17 惠州市顺大新型建筑科技有限公司 Welding-free assembly type curtain wall and assembly method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001214560A (en) * 2000-01-31 2001-08-10 Nisshin Steel Co Ltd Watertight structure of curtain wall
CN101289893A (en) * 2008-01-21 2008-10-22 沈英 Pottery clay plate curtain wall crossbeam-free mounting structure
CN101649659A (en) * 2009-07-17 2010-02-17 浙江太阳岛建筑陶土板有限公司 Improved mounting structure of clay plate curtain wall
CN101701490A (en) * 2009-10-15 2010-05-05 淮南市顺辉锚固有限公司 Light adjustable skeletal frame without welding
CN202731044U (en) * 2012-07-05 2013-02-13 中国建筑装饰集团有限公司 Dismountable frameless big glass keel dry-hanging method construction system
CN203701381U (en) * 2014-01-22 2014-07-09 合肥建工集团有限公司 Irregular vertical face rack type GRC curtain wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001214560A (en) * 2000-01-31 2001-08-10 Nisshin Steel Co Ltd Watertight structure of curtain wall
CN101289893A (en) * 2008-01-21 2008-10-22 沈英 Pottery clay plate curtain wall crossbeam-free mounting structure
CN101649659A (en) * 2009-07-17 2010-02-17 浙江太阳岛建筑陶土板有限公司 Improved mounting structure of clay plate curtain wall
CN101701490A (en) * 2009-10-15 2010-05-05 淮南市顺辉锚固有限公司 Light adjustable skeletal frame without welding
CN202731044U (en) * 2012-07-05 2013-02-13 中国建筑装饰集团有限公司 Dismountable frameless big glass keel dry-hanging method construction system
CN203701381U (en) * 2014-01-22 2014-07-09 合肥建工集团有限公司 Irregular vertical face rack type GRC curtain wall

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924786B (en) * 2014-05-05 2015-09-30 北京市第三建筑工程有限公司 Mounting bracket and the construction method for hanging of GRC plate is chosen outside a kind of large span
CN103924786A (en) * 2014-05-05 2014-07-16 北京市第三建筑工程有限公司 Installation support for large-span out-extended GRC plates and lifting construction method
CN104153465A (en) * 2014-08-27 2014-11-19 中建八局第三建设有限公司 Connecting structure of heavy-load GRC curtain wall system and all-steel main structure
CN104153465B (en) * 2014-08-27 2016-08-31 中建八局第三建设有限公司 Heavy load GRC Curtain Wall and the attachment structure of all steel agent structure
CN104358374A (en) * 2014-11-04 2015-02-18 中建三局东方装饰设计工程有限公司 Wall-face dry-hanging system of large metal aluminum sheet
CN107762017A (en) * 2016-08-15 2018-03-06 中国二十冶集团有限公司 The connection method of curtain skeleton and the pre-buried anchor slab of major structure of construction
CN108691377A (en) * 2017-04-05 2018-10-23 通州建总集团有限公司 A kind of exterior wall dried hanging GRC plate faces spraying lacquer construction method
CN106906970A (en) * 2017-04-27 2017-06-30 中国建筑第八工程局有限公司 The mounting structure and installation method of cylindric stone curtain wall
CN106906970B (en) * 2017-04-27 2023-05-02 中国建筑第八工程局有限公司 Mounting structure and mounting method of cylindrical stone curtain wall
CN108560772A (en) * 2018-06-15 2018-09-21 浙江绿筑集成科技有限公司 The assembling type outer wall system of standardized connections and the application connector
CN110984446A (en) * 2019-12-17 2020-04-10 天邑昊建筑装饰工程有限公司 Efficient curtain wall installation method
CN111305501A (en) * 2020-03-04 2020-06-19 中国十七冶集团有限公司 Flatness and verticality control technology for large-scale outer wall dry-hanging stone
CN111962859A (en) * 2020-07-22 2020-11-20 晟通科技集团有限公司 Combination C groove and template combination
CN112012381A (en) * 2020-09-14 2020-12-01 中建三局集团有限公司 Anodic aluminum oxide plate curtain wall mounting node and mounting method thereof
CN113062563A (en) * 2021-03-24 2021-07-02 中国五冶集团有限公司 Method for quickly installing special-shaped GRP structure
CN114197710A (en) * 2021-11-15 2022-03-18 中建八局第二建设有限公司 Large-plate open-type embossed plate GRC curtain wall and high-precision construction method
CN114197710B (en) * 2021-11-15 2023-06-20 中建八局第二建设有限公司 Large plate open relief plate GRC curtain wall and high-precision construction method
CN114635521A (en) * 2022-04-25 2022-06-17 惠州市顺大新型建筑科技有限公司 Welding-free assembly type curtain wall and assembly method

Also Published As

Publication number Publication date
CN103758265B (en) 2016-10-26

Similar Documents

Publication Publication Date Title
CN103758265A (en) Rack type GRC curtain wall with irregular vertical face and mounting method thereof
CN101575889B (en) Multi-curved surface overhung copper plate curtain wall and construction method thereof
CN201292587Y (en) Connecting piece for tall building combined stone curtain wall
CN201502164U (en) Tool for paving floor tile
CN110984446A (en) Efficient curtain wall installation method
CN203701381U (en) Irregular vertical face rack type GRC curtain wall
CN104895193A (en) Precast outer wallboard connecting box and connecting joint
CN104153495A (en) Multifunctional lightweight concrete curtain wall connecting structure
CN101906858B (en) Seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board
CN102839805A (en) Dry-hanging resin plate wall surface decoration system and construction method thereof
CN102926554A (en) Steel hanging seat template supports and construction method thereof
CN202430879U (en) Perforated panel connecting mechanism
CN112942849B (en) Efficient scaffold-free construction process for special-shaped curtain wall
CN204402039U (en) A kind of aluminum alloy mould plate system exterior wall straightening board member
CN202000692U (en) Light toilet unit
CN204001309U (en) A kind of syndeton of Multi-function light concrete curtain wall
CN212613222U (en) Mounting structure of curtain stand between layer
CN204899108U (en) Node structure is hung futilely to marble
CN204001289U (en) There is the light steel keel partition that carries the arm of encorbelmenting
CN102535866B (en) Construction process of overlapped stone curtain wall
CN214615180U (en) Ceramic tile dry hanging structure
CN103628602A (en) Building curtain wall glass fiber reinforcement composite board mounting assembly and method
CN204626819U (en) The splicing structure of imitative stone material aluminium sheet
CN101666145B (en) Method for upward hanging projecting eave stones
CN114892863A (en) Overhanging inward-retreating type structural unit type energy-saving curtain wall system and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant