CN104389346B - A kind of high-strength light shearing formula assembled building structural system and preparation method thereof - Google Patents

A kind of high-strength light shearing formula assembled building structural system and preparation method thereof Download PDF

Info

Publication number
CN104389346B
CN104389346B CN201410663850.XA CN201410663850A CN104389346B CN 104389346 B CN104389346 B CN 104389346B CN 201410663850 A CN201410663850 A CN 201410663850A CN 104389346 B CN104389346 B CN 104389346B
Authority
CN
China
Prior art keywords
fiber concrete
concrete wallboard
wallboard
board
metal threaded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410663850.XA
Other languages
Chinese (zh)
Other versions
CN104389346A (en
Inventor
吕大俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANXI AOMING TECHNOLOGY Co Ltd
Original Assignee
SHANXI AOMING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANXI AOMING TECHNOLOGY Co Ltd filed Critical SHANXI AOMING TECHNOLOGY Co Ltd
Priority to CN201410663850.XA priority Critical patent/CN104389346B/en
Publication of CN104389346A publication Critical patent/CN104389346A/en
Application granted granted Critical
Publication of CN104389346B publication Critical patent/CN104389346B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention is specially a kind of high-strength light shearing formula assembled building structural system and preparation method thereof, solve existing storied building structure system use the structure of general frame casting concrete exist waste time and energy, production efficiency underground and more difficult problem of doing over again.Concrete foundation beam upper end is provided with fiber concrete wallboard, is provided with the floor being connected with both between adjacent two layers fiber concrete wallboard, and the superiors' fiber concrete body of wall upper end connects roofing board;Steel bar girder and light thermal-insulation block it is provided with in fiber concrete wallboard, the end face surrounding of fiber concrete wallboard is uniform has some through holes, fiber concrete wallboard downside is provided with nut cover, the lower surface of nut cover has screw via, the side of nut cover has keeper, and other sides of fiber concrete wallboard are uniform has metal threaded set;The end face surrounding of floor has through hole I.While energy-conserving and environment-protective of the present invention, effectively raise quality and comfort level and practical degree.

Description

A kind of high-strength light shearing formula assembled building structural system and preparation method thereof
Technical field
The present invention relates to building structure field, be specially a kind of high-strength light shearing formula assembled building structural system and preparation method thereof.
Background technology
Along with Large scale construction and country's Urbanization Construction of apartment house, and rural area transformation, the appearance of relevant policies, our people gradually breaks away from house " simply having adequate food and clothing ", strides forward to " moderately well-off comfort type ";Along with industrial upgrading, the transformation of the mode of production, in order to meet the demand of higher living quality, housing industry is important basis and condition.
The industrialization of building trade can greatly reduce the wasting of resources, promote environmental protection, at global warming, under the overall background that the whole society pair is surging with resources and environmental crises consciousness, developing industry house is for consumer, enterprise, and industry is important low-carbon (LC) action and behave, it also it is significant contribution for the world, therefore development and the technical characterstic in industrial information epoch are combined, build the design under environmental protection, manufacture, the housing industry system that construction and maintenance service are integrated, to be developing goal and the mission of Transformation Development China in period housing industry.
Domestic construction industry is when carrying out dwelling construction at present, mostly uses whole building framework and body of wall all to carry out the mode of concreting.Although this construction method uses brick mix structure good in building body intensity than before, but it is slow to there will be long in time limit, building progress, and production efficiency is low, expends more buildings and resources and human cost;It is and if construction quality is defective, extremely difficult when doing over again.
Summary of the invention
The present invention is to solve existing storied building structure system use the structure of general frame casting concrete exist waste time and energy, production efficiency is low and more difficult problem of doing over again, it is provided that a kind of high-strength light shearing formula assembled building structural system and preparation method thereof.
The present invention adopts the following technical scheme that realization: a kind of high-strength light shearing formula assembled building structural system, including the concrete foundation beam being provided with pre-embedded bolt, it is distributed up and down and same layer interconnective fiber concrete wallboard if concrete foundation beam upper end is provided with dried layer, being provided with the floor being connected with both between adjacent two layers fiber concrete wallboard, the superiors' fiber concrete wallboard upper end connects roofing board;It is provided with steel bar girder in fiber concrete wallboard and some is generally aligned in the same plane and light thermal-insulation block spaced apart, the end face surrounding of fiber concrete wallboard is uniform has some through holes, fiber concrete wallboard downside is provided with nut cover, the lower surface of nut cover has screw via, the side of nut cover has keeper, and other sides of fiber concrete wallboard are uniform has some fixing and the metal threaded set of two-layer distribution with steel bar girder;The end face surrounding of floor has the through hole I that set position metal threaded with on the upside of fiber concrete wallboard is corresponding.
When carrying out assembling work, first design is embedded with the concrete foundation beam of fang bolt;When then carrying out the connection of foundation beam and fiber concrete wallboard, the nut cover of fiber concrete wallboard is inserted in pre-embedded bolt, and is locked by keeper Upper gasket and nut;When carrying out the right angle connection of fiber concrete wallboard subsequently, the through hole of one of fiber concrete wallboard is corresponding with the metal threaded set on another block fiber concrete wallboard, and connected by screw rod;When carrying out T-shaped connection, being all installed with screw rod in the adjacent through-holes of two blocks of fiber concrete wallboards on same plane, the other end of screw rod is screwed in the double layer of metal thread bush of perpendicular fiber concrete wallboard side connection;When carrying out ten types connections, it is provided with right-angle connecting plate between the adjacent through-holes of orthogonal fiber concrete wallboard, and in the through hole at right-angle connecting plate place, is installed with bolt, and by nut, right-angle connecting plate is fixed;The upper side of this layer of fiber concrete wallboard is provided with floor, makes the through hole I on floor corresponding with the metal threaded set position of the upper side of this layer of fiber concrete wallboard, and be attached by screw rod, nut;Then pass through the nut cover bottom last layer to be connected with screw rod, repeatedly operate to reaching the number of plies needed for building;After connecting Roofing slab, damage location when floating all houses fiber concrete wallboard, the horizontal joint of floor, perps, nut cover, metal threaded set and transporting and hoisting, major project all completes, overcome existing storied building structure system use the structure of general frame casting concrete exist waste time and energy, production efficiency is low and more difficult problem of doing over again.
Roofing board is that to be spliced into cross section by the fiber concrete top board tilting forward and back setting be triangular form structure, and fiber concrete top board end bottom all has and is vertically arranged and the through hole II corresponding with fiber concrete wallboard upper side metal threaded set position, other positions of fiber concrete top board end face all have vertically disposed through hole III, and the fiber concrete top board upper side of rear side has the metal threaded set I corresponding with fiber concrete top board end top through hole III position, front side, and the superiors' fiber concrete panel tops on the upside of left and right is cone structure upwardly, and have corresponding with through hole III position, position, fiber concrete top board end face left and right with metal threaded set II on two conical surfaces of the superiors' fiber concrete wallboard on the upside of left and right.
When installing to the superiors' fiber concrete wallboard, left and right sides arranges the fiber concrete wallboard that top is cone structure, the screw rod that set metal threaded with front and back side fiber concrete wallboard upper side is connected it is installed with in the through hole II of fiber concrete top board, it is installed with, in the through hole III of fiber concrete top board end face left and right end, the screw rod being screwed in metal threaded set II, it is installed with, in the through hole III of fiber concrete top board end face upper end, the screw rod being screwed in metal threaded set I, it is achieved the connection of taper roofing board.
The preparation method of a kind of high-strength light shearing formula assembled building structural system, is used following steps: a, the nut cover of fiber concrete wallboard is inserted in pre-embedded bolt, and locked by keeper Upper gasket and nut;B, carry out the right angle of fiber concrete wallboard subsequently when connecting, the through hole of one of fiber concrete wallboard is overlapped with metal threaded on another block fiber concrete wallboard corresponding, and is connected by screw rod;When carrying out T-shaped connection, being all installed with screw rod in the adjacent through-holes of two blocks of fiber concrete wallboards on same plane, the other end of screw rod is screwed in the double layer of metal thread bush of perpendicular fiber concrete wallboard side connection;When carrying out ten types connections, it is provided with right-angle connecting plate between the adjacent through-holes of orthogonal fiber concrete wallboard, and in the through hole at right-angle connecting plate place, is installed with bolt, and by nut, right-angle connecting plate is fixed;C, fiber concrete wallboard upper side on be provided with floor, make the through hole I on floor corresponding with the metal threaded set position of the upper side of this layer of fiber concrete wallboard, and be attached by screw rod, nut;D, then pass through the nut cover bottom last layer and be connected with screw rod, repeatedly operate to reaching the number of plies needed for building;E, when install to the superiors' fiber concrete wallboard time, left and right sides arranges the fiber concrete wallboard that top is cone structure, the screw rod that set metal threaded with front and back side fiber concrete wallboard upper side is connected it is installed with in the through hole II of fiber concrete top board, it is installed with, in the through hole III of fiber concrete top board end face left and right end, the screw rod being screwed in metal threaded set II, it is installed with, in the through hole III of fiber concrete top board end face upper end, the screw rod being screwed in metal threaded set I, it is achieved the connection of taper roofing board;After f, connection Roofing slab, damage location when floating all houses fiber concrete wallboard, the horizontal joint of floor, perps, nut cover, metal threaded set and transporting and hoisting, major project all completes.
Present configuration is reasonable in design reliably, integrate foundry engieering, Tool and Die Technology, industry mounting technology, screw and nut is utilized to be assembled into assembled building variously-shaped, various levels of, energy-conserving and environment-protective, and repeatable utilization, do not result in secondary pollution, effectively raise quality and comfort level and practical degree simultaneously, there is simple in construction, the easy to operate and advantage of remarkable in economical benefits.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the test schematic diagram of Fig. 1;
Fig. 3 is the schematic top plan view of Fig. 1;
Fig. 4 is the enlarged diagram of A in Fig. 1;
Fig. 5 is the enlarged diagram of B in Fig. 3;
Fig. 6 is the enlarged diagram of C in Fig. 3;
Fig. 7 is the enlarged diagram of D in Fig. 3;
Fig. 8 is the enlarged diagram of E in Fig. 1;
Fig. 9 is the enlarged diagram of F in Fig. 2;
Figure 10 is the enlarged diagram of G in Fig. 2;
Figure 11 is the enlarged diagram of H in Fig. 2;
Figure 12 is the structural representation of fiber concrete wallboard in Fig. 1;
Figure 13 is the schematic side view of Figure 12.
In figure: 1-pre-embedded bolt, 2-concrete foundation beam, 3-fiber concrete wallboard, 4-floor, 5-roofing board, 6-steel bar girder, 7-light thermal-insulation block, 8-through hole, 9-nut cover, 10-screw via, 11-keeper, the metal threaded set of 12-, 13-through hole I, 14-fiber concrete top board, 15-through hole II, 16-through hole III, the metal threaded set of 17-I, the metal threaded set of 18-II.
Detailed description of the invention
A kind of high-strength light shearing formula assembled building structural system, including the concrete foundation beam 2 being provided with pre-embedded bolt 1, it is distributed up and down and same layer interconnective fiber concrete wallboard 3 if concrete foundation beam 2 upper end is provided with dried layer, being provided with the floor 4 being connected with both between adjacent two layers fiber concrete wallboard 3, the superiors' fiber concrete wallboard 3 upper end connects roofing board 5;
It is provided with steel bar girder 6 in fiber concrete wallboard 3 and some is generally aligned in the same plane and light thermal-insulation block 7 spaced apart, the end face surrounding of fiber concrete wallboard 3 is uniform has some through holes 8, fiber concrete wallboard 3 downside is provided with nut cover 9, the lower surface of nut cover 9 has screw via 10, the side of nut cover 9 has keeper 11, and other sides of fiber concrete wallboard 3 are uniform has some fixing with the steel bar girder 6 and metal threaded set 12 of two-layer distribution;
The end face surrounding of floor 4 has the through hole I 13 that set 12 position metal threaded with on the upside of fiber concrete wallboard 3 is corresponding.
nullRoofing board 5 is that to be spliced into cross section by the fiber concrete top board 14 tilting forward and back setting be triangular form structure,And fiber concrete top board 14 end bottom all has and is vertically arranged and the through hole II 15 corresponding with fiber concrete wallboard 3 upper side metal threaded set 12 position,Other positions of fiber concrete top board 14 end face all have vertically disposed through hole III 16,And fiber concrete top board 14 upper side of rear side has the metal threaded set I 17 corresponding with fiber concrete top board 14 end top through hole III 16 position, front side,And the superiors' fiber concrete wallboard 3 top on the upside of left and right is cone structure upwardly,And have corresponding with through hole III 16 position, position, fiber concrete top board 14 end face left and right with metal threaded set II 18 on two conical surfaces of the superiors' fiber concrete wallboard 3 on the upside of left and right;
The preparation method of a kind of high-strength light shearing formula assembled building structural system, is used following steps: a, the nut cover 9 of fiber concrete wallboard 3 is inserted in pre-embedded bolt 1, and locked by keeper 11 Upper gasket and nut;B, carry out the right angle of fiber concrete wallboard 3 subsequently when connecting, the through hole 8 of one of fiber concrete wallboard 3 is corresponding with the metal threaded set 12 on another block fiber concrete wallboard 3, and connected by screw rod;When carrying out T-shaped connection, being all installed with screw rod in the adjacent through-holes 8 of two blocks of fiber concrete wallboards 3 on same plane, the other end of screw rod is screwed in the double layer of metal thread bush 12 of perpendicular fiber concrete wallboard 3 side connection;When carrying out ten types connections, it is provided with right-angle connecting plate between the adjacent through-holes 8 of orthogonal fiber concrete wallboard 3, and in the through hole 8 at right-angle connecting plate place, is installed with bolt, and by nut, right-angle connecting plate is fixed;C, fiber concrete wallboard 3 upper side on be provided with floor 4, make the through hole I 13 on floor 4 corresponding with metal threaded set 12 position of the upper side of this layer of fiber concrete wallboard 3, and be attached by screw rod, nut;D, then pass through the nut cover 9 bottom last layer and be connected with screw rod, repeatedly operate to reaching the number of plies needed for building;E, when install to the superiors' fiber concrete wallboard 3 time, left and right sides arranges the fiber concrete wallboard 3 that top is cone structure, the screw rod being connected with the front and back side fiber concrete wallboard 3 metal threaded set of upper side 12 it is installed with in the through hole II 15 of fiber concrete top board 14, it is installed with, in the through hole III 16 of fiber concrete top board 14 end face left and right end, the screw rod being screwed in metal threaded set II 18, the screw rod being screwed in metal threaded set I 17 it is installed with, it is achieved the connection of taper roofing board in the through hole III 16 of fiber concrete top board 14 end face upper end;After f, connection Roofing slab, damage location when floating all houses fiber concrete wallboard 3, the horizontal joint of floor 4, perps, nut cover 9, metal threaded set 12 and transporting and hoisting, major project all completes.
In specific implementation process, fiber concrete wallboard 3 uses glass fibre, polypropylene fibre or metallic fiber;Light thermal-insulation block 7 is pressed in a mold by all light-weight environment-friendly materials such as fire-fighting foam, wood fibre, rural area waste straw, waste paper, useless packing cases;Door, window and lighting technique code according to shearing formula building, once watering into during casting concrete, can reach the purpose of pre-buried Frame for door and window in a mold fixing in advance for the framework of door and window, makes that framework and body of wall are tight to be seamlessly combined, waterproof anticracking;Simultaneously various spools and terminal box, plug box, the switch enclosure etc. such as the most pre-buried illumination, phone, network, TV;Directly produce the dim groove in positive convex ladder type ground on mould, floor forms the dim groove in cloudy recessed ladder type ground after depanning, makes dim construction simple, levelling without cement sand oar, saving of labor, material-saving, and decreases many weight;Produce imitative ceramic tile, imitative stone material in a mold, in the recessed decorative pattern of European the moon, wallboard forms the various decorative patterns that sun is convex after depanning, is coated with exterior wall and washs and expect, has significantly dropped at the end trimming cost of exterior wall;Making viscous seam Ji with micro-swollen cement, water of coal ash between wallboard and wallboard, floor when mounted, after solidification, polishing is smooth, i.e. can get the metope that exterior wall is smooth.

Claims (3)

1. a high-strength light shearing formula assembled building structural system, including the concrete foundation beam (2) being provided with pre-embedded bolt (1), it is characterized in that: concrete foundation beam (2) is if upper end is provided with dried layer and is distributed up and down and same layer interconnective fiber concrete wallboard (3), being provided with the floor (4) being connected with both between adjacent two layers fiber concrete wallboard (3), the superiors fiber concrete wallboard (3) upper end connects roofing board (5);
It is provided with steel bar girder (6) in fiber concrete wallboard (3) and some is generally aligned in the same plane and light thermal-insulation block (7) spaced apart, the end face surrounding of fiber concrete wallboard (3) is uniform has some through holes (8), fiber concrete wallboard (3) downside is provided with nut cover (9), the lower surface of nut cover (9) has screw via (10), the side of nut cover (9) has keeper (11), and other sides of fiber concrete wallboard (3) are uniform has some fixing with steel bar girder (6) and the metal threaded set (12) of two-layer distribution;
The end face surrounding of floor (4) has the through hole I (13) corresponding with metal threaded set (12) position, fiber concrete wallboard (3) upside.
nullA kind of high-strength light shearing formula assembled building structural system the most according to claim 1,It is characterized in that: roofing board (5) is that to be spliced into cross section by the fiber concrete top board (14) tilting forward and back setting be triangular form structure,And fiber concrete top board (14) end bottom all has and is vertically arranged and the through hole II (15) corresponding with fiber concrete wallboard (3) upper side metal threaded set (12) position,Other positions of fiber concrete top board (14) end face all have vertically disposed through hole III (16),And fiber concrete top board (14) upper side of rear side has the metal threaded set I (17) corresponding with fiber concrete top board (14) end top through hole III (16) position, front side,And the superiors fiber concrete wallboard (3) top on the upside of left and right is cone structure upwardly,And have corresponding with through hole III (16) position, position, fiber concrete top board (14) end face left and right with metal threaded set II (18) on two conical surfaces of the superiors' fiber concrete wallboard (3) on the upside of left and right.
The preparation method of a kind of high-strength light shearing formula assembled building structural system the most according to claim 2, it is characterized in that: use following steps: a, the nut cover (9) of fiber concrete wallboard (3) is inserted in pre-embedded bolt (1), and locked by keeper (11) Upper gasket and nut;B, carry out subsequently fiber concrete wallboard (3) right angle connect time, by corresponding with the metal threaded set (12) on another block fiber concrete wallboard (3) for the through hole (8) of one of fiber concrete wallboard (3), and connected by screw rod;When carrying out T-shaped connection, being all installed with screw rod in the adjacent through-holes (8) of two pieces of fiber concrete wallboards (3) on same plane, the other end of screw rod is screwed in the double layer of metal thread bush (12) of perpendicular fiber concrete wallboard (3) side and connects;When carrying out ten types connections, it is provided with right-angle connecting plate between the adjacent through-holes (8) of orthogonal fiber concrete wallboard (3), and is installed with bolt in the through hole (8) at right-angle connecting plate place, and by nut, right-angle connecting plate is fixed;C, fiber concrete wallboard (3) upper side on be provided with floor (4), make the through hole I (13) on floor (4) corresponding with metal threaded set (12) position of the upper side of this layer of fiber concrete wallboard (3), and be attached by screw rod, nut;D, then pass through the nut cover (9) bottom last layer and be connected with screw rod, repeatedly operate to reaching the number of plies needed for building;E, when installing to the superiors fiber concrete wallboard (3), left and right sides arranges fiber concrete wallboard (3) that top is cone structure, it is installed with, in the through hole II (15) of fiber concrete top board (14), the screw rod being connected with the front and back side metal threaded set of fiber concrete wallboard (3) upper side (12), the screw rod being screwed in metal threaded set II (18) it is installed with in the through hole III (16) of fiber concrete top board (14) end face left and right end, the screw rod being screwed in metal threaded set I (17) it is installed with in the through hole III (16) of fiber concrete top board (14) end face upper end, realize the connection of taper roofing board;After f, connection Roofing slab, damage location when floating all houses fiber concrete wallboard (3), the horizontal joint of floor (4), perps, nut cover (9), metal threaded set (12) and transporting and hoisting, major project all completes.
CN201410663850.XA 2014-11-19 2014-11-19 A kind of high-strength light shearing formula assembled building structural system and preparation method thereof Active CN104389346B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410663850.XA CN104389346B (en) 2014-11-19 2014-11-19 A kind of high-strength light shearing formula assembled building structural system and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410663850.XA CN104389346B (en) 2014-11-19 2014-11-19 A kind of high-strength light shearing formula assembled building structural system and preparation method thereof

Publications (2)

Publication Number Publication Date
CN104389346A CN104389346A (en) 2015-03-04
CN104389346B true CN104389346B (en) 2016-08-31

Family

ID=52607299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410663850.XA Active CN104389346B (en) 2014-11-19 2014-11-19 A kind of high-strength light shearing formula assembled building structural system and preparation method thereof

Country Status (1)

Country Link
CN (1) CN104389346B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400966B (en) * 2016-11-21 2018-09-18 安徽宇辉新型建筑材料有限公司 A kind of assembling method of prefabricated integral assembling formula movable plank house

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010150889A (en) * 2008-12-26 2010-07-08 Japan Life Kk Connection structure of non load-bearing wall and construction method for connection of the connection structure
CN201738600U (en) * 2010-06-04 2011-02-09 北京万科企业有限公司 Assembled integrated type building
CN102535739B (en) * 2012-03-05 2014-11-26 沈汉杰 Prefabricated module board body and outer wall system of curtain wall type building as well as construction method of outer wall system
CN102587693B (en) * 2012-03-09 2013-10-23 沈汉杰 Two-storey modular villa building and construction method thereof
CN203096731U (en) * 2013-01-18 2013-07-31 上海中技桩业股份有限公司 Pre-stressed hollow square pile assembly without end plate at one end
FR3004475B1 (en) * 2013-04-11 2017-07-21 Eco-Logis-Innovation Assembly element, kit and method for assembling wood structure
CN204225270U (en) * 2014-11-19 2015-03-25 山西奥铭科技有限公司 A kind of high-strength light shearing formula assembled building structural system

Also Published As

Publication number Publication date
CN104389346A (en) 2015-03-04

Similar Documents

Publication Publication Date Title
CN102561584B (en) The production method of fiber reinforced cement composite concrete precast construction member
CN102505763B (en) Externally laid masonry composite heat-insulating sintered building block exterior wall heat insulating system
CN101818527B (en) Assembled integral shear wall structure system and construction method thereof
CN102758509B (en) Horizontal seam waterproof plate of prefabricated exterior wall cladding
CN203066343U (en) Steel edge frame heat insulation light board/wall board/roof board/LOFT interlayer floor slab
CN102587693B (en) Two-storey modular villa building and construction method thereof
CN103114663B (en) Assemble type multifunctional outer wall body and production and installation method thereof
CN203393894U (en) Thin-wall profile steel compounded external wallboard
CN101307629B (en) Fastener type self-decoration composite heat insulation high layer dwelling building module and its construction method
CN204252269U (en) A kind of Prefabricated steel construction integration assembling green building Component composition assembly unit
CN103374986B (en) A kind of multifunction combined light weight concrete construction curtain wall and preparation method thereof
CN104947792A (en) Simply-built green light steel fabricated building and installation method
CN201687102U (en) Assembled integral type shear wall structure system
CN104594522B (en) A kind of prefabricated outer wall panel and its production method and assembling type outer wall system
CN102182260B (en) Composite armored thermal insulation wall of foamed concrete and construction method thereof
CN104947788B (en) A kind of modular assembly formula building systems and its method of construction
CN204163299U (en) For the indoor integrated finishing assembly of integration
CN102359199B (en) Integrated finished wall and industrialized preparing process thereof and method for dismounting
CN103334504B (en) High-strength composite corrugated fiber foam cement heat insulation material
CN102051923B (en) Fireproofing retardant cement calcium silicate board insulating wall body and construction method thereof
CN104563384B (en) A kind of decoration integrated large scale prefabricated out-hung panel of structural thermal insulation and preparation method thereof
CN203247737U (en) Light steel keel composite board partition wall
CN102477778A (en) Prefabricated heat-retaining composite plate and assembly, prefabricating method and mould profile thereof as well as template and concrete slab comprising composite plate
CN102650152A (en) Prefabricated sandwich heat-preservation heat insulation concrete external wall panel and fabrication method
CN101368428B (en) Prefabricated component house and its construction method

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
GR01 Patent grant
C14 Grant of patent or utility model