CN102505685A - 管桩缺陷的处理方法 - Google Patents

管桩缺陷的处理方法 Download PDF

Info

Publication number
CN102505685A
CN102505685A CN2011103741168A CN201110374116A CN102505685A CN 102505685 A CN102505685 A CN 102505685A CN 2011103741168 A CN2011103741168 A CN 2011103741168A CN 201110374116 A CN201110374116 A CN 201110374116A CN 102505685 A CN102505685 A CN 102505685A
Authority
CN
China
Prior art keywords
pile tube
depth
pile
defective
processing method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103741168A
Other languages
English (en)
Inventor
叶永毅
谭骞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Institute of Architectural Design Co., Ltd.
Original Assignee
SUZHOU INSTITUTE OF ARCHITECTURAL DESIGN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU INSTITUTE OF ARCHITECTURAL DESIGN Co Ltd filed Critical SUZHOU INSTITUTE OF ARCHITECTURAL DESIGN Co Ltd
Priority to CN2011103741168A priority Critical patent/CN102505685A/zh
Publication of CN102505685A publication Critical patent/CN102505685A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

本发明公开了一种 管桩缺陷的处理方法,管桩在距桩顶 2m 以下存在较严重缺陷,其特征在于,步骤 1 ,管桩内掏土至缺陷以下一定深度;步骤 2 ,对管桩内用钢筋混凝土进行灌芯补强,灌芯深度为自缺陷往下 2m 左右;步骤 3 ,管桩外一圈采用护筒支护,挖出管桩周边与护筒之间的土,深度至缺陷以下 2m 左右;步骤 4 ,往管桩周边与护筒之间浇筑钢筋混凝土加强,浇筑深度为步骤 3 中挖土深度。本发明方法工艺简单,施工容易,且造价较低。

Description

管桩缺陷的处理方法
技术领域
本发明涉及建筑施工技术领域,尤其是一种管桩缺陷的处理方法。
背景技术
管桩在施工过程中以及由于开挖等原因造成的断桩等缺陷,特别是在软土地区此类情况比较常见。经检测单位检测认定为Ⅲ、Ⅳ类桩的基桩通常要分析产生缺陷的原因,并提出适当加固补强的方案。目前已有的常规处理方法有:灌芯补强法、补桩法等。灌芯补强法对于管桩缺陷较严重的则无法保证处理后的承载力;而补桩法由于施工难度较大,对工期和造价影响较大。因此对于软土地区在桩顶2m以下有较严重缺陷的管桩目前尚无工艺比较简单,造价较低的处理方法。
发明内容
本发明目的是:提供一种针对软土地区在桩顶2m以下有较严重缺陷的管桩的处理方法。
本发明的技术方案是:
一种管桩缺陷的处理方法,管桩在距桩顶2m以下存在较严重缺陷,其特征在于,
步骤1,管桩内掏土至缺陷以下一定深度;
步骤2,对管桩内用钢筋混凝土进行灌芯补强,灌芯深度为自缺陷往下2m左右;
步骤3,管桩外一圈采用护筒支护,挖出管桩周边与护筒之间的土,深度至缺陷以下2m左右;
步骤4,往管桩周边与护筒之间浇筑钢筋混凝土加强,浇筑深度为步骤3中挖土深度。
优选的,步骤3中管桩与护筒间距大于等于200mm。
优选的,步骤3中所述挖土方法采用人工挖土或者水冲刷法。
优选的,步骤2和步骤4所述钢筋混凝土为不低于C25钢筋混凝土。
本发明的优点是:
采用本发明方法处理软土地区在桩顶2m以下有较严重缺陷的管桩,工艺较为简单,容易施工操作,而且造价较低。
附图说明
下面结合附图及实施例对本发明作进一步描述:
图1为本发明实施方案示意图。
其中:1、管桩,2、缺陷位置,3、护筒。
具体实施方式
实施例:
以下结合具体实施例对上述方案做进一步说明。应理解,这些实施例是用于说明本发明而不限于限制本发明的范围。实施例中采用的实施条件可以根据具体厂家的条件做进一步调整,未注明的实施条件通常为常规实验中的条件。
一种管桩缺陷的处理方法,管桩1在距桩顶2m以下存在较严重缺陷,
步骤1,管桩1内掏土至缺陷位置2以下一定深度;
步骤2,对管桩1内用钢筋混凝土进行灌芯补强,灌芯深度为自缺陷位置2往下2m左右;
步骤3,管桩1外一圈采用护筒3支护,挖出管桩1周边与护筒3之间的土,深度至缺陷以下2m左右;
步骤4,往管桩1周边与护筒3之间浇筑钢筋混凝土加强,浇筑深度为步骤3中挖土深度。
本发明新型的一优选实施例中,步骤3中管桩1与护筒3间距大于等于200mm。
本发明新型的一优选实施例中,步骤3中所述挖土方法采用人工挖土或者水冲刷法。
本发明新型的一优选实施例中,步骤2和步骤4所述钢筋混凝土为不低于C25钢筋混凝土。
以上显示和描述了本发明的基本原理、主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。

Claims (4)

1. 一种管桩缺陷的处理方法,管桩在距桩顶2m以下存在较严重缺陷,其特征在于,
步骤1,管桩内掏土至缺陷以下一定深度;
步骤2,对管桩内用钢筋混凝土进行灌芯补强,灌芯深度为自缺陷往下2m左右;
步骤3,管桩外一圈采用护筒支护,挖出管桩周边与护筒之间的土,深度至缺陷以下2m左右;
步骤4,往管桩周边与护筒之间浇筑钢筋混凝土加强,浇筑深度为步骤3中挖土深度。
2. 根据权利要求1所述的管桩缺陷的处理方法,其特征在于,步骤3中管桩与护筒间距大于等于200mm。
3. 根据权利要求1所述的管桩缺陷的处理方法,其特征在于,步骤3中所述挖土方法采用人工挖土或者水冲刷法。
4. 根据权利要求1所述的管桩缺陷的处理方法,其特征在于,步骤2和步骤4所述钢筋混凝土为不低于C25钢筋混凝土。
CN2011103741168A 2011-11-22 2011-11-22 管桩缺陷的处理方法 Pending CN102505685A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103741168A CN102505685A (zh) 2011-11-22 2011-11-22 管桩缺陷的处理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103741168A CN102505685A (zh) 2011-11-22 2011-11-22 管桩缺陷的处理方法

Publications (1)

Publication Number Publication Date
CN102505685A true CN102505685A (zh) 2012-06-20

Family

ID=46217812

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103741168A Pending CN102505685A (zh) 2011-11-22 2011-11-22 管桩缺陷的处理方法

Country Status (1)

Country Link
CN (1) CN102505685A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103132513A (zh) * 2013-02-25 2013-06-05 中交武汉港湾工程设计研究院有限公司 高桩码头受损基桩的修复方法
CN108914932A (zh) * 2018-07-16 2018-11-30 中建四局第建筑工程有限公司 一种预应力管桩接桩施工方法及装置
CN112411642A (zh) * 2020-11-13 2021-02-26 浙江杰地建筑设计有限公司 大直径混凝土灌注桩缺陷处理的加固结构及施工方法
CN113062312A (zh) * 2021-03-31 2021-07-02 山东建筑大学 一种抗浮桩爆桩用加固方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19518066C1 (de) * 1995-05-17 1996-08-01 Bilfinger Berger Bau Verfahren zur Sanierung eines Bohrpfahls
JPH0960028A (ja) * 1995-08-25 1997-03-04 Shimizu Corp 既存鋼管杭の耐力増強方法
JP2001049661A (ja) * 1999-08-05 2001-02-20 Nippon Hume Corp 既設コンクリート杭の耐震補強方法
CN101220593A (zh) * 2008-01-25 2008-07-16 东莞市桦业土木基础工程有限公司 一种预应力管桩施工后处理该管桩断裂的加固方法
CN101906789A (zh) * 2010-07-23 2010-12-08 中国建筑第二工程局有限公司 软土地基预应力高强混凝土管桩倾斜缺陷的修补方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19518066C1 (de) * 1995-05-17 1996-08-01 Bilfinger Berger Bau Verfahren zur Sanierung eines Bohrpfahls
JPH0960028A (ja) * 1995-08-25 1997-03-04 Shimizu Corp 既存鋼管杭の耐力増強方法
JP2001049661A (ja) * 1999-08-05 2001-02-20 Nippon Hume Corp 既設コンクリート杭の耐震補強方法
CN101220593A (zh) * 2008-01-25 2008-07-16 东莞市桦业土木基础工程有限公司 一种预应力管桩施工后处理该管桩断裂的加固方法
CN101906789A (zh) * 2010-07-23 2010-12-08 中国建筑第二工程局有限公司 软土地基预应力高强混凝土管桩倾斜缺陷的修补方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
樊富春等: "PHC桩断桩问题的处理与分析研究", 《建筑施工》, no. 06, 25 June 2009 (2009-06-25) *
陆祖安: "钻孔灌注桩强度缺陷的补强方法", 《探矿工程(岩土钻掘工程)》, no. 03, 25 March 1992 (1992-03-25) *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103132513A (zh) * 2013-02-25 2013-06-05 中交武汉港湾工程设计研究院有限公司 高桩码头受损基桩的修复方法
CN108914932A (zh) * 2018-07-16 2018-11-30 中建四局第建筑工程有限公司 一种预应力管桩接桩施工方法及装置
CN112411642A (zh) * 2020-11-13 2021-02-26 浙江杰地建筑设计有限公司 大直径混凝土灌注桩缺陷处理的加固结构及施工方法
CN113062312A (zh) * 2021-03-31 2021-07-02 山东建筑大学 一种抗浮桩爆桩用加固方法
CN113062312B (zh) * 2021-03-31 2022-10-25 山东建筑大学 一种抗浮桩爆桩用加固方法

Similar Documents

Publication Publication Date Title
CN103485343B (zh) 灌注桩桩头处理方法
CN101220593A (zh) 一种预应力管桩施工后处理该管桩断裂的加固方法
CN105155516B (zh) 在全面清理地下障碍物前施工钻孔灌注桩的方法
CN104775433B (zh) 一种拔桩施工的方法
CN102505685A (zh) 管桩缺陷的处理方法
CN107542093B (zh) 一种冲孔灌注桩清底方法
CN104746519A (zh) 一种清障施工方法
CN107503344A (zh) 周转式分节钢护筒护壁人工挖孔灌注桩的施工方法
CN105625430A (zh) 一种狭小施工区域高压水切割土体拔桩方法
CN101798823B (zh) 通道法远程纠偏工法
CN103643688A (zh) 用于浅水水域高桩承台施工的无填土钢板桩围堰
CN102912789A (zh) 喀斯特地貌下机械成孔技术
CN102220764B (zh) 深基坑支护体系的施工方法
CN104074184B (zh) 一种桩底后注浆扩底灌注桩
CN203007940U (zh) 边坡锤击施工中的管桩防护结构
CN107299635A (zh) 一种软土地基边坡塌方支护加固方法
CN205242382U (zh) 一种局部可回收支护桩
CN205444192U (zh) 一种桥梁桩冲桩施工系统
CN204780975U (zh) 用于中压配电线路的四回路终端钢管杆掏挖锚桩复合基础
CN103790173B (zh) 灰土挤密桩与cfg刚性桩联合处理湿陷性黄土的装置及方法
CN103015433A (zh) 一种超大直径圆方形组合的深基坑施工方法
CN203891045U (zh) 深基坑围护桩间的堵漏注浆装置
CN106545012B (zh) 钢立柱导向管插入法工艺
CN105862864A (zh) 预应力混凝土管桩桩顶清土的施工方法
CN206246064U (zh) 一种旋挖钻辅助卸渣简易装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20120710

Address after: 215021 Suzhou Industrial Park, Jiangsu Xinghai street, No. 9

Applicant after: Suzhou Institute of Architectural Design Co., Ltd.

Address before: 215021 Suzhou Industrial Park, Jiangsu, Xinghai street, No. 9, No.

Applicant before: Suzhou Institute of Architectural Design Co., Ltd.

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120620