CN105625430A - 一种狭小施工区域高压水切割土体拔桩方法 - Google Patents

一种狭小施工区域高压水切割土体拔桩方法 Download PDF

Info

Publication number
CN105625430A
CN105625430A CN201410825546.0A CN201410825546A CN105625430A CN 105625430 A CN105625430 A CN 105625430A CN 201410825546 A CN201410825546 A CN 201410825546A CN 105625430 A CN105625430 A CN 105625430A
Authority
CN
China
Prior art keywords
pile
pressure
pressure water
obstacle
soil body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410825546.0A
Other languages
English (en)
Other versions
CN105625430B (zh
Inventor
王路路
纪尊众
杨绍普
周冠男
任宏茂
窦洪羽
许国涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN201410825546.0A priority Critical patent/CN105625430B/zh
Publication of CN105625430A publication Critical patent/CN105625430A/zh
Application granted granted Critical
Publication of CN105625430B publication Critical patent/CN105625430B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

一种狭小施工区域高压水切割土体拔桩方法,其特征在于:所述的狭小施工区域高压水切割土体拔桩方法,采用三重管高压旋喷桩机喷射高压水切割土体,使障碍桩与周围土体分离,利用吊车将障碍桩吊出的新型拔桩方法;根据障碍桩基参数、拔除位置确定高压旋喷桩机的布置及钻孔深度,障碍桩拔除后采用水泥土回填夯实,对拔桩位置进行压密注浆;高压水压力主要用于切削障碍桩周围土体,低压水和气将桩周围土砾跟随浆液反上来,保证桩与周围土体分离彻底。本发明的优点:工艺简便,对障碍拔除施工效果良好。

Description

一种狭小施工区域高压水切割土体拔桩方法
技术领域
本发明涉及涉及高压水切割土体拔桩方法,特别涉及了一种狭小施工区域高压水切割土体拔桩方法。
背景技术
随着城市地下空间的不断开发利用,出现了大量在原有建(构)筑物上改建的深基坑工程。该类型的深基坑工程施工前需对原有建(构)筑物进行拆除。因施工需要对原有基坑工程的障碍桩进行拔除,常常会遇到桩数量较少、施工场地狭小,大型拔桩机械无法施工或施工成本过高的情况。
发明内容
本发明的目的是针对障碍桩拔除场地限制无法施工和费用较高的难点,克服场地狭小,大型拔桩设备无法施工的不利条件,特提供了一种狭小施工区域高压水切割土体拔桩方法。
本发明提供了一种狭小施工区域高压水切割土体拔桩方法,其特征在于:所述的狭小施工区域高压水切割土体拔桩方法,采用三重管高压旋喷桩机喷射高压水切割土体,使障碍桩与周围土体分离,利用吊车将障碍桩吊出的新型拔桩方法。根据障碍桩基参数、拔除位置确定高压旋喷桩机的布置及钻孔深度,障碍桩拔除后采用水泥土回填夯实,对拔桩位置进行压密注浆。
所述的拔桩方法中的小型高压旋喷桩机成桩直径为1000mm,高压水压力27~29MPa,流量75~85L/min,喷嘴直径1.6~2mm,喷嘴数2个;
空气压力0.7~0.8MPa,流量3~10m3/min;低压水压力3MP,流量90~100L/min,喷嘴直径3~4mm,喷嘴数3个;注浆管外径91mm,提升速度10cm/min,旋转速度10r/min,桩心偏位不超过50mm,垂直度误差不得超过1/200的桩长。高压水压力主要用于切削障碍桩周围土体,低压水和气将桩周围土砾跟随浆液反上来,保证桩与周围土体分离彻底。
凿除障碍桩桩头露出50cm长钢筋,根据障碍桩直径焊接好设计的吊装连接器,通过受力计算好的卡扣钢丝绳连接好吊车,高压旋喷施工时应适当加以起重力,防止喷射过程中桩体下沉。
高压旋喷桩桩位布置应满足一根障碍桩均匀分布4根直径1000mm的高压旋喷水桩,直径比为5:4,高压旋喷桩钻进深度应超过设计桩长1.5m。
本发明的优点:
本发明所述的狭小施工区域高压水切割土体拔桩方法,工艺简便,对障碍拔除施工效果良好。
附图说明
下面结合附图及实施方式对本发明作进一步详细的说明:
图1是本发明桩体吊装连接器平面设计图;
图2是A-A剖面图;
图3是侧面示意图;
具体实施方式
实施例1
本实施例提供了一种狭小施工区域高压水切割土体拔桩方法,其特征在于:所述的狭小施工区域高压水切割土体拔桩方法,采用三重管高压旋喷桩机喷射高压水切割土体,使障碍桩与周围土体分离,利用吊车将障碍桩吊出的新型拔桩方法。根据障碍桩基参数、拔除位置确定高压旋喷桩机的布置及钻孔深度,障碍桩拔除后采用水泥土回填夯实,对拔桩位置进行压密注浆。
所述的拔桩方法中的小型高压旋喷桩机成桩直径为1000mm,高压水压力27MPa,流量75L/min,喷嘴直径1.6mm,喷嘴数2个;
空气压力0.7MPa,流量3m3/min;低压水压力3MP,流量90L/min,喷嘴直径3~4mm,喷嘴数3个;注浆管外径91mm,提升速度10cm/min,旋转速度10r/min,桩心偏位不超过50mm,垂直度误差不得超过1/200的桩长。高压水压力主要用于切削障碍桩周围土体,低压水和气将桩周围土砾跟随浆液反上来,保证桩与周围土体分离彻底。
凿除障碍桩桩头露出50cm长钢筋,根据障碍桩直径焊接好设计的吊装连接器,通过受力计算好的卡扣钢丝绳连接好吊车,高压旋喷施工时应适当加以起重力,防止喷射过程中桩体下沉。
高压旋喷桩桩位布置应满足一根障碍桩均匀分布4根直径1000mm的高压旋喷水桩,直径比为5:4,高压旋喷桩钻进深度应超过设计桩长1.5m。
实施例2
本实施例提供了一种狭小施工区域高压水切割土体拔桩方法,其特征在于:所述的狭小施工区域高压水切割土体拔桩方法,采用三重管高压旋喷桩机喷射高压水切割土体,使障碍桩与周围土体分离,利用吊车将障碍桩吊出的新型拔桩方法。根据障碍桩基参数、拔除位置确定高压旋喷桩机的布置及钻孔深度,障碍桩拔除后采用水泥土回填夯实,对拔桩位置进行压密注浆。
所述的拔桩方法中的小型高压旋喷桩机成桩直径为1000mm,高压水压力28MPa,流量80L/min,喷嘴直径1.8mm,喷嘴数2个;
空气压力0.7MPa,流量5m3/min;低压水压力3MP,流量95L/min,喷嘴直径4mm,喷嘴数3个;注浆管外径91mm,提升速度10cm/min,旋转速度10r/min,桩心偏位不超过50mm,垂直度误差不得超过1/200的桩长。高压水压力主要用于切削障碍桩周围土体,低压水和气将桩周围土砾跟随浆液反上来,保证桩与周围土体分离彻底。
凿除障碍桩桩头露出50cm长钢筋,根据障碍桩直径焊接好设计的吊装连接器,通过受力计算好的卡扣钢丝绳连接好吊车,高压旋喷施工时应适当加以起重力,防止喷射过程中桩体下沉。
高压旋喷桩桩位布置应满足一根障碍桩均匀分布4根直径1000mm的高压旋喷水桩,直径比为5:4,高压旋喷桩钻进深度应超过设计桩长1.5m。
实施例3
本实施例提供了一种狭小施工区域高压水切割土体拔桩方法,其特征在于:所述的狭小施工区域高压水切割土体拔桩方法,采用三重管高压旋喷桩机喷射高压水切割土体,使障碍桩与周围土体分离,利用吊车将障碍桩吊出的新型拔桩方法。根据障碍桩基参数、拔除位置确定高压旋喷桩机的布置及钻孔深度,障碍桩拔除后采用水泥土回填夯实,对拔桩位置进行压密注浆。
所述的拔桩方法中的小型高压旋喷桩机成桩直径为1000mm,高压水压力27MPa,流量85L/min,喷嘴直径2mm,喷嘴数2个;
空气压力0.8MPa,流量10m3/min;低压水压力3MP,流量100L/min,喷嘴直径4mm,喷嘴数3个;注浆管外径91mm,提升速度10cm/min,旋转速度10r/min,桩心偏位不超过50mm,垂直度误差不得超过1/200的桩长。高压水压力主要用于切削障碍桩周围土体,低压水和气将桩周围土砾跟随浆液反上来,保证桩与周围土体分离彻底。
凿除障碍桩桩头露出50cm长钢筋,根据障碍桩直径焊接好设计的吊装连接器,通过受力计算好的卡扣钢丝绳连接好吊车,高压旋喷施工时应适当加以起重力,防止喷射过程中桩体下沉。
高压旋喷桩桩位布置应满足一根障碍桩均匀分布4根直径1000mm的高压旋喷水桩,直径比为5:4,高压旋喷桩钻进深度应超过设计桩长1.5m。

Claims (3)

1.一种狭小施工区域高压水切割土体拔桩方法,其特征在于:所述的狭小施工区域高压水切割土体拔桩方法,采用三重管高压旋喷桩机喷射高压水切割土体,使障碍桩与周围土体分离,利用吊车将障碍桩吊出的新型拔桩方法;根据障碍桩基参数、拔除位置确定高压旋喷桩机的布置及钻孔深度,障碍桩拔除后采用水泥土回填夯实,对拔桩位置进行压密注浆;
所述的拔桩方法中的小型高压旋喷桩机成桩直径为1000mm,高压水压力27~29MPa,流量75~85L/min,喷嘴直径1.6~2mm,喷嘴数2个;
空气压力0.7~0.8MPa,流量3~10m3/min;低压水压力3MP,流量90~100L/min,喷嘴直径3~4mm,喷嘴数3个;注浆管外径91mm,提升速度10cm/min,旋转速度10r/min,桩心偏位不超过50mm,垂直度误差不得超过1/200的桩长;高压水压力主要用于切削障碍桩周围土体,低压水和气将桩周围土砾跟随浆液反上来,保证桩与周围土体分离彻底。
2.按照权利要求1所述的狭小施工区域高压水切割土体拔桩方法,其特征在于:凿除障碍桩桩头露出50cm长钢筋,根据障碍桩直径焊接好设计的吊装连接器,通过受力计算好的卡扣钢丝绳连接好吊车,高压旋喷施工时应适当加以起重力,防止喷射过程中桩体下沉。
3.按照权利要求1所述的狭小施工区域高压水切割土体拔桩方法,其特征在于:高压旋喷桩桩位布置应满足一根障碍桩均匀分布4根直径1000mm的高压旋喷水桩,直径比为5:4,高压旋喷桩钻进深度应超过设计桩长1.5m。
CN201410825546.0A 2014-12-26 2014-12-26 一种狭小施工区域高压水切割土体拔桩方法 Expired - Fee Related CN105625430B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410825546.0A CN105625430B (zh) 2014-12-26 2014-12-26 一种狭小施工区域高压水切割土体拔桩方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410825546.0A CN105625430B (zh) 2014-12-26 2014-12-26 一种狭小施工区域高压水切割土体拔桩方法

Publications (2)

Publication Number Publication Date
CN105625430A true CN105625430A (zh) 2016-06-01
CN105625430B CN105625430B (zh) 2018-05-25

Family

ID=56040740

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410825546.0A Expired - Fee Related CN105625430B (zh) 2014-12-26 2014-12-26 一种狭小施工区域高压水切割土体拔桩方法

Country Status (1)

Country Link
CN (1) CN105625430B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759297A (zh) * 2016-11-22 2017-05-31 广州中煤江南基础工程公司 一种支护桩与三管高压旋喷桩深基坑的施工方法
CN106930288A (zh) * 2016-11-11 2017-07-07 叶长青 一种拔桩方法
CN110453685A (zh) * 2019-09-16 2019-11-15 腾达建设集团股份有限公司 一种免凿桩头装置及其使用方法
CN110644489A (zh) * 2019-09-27 2020-01-03 中冶成都勘察研究总院有限公司 一种截取桩体的桩头锚固段的施工方法
CN112483145A (zh) * 2020-12-16 2021-03-12 河南理工大学 一种高压水射流解锚退锚设备及退锚方法
CN113931186A (zh) * 2021-10-18 2022-01-14 中交第二航务工程局有限公司 空间受限条件下的辅助桩基拔除施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101130988A (zh) * 2007-08-16 2008-02-27 江苏华东建设基础工程总公司 一种拔桩机及其拔桩的施工方法
CN101538857A (zh) * 2009-04-10 2009-09-23 黄河水利委员会河南黄河河务局 一种拔桩施工方法
CN101886390A (zh) * 2010-06-12 2010-11-17 中铁十六局集团有限公司 狭小空间全套管静压拔桩技术
CN103741691A (zh) * 2014-02-11 2014-04-23 中国石油大学(华东) 一种海上桩管压力反拔拆除装置及拆除方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101130988A (zh) * 2007-08-16 2008-02-27 江苏华东建设基础工程总公司 一种拔桩机及其拔桩的施工方法
CN101538857A (zh) * 2009-04-10 2009-09-23 黄河水利委员会河南黄河河务局 一种拔桩施工方法
CN101886390A (zh) * 2010-06-12 2010-11-17 中铁十六局集团有限公司 狭小空间全套管静压拔桩技术
CN103741691A (zh) * 2014-02-11 2014-04-23 中国石油大学(华东) 一种海上桩管压力反拔拆除装置及拆除方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930288A (zh) * 2016-11-11 2017-07-07 叶长青 一种拔桩方法
CN106930288B (zh) * 2016-11-11 2018-11-09 叶长青 一种拔桩方法
CN106759297A (zh) * 2016-11-22 2017-05-31 广州中煤江南基础工程公司 一种支护桩与三管高压旋喷桩深基坑的施工方法
CN110453685A (zh) * 2019-09-16 2019-11-15 腾达建设集团股份有限公司 一种免凿桩头装置及其使用方法
CN110644489A (zh) * 2019-09-27 2020-01-03 中冶成都勘察研究总院有限公司 一种截取桩体的桩头锚固段的施工方法
CN112483145A (zh) * 2020-12-16 2021-03-12 河南理工大学 一种高压水射流解锚退锚设备及退锚方法
CN113931186A (zh) * 2021-10-18 2022-01-14 中交第二航务工程局有限公司 空间受限条件下的辅助桩基拔除施工方法
CN113931186B (zh) * 2021-10-18 2023-08-15 中交第二航务工程局有限公司 空间受限条件下的辅助桩基拔除施工方法

Also Published As

Publication number Publication date
CN105625430B (zh) 2018-05-25

Similar Documents

Publication Publication Date Title
CN105625430A (zh) 一种狭小施工区域高压水切割土体拔桩方法
CN104533467B (zh) 一种高承压水、断层破碎巷道的支护方法
CN103510957B (zh) 一种组合式石门揭煤方法
CN103603342B (zh) 大直径组合套管超长灌注桩施工方法
CN104775433B (zh) 一种拔桩施工的方法
CN103485343A (zh) 灌注桩桩头处理方法
CN106437798A (zh) 一种穿过盾构掘进断面的锚索群的预处理方法
CN203256729U (zh) 一种沉井施工的拉森钢板桩围护装置
CN204298821U (zh) 双套筒拔桩设备
CN103742157A (zh) 用顶管法在地下新建地下空间的方法
CN104695457B (zh) 一种新型竖井水平旋喷桩基坑封底隔水层的施工方法
CN105350554A (zh) 一种高水位基坑降水施工方法
CN202323950U (zh) 一种旋转式拔桩机的旋转套管连接结构
CN105040705A (zh) 多溶洞地质条件下地基基础处理施工工艺
JP2007332559A (ja) 既設地中杭の撤去方法
CN205444192U (zh) 一种桥梁桩冲桩施工系统
CN102505685A (zh) 管桩缺陷的处理方法
CN202830938U (zh) 一种控制基坑稳定性的支护结构
CN103911988A (zh) 一种用于基坑支护的新型护壁桩
JP2005120622A (ja) 地下構造物の施工法
CN103790162B (zh) 同步式钢板桩桩孔填充装置
CN105220683B (zh) 一种工字钢接头式地下连续墙绕流处理装置及方法
CN203891911U (zh) 一种竹筋注浆锚杆
CN203808074U (zh) 同步式钢板桩桩孔填充装置
CN204326061U (zh) 一种易拔出的管桩

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180525