CN105155857A - Construction and installation method of architectural engineering partition wall boards - Google Patents

Construction and installation method of architectural engineering partition wall boards Download PDF

Info

Publication number
CN105155857A
CN105155857A CN201510487432.4A CN201510487432A CN105155857A CN 105155857 A CN105155857 A CN 105155857A CN 201510487432 A CN201510487432 A CN 201510487432A CN 105155857 A CN105155857 A CN 105155857A
Authority
CN
China
Prior art keywords
partition wall
construction
partition board
wall batten
partition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510487432.4A
Other languages
Chinese (zh)
Other versions
CN105155857B (en
Inventor
孟凡林
孟祥瑞
付萍
孟锦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Ding Yuan Construction Co., Ltd.
Original Assignee
孟凡林
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 孟凡林 filed Critical 孟凡林
Priority to CN201510487432.4A priority Critical patent/CN105155857B/en
Publication of CN105155857A publication Critical patent/CN105155857A/en
Application granted granted Critical
Publication of CN105155857B publication Critical patent/CN105155857B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention belongs to the field of architectural engineering and relates to a construction and installation method of architectural engineering partition wall boards. The top end of each partition wall slat is made into a fold-line end section, comprising slope top faces on two sides of the top end of the partition wall slat and an inverted-trapezoid groove in the top end of the partition wall slat; at the bottom of a mounting contact face of the partition wall slat corresponding to a center line of a whole partition wall board segment, a full-length inverted-trapezoid wooden batten is fixed through steel nails, the fixed inverted-trapezoid wood batten is clamped in the inverted-trapezoid groove in the top end of the partition wall slat; opposing trapezoidal wooden wedges at two ends of the whole partition wall board segment are symmetrically fastened for multiple times to implement tightening, and the fastening of the opposing trapezoidal wooden wedges at two ends of the whole partition wall board segment enables horizontal pre-compressive stress to occur in the plane of the whole partition wall board segment. The construction process and steps are simple, construction and installation are high in efficiency, a wall is smooth and clean, wall coloring caused by the fact that steel U-shaped clamps are rusted easily is avoided, the problem that cracks of the wall at vertical joints of the partition wall slats caused by the fact that the wall dries and shrinks easily can be effectively avoided, and the construction and installation cost is low.

Description

A kind of construction installation method of construction work partition board
Technical field
The invention belongs to construction engineering technical field, particularly relate to a kind of construction installation method of partition board.
Background technology
Construction work partition board, has National Standard of the People's Republic of China " light partition board for building " (GB/T23451-2009) and People's Republic of China's construction industry industry standard " concrete light batten " (JG/T350-2011); National building standard design atlas has China Inst of Architectural Standard Design to edit " internal partition wall-light lath (one) " (10J113-1).The building standard design atlas of all parts of the country side has a lot, as Jiangsu Province's engineering construction standard design atlas (recommending figure) " Light trabs construction drawings " (light aggregate concrete mill for slats of center partition wall made (Soviet Union J/T15-2005 (four)), Xinjiang engineering construction standard design atlas " internal partition wall structure (light hollow slat) " (new 12J11-1) etc.
The construction installation method of currently available technology construction work partition board, visible above-mentioned standard and type design atlas.Partition board top is concordant, and partition board top and beam (or floor) bottom method of attachment adopt steel U-shaped to fasten; Partition board horizontal end leaves space (what have does not do any process, and what have is also adopt steel U-shaped to fasten).Mainly there is two large problems in prior art: first steel U-shaped card gets rusty easily and causes metope mordanting, affects appearance effect; It two is that the drying shrinkage of body of wall easily causes body of wall at the vertical edge joint position cracking of batten, and have a strong impact on sight, cause a large amount of customer complaints, repair process is very difficult, is difficult to tackle the problem at its root.These two reasons cause Construction Party to using the conflict of partition board, make this building materials application very difficulty being conducive to environmental protection, material-saving, efficient and high-quality.Therefore a kind of technical scheme is needed to solve these problems.
Summary of the invention
Technical problem to be solved by this invention is: the construction installation method providing a kind of construction work partition board, its construction technology and operation are simple, construction and installation work efficiency is high, metope neatly smooth, there is not steel U-shaped card and get rusty easily and cause metope mordanting, can effectively prevent the drying shrinkage of body of wall and produce the vertical edge joint position cracking of body of wall at partition wall batten, construction and installation cost is low.
A construction installation method for construction work partition board, is characterized in that:
One, the preparation before construction
Make partition wall batten, the top vertical cross-section of described partition wall batten is fold-line-shaped, and the both sides on partition wall batten top are domatic end face, and there is inverted trapezoidal groove middle part, top; Make inverted trapezoidal flitch and trapezoidal timber wedge; By the bottom of the installation contact surface of partition wall batten, flooring and cylinder or metope cleaning leveling;
Two, construction and installation
Unwrapping wire on the bottom of the installation contact surface of described step one partition wall batten, flooring and cylinder or metope, bottom the installation contact surface of partition wall batten, inverted trapezoidal flitch is fixed by the position of center line steel nail of corresponding whole section of partition board;
Order installation is carried out in the one end choosing whole section of partition wall, snaps in the inverted trapezoidal groove on partition wall batten top by the inverted trapezoidal flitch after fixing with steel nail, and partition wall batten and horizontal plane, by two correct trapezoidal timber wedge jack-up of arranging, are guaranteed in the bottom of partition wall batten; Two correct trapezoidal timber wedges arranged are adopted to isolate between partition wall batten and cylinder or metope, and two correct trapezoidal timber wedges arranged leave stroke fastening further, and form partition board end side surface space between partition wall batten and cylinder or metope, partition wall batten top and be formed with partition board head room clearance between installing bottom contact surface, is formed with space bottom partition board bottom partition wall batten and between flooring;
Before continuation order installs partition wall batten, in the edge joint position side of two pieces of partition wall battens, glue is cohered in brushing, installs partition wall batten according to aforesaid operations continuation order;
Partition board is installed to last block partition wall batten according to aforesaid operations, isolate between partition wall batten and cylinder or metope with two correct trapezoidal timber wedges arranged between partition wall batten and cylinder or metope, then the trapezoidal timber wedge correspondence that the enemy at whole section of partition board two ends arranges is carried out top solid, the trapezoidal timber wedge arranged by the enemy at whole section of partition wall two ends fastening, makes to produce the compressive pre-stress having horizontal direction in whole section of partition board plane;
By fastening for the correct trapezoidal timber wedge arranged of two bottom partition wall batten, the space of whole section of partition wall periphery comprised harsh concrete filling in space bottom partition board end side surface space, partition board head room clearance and partition board and hit tight;
The end of whole section of partition board be there is no to the position of cylinder or metope contact, using the correct trapezoidal timber wedge arranged solid by pushing up in fact to the center position of whole section of partition board respectively at the top of whole section of partition board end side surface and bottom, making in whole section of partition board plane, to produce the compressive pre-stress having horizontal direction;
Repeat above-mentioned steps to complete to partition board construction and installation.
The compressive pre-stress that described whole section of partition wall is formed in its board plane is horizontal direction.
The bottom that described partition wall batten installs contact surface is provided with inverted trapezoidal flitch.
By above-mentioned design scheme, the present invention can bring following beneficial effect: a kind of construction installation method of construction work partition board, its construction technology and operation are simple, construction and installation work efficiency is high, metope neatly smooth, there is not steel U-shaped card and get rusty easily and cause metope mordanting, can effectively prevent the drying shrinkage of body of wall from easily causing body of wall at the vertical edge joint position cracking of partition wall batten, construction and installation cost is low.The employing of this construction installation method, can reach the object of environmental protection, material-saving, of fine quality, efficient and low consumption in the application of construction work partition board.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the present invention is further illustrated:
Fig. 1 is the construction installation method partition board top vertical cross-section figure of a kind of construction work partition board of the present invention.
Fig. 2 is the construction installation method inverted trapezoidal flitch sectional view of a kind of construction work partition board of the present invention.
Fig. 3 is the trapezoidal timber wedge elevation of construction installation method of a kind of construction work of the present invention partition board.
Fig. 4 is the hole elevational schematic view before the construction installation method partition board construction and installation of a kind of construction work partition board of the present invention.
Fig. 5 is the construction installation method inverted trapezoidal flitch construction and installation elevational schematic view of a kind of construction work partition board of the present invention.
Fig. 6 is the A-A sectional drawing of the construction installation method inverted trapezoidal flitch construction and installation of a kind of construction work partition board of the present invention.
Fig. 7 is the B-B sectional drawing of the construction installation method inverted trapezoidal flitch construction and installation of a kind of construction work partition board of the present invention.
Fig. 8 is the elevational schematic view of the construction installation method partition wall first piece of partition board construction and installation of a kind of construction work of the present invention partition board.
Fig. 9 is the C-C sectional drawing of the construction installation method partition board construction and installation of a kind of construction work partition board of the present invention.
Figure 10 is the D-D sectional drawing of the construction installation method partition board construction and installation of a kind of construction work partition board of the present invention.
Figure 11 is the E-E sectional drawing of the construction installation method partition board construction and installation of a kind of construction work partition board of the present invention.
Figure 12 is the F-F sectional drawing of the construction installation method partition board construction and installation of a kind of construction work partition board of the present invention.
Figure 13 is the elevational schematic view of the construction installation method partition board construction and installation of a kind of construction work partition board of the present invention.
Figure 14 is the elevational schematic view after the construction installation method partition wall construction and installation of a kind of construction work partition board of the present invention.
Figure 15 is the G-G sectional drawing of the construction installation method partition board construction and installation of a kind of construction work partition board of the present invention.
Figure 16 is the H-H sectional drawing of the construction installation method partition board construction and installation of a kind of construction work partition board of the present invention.
Figure 17 is the J-J sectional drawing of the construction installation method partition board construction and installation of a kind of construction work partition board of the present invention.
Figure 18 is the elevational schematic view of the construction installation method partition wall end of a kind of construction work partition board of the present invention partition board construction and installation when having a hole.
Figure 19 is the construction installation method partition wall end of a kind of construction work partition board of the present invention hole edge bottom partial enlarged drawing K when having a hole.
Figure 20 is the construction installation method partition wall end of a kind of construction work partition board of the present invention hole edge top partial enlarged drawing L when having a hole.
1-partition wall batten in figure, 2-domatic end face, 3-inverted trapezoidal groove, 4-inverted trapezoidal flitch, the trapezoidal timber wedge of 5-, 6-install space, 13-harsh concrete bottom the bottom of contact surface, 7-flooring, 8-cylinder or metope, 9-steel nail, 10-partition board end side surface space, 11-partition board head room clearance, 12-partition board.
Detailed description of the invention
A construction installation method for construction work partition board, comprising:
As shown in Fig. 1 ~ Figure 20, concrete operation step of the present invention is as follows:
Prepare before step one, construction and installation
As shown in Figure 1, partition wall batten 1 is the partition wall batten that existing country and provincial standard and standard design drawing are concentrated, and make partition wall batten 1, the top vertical cross-section of described partition wall batten 1 is fold-line-shaped, the both sides on partition wall batten 1 top are domatic end face 2, and there is inverted trapezoidal groove 3 middle part, top.
As shown in Figure 2 and Figure 3, inverted trapezoidal flitch 4 and trapezoidal timber wedge 5 is made.
As shown in Figure 4, by bottom the installation contact surface of partition wall batten 16, flooring 7 and cylinder or metope 8 clear up leveling.
Step 2, construction and installation process
As shown in Fig. 5, Fig. 6 and Fig. 7, unwrapping wire on the bottom 6 of the installation contact surface of partition wall batten 1, flooring 7 and cylinder or metope 8, in the bottom 6 of the installation contact surface of partition wall batten 1, elongated inverted trapezoidal flitch 4 is fixed by the position of center line steel nail 9 of corresponding whole section of partition board.
As Fig. 8, Fig. 9, Figure 10, shown in Figure 11 and Figure 12, one end along whole section of partition wall starts to install, the inverted trapezoidal flitch 4 fixed is snapped in partition wall batten 1 top inverted trapezoidal groove 3, bottom partition wall batten 1 with two correct trapezoidal timber wedges 5 arranged gently by partition wall batten 1 jack-up, do not push up to obtain tension (surplus held out against further need be left), do not roll as principle with partition wall batten 1, isolate between partition wall batten 1 and cylinder or metope 8 gently with two correct trapezoidal timber wedges 5 arranged between partition wall batten 1 and cylinder or metope 8, two correct trapezoidal timber wedges 5 arranged do not push up to obtain tension (need leave the surplus held out against further), partition board end side surface space 10 is formed between partition wall batten 1 and cylinder or metope 8, partition board head room clearance 11 is formed between partition wall batten 1 top and the bottom 6 of installing contact surface, space 12 bottom partition board is formed bottom partition wall batten 1 and between flooring 7.
As shown in Figure 11, Figure 12 and Figure 13, before partition wall batten 1 is installed in continuation, in partition wall batten 1 side of two pieces of partition wall batten 1 edge joint positions, glue is cohered in brushing, and then installs partition wall batten 1, and process is identical with aforesaid operations step.
As shown in Figure 13 and Figure 16, after last block partition wall batten 1 of whole section of partition board is installed, isolate between partition wall batten 1 and cylinder or metope 8 gently with two correct trapezoidal timber wedges 5 arranged between partition wall batten 1 and cylinder or metope 8, then trapezoidal timber wedge 5 symmetry that the enemy at whole section of partition board two ends arranges is carried out repeatedly fastening enforcement to hold out against, fastening the making of the trapezoidal timber wedge 5 arranged by the enemy at whole section of partition wall two ends produces the compressive pre-stress having horizontal direction in whole section of partition board plane.
As shown in Figure 14, Figure 15 and Figure 17, by fastening for the correct trapezoidal timber wedge 5 arranged of two bottom partition wall batten 1, the space (bottom partition board end side surface space 10, partition board head room clearance 11, partition board space 12) of whole section of partition wall periphery filled with harsh concrete 13 and hits tight.
As shown in Figure 18, Figure 19 and Figure 20, to the situation (comprising hole place) that the end of whole section of partition board does not have cylinder or metope 8 to contact, then hold out against by reality with the center position of the correct trapezoidal timber wedge 5 arranged to whole section of partition board respectively at the top of whole section of partition board end side surface and bottom, make to produce the compressive pre-stress having horizontal direction in whole section of partition board plane, other construction and installation process is the same.
The construction and installation of partition board complete.

Claims (3)

1. a construction installation method for construction work partition board, is characterized in that:
Comprise the following steps
Preparation before step one, construction
Make partition wall batten (1), the top vertical cross-section of described partition wall batten (1) is fold-line-shaped, the both sides on partition wall batten (1) top are domatic end face (2), and there is inverted trapezoidal groove (3) middle part, top; Make inverted trapezoidal flitch (4) and trapezoidal timber wedge (5); By the bottom (6) of the installation contact surface of partition wall batten (1), flooring (7) and cylinder or metope (8) cleaning leveling;
Step 2, construction and installation
At the bottom (6) of the installation contact surface of described step one partition wall batten (1), flooring (7) and cylinder or the upper unwrapping wire of metope (8), bottom the installation contact surface of partition wall batten (1), inverted trapezoidal flitch (4) is fixed by the position of center line steel nail (9) of (6) corresponding whole section of partition board;
Order installation is carried out in the one end choosing whole section of partition wall, inverted trapezoidal flitch (4) after fixing with steel nail (9) is snapped in the inverted trapezoidal groove (3) on partition wall batten (1) top, partition wall batten (1) and horizontal plane, by two correct trapezoidal timber wedge (5) jack-up of arranging, are guaranteed in the bottom of partition wall batten (1); Two correct trapezoidal timber wedges (5) arranged are adopted to isolate between partition wall batten (1) and cylinder or metope (8), and two correct trapezoidal timber wedges (5) arranged leave stroke fastening further, and form partition board end side surface space (10) between partition wall batten (1) and cylinder or metope (8), partition wall batten (1) top and install bottom contact surface and be formed with partition board head room clearance (11) between (6), is formed with space bottom partition board (12) between partition wall batten (1) bottom and flooring (7);
Install partition wall batten (1) in continuation order front, in the edge joint position side of two pieces of partition wall battens (1), glue is cohered in brushing, installs partition wall batten (1) according to aforesaid operations continuation order;
Partition board is installed to last block partition wall batten (1) according to aforesaid operations, isolate between partition wall batten (1) and cylinder or metope (8) with two correct trapezoidal timber wedges (5) arranged between partition wall batten (1) and cylinder or metope (8), then trapezoidal timber wedge (5) correspondence that the enemy at whole section of partition board two ends arranges is carried out top solid, the trapezoidal timber wedge (5) arranged by the enemy at whole section of partition wall two ends fastening, makes to produce the compressive pre-stress having horizontal direction in whole section of partition board plane;
By fastening for two of partition wall batten (1) the bottom correct trapezoidal timber wedges (5) arranged, the space of whole section of partition wall periphery comprised space (12) harsh concrete (13) filling bottom partition board end side surface space (10), partition board head room clearance (11) and partition board and hit tight;
To the position that the end of whole section of partition board does not have cylinder or metope (8) to contact, using the correct trapezoidal timber wedge (5) arranged solid by pushing up in fact to the center position of whole section of partition board respectively at the top of whole section of partition board end side surface and bottom, making in whole section of partition board plane, to produce the compressive pre-stress having horizontal direction;
Repeat above-mentioned steps to complete to partition board construction and installation.
2. the construction installation method of a kind of construction work partition board according to claim 1, is characterized in that: the compressive pre-stress that described whole section of partition wall is formed in its board plane is horizontal direction.
3. the construction installation method of a kind of construction work partition board according to claim 1, is characterized in that: the bottom (6) that described partition wall batten (1) installs contact surface is provided with inverted trapezoidal flitch (4).
CN201510487432.4A 2015-08-11 2015-08-11 A kind of construction installation method of architectural engineering partition plate Expired - Fee Related CN105155857B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510487432.4A CN105155857B (en) 2015-08-11 2015-08-11 A kind of construction installation method of architectural engineering partition plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510487432.4A CN105155857B (en) 2015-08-11 2015-08-11 A kind of construction installation method of architectural engineering partition plate

Publications (2)

Publication Number Publication Date
CN105155857A true CN105155857A (en) 2015-12-16
CN105155857B CN105155857B (en) 2017-04-05

Family

ID=54796866

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510487432.4A Expired - Fee Related CN105155857B (en) 2015-08-11 2015-08-11 A kind of construction installation method of architectural engineering partition plate

Country Status (1)

Country Link
CN (1) CN105155857B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024998A (en) * 2018-08-06 2018-12-18 庐江荣睿建设工程有限公司 A kind of mounting process of batten of internal partition for building

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2625244A1 (en) * 1987-12-24 1989-06-30 Bonnivard Guy Wedging device for levelling a floor, ceiling, wall or panel
CN102251606A (en) * 2011-04-26 2011-11-23 北京城建五建设工程有限公司 Outer partition wall built by adopting light concrete partition wall boards and construction method thereof
CN102352660A (en) * 2011-06-02 2012-02-15 南通建筑工程总承包有限公司 Gypsum block masonry and construction method thereof
CN102505862A (en) * 2011-11-03 2012-06-20 中山建华墙体材料有限公司 Installing process of lightweight internal partition wallboards

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2625244A1 (en) * 1987-12-24 1989-06-30 Bonnivard Guy Wedging device for levelling a floor, ceiling, wall or panel
CN102251606A (en) * 2011-04-26 2011-11-23 北京城建五建设工程有限公司 Outer partition wall built by adopting light concrete partition wall boards and construction method thereof
CN102352660A (en) * 2011-06-02 2012-02-15 南通建筑工程总承包有限公司 Gypsum block masonry and construction method thereof
CN102505862A (en) * 2011-11-03 2012-06-20 中山建华墙体材料有限公司 Installing process of lightweight internal partition wallboards

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024998A (en) * 2018-08-06 2018-12-18 庐江荣睿建设工程有限公司 A kind of mounting process of batten of internal partition for building

Also Published As

Publication number Publication date
CN105155857B (en) 2017-04-05

Similar Documents

Publication Publication Date Title
CN107044179B (en) Decorative panel and template integrated heat-preservation decorative composite wall and construction method thereof
CN106088471B (en) A kind of pseudo-classic architecture beam column wood armored structure construction method
CN205024849U (en) Wood structure building beam -column connection node structure
CN200992781Y (en) Indoor decorative column or beam
CN102777040A (en) Installation process of stagger-joint dual-wallboard inner partition wall and dual-wallboard inner partition
CN204919828U (en) Archaize building's wooden frame and steel structure column's connection structure
CN105155857A (en) Construction and installation method of architectural engineering partition wall boards
CN203603309U (en) Mesh plate outer wall with mesh joints mutually staggered
CN105155836A (en) Aluminum alloy formwork for buildings and method for applying aluminum alloy formwork
CN101392587B (en) Wood grille decorative system
CN209603421U (en) A kind of decorative heat-preservation plate used for building exterior wall
CN109537776A (en) A kind of construction method of architectural engineering partition plate
CN207959768U (en) A kind of connector and heat insulating decorative board
CN205637278U (en) Modular ridge in room is moulded to environment -friendly wood
CN205476280U (en) A hang subassembly futilely for ceramic sheet metal
CN204040360U (en) Prefabricated Woodveneer structure
CN100390370C (en) Rust-proof deform-proof wooden floor assembly and construction method thereof
CN208293977U (en) Dry-hang wall brick system in a kind of assembled room
CN202831299U (en) Double-wallboard staggered joint internal partition
CN202787714U (en) Archaized architecture roof with rafters wrapped by aluminium veneers
CN112854553A (en) Limiting method for free end of partition board
CN220318996U (en) Stone wood veneer external corner node
CN105040864A (en) Formwork supporting method for constructional column in limited space
CN215716756U (en) Building outer wall marble slab of antidetonation crack control
CN207776119U (en) A kind of connection structure of assembled wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180925

Address after: 130000 Changying business center 1106, 1768 Hongqi Street, Changchun, Jilin.

Patentee after: Jilin Ding Yuan Construction Co., Ltd.

Address before: 130061 Room 405, four building, Star Street, 2577 building street, Changchun, Jilin.

Patentee before: Meng Fanlin

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170405

Termination date: 20200811

CF01 Termination of patent right due to non-payment of annual fee