CN113404080A - Method for fixing base steel column of bearing platform cup opening - Google Patents
Method for fixing base steel column of bearing platform cup opening Download PDFInfo
- Publication number
- CN113404080A CN113404080A CN202110845419.7A CN202110845419A CN113404080A CN 113404080 A CN113404080 A CN 113404080A CN 202110845419 A CN202110845419 A CN 202110845419A CN 113404080 A CN113404080 A CN 113404080A
- Authority
- CN
- China
- Prior art keywords
- steel
- plate
- cup
- steel column
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2406—Connection nodes
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2415—Brackets, gussets, joining plates
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2421—Socket type connectors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2463—Connections to foundations
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a method for fixing a base steel column of a bearing platform cup opening, which comprises the following steps: 1) positioning steel plates are arranged on four side surfaces of the steel column; 2) concrete is laid at the bottom of the cup rim foundation, and a base plate is laid on the upper end face of the cup rim foundation; 3) hoisting the steel column through the hoisting mechanism to enable a column foot of the steel column to be inserted into the cup opening foundation; 4) installing a wedge-shaped adjusting plate between the positioning steel plate and the base plate to enable the top end of the steel column to be located at a designed elevation position; 5) respectively welding at least one group of angle steel groups on each side surface of the steel column inserted into the cup opening base part; 6) and finally, pouring concrete, and cutting the positioning steel plate to finish construction. The invention has convenient construction, can effectively reduce the construction cost and improve the construction efficiency.
Description
Technical Field
The invention relates to the technical field of building construction, in particular to a method for fixing a base steel column of a bearing platform cup opening.
Background
At present, in the construction and fixation of a foundation steel column of a bearing platform cup mouth, a steel column is hoisted into the cup mouth, a steel wedge and a jacking device are used for enabling the plane position of the steel column to meet the requirement, and meanwhile, a theodolite, a level and a guy rope are used for adjusting the verticality and the elevation of the steel column. After the plane position, the verticality and the elevation meet the requirements at the same time, the steel wedge, the jacking device and the wind cable are firmly fixed, the parameters are checked again, and after the correctness is confirmed, the hoisting rope is released, and the next steel column is hoisted. The disadvantages of this approach are: 1. a large amount of steel is needed to be used as a fixed steel column, and the cost is increased due to the rapid increase of the price of the steel at the present stage; 2. the construction is also troublesome, and the processing and manufacturing of a large amount of steel wedges can also increase the labor, time and transportation cost.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide a method for fixing a base steel column of a bearing platform cup mouth, which is convenient to construct and can effectively solve the problems of high construction cost and low efficiency.
In order to solve the technical problem, the technical scheme adopted by the invention is as follows: a method for fixing a base steel column of a bearing platform cup opening is characterized by comprising the following steps: the method comprises the following steps:
1) respectively and fixedly mounting a positioning steel plate at the corresponding positions of the four side surfaces of the steel column according to design requirements, wherein the positioning steel plate is positioned on a vertical plane and is perpendicular to the side surfaces of the connected steel column;
2) concrete is laid at the bottom of the cup rim foundation for leveling, and a base plate is laid on the upper end face of each side wall of the cup rim foundation;
3) laying sleepers below bases of the steel columns, hoisting the steel columns through a hoisting mechanism, driving the top ends of the steel columns to move upwards by the hoisting mechanism in the hoisting process, enabling the bases of the steel columns to slide along with the rising of the top ends of the columns until the columns are erected and then hoisted off the ground, driving the steel columns to rotate right above the cup foundation by the hoisting mechanism after the bases with the steel columns move upwards to the position above the cup foundation, and gradually lowering the steel columns to enable the bases of the steel columns to be inserted into the cup foundation;
4) after the column foot of the steel column is contacted with the bottom of the cup foundation, a wedge-shaped adjusting plate is arranged between the positioning steel plate and the base plate, the positioning steel plate is supported by the adjusting plate, and the position of the adjusting plate is moved, so that the top end of the steel column is located at the designed elevation position;
5) at least one group of angle steel groups are respectively welded on each side surface of the part, inserted into the cup opening base, of the steel column, each angle steel group comprises two angle steels located at the same horizontal height, one side wall of each angle steel is welded with the steel column, and one end, deviated from each angle steel, of each angle steel extends to be attached to the side wall of the cup opening base;
6) finally, pouring concrete into the cup rim foundation until the cup rim foundation is filled; and after the concrete is solidified, cutting the positioning steel plate along the surface of the steel column, and taking down the base plate and the adjusting plate to finish construction.
Further, in step 5), when the angle steel group is a group, the angle steel group is positioned at the upper part of the cup mouth base.
Further, in the step 4), the number of the wedge-shaped adjusting plates below the positioning steel plate is two, the tips of the two wedge-shaped adjusting plates are arranged oppositely, and the two wedge-shaped adjusting plates are inserted between the positioning steel plate and the backing plate from two sides of the positioning steel plate.
Compared with the prior art, the invention has the following advantages:
1. the adjusting plate and the base plate can be repeatedly used, the construction amount of steel can be effectively reduced, and the cost is saved.
2. The steel column is fixed by positioning angle steel, an adjusting plate, a base plate and angle steel inside the cup mouth, so that the steel column is more stable; moreover, the construction is more convenient, and the construction quality can be better ensured.
3. The angle steel, the adjusting plate, the base plate and the angle steel in the cup mouth can be made of processing waste materials, so that materials are further saved, and construction cost is reduced.
Drawings
FIG. 1 is a top view of the structure during the construction process of the present invention.
FIG. 2 is a side view of the structure during the construction process of the present invention.
In the figure: the steel cup comprises 1-a cup opening foundation, 2-a steel column, 3-a positioning steel plate, 4-a base plate, 5-a wedge-shaped adjusting plate and 6-angle steel.
Detailed Description
The invention will be further explained with reference to the drawings and the embodiments.
Example (b): referring to fig. 1 and 2, a method for fixing a base steel column of a cup rim of a bearing platform comprises the following steps:
1) respectively and fixedly mounting a positioning steel plate 3 at the corresponding positions of the four side surfaces of the steel column 2 according to design requirements, wherein the positioning steel plate 3 is positioned on a vertical plane and is perpendicular to the side surfaces of the connected steel column 2; wherein, positioning steel plate 3 and steel column 2 adopt welded fastening to transport the construction site after the workshop direct processing, thereby reduce the field installation, can effectively improve positioning steel plate 3's installation uniformity, thereby improve steel column 2's installation accuracy. As an embodiment, the positioning steel plate 3 is a 25 × 300 steel plate: the steel column 2 and the steel column are processed and manufactured in a factory and welded to the periphery of the lower portion of the steel column 2, and the main function of the steel column 2 is to place the steel column 2 in a cup mouth to achieve the temporary fixing function.
2) Concrete is paved at the bottom of the cup rim foundation 1 for leveling, and a backing plate 4 is paved on the upper end face of each side wall of the cup rim foundation 1; as an embodiment, the backing plate 4 is made of 12 × 150 wood board: before the steel column 2 is installed, the base plate 4 is placed on the cup opening and plays a role of a liner, and the steel plate is prevented from being directly contacted with a bearing platform to cause damage to the bearing platform.
3) Laying sleepers below the column bases of the steel columns 2, hoisting the steel columns 2 through a hoisting mechanism, driving the top ends of the steel columns 2 to move upwards by the hoisting mechanism in the hoisting process, enabling the column bases of the steel columns 2 to slide along with the rising of the column top ends until the columns are erected and then hoisted away from the ground, driving the steel columns 2 to rotate right above the cup foundation 1 by the hoisting mechanism after the column bases of the strip steel columns 2 move upwards to the upper side of the cup foundation 1, and then gradually lowering the steel columns 2 to enable the column bases of the steel columns 2 to be inserted into the cup foundation 1.
4) After the column base of steel column 2 contacts with the bottom of rim of a cup basis 1, install wedge regulating plate 5 between location steel sheet 3 and backing plate 4, hold up location steel sheet 3 through the regulating plate to remove the position of regulating plate, make the top of steel column 2 be located design elevation position. The two wedge-shaped adjusting plates 5 are arranged below the positioning steel plate 3, the tips of the two wedge-shaped adjusting plates 5 are arranged oppositely, and the two wedge-shaped adjusting plates are inserted between the positioning steel plate 3 and the backing plate 4 from two sides of the positioning steel plate 3; this can better support the positioning steel plate 3 to effectively adjust the height position of the steel column 2. The wedge-shaped adjusting plate 5 is a 25 × 100 × 50 steel wedge: the steel column 2 elevation adjusting device has the function of adjusting elevation so that the steel column 2 reaches the designed elevation.
5) At least one group of angle steel 6 is respectively welded on each side surface of the part, inserted into the cup rim base 1, of the steel column 2, wherein the angle steel 6 comprises two angle steels 6 located at the same horizontal height, one side wall of each angle steel 6 is welded with the steel column 2, and one end, departing from the two angle steels 6, extends to be attached to the side wall of the cup rim base; when the angle steel 6 groups are in one group, the angle steel 6 groups are positioned at the upper part of the cup mouth base; when the angle steel 6 groups are a plurality of groups, the angle steel groups are distributed at intervals along the vertical direction. During the construction, after steel column 2 installation is fixed, pass through welded connection with angle steel 6 and steel column 2, like this, behind the pouring concrete in the rim of a cup basis 1 for the connection stability of steel column 2 is better.
6) Finally, pouring concrete into the cup rim foundation 1 until the cup rim foundation 1 is filled; and after the concrete is solidified, cutting the positioning steel plate 3 along the surface of the steel column 2, and taking down the base plate 4 and the adjusting plate to finish construction.
By adopting the scheme, the adjusting plate and the backing plate can be repeatedly used, the steel construction consumption can be effectively reduced, and the cost is saved; the steel column 2 is more stable by fixing the positioning angle steel 6, the adjusting plate, the base plate 4 and the angle steel 6 in the cup mouth; the construction is more convenient, and the construction quality can be better ensured; the angle steel 6, the adjusting plate, the base plate 4 and the angle steel 6 in the cup mouth can be made of processing waste materials, so that materials are further saved, and the construction cost is reduced.
Finally, it should be noted that the above embodiments are only used for illustrating the technical solutions of the present invention and not for limiting the technical solutions, and those skilled in the art should understand that modifications or equivalent substitutions can be made on the technical solutions of the present invention without departing from the spirit and scope of the technical solutions, and all that should be covered by the claims of the present invention.
Claims (3)
1. A method for fixing a base steel column of a bearing platform cup opening is characterized by comprising the following steps: the method comprises the following steps:
1) respectively and fixedly mounting a positioning steel plate at the corresponding positions of the four side surfaces of the steel column according to design requirements, wherein the positioning steel plate is positioned on a vertical plane and is perpendicular to the side surfaces of the connected steel column;
2) concrete is laid at the bottom of the cup rim foundation for leveling, and a base plate is laid on the upper end face of each side wall of the cup rim foundation;
3) laying sleepers below bases of the steel columns, hoisting the steel columns through a hoisting mechanism, driving the top ends of the steel columns to move upwards by the hoisting mechanism in the hoisting process, enabling the bases of the steel columns to slide along with the rising of the top ends of the columns until the columns are erected and then hoisted off the ground, driving the steel columns to rotate right above the cup foundation by the hoisting mechanism after the bases with the steel columns move upwards to the position above the cup foundation, and gradually lowering the steel columns to enable the bases of the steel columns to be inserted into the cup foundation;
4) after the column foot of the steel column is contacted with the bottom of the cup foundation, a wedge-shaped adjusting plate is arranged between the positioning steel plate and the base plate, the positioning steel plate is supported by the adjusting plate, and the position of the adjusting plate is moved, so that the top end of the steel column is located at the designed elevation position;
5) at least one group of angle steel groups are respectively welded on each side surface of the part, inserted into the cup opening base, of the steel column, each angle steel group comprises two angle steels located at the same horizontal height, one side wall of each angle steel is welded with the steel column, and one end, deviated from each angle steel, of each angle steel extends to be attached to the side wall of the cup opening base;
6) finally, pouring concrete into the cup rim foundation until the cup rim foundation is filled; and after the concrete is solidified, cutting the positioning steel plate along the surface of the steel column, and taking down the base plate and the adjusting plate to finish construction.
2. The method for fixing the foundation steel column of the bearing platform and the cup opening as claimed in claim 1, wherein: in the step 5), when the angle steel group is a group, the angle steel group is positioned at the upper part of the cup mouth base.
3. The method for fixing the foundation steel column of the bearing platform and the cup opening as claimed in claim 1, wherein: in the step 4), the two wedge-shaped adjusting plates are arranged below the positioning steel plate, the tips of the two wedge-shaped adjusting plates are arranged oppositely, and the two wedge-shaped adjusting plates are inserted between the positioning steel plate and the backing plate from the two sides of the positioning steel plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110845419.7A CN113404080A (en) | 2021-07-26 | 2021-07-26 | Method for fixing base steel column of bearing platform cup opening |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110845419.7A CN113404080A (en) | 2021-07-26 | 2021-07-26 | Method for fixing base steel column of bearing platform cup opening |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113404080A true CN113404080A (en) | 2021-09-17 |
Family
ID=77687721
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110845419.7A Pending CN113404080A (en) | 2021-07-26 | 2021-07-26 | Method for fixing base steel column of bearing platform cup opening |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113404080A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114809675A (en) * | 2022-05-24 | 2022-07-29 | 中冶建工集团有限公司 | Quick positioner in rim of a cup is installed to steel column |
CN115198785A (en) * | 2022-06-28 | 2022-10-18 | 甘肃建投土木工程建设集团有限责任公司 | Steel structure column independent anti-seismic foundation convenient to construct |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101484643A (en) * | 2006-07-05 | 2009-07-15 | 维斯塔斯风力系统有限公司 | A tower construction |
CN102505862A (en) * | 2011-11-03 | 2012-06-20 | 中山建华墙体材料有限公司 | Installing process of lightweight internal partition wallboards |
CN102777045A (en) * | 2012-08-09 | 2012-11-14 | 龙信建设集团有限公司 | Construction method for assembling light energy-saving composite wallboards on separation wall |
CN203080546U (en) * | 2013-02-06 | 2013-07-24 | 陕西建工集团机械施工有限公司 | Prefabricated column concrete cup opening base double-layer limiting fixed structure |
CN103590416A (en) * | 2013-11-01 | 2014-02-19 | 浙江水利水电学院 | Pre-buried construction method for high-precision foundation bolts |
CN105442433A (en) * | 2015-11-30 | 2016-03-30 | 中铁二十四局集团安徽工程有限公司 | Connection structure of prefabricated bridge pier and bearing platform and construction method thereof |
CN207392771U (en) * | 2017-09-04 | 2018-05-22 | 中建钢构有限公司 | A kind of guide type steel column locator |
CN109162204A (en) * | 2018-09-30 | 2019-01-08 | 北京城建道桥建设集团有限公司 | A kind of construction method of the quick spelling of bridge substructure transverse direction piecemeal |
CN209741895U (en) * | 2019-02-28 | 2019-12-06 | 杭州西奥电梯现代化更新有限公司 | Connection structure of assembled elevator steel construction and base |
CN209780282U (en) * | 2019-01-11 | 2019-12-13 | 山西省工业设备安装集团有限公司 | Temporary reinforcing device for bottom plate of assembled steel column base |
CN210032092U (en) * | 2019-03-22 | 2020-02-07 | 浙江东南建筑设计有限公司 | Column base node |
CN210737580U (en) * | 2019-07-04 | 2020-06-12 | 信息产业电子第十一设计研究院科技工程股份有限公司 | Mounting structure of bayonet steel column base |
CN213682187U (en) * | 2020-11-16 | 2021-07-13 | 安徽富煌钢构股份有限公司 | Hoisting adjusting structure of cup-mouth foundation double-limb lattice column |
-
2021
- 2021-07-26 CN CN202110845419.7A patent/CN113404080A/en active Pending
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101484643A (en) * | 2006-07-05 | 2009-07-15 | 维斯塔斯风力系统有限公司 | A tower construction |
CN102505862A (en) * | 2011-11-03 | 2012-06-20 | 中山建华墙体材料有限公司 | Installing process of lightweight internal partition wallboards |
CN102777045A (en) * | 2012-08-09 | 2012-11-14 | 龙信建设集团有限公司 | Construction method for assembling light energy-saving composite wallboards on separation wall |
CN203080546U (en) * | 2013-02-06 | 2013-07-24 | 陕西建工集团机械施工有限公司 | Prefabricated column concrete cup opening base double-layer limiting fixed structure |
CN103590416A (en) * | 2013-11-01 | 2014-02-19 | 浙江水利水电学院 | Pre-buried construction method for high-precision foundation bolts |
CN105442433A (en) * | 2015-11-30 | 2016-03-30 | 中铁二十四局集团安徽工程有限公司 | Connection structure of prefabricated bridge pier and bearing platform and construction method thereof |
CN207392771U (en) * | 2017-09-04 | 2018-05-22 | 中建钢构有限公司 | A kind of guide type steel column locator |
CN109162204A (en) * | 2018-09-30 | 2019-01-08 | 北京城建道桥建设集团有限公司 | A kind of construction method of the quick spelling of bridge substructure transverse direction piecemeal |
CN209780282U (en) * | 2019-01-11 | 2019-12-13 | 山西省工业设备安装集团有限公司 | Temporary reinforcing device for bottom plate of assembled steel column base |
CN209741895U (en) * | 2019-02-28 | 2019-12-06 | 杭州西奥电梯现代化更新有限公司 | Connection structure of assembled elevator steel construction and base |
CN210032092U (en) * | 2019-03-22 | 2020-02-07 | 浙江东南建筑设计有限公司 | Column base node |
CN210737580U (en) * | 2019-07-04 | 2020-06-12 | 信息产业电子第十一设计研究院科技工程股份有限公司 | Mounting structure of bayonet steel column base |
CN213682187U (en) * | 2020-11-16 | 2021-07-13 | 安徽富煌钢构股份有限公司 | Hoisting adjusting structure of cup-mouth foundation double-limb lattice column |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114809675A (en) * | 2022-05-24 | 2022-07-29 | 中冶建工集团有限公司 | Quick positioner in rim of a cup is installed to steel column |
CN115198785A (en) * | 2022-06-28 | 2022-10-18 | 甘肃建投土木工程建设集团有限责任公司 | Steel structure column independent anti-seismic foundation convenient to construct |
CN115198785B (en) * | 2022-06-28 | 2024-05-17 | 甘肃建投土木工程建设集团有限责任公司 | Independent antidetonation basis of steel construction post convenient to construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2886751B1 (en) | Method for the assembly of frustoconical concrete towers | |
US8365485B2 (en) | Method and apparatus for setting support columns within a foundation | |
CN107090975B (en) | Formwork erecting construction method for ultrahigh large-span concrete cast-in-place beam bailey truss | |
CN113404080A (en) | Method for fixing base steel column of bearing platform cup opening | |
US20090178353A1 (en) | Method and apparatus for setting support columns within a foundation | |
US20140215953A1 (en) | Solar panel mounting stand installation method, pile and solar panel mounting stand | |
US11946217B1 (en) | Top plate jacking device and jacking construction method configured for V-shaped columns | |
CN217353459U (en) | Temporary operation platform for construction in separated-bin walls of inclined roof panels | |
CN217000940U (en) | High-precision mounting system for rear-mounted inclined steel column | |
CN214883824U (en) | Pre-leveling tower foundation | |
CN113293790B (en) | Pre-leveling tower foundation and leveling construction method thereof | |
CN215166585U (en) | Quick connecting device without beam arch | |
CN110593111B (en) | Method for installing beam section of cable tower area | |
CN203222810U (en) | Steel column and base structure system | |
CN102943484B (en) | Tapered-iron pulp-bedding rapid leveling method for large-size and middle-size equipment installation | |
CN108560417B (en) | Quick construction method and positioning jig frame for guardrail | |
CN218814622U (en) | Hoisting platform suitable for soft soil foundation | |
KR20070079086A (en) | Method of bent construction for temporary bridge | |
CN203583854U (en) | Temporary construction land-saving steel platform | |
CN103590591A (en) | Construction overlay land-saving type steel platform and construction method thereof | |
CN111005302B (en) | Steel anchor beam mounting method | |
CN115404893B (en) | Steel column pier foundation, construction method and emergency temporary building | |
CN112412068B (en) | Accurate positioning and assembling method for prefabricated staircase | |
CN217580582U (en) | Building shock insulation support mounting structure | |
CN217579798U (en) | Prefabricated bent cap high accuracy mounting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210917 |
|
RJ01 | Rejection of invention patent application after publication |