CN105064391A - Assembly type device foundation - Google Patents

Assembly type device foundation Download PDF

Info

Publication number
CN105064391A
CN105064391A CN201510425393.5A CN201510425393A CN105064391A CN 105064391 A CN105064391 A CN 105064391A CN 201510425393 A CN201510425393 A CN 201510425393A CN 105064391 A CN105064391 A CN 105064391A
Authority
CN
China
Prior art keywords
side plate
tie beam
collar tie
plate
mounted equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510425393.5A
Other languages
Chinese (zh)
Inventor
龚武良
黄有为
张雪峰
姚淼
彭平
柴琳
樊勇
周镇涛
袁立侠
何光军
吕为
谭卫成
赫哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN POWER SUPPLY PLANNING DESIGN INSTITUTE Co Ltd
Shenzhen Power Supply Bureau Co Ltd
Original Assignee
SHENZHEN POWER SUPPLY PLANNING DESIGN INSTITUTE Co Ltd
Shenzhen Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN POWER SUPPLY PLANNING DESIGN INSTITUTE Co Ltd, Shenzhen Power Supply Bureau Co Ltd filed Critical SHENZHEN POWER SUPPLY PLANNING DESIGN INSTITUTE Co Ltd
Priority to CN201510425393.5A priority Critical patent/CN105064391A/en
Publication of CN105064391A publication Critical patent/CN105064391A/en
Pending legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention provides an assembly type device foundation. The foundation comprises a bottom plate, side plates, ring beams, fixing elements and a cover plate. The side plates are spliced in an end-to-end mode and are fixedly arranged on the upper surface of the bottom plate. The ring beams are fixedly arranged at the upper ends of the side plates and include the cover plate ring beam and the device ring beam which are arranged side by side. At least one cover plate is arranged on the cover plate ring beam. The fixing elements are used for fixedly connecting the adjacent side plates. The two ends of each fixing element are fixedly connected to the two adjacent side plates. The assembly type device foundation is formed by splicing prefabricated elements, and is easy and quick to construct. By adopting the assembly type structure, the site construction workload is greatly reduced, the construction period is shortened, the labor cost is reduced, the influence on the surrounding environment is little, and environmental protection and energy conservation are achieved.

Description

A kind of mounted equipment basis
Technical field
The present invention relates to power engineering equipment technical field, particularly relate to the basis of a kind of installation, holding electrical equipment.
Background technology
Conventional electrical devices foundation construction mode mainly adopts brick or cast in situs mode, speed of application is slow, hand labor intensity is high, quality control is unstable, and the duration affects comparatively large by seasonal weather etc., finished surface is coarse, poor flatness, and construction period is large to traffic, ambient influnence, the raising required power engineering construction along with urban construction, the form of construction work on traditional electric fixtures basis can not meet urban construction requirement.
Summary of the invention
Technical problem to be solved by this invention, be to provide a kind of construct simple, the duration is short, affect little mounted equipment basis to building site surrounding enviroment.
The present invention solves the problems of the technologies described above adopted technical scheme:
The invention provides a kind of mounted equipment basis, comprise base plate, side plate, collar tie beam, fixture and cover plate, described side plate head and the tail splice and are fixedly arranged on the upper surface of described base plate, described collar tie beam is fixedly arranged on the upper end of described side plate, it comprises cover plate collar tie beam placed side by side and equipment collar tie beam, place at least one piece of described cover plate above described cover plate collar tie beam, described fixture is used for being fixed connection to adjacent side plate, and its two ends are connected with adjacent biside plate respectively.
As the further improvement of technique scheme, described side plate is connected by bolt and fixture, and described side plate has one for the first fixing hole of erection bolt, and the two ends correspondence of described fixture is respectively provided with one second fixing hole.
As the further improvement of technique scheme, the soffit of described collar tie beam is provided with some for the projection affixed with described side plate, and the upper end correspondence of described side plate is provided with the blind hole matched with described projection.
As the further improvement of technique scheme, described base plate is provided with a groove coincide with described side plate bottom shape, and described side plate is vertically inserted in described groove.
As the further improvement of technique scheme, the joint of described side plate and side plate is stepped interface.
As the further improvement of technique scheme, described in water-swellable adhesive tape is housed between the side plate that connects.
As the further improvement of technique scheme, two sides that described equipment collar tie beam is relative are provided with ventilation opening.
As the further improvement of technique scheme, described base plate, side plate, collar tie beam and cover plate are all concrete precast element.
The invention has the beneficial effects as follows:
Mounted equipment of the present invention basis is all assembled by prefabricated component, and construction is simple, fast, and fabricated structure significantly reduces site operation workload, reduction of erection time, saving human cost and little on the impact of surrounding enviroment, environmental protection, energy-conservation.
Accompanying drawing explanation
Fig. 1 is the overall structure schematic diagram on mounted equipment basis of the present invention;
Fig. 2 is the fractionation structural representation on mounted equipment basis of the present invention;
Fig. 3 is the base plate on mounted equipment basis of the present invention and the assembly structure schematic diagram of side plate;
Fig. 4 is the base plate on mounted equipment basis of the present invention and the assembly structure schematic diagram of two blocks of side plates;
Fig. 5 is the schematic diagram that the fixture on mounted equipment basis of the present invention has assembled with side plate;
Fig. 6 is the assembly structure schematic diagram of the cover plate collar tie beam on mounted equipment basis of the present invention;
Fig. 7 is the assembly structure schematic diagram of the equipment collar tie beam on mounted equipment basis of the present invention.
Detailed description of the invention
Be clearly and completely described below with reference to embodiment and the accompanying drawing technique effect to design of the present invention, concrete structure and generation, to understand object of the present invention, characteristic sum effect fully.Obviously; described embodiment is a part of embodiment of the present invention, instead of whole embodiment, based on embodiments of the invention; other embodiments that those skilled in the art obtains under the prerequisite not paying creative work, all belong to the scope of protection of the invention.In addition, all connection/annexations related in patent, not singly refer to that component directly connects, and refer to and according to concrete performance, can connect auxiliary by adding or reducing, and form more excellent draw bail.Each technical characteristic in the present invention, can combination of interactions under the prerequisite of not conflicting conflict.
Please refer to Fig. 1 and Fig. 2, mounted equipment basis of the present invention comprises: base plate 10, side plate 20, cover plate collar tie beam 30, equipment collar tie beam 40, cover plate 60 and fixture 50.Described base plate 10, side plate 20, cover plate collar tie beam 30, equipment collar tie beam 40, cover plate 60 are all by the prefabricated component of the materials such as steel concrete, composite material or steel according to certain size and intensity of load, factorial praluction, described fixture 50 be for installing, the angle steel of fixing each prefabricated component.
Base plate 10 is a rectangular slab, and it is provided with the groove 11 for side plate described in positioned vertical 20, and the width of groove 11 is identical with the width of side plate 20 or slightly wide.
Side plate 20 head and the tail splice and are fixedly arranged in the groove 11 of described base plate 10 upper surface, in the present embodiment, the joint of adjacent side plates 20 is stepped interface and the mode adopting mismatch to connect, namely from the cross section of interface, seam is broken line, and this connected mode makes the connection of adjacent side plates 20 more fastening and have certain waterproof action.In addition, in order to reach more excellent waterproof effect, preferably, water-swellable adhesive tape is folded with at adjacent side plate connecting sewing place.In the present embodiment, described side plate 20 is connected by bolt and fixture 50, and described side plate 20 has one for the first fixing hole 21 of erection bolt, and the two ends correspondence of described fixture is respectively provided with one second fixing hole 51.
Described cover plate collar tie beam 30 and equipment collar tie beam 40 are arranged side by side the upper end in described side plate 20, namely side plate 20 supports above-mentioned collar tie beam, the soffit of collar tie beam is all provided with some for the projection 41 affixed with described side plate 20, the upper end correspondence of described side plate is provided with and described protruding 41 blind holes matched 22, preferably, protruding 41 is reserved protrusion reinforcing bar, in various embodiments, also side plate 20 can be made to stretch out reinforcing bar, and collar tie beam reserves blind hole, also can reach in the present embodiment and coordinate spacing, fixing object.Described equipment collar tie beam 40 arranges ventilation opening 42 relative two sides, is convenient to heat radiation, anti-condensation.At least one piece of cover plate 60 is settled in the upper end of cover plate collar tie beam 30, and the quantity of cover plate 60 sets flexibly according to the area of cover plate collar tie beam 30, in the present embodiment, is preferably 5 pieces of cover plates 60.
Fig. 3 to Fig. 7 shows the installation process on mounted equipment basis of the present invention, Fig. 3 is the base plate on mounted equipment basis of the present invention and the assembly structure schematic diagram of side plate, Fig. 4 is the base plate on mounted equipment basis of the present invention and the assembly structure schematic diagram of two blocks of side plates, Fig. 5 is the schematic diagram that the fixture on mounted equipment basis of the present invention has assembled with side plate, Fig. 6 is the assembly structure schematic diagram of the cover plate collar tie beam on mounted equipment basis of the present invention, and Fig. 7 is the assembly structure schematic diagram of the equipment collar tie beam on mounted equipment basis of the present invention.
As shown in Figure 3, first according to the foundation ditch on plan excavation equipment basis, and lay stonework road cutting, compacting, levelling, prefabricated panel 10 is lain against bottom foundation ditch, is adjusted to level.
As shown in Figures 3 and 4, vertically inserted in the groove 11 of base plate 10 by prefabricated side plate 20, adjacent side plates 20 is installed successively, is adjusted to vertical with base plate 10.
As shown in Figure 5, fixture 50 is adopted to be fixedly connected with by adjacent side plate 20.Side plate 20 joint is provided with the water-swellable adhesive tape (not drawing) for waterproof sealing.
As shown in Figure 6 and Figure 7, be placed in above side plate 20 by prefabricated collar tie beam (comprising cover plate collar tie beam 30 and equipment collar tie beam 40) level, bottom protrusion 41 is aimed at side plate 20 top blind hole 22 and is inserted, and guarantees that insertion puts in place, collar tie beam top level, adopt waterproof concrete to fill splicing seams again, guarantee waterproof.
Finally, prefabricated cover plate is lain against on cover plate collar tie beam, pit backfill stone flour outside work well, compaction in layers, recover road surface, above equipment hoisting to equipment collar tie beam, aim at erection bolt, fixing.
More than that better enforcement of the present invention is illustrated, but the present invention is not limited to described embodiment, those of ordinary skill in the art also can make all equivalent variations or replacement under the prerequisite without prejudice to spirit of the present invention, and these equivalent distortion or replacement are all included in the application's claim limited range.

Claims (8)

1. a mounted equipment basis, it is characterized in that: comprise base plate, side plate, collar tie beam, fixture and cover plate, described side plate head and the tail splice and are fixedly arranged on the upper surface of described base plate, described collar tie beam is fixedly arranged on the upper end of described side plate, it comprises cover plate collar tie beam placed side by side and equipment collar tie beam, place at least one piece of described cover plate above described cover plate collar tie beam, described fixture is used for being fixed connection to adjacent side plate, and its two ends are connected with adjacent biside plate respectively.
2. mounted equipment basis as claimed in claim 1, is characterized in that: described side plate is connected by bolt and fixture, and described side plate has one for the first fixing hole of erection bolt, and the two ends correspondence of described fixture is respectively provided with one second fixing hole.
3. mounted equipment basis as claimed in claim 1, is characterized in that: the soffit of described collar tie beam is provided with some for the projection affixed with described side plate, and the upper end correspondence of described side plate is provided with the blind hole matched with described projection.
4. mounted equipment basis as claimed in claim 1, is characterized in that: described base plate is provided with a groove coincide with described side plate bottom shape, and described side plate is vertically inserted in described groove.
5. mounted equipment basis as claimed in claim 1, is characterized in that: the joint of described side plate and side plate is stepped interface.
6. mounted equipment basis as claimed in claim 1, is characterized in that: described in water-swellable adhesive tape is housed between the side plate that connects.
7. mounted equipment basis as claimed in claim 1, is characterized in that: two sides that described equipment collar tie beam is relative are provided with ventilation opening.
8. mounted equipment basis as claimed in claim 1, is characterized in that: described base plate, side plate, collar tie beam and cover plate are all concrete precast element.
CN201510425393.5A 2015-07-17 2015-07-17 Assembly type device foundation Pending CN105064391A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510425393.5A CN105064391A (en) 2015-07-17 2015-07-17 Assembly type device foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510425393.5A CN105064391A (en) 2015-07-17 2015-07-17 Assembly type device foundation

Publications (1)

Publication Number Publication Date
CN105064391A true CN105064391A (en) 2015-11-18

Family

ID=54493878

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510425393.5A Pending CN105064391A (en) 2015-07-17 2015-07-17 Assembly type device foundation

Country Status (1)

Country Link
CN (1) CN105064391A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107742830A (en) * 2017-10-11 2018-02-27 内蒙古利元管涵工程有限责任公司 A kind of prefabricated ring main unit basis
CN109137884A (en) * 2018-09-28 2019-01-04 广东水电二局股份有限公司 Cut-pff wall assembled leads wall and its construction method
CN109750688A (en) * 2017-11-07 2019-05-14 青岛中科坤泰管廊有限公司 A kind of pin-connected panel prefabricated foundation
CN110067258A (en) * 2019-05-17 2019-07-30 山东鲁泰建材科技集团有限公司 A kind of modularized combination type ring network cabinet basis and construction method
CN111636468A (en) * 2020-04-23 2020-09-08 青岛中科坤泰装配建筑科技有限公司 High-sealing plug-in type ring main unit prefabricated foundation and installation method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107742830A (en) * 2017-10-11 2018-02-27 内蒙古利元管涵工程有限责任公司 A kind of prefabricated ring main unit basis
CN109750688A (en) * 2017-11-07 2019-05-14 青岛中科坤泰管廊有限公司 A kind of pin-connected panel prefabricated foundation
CN109137884A (en) * 2018-09-28 2019-01-04 广东水电二局股份有限公司 Cut-pff wall assembled leads wall and its construction method
CN109137884B (en) * 2018-09-28 2024-05-14 广东水电二局股份有限公司 Assembled guide wall of impervious wall and construction method thereof
CN110067258A (en) * 2019-05-17 2019-07-30 山东鲁泰建材科技集团有限公司 A kind of modularized combination type ring network cabinet basis and construction method
CN111636468A (en) * 2020-04-23 2020-09-08 青岛中科坤泰装配建筑科技有限公司 High-sealing plug-in type ring main unit prefabricated foundation and installation method thereof

Similar Documents

Publication Publication Date Title
CN105064391A (en) Assembly type device foundation
CN106759420B (en) A kind of prefabricated assembled transformer substation foundation structure
CN103374986A (en) Multifunctional combined lightweight concrete curtain wall and constructing method thereof
CN104652364A (en) Construction method of vertical water-sealing structure for water conservancy project
CN104389349A (en) Novel house capable of being fast disassembled and assembled and assembling method thereof
CN102797357A (en) Construction method of single-side mould supporting system
CN204940328U (en) A kind of mounted equipment basis
CN111733873A (en) Construction method of assembled subway station
CN110424447A (en) A kind of assembled substation integration foundation structure and its construction method
CN210562276U (en) Integrated foundation structure of assembled transformer substation
CN106436746A (en) Prefabricated box-type substation cement foundation
CN210178013U (en) Fully-prefabricated assembled house
CN206635786U (en) Prefabricated assembled transformer substation foundation structure
CN109025084B (en) Lighting skylight for civil air defense engineering and installation and application method thereof
CN218345839U (en) Construction access road capable of being circulated
CN203905282U (en) Precast wall-panel and precast wall thereof
CN206737198U (en) A kind of Combined type external wall panel with reinforced fixed structure
CN206158255U (en) Prefabricated assembled communication machinery room
CN212452751U (en) Direct-rotating assembled retaining wall
CN205875472U (en) A concrete inside casing partition wall installation node for steel frame
CN209329658U (en) A kind of assembly type cable slot
CN208782449U (en) A kind of cable duct bank
CN206143802U (en) Prefabricated formula box -type substation cement foundation
CN204282534U (en) Can fast dismantling except, assembling novel house
CN206545219U (en) Airport roof photovoltaic bracket basis and airport roof photovoltaic support structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151118