CN102505685A - 管桩缺陷的处理方法 - Google Patents
管桩缺陷的处理方法 Download PDFInfo
- Publication number
- CN102505685A CN102505685A CN2011103741168A CN201110374116A CN102505685A CN 102505685 A CN102505685 A CN 102505685A CN 2011103741168 A CN2011103741168 A CN 2011103741168A CN 201110374116 A CN201110374116 A CN 201110374116A CN 102505685 A CN102505685 A CN 102505685A
- Authority
- CN
- China
- Prior art keywords
- pile tube
- depth
- pile
- defective
- processing method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
本发明公开了一种
管桩缺陷的处理方法,管桩在距桩顶
2m
以下存在较严重缺陷,其特征在于,步骤
1
,管桩内掏土至缺陷以下一定深度;步骤
2
,对管桩内用钢筋混凝土进行灌芯补强,灌芯深度为自缺陷往下
2m
左右;步骤
3
,管桩外一圈采用护筒支护,挖出管桩周边与护筒之间的土,深度至缺陷以下
2m
左右;步骤
4
,往管桩周边与护筒之间浇筑钢筋混凝土加强,浇筑深度为步骤
3
中挖土深度。本发明方法工艺简单,施工容易,且造价较低。
Description
技术领域
本发明涉及建筑施工技术领域,尤其是一种管桩缺陷的处理方法。
背景技术
管桩在施工过程中以及由于开挖等原因造成的断桩等缺陷,特别是在软土地区此类情况比较常见。经检测单位检测认定为Ⅲ、Ⅳ类桩的基桩通常要分析产生缺陷的原因,并提出适当加固补强的方案。目前已有的常规处理方法有:灌芯补强法、补桩法等。灌芯补强法对于管桩缺陷较严重的则无法保证处理后的承载力;而补桩法由于施工难度较大,对工期和造价影响较大。因此对于软土地区在桩顶2m以下有较严重缺陷的管桩目前尚无工艺比较简单,造价较低的处理方法。
发明内容
本发明目的是:提供一种针对软土地区在桩顶2m以下有较严重缺陷的管桩的处理方法。
本发明的技术方案是:
一种管桩缺陷的处理方法,管桩在距桩顶2m以下存在较严重缺陷,其特征在于,
步骤1,管桩内掏土至缺陷以下一定深度;
步骤2,对管桩内用钢筋混凝土进行灌芯补强,灌芯深度为自缺陷往下2m左右;
步骤3,管桩外一圈采用护筒支护,挖出管桩周边与护筒之间的土,深度至缺陷以下2m左右;
步骤4,往管桩周边与护筒之间浇筑钢筋混凝土加强,浇筑深度为步骤3中挖土深度。
优选的,步骤3中管桩与护筒间距大于等于200mm。
优选的,步骤3中所述挖土方法采用人工挖土或者水冲刷法。
优选的,步骤2和步骤4所述钢筋混凝土为不低于C25钢筋混凝土。
本发明的优点是:
采用本发明方法处理软土地区在桩顶2m以下有较严重缺陷的管桩,工艺较为简单,容易施工操作,而且造价较低。
附图说明
下面结合附图及实施例对本发明作进一步描述:
图1为本发明实施方案示意图。
其中:1、管桩,2、缺陷位置,3、护筒。
具体实施方式
实施例:
以下结合具体实施例对上述方案做进一步说明。应理解,这些实施例是用于说明本发明而不限于限制本发明的范围。实施例中采用的实施条件可以根据具体厂家的条件做进一步调整,未注明的实施条件通常为常规实验中的条件。
一种管桩缺陷的处理方法,管桩1在距桩顶2m以下存在较严重缺陷,
步骤1,管桩1内掏土至缺陷位置2以下一定深度;
步骤2,对管桩1内用钢筋混凝土进行灌芯补强,灌芯深度为自缺陷位置2往下2m左右;
步骤3,管桩1外一圈采用护筒3支护,挖出管桩1周边与护筒3之间的土,深度至缺陷以下2m左右;
步骤4,往管桩1周边与护筒3之间浇筑钢筋混凝土加强,浇筑深度为步骤3中挖土深度。
本发明新型的一优选实施例中,步骤3中管桩1与护筒3间距大于等于200mm。
本发明新型的一优选实施例中,步骤3中所述挖土方法采用人工挖土或者水冲刷法。
本发明新型的一优选实施例中,步骤2和步骤4所述钢筋混凝土为不低于C25钢筋混凝土。
以上显示和描述了本发明的基本原理、主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。
Claims (4)
1. 一种管桩缺陷的处理方法,管桩在距桩顶2m以下存在较严重缺陷,其特征在于,
步骤1,管桩内掏土至缺陷以下一定深度;
步骤2,对管桩内用钢筋混凝土进行灌芯补强,灌芯深度为自缺陷往下2m左右;
步骤3,管桩外一圈采用护筒支护,挖出管桩周边与护筒之间的土,深度至缺陷以下2m左右;
步骤4,往管桩周边与护筒之间浇筑钢筋混凝土加强,浇筑深度为步骤3中挖土深度。
2. 根据权利要求1所述的管桩缺陷的处理方法,其特征在于,步骤3中管桩与护筒间距大于等于200mm。
3. 根据权利要求1所述的管桩缺陷的处理方法,其特征在于,步骤3中所述挖土方法采用人工挖土或者水冲刷法。
4. 根据权利要求1所述的管桩缺陷的处理方法,其特征在于,步骤2和步骤4所述钢筋混凝土为不低于C25钢筋混凝土。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103741168A CN102505685A (zh) | 2011-11-22 | 2011-11-22 | 管桩缺陷的处理方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103741168A CN102505685A (zh) | 2011-11-22 | 2011-11-22 | 管桩缺陷的处理方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102505685A true CN102505685A (zh) | 2012-06-20 |
Family
ID=46217812
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011103741168A Pending CN102505685A (zh) | 2011-11-22 | 2011-11-22 | 管桩缺陷的处理方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102505685A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103132513A (zh) * | 2013-02-25 | 2013-06-05 | 中交武汉港湾工程设计研究院有限公司 | 高桩码头受损基桩的修复方法 |
CN108914932A (zh) * | 2018-07-16 | 2018-11-30 | 中建四局第建筑工程有限公司 | 一种预应力管桩接桩施工方法及装置 |
CN112411642A (zh) * | 2020-11-13 | 2021-02-26 | 浙江杰地建筑设计有限公司 | 大直径混凝土灌注桩缺陷处理的加固结构及施工方法 |
CN113062312A (zh) * | 2021-03-31 | 2021-07-02 | 山东建筑大学 | 一种抗浮桩爆桩用加固方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19518066C1 (de) * | 1995-05-17 | 1996-08-01 | Bilfinger Berger Bau | Verfahren zur Sanierung eines Bohrpfahls |
JPH0960028A (ja) * | 1995-08-25 | 1997-03-04 | Shimizu Corp | 既存鋼管杭の耐力増強方法 |
JP2001049661A (ja) * | 1999-08-05 | 2001-02-20 | Nippon Hume Corp | 既設コンクリート杭の耐震補強方法 |
CN101220593A (zh) * | 2008-01-25 | 2008-07-16 | 东莞市桦业土木基础工程有限公司 | 一种预应力管桩施工后处理该管桩断裂的加固方法 |
CN101906789A (zh) * | 2010-07-23 | 2010-12-08 | 中国建筑第二工程局有限公司 | 软土地基预应力高强混凝土管桩倾斜缺陷的修补方法 |
-
2011
- 2011-11-22 CN CN2011103741168A patent/CN102505685A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19518066C1 (de) * | 1995-05-17 | 1996-08-01 | Bilfinger Berger Bau | Verfahren zur Sanierung eines Bohrpfahls |
JPH0960028A (ja) * | 1995-08-25 | 1997-03-04 | Shimizu Corp | 既存鋼管杭の耐力増強方法 |
JP2001049661A (ja) * | 1999-08-05 | 2001-02-20 | Nippon Hume Corp | 既設コンクリート杭の耐震補強方法 |
CN101220593A (zh) * | 2008-01-25 | 2008-07-16 | 东莞市桦业土木基础工程有限公司 | 一种预应力管桩施工后处理该管桩断裂的加固方法 |
CN101906789A (zh) * | 2010-07-23 | 2010-12-08 | 中国建筑第二工程局有限公司 | 软土地基预应力高强混凝土管桩倾斜缺陷的修补方法 |
Non-Patent Citations (2)
Title |
---|
樊富春等: "PHC桩断桩问题的处理与分析研究", 《建筑施工》, no. 06, 25 June 2009 (2009-06-25) * |
陆祖安: "钻孔灌注桩强度缺陷的补强方法", 《探矿工程(岩土钻掘工程)》, no. 03, 25 March 1992 (1992-03-25) * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103132513A (zh) * | 2013-02-25 | 2013-06-05 | 中交武汉港湾工程设计研究院有限公司 | 高桩码头受损基桩的修复方法 |
CN108914932A (zh) * | 2018-07-16 | 2018-11-30 | 中建四局第建筑工程有限公司 | 一种预应力管桩接桩施工方法及装置 |
CN112411642A (zh) * | 2020-11-13 | 2021-02-26 | 浙江杰地建筑设计有限公司 | 大直径混凝土灌注桩缺陷处理的加固结构及施工方法 |
CN113062312A (zh) * | 2021-03-31 | 2021-07-02 | 山东建筑大学 | 一种抗浮桩爆桩用加固方法 |
CN113062312B (zh) * | 2021-03-31 | 2022-10-25 | 山东建筑大学 | 一种抗浮桩爆桩用加固方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103485343B (zh) | 灌注桩桩头处理方法 | |
CN101220593A (zh) | 一种预应力管桩施工后处理该管桩断裂的加固方法 | |
CN105155516B (zh) | 在全面清理地下障碍物前施工钻孔灌注桩的方法 | |
CN104775433B (zh) | 一种拔桩施工的方法 | |
CN102505685A (zh) | 管桩缺陷的处理方法 | |
CN107542093B (zh) | 一种冲孔灌注桩清底方法 | |
CN104746519A (zh) | 一种清障施工方法 | |
CN107503344A (zh) | 周转式分节钢护筒护壁人工挖孔灌注桩的施工方法 | |
CN105625430A (zh) | 一种狭小施工区域高压水切割土体拔桩方法 | |
CN101798823B (zh) | 通道法远程纠偏工法 | |
CN103643688A (zh) | 用于浅水水域高桩承台施工的无填土钢板桩围堰 | |
CN102912789A (zh) | 喀斯特地貌下机械成孔技术 | |
CN102220764B (zh) | 深基坑支护体系的施工方法 | |
CN104074184B (zh) | 一种桩底后注浆扩底灌注桩 | |
CN203007940U (zh) | 边坡锤击施工中的管桩防护结构 | |
CN107299635A (zh) | 一种软土地基边坡塌方支护加固方法 | |
CN205242382U (zh) | 一种局部可回收支护桩 | |
CN205444192U (zh) | 一种桥梁桩冲桩施工系统 | |
CN204780975U (zh) | 用于中压配电线路的四回路终端钢管杆掏挖锚桩复合基础 | |
CN103790173B (zh) | 灰土挤密桩与cfg刚性桩联合处理湿陷性黄土的装置及方法 | |
CN103015433A (zh) | 一种超大直径圆方形组合的深基坑施工方法 | |
CN203891045U (zh) | 深基坑围护桩间的堵漏注浆装置 | |
CN106545012B (zh) | 钢立柱导向管插入法工艺 | |
CN105862864A (zh) | 预应力混凝土管桩桩顶清土的施工方法 | |
CN206246064U (zh) | 一种旋挖钻辅助卸渣简易装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20120710 Address after: 215021 Suzhou Industrial Park, Jiangsu Xinghai street, No. 9 Applicant after: Suzhou Institute of Architectural Design Co., Ltd. Address before: 215021 Suzhou Industrial Park, Jiangsu, Xinghai street, No. 9, No. Applicant before: Suzhou Institute of Architectural Design Co., Ltd. |
|
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120620 |