CN108914932A - 一种预应力管桩接桩施工方法及装置 - Google Patents

一种预应力管桩接桩施工方法及装置 Download PDF

Info

Publication number
CN108914932A
CN108914932A CN201810778097.7A CN201810778097A CN108914932A CN 108914932 A CN108914932 A CN 108914932A CN 201810778097 A CN201810778097 A CN 201810778097A CN 108914932 A CN108914932 A CN 108914932A
Authority
CN
China
Prior art keywords
pile
prestressed pipe
steel
casting
prefabricated board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810778097.7A
Other languages
English (en)
Inventor
韩伟伟
丘华生
刘礼坤
张铮太
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau First Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau First Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority to CN201810778097.7A priority Critical patent/CN108914932A/zh
Publication of CN108914932A publication Critical patent/CN108914932A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/64Repairing piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种预应力管桩接桩施工方法及装置,该装置包括两段以上并以预应力管桩为中心设置的钢护筒,钢护筒的直径由下至上逐级递增,在钢护筒内安装有两段以上并以预应力管桩为中心的预制板墙,且最上段钢护筒和最上段预制板墙的顶部高度均超过预应力管桩的桩顶标高。本发明有效解决传统人工挖孔桩接桩施工难度大、工期长的问题,而且施工工艺简单、效率高,并保证了预应力管桩接桩的质量,取得了较好的经济和社会效益。

Description

一种预应力管桩接桩施工方法及装置
技术领域
本发明涉及一种预应力管桩接桩施工方法及装置,属于预应力管桩接桩施工技术领域。
背景技术
部分地区淤泥土质较多,且深度较深,淤泥层物理力学特性中高压缩性、触变性、流变性等对预应力管桩施工影响较大。预应力管桩施工速度快,投资成本低,从工期及成本上考虑,为缩短施工工期及降低投资成本,经常会选择在淤泥土质中采用预应力管桩基础。在施工过程中,土方开挖深度超限、土方开挖间歇时间过长、支护体系不合理等因素,使得淤泥土流动对预应力管桩产生侧压力,当土体的的流动位移超过一定程度,即施加在预应力管桩身上的推力所产生的弯矩超过管桩桩身的抗裂弯矩时,预应力管桩出现断桩现象,需在断桩位置进行接桩处理。因预应力管桩的接桩部位位于较深的淤泥质土层中,采用传统的人工挖孔桩接桩技术施工难度大、工期长、安全性差,采用补桩处理成本又非常高。
发明内容
本发明的目的在于,提供一种工艺简单、施工效率高、安全性高、成型质量好的预应力管桩接桩施工方法及装置,以克服现有技术中的不足。
本发明的技术方案:一种预应力管桩接桩施工方法,首先以预应力管桩为中心开挖预应力管桩周围的土体,开挖土体时,采用两个以上的钢护筒对预应力管桩周围的土体进行侧壁支护,钢护筒由下至上分段安装,直至最上段钢护筒的顶部高度超过预应力管桩的桩顶标高,然后在钢护筒内以预应力管桩为中心分段安装预制板墙,直至预制板墙的顶部高度超过预应力管桩的桩顶标高50cm以上,此时将各段钢护筒吊装起来,然后对预制板墙的外壁进行回填,最后在预制板墙内吊装桩身钢筋笼并灌注混凝土,即可完成预应力管桩断桩的接桩施工。
进一步,所述钢护筒的直径由下至上逐级递增,相邻两段钢护筒的直径相差200mm,最下面一段钢护筒的内径比预应力管桩的直径大1300mm。
同时,本发明还提供一种预应力管桩接桩施工装置,包括两段以上并以预应力管桩为中心设置的钢护筒,钢护筒的直径由下至上逐级递增,在钢护筒内安装有两段以上并以预应力管桩为中心的预制板墙,且最上段钢护筒和最上段预制板墙的顶部高度均超过预应力管桩的桩顶标高。
进一步,所述钢护筒的外壁均布有加强筋。
进一步,所述钢护筒的上端对称地设置有吊孔。
进一步,所述预制板墙的端部均布有定位孔,相邻预制板墙的定位孔中插入有连接钢筋。
由于采用上述技术方案,本发明的优点在于:本发明有效解决传统人工挖孔桩接桩施工难度大、工期长的问题,而且施工工艺简单、效率高,并保证了预应力管桩接桩的质量,取得了较好的经济和社会效益。
附图说明
图1是本发明的结构示意图的主视图;
图2是图1的俯视图;
图3是钢护筒的结构示意图;
图4是相邻的预制板墙的连接结构示意图。
附图标记说明:1-钢护筒;2-预制墙板;3-预应力管桩;4-加强筋;5-吊孔;6-定位孔;7-土体;8-连接钢筋。
具体实施方式
为了使本发明的目的、技术方案和优点更加清楚,下面结合附图和实施例对本发明作进一步的详细说明。
本发明的实施例:预应力管桩接桩施工装置的结构示意图如图1~4所示,包括三段并以预应力管桩1为中心设置的钢护筒1,所述钢护筒1的外壁均布有加强筋4,钢护筒1的直径由下至上逐级递增,在钢护筒1内安装有三段并以预应力管桩1为中心的预制板墙2,且最上段钢护筒1和最上段预制板墙2的顶部高度均超过预应力管桩1的桩顶标高。所述钢护筒1的上端对称地设置有吊孔5,便于吊装。所述预制板墙2的端部均布有定位孔6,定位定位孔6的深度为100mm、半径为10mm,相邻预制板墙2的定位孔6中插入有连接钢筋8,从而将相邻的预制板墙2连接在一起。预制板墙2的内径为1000mm,厚度为125mm,每段预制板墙2的高度为1500mm。
采用上述预应力管桩接桩施工装置进行施工时,首先以预应力管桩1为中心开挖预应力管桩1周围的土体7,开挖土体7时,采用三段钢护筒1对预应力管桩1周围的土体7进行侧壁支护,三段钢护筒1由下至上分段安装,直至最上段钢护筒1的顶部高度超过预应力管桩1的桩顶标高,所述钢护筒1的直径由下至上逐级递增,相邻两段钢护筒1的直径相差200mm,最下面一段钢护筒1的内径比预应力管桩1的直径大1300mm;然后在钢护筒1内以预应力管桩1为中心分段安装预制板墙2,直至预制板墙2的顶部高度超过预应力管桩1的桩顶标高50cm以上,此时将各段钢护筒1吊装起来,钢护筒1后期可以重复使用,然后对预制板墙2的外壁进行回填,最后在预制板墙2内吊装桩身钢筋笼并灌注混凝土,即可完成预应力管桩1断桩的接桩施工。

Claims (6)

1.一种预应力管桩接桩施工方法,其特征在于:首先以预应力管桩(1)为中心开挖预应力管桩(1)周围的土体(7),开挖土体(7)时,采用两个以上的钢护筒(1)对预应力管桩(1)周围的土体(7)进行侧壁支护,钢护筒(1)由下至上分段安装,直至最上段钢护筒(1)的顶部高度超过预应力管桩(1)的桩顶标高,然后在钢护筒(1)内以预应力管桩(1)为中心分段安装预制板墙(2),直至预制板墙(2)的顶部高度超过预应力管桩(1)的桩顶标高50cm以上,此时将各段钢护筒(1)吊装起来,然后对预制板墙(2)的外壁进行回填,最后在预制板墙(2)内吊装桩身钢筋笼并灌注混凝土,即可完成预应力管桩(1)断桩的接桩施工。
2.根据权利要求1所述的预应力管桩接桩施工方法,其特征在于:所述钢护筒(1)的直径由下至上逐级递增,相邻两段钢护筒(1)的直径相差200mm,最下面一段钢护筒(1)的内径比预应力管桩(1)的直径大1300mm。
3.一种预应力管桩接桩施工装置,其特征在于:包括两段以上并以预应力管桩(1)为中心设置的钢护筒(1),钢护筒(1)的直径由下至上逐级递增,在钢护筒(1)内安装有两段以上并以预应力管桩(1)为中心的预制板墙(2),且最上段钢护筒(1)和最上段预制板墙(2)的顶部高度均超过预应力管桩(1)的桩顶标高。
4.根据权利要求3所述的预应力管桩接桩施工装置,其特征在于:所述钢护筒(1)的外壁均布有加强筋(4)。
5.根据权利要求3所述的预应力管桩接桩施工装置,其特征在于:所述钢护筒(1)的上端对称地设置有吊孔(5)。
6.根据权利要求3所述的预应力管桩接桩施工装置,其特征在于:所述预制板墙(2)的端部均布有定位孔(6),相邻预制板墙(2)的定位孔(6)中插入有连接钢筋(8)。
CN201810778097.7A 2018-07-16 2018-07-16 一种预应力管桩接桩施工方法及装置 Pending CN108914932A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810778097.7A CN108914932A (zh) 2018-07-16 2018-07-16 一种预应力管桩接桩施工方法及装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810778097.7A CN108914932A (zh) 2018-07-16 2018-07-16 一种预应力管桩接桩施工方法及装置

Publications (1)

Publication Number Publication Date
CN108914932A true CN108914932A (zh) 2018-11-30

Family

ID=64412245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810778097.7A Pending CN108914932A (zh) 2018-07-16 2018-07-16 一种预应力管桩接桩施工方法及装置

Country Status (1)

Country Link
CN (1) CN108914932A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114855789A (zh) * 2022-03-25 2022-08-05 标力建设集团有限公司 软土地区工程桩断桩处理施工工法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1609346A (zh) * 2003-10-20 2005-04-27 胡柏英 一种迭合桩的结构和施工方法
CN102505685A (zh) * 2011-11-22 2012-06-20 苏州市建筑设计研究院有限责任公司 管桩缺陷的处理方法
CN203559420U (zh) * 2013-11-15 2014-04-23 中建五局上海建设有限公司 一种流砂地质条件下接桩施工装置
CN103758123A (zh) * 2014-01-24 2014-04-30 江苏建筑职业技术学院 人工挖孔灌注桩护壁衬的施工方法
CN104153361A (zh) * 2014-08-25 2014-11-19 中国十七冶集团有限公司 预应力混凝土管桩地下接桩施工方法
CN104153360A (zh) * 2014-09-02 2014-11-19 德翰智慧科技有限公司 预应力混凝土管桩接桩处的填芯混凝土灌注装置及其方法
US20150059926A1 (en) * 2013-09-04 2015-03-05 Mohammad R. Ehsani Wood column repair, reinforcement, and extension
CN204753570U (zh) * 2015-06-12 2015-11-11 中石化洛阳工程有限公司 一种储罐架空式高桩承台灌注桩施工装置
CN106049491A (zh) * 2016-08-03 2016-10-26 江苏建筑职业技术学院 一种免拆预制混凝土桩保护模板及施工方法
CN208830308U (zh) * 2018-07-16 2019-05-07 中建四局第一建筑工程有限公司 一种预应力管桩接桩施工装置

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1609346A (zh) * 2003-10-20 2005-04-27 胡柏英 一种迭合桩的结构和施工方法
CN102505685A (zh) * 2011-11-22 2012-06-20 苏州市建筑设计研究院有限责任公司 管桩缺陷的处理方法
US20150059926A1 (en) * 2013-09-04 2015-03-05 Mohammad R. Ehsani Wood column repair, reinforcement, and extension
CN203559420U (zh) * 2013-11-15 2014-04-23 中建五局上海建设有限公司 一种流砂地质条件下接桩施工装置
CN103758123A (zh) * 2014-01-24 2014-04-30 江苏建筑职业技术学院 人工挖孔灌注桩护壁衬的施工方法
CN104153361A (zh) * 2014-08-25 2014-11-19 中国十七冶集团有限公司 预应力混凝土管桩地下接桩施工方法
CN104153360A (zh) * 2014-09-02 2014-11-19 德翰智慧科技有限公司 预应力混凝土管桩接桩处的填芯混凝土灌注装置及其方法
CN204753570U (zh) * 2015-06-12 2015-11-11 中石化洛阳工程有限公司 一种储罐架空式高桩承台灌注桩施工装置
CN106049491A (zh) * 2016-08-03 2016-10-26 江苏建筑职业技术学院 一种免拆预制混凝土桩保护模板及施工方法
CN208830308U (zh) * 2018-07-16 2019-05-07 中建四局第一建筑工程有限公司 一种预应力管桩接桩施工装置

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114855789A (zh) * 2022-03-25 2022-08-05 标力建设集团有限公司 软土地区工程桩断桩处理施工工法

Similar Documents

Publication Publication Date Title
CN101122131B (zh) 一种用管件桩嵌岩的基坑支护桩
CN109630127B (zh) 一种富水软弱地层超深盾构竖井的施工方法
CN106638640A (zh) 岩层地质条件下无封底混凝土组合式围堰的施工方法
CN105781582A (zh) 一种适用于城市敏感区的浅埋隧道新型支护结构及其施工方法
CN111560962A (zh) 一种回填区基坑支护结构及其施工方法
CN108798065B (zh) 一种古建筑物整体顶升方法
CN104264683B (zh) 三面环绕文保建筑凹字形超深基坑分区支护方法
CN106522236A (zh) 基坑支护的结构及施工方法
CN208088288U (zh) 大粒径碎块石高填区桩基快速成孔结构
CN108316289A (zh) 大粒径碎块石高填区桩基快速成孔结构及其施工工艺
CN106545020A (zh) 一种深基坑支护的施工方法
CN104480929B (zh) 一种将咬合桩应用于永久地下室外墙的桩墙合一施工方法
CN201762702U (zh) 钻孔咬合桩
CN111236208A (zh) 地下连续墙基础基坑施工方法
CN208830308U (zh) 一种预应力管桩接桩施工装置
CN109235477A (zh) 一种适用于沉井施工方法的管片提压装置及其提压方法
CN110700270B (zh) 一种超深基坑不排水土方开挖的施工方法
CN108914932A (zh) 一种预应力管桩接桩施工方法及装置
CN205778943U (zh) 一种适用于盾构隧道管片沉降超限的提升系统
CN114892690A (zh) 一种双壁钢套箱围堰施工方法
CN209066469U (zh) 一种适用于沉井施工方法的管片提压装置
CN112942377A (zh) 一种新型支撑抗剪结构及其施工方法
CN206233244U (zh) 基坑的支护结构
CN219261048U (zh) 一种工作井
CN219343230U (zh) 一种控制基坑外邻近隧道变形的结构体系

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination