CN113404080A - Method for fixing base steel column of bearing platform cup opening - Google Patents

Method for fixing base steel column of bearing platform cup opening Download PDF

Info

Publication number
CN113404080A
CN113404080A CN202110845419.7A CN202110845419A CN113404080A CN 113404080 A CN113404080 A CN 113404080A CN 202110845419 A CN202110845419 A CN 202110845419A CN 113404080 A CN113404080 A CN 113404080A
Authority
CN
China
Prior art keywords
steel
plate
cup
steel column
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110845419.7A
Other languages
Chinese (zh)
Inventor
罗术荣
李欣
陶思宇
邹林峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN202110845419.7A priority Critical patent/CN113404080A/en
Publication of CN113404080A publication Critical patent/CN113404080A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2406Connection nodes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2415Brackets, gussets, joining plates
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2421Socket type connectors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2463Connections to foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a method for fixing a base steel column of a bearing platform cup opening, which comprises the following steps: 1) positioning steel plates are arranged on four side surfaces of the steel column; 2) concrete is laid at the bottom of the cup rim foundation, and a base plate is laid on the upper end face of the cup rim foundation; 3) hoisting the steel column through the hoisting mechanism to enable a column foot of the steel column to be inserted into the cup opening foundation; 4) installing a wedge-shaped adjusting plate between the positioning steel plate and the base plate to enable the top end of the steel column to be located at a designed elevation position; 5) respectively welding at least one group of angle steel groups on each side surface of the steel column inserted into the cup opening base part; 6) and finally, pouring concrete, and cutting the positioning steel plate to finish construction. The invention has convenient construction, can effectively reduce the construction cost and improve the construction efficiency.

Description

Method for fixing base steel column of bearing platform cup opening
Technical Field
The invention relates to the technical field of building construction, in particular to a method for fixing a base steel column of a bearing platform cup opening.
Background
At present, in the construction and fixation of a foundation steel column of a bearing platform cup mouth, a steel column is hoisted into the cup mouth, a steel wedge and a jacking device are used for enabling the plane position of the steel column to meet the requirement, and meanwhile, a theodolite, a level and a guy rope are used for adjusting the verticality and the elevation of the steel column. After the plane position, the verticality and the elevation meet the requirements at the same time, the steel wedge, the jacking device and the wind cable are firmly fixed, the parameters are checked again, and after the correctness is confirmed, the hoisting rope is released, and the next steel column is hoisted. The disadvantages of this approach are: 1. a large amount of steel is needed to be used as a fixed steel column, and the cost is increased due to the rapid increase of the price of the steel at the present stage; 2. the construction is also troublesome, and the processing and manufacturing of a large amount of steel wedges can also increase the labor, time and transportation cost.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide a method for fixing a base steel column of a bearing platform cup mouth, which is convenient to construct and can effectively solve the problems of high construction cost and low efficiency.
In order to solve the technical problem, the technical scheme adopted by the invention is as follows: a method for fixing a base steel column of a bearing platform cup opening is characterized by comprising the following steps: the method comprises the following steps:
1) respectively and fixedly mounting a positioning steel plate at the corresponding positions of the four side surfaces of the steel column according to design requirements, wherein the positioning steel plate is positioned on a vertical plane and is perpendicular to the side surfaces of the connected steel column;
2) concrete is laid at the bottom of the cup rim foundation for leveling, and a base plate is laid on the upper end face of each side wall of the cup rim foundation;
3) laying sleepers below bases of the steel columns, hoisting the steel columns through a hoisting mechanism, driving the top ends of the steel columns to move upwards by the hoisting mechanism in the hoisting process, enabling the bases of the steel columns to slide along with the rising of the top ends of the columns until the columns are erected and then hoisted off the ground, driving the steel columns to rotate right above the cup foundation by the hoisting mechanism after the bases with the steel columns move upwards to the position above the cup foundation, and gradually lowering the steel columns to enable the bases of the steel columns to be inserted into the cup foundation;
4) after the column foot of the steel column is contacted with the bottom of the cup foundation, a wedge-shaped adjusting plate is arranged between the positioning steel plate and the base plate, the positioning steel plate is supported by the adjusting plate, and the position of the adjusting plate is moved, so that the top end of the steel column is located at the designed elevation position;
5) at least one group of angle steel groups are respectively welded on each side surface of the part, inserted into the cup opening base, of the steel column, each angle steel group comprises two angle steels located at the same horizontal height, one side wall of each angle steel is welded with the steel column, and one end, deviated from each angle steel, of each angle steel extends to be attached to the side wall of the cup opening base;
6) finally, pouring concrete into the cup rim foundation until the cup rim foundation is filled; and after the concrete is solidified, cutting the positioning steel plate along the surface of the steel column, and taking down the base plate and the adjusting plate to finish construction.
Further, in step 5), when the angle steel group is a group, the angle steel group is positioned at the upper part of the cup mouth base.
Further, in the step 4), the number of the wedge-shaped adjusting plates below the positioning steel plate is two, the tips of the two wedge-shaped adjusting plates are arranged oppositely, and the two wedge-shaped adjusting plates are inserted between the positioning steel plate and the backing plate from two sides of the positioning steel plate.
Compared with the prior art, the invention has the following advantages:
1. the adjusting plate and the base plate can be repeatedly used, the construction amount of steel can be effectively reduced, and the cost is saved.
2. The steel column is fixed by positioning angle steel, an adjusting plate, a base plate and angle steel inside the cup mouth, so that the steel column is more stable; moreover, the construction is more convenient, and the construction quality can be better ensured.
3. The angle steel, the adjusting plate, the base plate and the angle steel in the cup mouth can be made of processing waste materials, so that materials are further saved, and construction cost is reduced.
Drawings
FIG. 1 is a top view of the structure during the construction process of the present invention.
FIG. 2 is a side view of the structure during the construction process of the present invention.
In the figure: the steel cup comprises 1-a cup opening foundation, 2-a steel column, 3-a positioning steel plate, 4-a base plate, 5-a wedge-shaped adjusting plate and 6-angle steel.
Detailed Description
The invention will be further explained with reference to the drawings and the embodiments.
Example (b): referring to fig. 1 and 2, a method for fixing a base steel column of a cup rim of a bearing platform comprises the following steps:
1) respectively and fixedly mounting a positioning steel plate 3 at the corresponding positions of the four side surfaces of the steel column 2 according to design requirements, wherein the positioning steel plate 3 is positioned on a vertical plane and is perpendicular to the side surfaces of the connected steel column 2; wherein, positioning steel plate 3 and steel column 2 adopt welded fastening to transport the construction site after the workshop direct processing, thereby reduce the field installation, can effectively improve positioning steel plate 3's installation uniformity, thereby improve steel column 2's installation accuracy. As an embodiment, the positioning steel plate 3 is a 25 × 300 steel plate: the steel column 2 and the steel column are processed and manufactured in a factory and welded to the periphery of the lower portion of the steel column 2, and the main function of the steel column 2 is to place the steel column 2 in a cup mouth to achieve the temporary fixing function.
2) Concrete is paved at the bottom of the cup rim foundation 1 for leveling, and a backing plate 4 is paved on the upper end face of each side wall of the cup rim foundation 1; as an embodiment, the backing plate 4 is made of 12 × 150 wood board: before the steel column 2 is installed, the base plate 4 is placed on the cup opening and plays a role of a liner, and the steel plate is prevented from being directly contacted with a bearing platform to cause damage to the bearing platform.
3) Laying sleepers below the column bases of the steel columns 2, hoisting the steel columns 2 through a hoisting mechanism, driving the top ends of the steel columns 2 to move upwards by the hoisting mechanism in the hoisting process, enabling the column bases of the steel columns 2 to slide along with the rising of the column top ends until the columns are erected and then hoisted away from the ground, driving the steel columns 2 to rotate right above the cup foundation 1 by the hoisting mechanism after the column bases of the strip steel columns 2 move upwards to the upper side of the cup foundation 1, and then gradually lowering the steel columns 2 to enable the column bases of the steel columns 2 to be inserted into the cup foundation 1.
4) After the column base of steel column 2 contacts with the bottom of rim of a cup basis 1, install wedge regulating plate 5 between location steel sheet 3 and backing plate 4, hold up location steel sheet 3 through the regulating plate to remove the position of regulating plate, make the top of steel column 2 be located design elevation position. The two wedge-shaped adjusting plates 5 are arranged below the positioning steel plate 3, the tips of the two wedge-shaped adjusting plates 5 are arranged oppositely, and the two wedge-shaped adjusting plates are inserted between the positioning steel plate 3 and the backing plate 4 from two sides of the positioning steel plate 3; this can better support the positioning steel plate 3 to effectively adjust the height position of the steel column 2. The wedge-shaped adjusting plate 5 is a 25 × 100 × 50 steel wedge: the steel column 2 elevation adjusting device has the function of adjusting elevation so that the steel column 2 reaches the designed elevation.
5) At least one group of angle steel 6 is respectively welded on each side surface of the part, inserted into the cup rim base 1, of the steel column 2, wherein the angle steel 6 comprises two angle steels 6 located at the same horizontal height, one side wall of each angle steel 6 is welded with the steel column 2, and one end, departing from the two angle steels 6, extends to be attached to the side wall of the cup rim base; when the angle steel 6 groups are in one group, the angle steel 6 groups are positioned at the upper part of the cup mouth base; when the angle steel 6 groups are a plurality of groups, the angle steel groups are distributed at intervals along the vertical direction. During the construction, after steel column 2 installation is fixed, pass through welded connection with angle steel 6 and steel column 2, like this, behind the pouring concrete in the rim of a cup basis 1 for the connection stability of steel column 2 is better.
6) Finally, pouring concrete into the cup rim foundation 1 until the cup rim foundation 1 is filled; and after the concrete is solidified, cutting the positioning steel plate 3 along the surface of the steel column 2, and taking down the base plate 4 and the adjusting plate to finish construction.
By adopting the scheme, the adjusting plate and the backing plate can be repeatedly used, the steel construction consumption can be effectively reduced, and the cost is saved; the steel column 2 is more stable by fixing the positioning angle steel 6, the adjusting plate, the base plate 4 and the angle steel 6 in the cup mouth; the construction is more convenient, and the construction quality can be better ensured; the angle steel 6, the adjusting plate, the base plate 4 and the angle steel 6 in the cup mouth can be made of processing waste materials, so that materials are further saved, and the construction cost is reduced.
Finally, it should be noted that the above embodiments are only used for illustrating the technical solutions of the present invention and not for limiting the technical solutions, and those skilled in the art should understand that modifications or equivalent substitutions can be made on the technical solutions of the present invention without departing from the spirit and scope of the technical solutions, and all that should be covered by the claims of the present invention.

Claims (3)

1. A method for fixing a base steel column of a bearing platform cup opening is characterized by comprising the following steps: the method comprises the following steps:
1) respectively and fixedly mounting a positioning steel plate at the corresponding positions of the four side surfaces of the steel column according to design requirements, wherein the positioning steel plate is positioned on a vertical plane and is perpendicular to the side surfaces of the connected steel column;
2) concrete is laid at the bottom of the cup rim foundation for leveling, and a base plate is laid on the upper end face of each side wall of the cup rim foundation;
3) laying sleepers below bases of the steel columns, hoisting the steel columns through a hoisting mechanism, driving the top ends of the steel columns to move upwards by the hoisting mechanism in the hoisting process, enabling the bases of the steel columns to slide along with the rising of the top ends of the columns until the columns are erected and then hoisted off the ground, driving the steel columns to rotate right above the cup foundation by the hoisting mechanism after the bases with the steel columns move upwards to the position above the cup foundation, and gradually lowering the steel columns to enable the bases of the steel columns to be inserted into the cup foundation;
4) after the column foot of the steel column is contacted with the bottom of the cup foundation, a wedge-shaped adjusting plate is arranged between the positioning steel plate and the base plate, the positioning steel plate is supported by the adjusting plate, and the position of the adjusting plate is moved, so that the top end of the steel column is located at the designed elevation position;
5) at least one group of angle steel groups are respectively welded on each side surface of the part, inserted into the cup opening base, of the steel column, each angle steel group comprises two angle steels located at the same horizontal height, one side wall of each angle steel is welded with the steel column, and one end, deviated from each angle steel, of each angle steel extends to be attached to the side wall of the cup opening base;
6) finally, pouring concrete into the cup rim foundation until the cup rim foundation is filled; and after the concrete is solidified, cutting the positioning steel plate along the surface of the steel column, and taking down the base plate and the adjusting plate to finish construction.
2. The method for fixing the foundation steel column of the bearing platform and the cup opening as claimed in claim 1, wherein: in the step 5), when the angle steel group is a group, the angle steel group is positioned at the upper part of the cup mouth base.
3. The method for fixing the foundation steel column of the bearing platform and the cup opening as claimed in claim 1, wherein: in the step 4), the two wedge-shaped adjusting plates are arranged below the positioning steel plate, the tips of the two wedge-shaped adjusting plates are arranged oppositely, and the two wedge-shaped adjusting plates are inserted between the positioning steel plate and the backing plate from the two sides of the positioning steel plate.
CN202110845419.7A 2021-07-26 2021-07-26 Method for fixing base steel column of bearing platform cup opening Pending CN113404080A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110845419.7A CN113404080A (en) 2021-07-26 2021-07-26 Method for fixing base steel column of bearing platform cup opening

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110845419.7A CN113404080A (en) 2021-07-26 2021-07-26 Method for fixing base steel column of bearing platform cup opening

Publications (1)

Publication Number Publication Date
CN113404080A true CN113404080A (en) 2021-09-17

Family

ID=77687721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110845419.7A Pending CN113404080A (en) 2021-07-26 2021-07-26 Method for fixing base steel column of bearing platform cup opening

Country Status (1)

Country Link
CN (1) CN113404080A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114809675A (en) * 2022-05-24 2022-07-29 中冶建工集团有限公司 Quick positioner in rim of a cup is installed to steel column
CN115198785A (en) * 2022-06-28 2022-10-18 甘肃建投土木工程建设集团有限责任公司 Steel structure column independent anti-seismic foundation convenient to construct

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101484643A (en) * 2006-07-05 2009-07-15 维斯塔斯风力系统有限公司 A tower construction
CN102505862A (en) * 2011-11-03 2012-06-20 中山建华墙体材料有限公司 Installing process of lightweight internal partition wallboards
CN102777045A (en) * 2012-08-09 2012-11-14 龙信建设集团有限公司 Construction method for assembling light energy-saving composite wallboards on separation wall
CN203080546U (en) * 2013-02-06 2013-07-24 陕西建工集团机械施工有限公司 Prefabricated column concrete cup opening base double-layer limiting fixed structure
CN103590416A (en) * 2013-11-01 2014-02-19 浙江水利水电学院 Pre-buried construction method for high-precision foundation bolts
CN105442433A (en) * 2015-11-30 2016-03-30 中铁二十四局集团安徽工程有限公司 Connection structure of prefabricated bridge pier and bearing platform and construction method thereof
CN207392771U (en) * 2017-09-04 2018-05-22 中建钢构有限公司 A kind of guide type steel column locator
CN109162204A (en) * 2018-09-30 2019-01-08 北京城建道桥建设集团有限公司 A kind of construction method of the quick spelling of bridge substructure transverse direction piecemeal
CN209741895U (en) * 2019-02-28 2019-12-06 杭州西奥电梯现代化更新有限公司 Connection structure of assembled elevator steel construction and base
CN209780282U (en) * 2019-01-11 2019-12-13 山西省工业设备安装集团有限公司 Temporary reinforcing device for bottom plate of assembled steel column base
CN210032092U (en) * 2019-03-22 2020-02-07 浙江东南建筑设计有限公司 Column base node
CN210737580U (en) * 2019-07-04 2020-06-12 信息产业电子第十一设计研究院科技工程股份有限公司 Mounting structure of bayonet steel column base
CN213682187U (en) * 2020-11-16 2021-07-13 安徽富煌钢构股份有限公司 Hoisting adjusting structure of cup-mouth foundation double-limb lattice column

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101484643A (en) * 2006-07-05 2009-07-15 维斯塔斯风力系统有限公司 A tower construction
CN102505862A (en) * 2011-11-03 2012-06-20 中山建华墙体材料有限公司 Installing process of lightweight internal partition wallboards
CN102777045A (en) * 2012-08-09 2012-11-14 龙信建设集团有限公司 Construction method for assembling light energy-saving composite wallboards on separation wall
CN203080546U (en) * 2013-02-06 2013-07-24 陕西建工集团机械施工有限公司 Prefabricated column concrete cup opening base double-layer limiting fixed structure
CN103590416A (en) * 2013-11-01 2014-02-19 浙江水利水电学院 Pre-buried construction method for high-precision foundation bolts
CN105442433A (en) * 2015-11-30 2016-03-30 中铁二十四局集团安徽工程有限公司 Connection structure of prefabricated bridge pier and bearing platform and construction method thereof
CN207392771U (en) * 2017-09-04 2018-05-22 中建钢构有限公司 A kind of guide type steel column locator
CN109162204A (en) * 2018-09-30 2019-01-08 北京城建道桥建设集团有限公司 A kind of construction method of the quick spelling of bridge substructure transverse direction piecemeal
CN209780282U (en) * 2019-01-11 2019-12-13 山西省工业设备安装集团有限公司 Temporary reinforcing device for bottom plate of assembled steel column base
CN209741895U (en) * 2019-02-28 2019-12-06 杭州西奥电梯现代化更新有限公司 Connection structure of assembled elevator steel construction and base
CN210032092U (en) * 2019-03-22 2020-02-07 浙江东南建筑设计有限公司 Column base node
CN210737580U (en) * 2019-07-04 2020-06-12 信息产业电子第十一设计研究院科技工程股份有限公司 Mounting structure of bayonet steel column base
CN213682187U (en) * 2020-11-16 2021-07-13 安徽富煌钢构股份有限公司 Hoisting adjusting structure of cup-mouth foundation double-limb lattice column

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114809675A (en) * 2022-05-24 2022-07-29 中冶建工集团有限公司 Quick positioner in rim of a cup is installed to steel column
CN115198785A (en) * 2022-06-28 2022-10-18 甘肃建投土木工程建设集团有限责任公司 Steel structure column independent anti-seismic foundation convenient to construct
CN115198785B (en) * 2022-06-28 2024-05-17 甘肃建投土木工程建设集团有限责任公司 Independent antidetonation basis of steel construction post convenient to construction

Similar Documents

Publication Publication Date Title
EP2886751B1 (en) Method for the assembly of frustoconical concrete towers
US8365485B2 (en) Method and apparatus for setting support columns within a foundation
CN107090975B (en) Formwork erecting construction method for ultrahigh large-span concrete cast-in-place beam bailey truss
CN113404080A (en) Method for fixing base steel column of bearing platform cup opening
US20090178353A1 (en) Method and apparatus for setting support columns within a foundation
US20140215953A1 (en) Solar panel mounting stand installation method, pile and solar panel mounting stand
US11946217B1 (en) Top plate jacking device and jacking construction method configured for V-shaped columns
CN217353459U (en) Temporary operation platform for construction in separated-bin walls of inclined roof panels
CN217000940U (en) High-precision mounting system for rear-mounted inclined steel column
CN214883824U (en) Pre-leveling tower foundation
CN113293790B (en) Pre-leveling tower foundation and leveling construction method thereof
CN215166585U (en) Quick connecting device without beam arch
CN110593111B (en) Method for installing beam section of cable tower area
CN203222810U (en) Steel column and base structure system
CN102943484B (en) Tapered-iron pulp-bedding rapid leveling method for large-size and middle-size equipment installation
CN108560417B (en) Quick construction method and positioning jig frame for guardrail
CN218814622U (en) Hoisting platform suitable for soft soil foundation
KR20070079086A (en) Method of bent construction for temporary bridge
CN203583854U (en) Temporary construction land-saving steel platform
CN103590591A (en) Construction overlay land-saving type steel platform and construction method thereof
CN111005302B (en) Steel anchor beam mounting method
CN115404893B (en) Steel column pier foundation, construction method and emergency temporary building
CN112412068B (en) Accurate positioning and assembling method for prefabricated staircase
CN217580582U (en) Building shock insulation support mounting structure
CN217579798U (en) Prefabricated bent cap high accuracy mounting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210917

RJ01 Rejection of invention patent application after publication