CN109537776A - A kind of construction method of architectural engineering partition plate - Google Patents
A kind of construction method of architectural engineering partition plate Download PDFInfo
- Publication number
- CN109537776A CN109537776A CN201811369496.4A CN201811369496A CN109537776A CN 109537776 A CN109537776 A CN 109537776A CN 201811369496 A CN201811369496 A CN 201811369496A CN 109537776 A CN109537776 A CN 109537776A
- Authority
- CN
- China
- Prior art keywords
- partition wall
- partition plate
- wall batten
- batten
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005192 partition Methods 0.000 title claims abstract description 109
- 238000010276 construction Methods 0.000 title claims abstract description 26
- 238000009434 installation Methods 0.000 claims abstract description 34
- 238000000034 method Methods 0.000 claims abstract description 14
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 11
- 239000010959 steel Substances 0.000 claims abstract description 11
- 238000009408 flooring Methods 0.000 claims description 6
- 239000004744 fabric Substances 0.000 claims description 4
- 239000003292 glue Substances 0.000 claims description 2
- 238000002360 preparation method Methods 0.000 claims description 2
- 230000003252 repetitive effect Effects 0.000 claims description 2
- 239000007787 solid Substances 0.000 claims description 2
- 238000001035 drying Methods 0.000 abstract description 4
- 238000005516 engineering process Methods 0.000 abstract description 3
- 238000005336 cracking Methods 0.000 abstract 1
- 239000000463 material Substances 0.000 description 2
- 239000004566 building material Substances 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
- E04B2/7401—Removable non-load-bearing partitions; Partitions with a free upper edge assembled using panels without a frame or supporting posts, with or without upper or lower edge locating rails
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
- E04B2/82—Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building
- E04B2/821—Connections between two opposed surfaces (i.e. floor and ceiling) by means of a device offering a restraining force acting in the plane of the partition
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Finishing Walls (AREA)
Abstract
A kind of construction installation method of architectural engineering partition plate, belongs to building engineering field, and fold-line-shaped end cross-sectional, including partition wall batten top two sides domatic top surface and partition wall batten top inverted trapezoidal groove are processed into the top of partition wall batten;Elongated inverted trapezoidal flitch is fixed with steel nail in the position of center line that the installation contact surface bottom of partition wall batten corresponds to whole section of partition plate, the inverted trapezoidal flitch fixed is caught in the inverted trapezoidal groove of partition wall batten top;The trapezoidal timber wedge of enemy of whole section of partition wall board ends is symmetrically carried out repeatedly fastening and implements to hold out against, by the fastening of the trapezoidal timber wedge of enemy at whole section of partition wall both ends, so that there is the compressive pre-stress of horizontal direction in whole section of partition plate plane.Construction technology and process of the present invention are simple, construction and installation work efficiency is high, metope it is clean and tidy it is smooth, there is no steel U-shaped card get rusty easily cause metope mordanting, the drying shrinkage that can be effectively prevented wall be easy to cause wall in the vertical edge joint position cracking of partition wall batten, construction and installation are at low cost.
Description
Technical field
The invention belongs to construction engineering technical fields, especially relate to a kind of construction installation method of partition plate.
Background technique
Architectural engineering partition plate has National Standard of the People's Republic of China " light partition board for building " (GB/
) and People's Republic of China's building industry professional standard " concrete light batten " (JG/T350-2011) T23451-2009;State
Family's building standard design atlas has China Inst of Architectural Standard Design to edit " internal partition wall-light lath (one) " (10J113-
1).The building standard design atlas of all parts of the country side has very much, as Jiangsu Province's engineering construction standard design atlas (recommending figure) is " light
Matter wall board structure atlas " (light aggregate concrete mill for slats of center partition wall (Soviet Union J/T15-2005 (four)), Xinjiang engineering construction standard is set
Count atlas " internal partition wall constructs (light hollow slat) " (new 12J11-1) etc..
The construction installation method of currently available technology architectural engineering partition plate, it is seen that above-mentioned standard and standard design drawing collection.
Partition plate top is concordant face, and partition plate top with beam (or floor) bottom connection method is fixed using steel U-shaped card;Partition wall
There are gap for plate horizontal end (some does not make any processing, and some is also to be fixed using steel U-shaped card).The prior art is mainly deposited
In two large problems: one is steel U-shaped card gets rusty easily and causes metope mordanting, influencing appearance;The second is the drying shrinkage of wall
It is easy to cause wall to crack in the vertical edge joint position of batten, seriously affects sight, cause a large amount of customer complaint, repair process is non-
It is often difficult, it is difficult to tackle the problem at its root.The two reasons cause conflict of the Construction Party to partition plate is used, so that this
It is good for the environment, saves material, efficient and good building material using extremely difficult.Therefore a kind of technical solution is needed to solve this
A little problems.
Summary of the invention
The technical problems to be solved by the present invention are: providing a kind of construction installation method of architectural engineering partition plate, apply
Work technique and process are simple, construction and installation work efficiency is high, metope is neatly smooth, get rusty easily there is no steel U-shaped card and cause metope
Mordanting, the vertical edge joint position that the drying shrinkage of wall can be effectively prevented and generate wall in partition wall batten crack, construction and installation cost
It is low.
A kind of construction installation method of architectural engineering partition plate, it is characterized in that:
One, the preparation before constructing
Partition wall batten is made, the top vertical cross-section of the partition wall batten is fold-line-shaped, and the two sides on partition wall batten top are slope
There is inverted trapezoidal groove at shape top surface, top centre position;Make inverted trapezoidal flitch and trapezoidal timber wedge;The installation of partition wall batten is contacted
Bottom, flooring and the cylinder or metope in face clear up leveling;
Two, construction and installation
The unwrapping wire on bottom, flooring and the cylinder or metope of the installation contact surface of the step 1 partition wall batten, in partition wall
The position of center line that the installation contact surface bottom of batten corresponds to whole section of partition plate is fixed inverted trapezoidal flitch with steel nail;
One end carry out sequence installation of whole section of partition wall is chosen, the inverted trapezoidal flitch after being fixed with steel nail is caught in partition wall batten top
Inverted trapezoidal groove in, the bottom of partition wall batten is jacked up by the trapezoidal timber wedges of two correct arrangements, it is ensured that partition wall batten and horizontal
Face is vertical;Trapezoidal timber wedge using two correct arrangements will be isolated between partition wall batten and cylinder or metope, and two correct cloth
There are the strokes further fastened for the trapezoidal timber wedge set, and it is empty that partition plate end side surface is formed between partition wall batten and cylinder or metope
Gap is formed with partition plate head room clearance, partition wall batten bottom and flooring between partition wall batten top and installation contact surface bottom
Between be formed with partition plate bottom gap;
Before continuation sequence installs partition wall batten, is brushed in the edge joint position side of two pieces of partition wall battens and cohere glue, according to above-mentioned behaviour
Make continuation sequence installation partition wall batten;
According to aforesaid operations installation partition plate to last block partition wall batten, with two between partition wall batten and cylinder or metope
The trapezoidal timber wedge of enemy's arrangement will be isolated between partition wall batten and cylinder or metope, then by the correct cloth of whole section of partition wall board ends
The trapezoidal timber wedge set is corresponding push up admittedly, by the fastening of the trapezoidal timber wedge of the correct arrangement at whole section of partition wall both ends, so that whole section
There is the compressive pre-stress of horizontal direction in partition plate plane;
By the trapezoidal timber wedge fastening of two of partition wall batten bottom correct arrangements, the gap by whole section of partition wall periphery includes partition plate
End side surface gap, partition plate head room clearance and the filling of partition plate bottom gap dry concrete are hit tight;
There is no the position of cylinder or metope contact to the end of whole section of partition plate, in the top and bottom of whole section of partition plate end side surface
It is solid by real top to the center position of whole section of partition plate with the trapezoidal timber wedge of correct arrangement respectively, so that being produced in whole section of partition plate plane
There is the compressive pre-stress of horizontal direction;
Repetitive operation above-mentioned steps to partition plate construction and installation are completed.
The compressive pre-stress that the whole section of partition wall is formed in its batten plane is horizontal direction.
The bottom of the partition wall batten installation contact surface is equipped with inverted trapezoidal flitch.
Through the above design, the present invention can be brought the following benefits: a kind of construction of architectural engineering partition plate
Installation method, construction technology and process are simple, construction and installation work efficiency is high, metope is neatly smooth, there is no steel U-shaped cards to be easy
Get rusty cause metope mordanting, the drying shrinkage that can be effectively prevented wall be easy to cause wall to open in the vertical edge joint position of partition wall batten
It splits, construction and installation are at low cost.The use of this construction installation method, architectural engineering partition plate application in can achieve environmental protection,
Save material, of fine quality, efficient and low consumption purpose.
Claims (1)
1. a kind of construction installation method of architectural engineering partition plate, it is characterized in that:
One, the preparation before constructing
Partition wall batten is made, the top vertical cross-section of the partition wall batten is fold-line-shaped, and the two sides on partition wall batten top are slope
There is inverted trapezoidal groove at shape top surface, top centre position;Make inverted trapezoidal flitch and trapezoidal timber wedge;The installation of partition wall batten is contacted
Bottom, flooring and the cylinder or metope in face clear up leveling;
Two, construction and installation
The unwrapping wire on bottom, flooring and the cylinder or metope of the installation contact surface of the step 1 partition wall batten, in partition wall
The position of center line that the installation contact surface bottom of batten corresponds to whole section of partition plate is fixed inverted trapezoidal flitch with steel nail;
One end carry out sequence installation of whole section of partition wall is chosen, the inverted trapezoidal flitch after being fixed with steel nail is caught in partition wall batten top
Inverted trapezoidal groove in, the bottom of partition wall batten is jacked up by the trapezoidal timber wedges of two correct arrangements, it is ensured that partition wall batten and horizontal
Face is vertical;Trapezoidal timber wedge using two correct arrangements will be isolated between partition wall batten and cylinder or metope, and two correct cloth
There are the strokes further fastened for the trapezoidal timber wedge set, and it is empty that partition plate end side surface is formed between partition wall batten and cylinder or metope
Gap is formed with partition plate head room clearance, partition wall batten bottom and flooring between partition wall batten top and installation contact surface bottom
Between be formed with partition plate bottom gap;
Before continuation sequence installs partition wall batten, is brushed in the edge joint position side of two pieces of partition wall battens and cohere glue, according to above-mentioned behaviour
Make continuation sequence installation partition wall batten;
According to aforesaid operations installation partition plate to last block partition wall batten, with two between partition wall batten and cylinder or metope
The trapezoidal timber wedge of enemy's arrangement will be isolated between partition wall batten and cylinder or metope, then by the correct cloth of whole section of partition wall board ends
The trapezoidal timber wedge set is corresponding push up admittedly, by the fastening of the trapezoidal timber wedge of the correct arrangement at whole section of partition wall both ends, so that whole section
There is the compressive pre-stress of horizontal direction in partition plate plane;
By the trapezoidal timber wedge fastening of two of partition wall batten bottom correct arrangements, the gap by whole section of partition wall periphery includes partition plate
End side surface gap, partition plate head room clearance and the filling of partition plate bottom gap dry concrete are hit tight;
There is no the position of cylinder or metope contact to the end of whole section of partition plate, in the top and bottom of whole section of partition plate end side surface
It is solid by real top to the center position of whole section of partition plate with the trapezoidal timber wedge of correct arrangement respectively, so that being produced in whole section of partition plate plane
There is the compressive pre-stress of horizontal direction;
Repetitive operation above-mentioned steps to partition plate construction and installation are completed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811369496.4A CN109537776A (en) | 2018-11-16 | 2018-11-16 | A kind of construction method of architectural engineering partition plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811369496.4A CN109537776A (en) | 2018-11-16 | 2018-11-16 | A kind of construction method of architectural engineering partition plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109537776A true CN109537776A (en) | 2019-03-29 |
Family
ID=65847747
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811369496.4A Pending CN109537776A (en) | 2018-11-16 | 2018-11-16 | A kind of construction method of architectural engineering partition plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109537776A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110792202A (en) * | 2019-11-01 | 2020-02-14 | 江苏省华建建设股份有限公司 | Surface crack prevention and control process for assembly type partition plate joint |
-
2018
- 2018-11-16 CN CN201811369496.4A patent/CN109537776A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110792202A (en) * | 2019-11-01 | 2020-02-14 | 江苏省华建建设股份有限公司 | Surface crack prevention and control process for assembly type partition plate joint |
CN110792202B (en) * | 2019-11-01 | 2022-05-03 | 江苏省华建建设股份有限公司 | Surface crack prevention and control process for assembly type partition plate joint |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103225362B (en) | Assembled light steel keel gypsum plate irregularly-shaped suspended ceiling system | |
CN106088471B (en) | A kind of pseudo-classic architecture beam column wood armored structure construction method | |
CN109537776A (en) | A kind of construction method of architectural engineering partition plate | |
CN105155836B (en) | Aluminum alloy mould plate for building and its using method | |
CN210918080U (en) | Wooden floor mosaic structure | |
CN205677110U (en) | A kind of wooden partition wall being easy for installation and removal | |
CN104120860A (en) | Construction method for cement mortar ground leveling | |
CN204186016U (en) | A kind of revetment | |
CN105155857B (en) | A kind of construction installation method of architectural engineering partition plate | |
CN208685979U (en) | A kind of decoration integrated heat-insulation wall plate of separate assembling | |
CN200946426Y (en) | Insert and fastener combined and adjustable door or window pocket | |
CN207776119U (en) | A kind of connection structure of assembled wall | |
CN206385766U (en) | A kind of assembled wall board buckle structure | |
CN204238498U (en) | A kind of Recombined bamboo assembled wall | |
CN207974424U (en) | A kind of mounting device of strip panel | |
CN112854553A (en) | Limiting method for free end of partition board | |
CN204531072U (en) | A kind of light thermal-insulation partition board connected without slurry | |
CN108360784B (en) | Assembled indoor dry-hanging wall brick and construction method thereof | |
CN209686435U (en) | A kind of novel building sinks to pilework | |
CN208073235U (en) | Combine sliding door set | |
CN201423693Y (en) | Toothing veneered solid wood painting-free board | |
CN206616799U (en) | A kind of sunk type concrete mixing plant aluminium alloy board house metope body structure | |
CN205712725U (en) | A kind of combined wall panel | |
CN208039697U (en) | A kind of wallboard buckle structure | |
CN205742865U (en) | A kind of mounting structure of environment-friendly type Wood-plastic floor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190329 |
|
WD01 | Invention patent application deemed withdrawn after publication |