CN102502392A - 一种油田橇块吊装结构 - Google Patents

一种油田橇块吊装结构 Download PDF

Info

Publication number
CN102502392A
CN102502392A CN2011103652643A CN201110365264A CN102502392A CN 102502392 A CN102502392 A CN 102502392A CN 2011103652643 A CN2011103652643 A CN 2011103652643A CN 201110365264 A CN201110365264 A CN 201110365264A CN 102502392 A CN102502392 A CN 102502392A
Authority
CN
China
Prior art keywords
hanger
sledge piece
sledge
skid block
hanging beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103652643A
Other languages
English (en)
Inventor
佘云龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Morimatsu Jiangsu CNOOC Engineering Equipment Co Ltd
Original Assignee
Morimatsu Jiangsu CNOOC Engineering Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Morimatsu Jiangsu CNOOC Engineering Equipment Co Ltd filed Critical Morimatsu Jiangsu CNOOC Engineering Equipment Co Ltd
Priority to CN2011103652643A priority Critical patent/CN102502392A/zh
Publication of CN102502392A publication Critical patent/CN102502392A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明涉及一种油田橇块吊装结构,包括橇块,其创新点在于:所述橇块的两条边对称设置数只吊耳;所述橇块上方设置与吊耳连接的吊装系统,所述吊装系统至少包括一水平设置在橇块正上方的吊梁,所述吊梁的轴线与橇块设置有吊耳的两条边垂直;数根与吊耳数量对应的分吊索,所述橇块吊耳中位于同一边的吊耳分别通过各分吊索与吊梁中靠近该条边的一端连接。使用时,吊装系统的吊梁直接或间接与吊机吊钩连接,吊装系统的分吊索与橇块吊耳连接实现起吊。分吊索在与吊耳连接时,由于橇块同侧边的吊耳分别通过分吊索与吊梁中靠近该条边的一端连接,使得分吊索远离橇块的安装平面,降低橇块上端面有效安装空间的占用,提高该吊装结构的适用范围。

Description

一种油田橇块吊装结构
技术领域
本发明涉及一种油田橇块,特别涉及一种油田橇块吊装结构。
背景技术
模块在海洋工程中专指整个系统的设备和设施按工艺要求组装在钢构架内,可整体运输和吊装的集装块。橇块作为各主要设备的子模块,在建造完成后需要吊装至平台上进行结构总装或在陆地上与结构、管道及其它专业一起装配成模块并进行整体吊装和运输。
目前油田橇块的吊装结构普遍为:橇块的两侧边分别设置数个吊耳,各吊耳分别与吊索的下端连接,吊索的上端与吊点处的吊钩相连,吊装时由吊机的吊吊钩直接钩住吊点即可吊装。该种吊装结构的缺陷是:各吊索从吊耳汇集到吊点时,吊索倾斜向内,会占用橇块上方的空间,从而影响橇块上的空间布置或造成吊索与橇块上布置的设备或其它组件发生碰撞,因此该种吊装结构有一定的局限性,无法适用于所有橇块的吊装。
发明内容
本发明要解决的技术问题是提供一种油田橇块吊装结构,减少橇块上方安装空间的占用,使得该吊装结构适用于各种橇块的吊装。
为解决上述技术问题,本发明的技术方案为:一种油田橇块吊装结构,包括橇块,其创新点在于:所述橇块的两条边对称设置数只吊耳;所述橇块上方设置与吊耳连接的吊装系统,所述吊装系统至少包括一水平设置在橇块正上方的吊梁,所述吊梁的轴线与橇块设置有吊耳的两条边垂直;数根与吊耳数量对应的分吊索,所述橇块吊耳中位于同一边的吊耳分别通过各分吊索与吊梁中靠近该条边的一端连接;所述吊梁直接或间接与吊机吊钩连接。
进一步的,所述吊梁的长度等于橇块两条设置吊耳的边之间的距离。
进一步的,所述吊耳设置橇块的两条长轴边上,且位于橇块上大型设备鞍座所在的结构梁上。
进一步的,所述吊梁与吊机吊钩间接连接结构为:包括两根主吊索,所述两主吊索的上端与吊机吊钩连接,两主吊索的下端分别与吊梁的两端连接。
进一步的,所述吊耳主板的两端设置与吊耳垂直的加劲板,所述加劲板侧面与吊耳主板端面焊接固定,加劲板的下端面与橇块上端面焊接固定。
本发明的优点在于:使用时,吊装系统的吊梁直接或间接与吊机吊钩连接,吊装系统的分吊索与橇块吊耳连接实现起吊。分吊索在与吊耳连接时,由于橇块同侧边的吊耳分别通过分吊索与吊梁中靠近该条边的一端连接,使得分吊索远离橇块的设备安装平面,降低橇块上端面有效安装空间的占用,提高该吊装结构的适用范围。
吊梁的长度与橇块设置吊耳的两侧边距离相同,使得分吊索与橇块外框架处于同一立面,分吊索完全离开橇块的安装平面,不会占用橇块的安装空间。
吊耳设置于橇块的两条长轴边上,且位于橇块上大型设备鞍座所在的结构梁上,从而使橇块重量的传递方式更简单明了,传力路径更短,而且可减小吊梁的长度,节约制作成本。
吊耳主板端部设置加劲板结构,可提高吊耳强度,相应的降低吊耳主板厚度,减少钢材消耗,节省成本。
附图说明
图1为本发明油田橇块吊装结构实施例的结构示意图。
图2为本发明油田橇块吊装结构实施例的侧视图。
图3为本发明中橇块与吊耳结构示意图。
具体实施方式
如图1所示,包括橇块1、吊耳2、吊梁3、分吊索4、主吊索5。
上述橇块1的两条边上分别设置有两只吊耳2,两条边的吊耳2对称设置。本实施例中设置吊耳2的两条边为长轴边,且位于橇块上大型设备鞍座所在的结构梁上。
在橇块1的上方设置有与吊耳连接的吊装系统,该吊装系统至少包括吊梁3和分吊索4。
具体的:吊梁3水平设置在橇块1的正上方,吊梁3的轴线与橇块1的长轴边垂直,且其长度等于橇块1两条长轴边之间的距离。
分吊索4的数量与吊耳2数量对应,本实施例中有四根,各分吊索4中位于同一长轴边的两只吊耳2与吊梁3中靠近该长轴边的一端连接,另一长轴边的两只吊耳2则与吊梁3的另一端连接,可参见图2。
吊装系统的吊梁3可直接或间接与吊机的吊钩连接,本实施例中采用间接连接,其包括两根主吊索5,该两主吊索5的上端与吊机吊钩连接,两主吊索5的下端分别与吊梁3的两端连接。
本实施例中的吊耳2采用加强结构,如图3所示,在吊耳2主板的两端设置与吊耳2主板垂直的加劲板6,加劲板6侧面与吊耳2主板端面焊接固定,加劲板6的下端面与橇块1上端面焊接固定。
该油田橇块吊装结构中,橇块同侧边的吊耳2分别通过分吊索4与吊梁3中靠近该条边的一端连接,使得分吊索4远离橇块1的安装平面,可参见图2降低橇块1上端面有效安装空间的占用,可扩大该吊装结构的适用范围。

Claims (5)

1.一种油田橇块吊装结构,包括橇块,其特征在于:所述橇块的两条边对称设置数只吊耳;所述橇块上方设置与吊耳连接的吊装系统,所述吊装系统至少包括:
一水平设置在橇块正上方的吊梁,所述吊梁的轴线与橇块设置有吊耳的两条边垂直;
数根与吊耳数量对应的分吊索,所述橇块吊耳中位于同一边的吊耳分别通过各分吊索与吊梁中靠近该条边的一端连接;
所述吊梁直接或间接与吊机吊钩连接。
2.根据权利要求1所述的油田橇块吊装结构,其特征在于:所述吊梁的长度等于橇块两条设置吊耳的边之间的距离。
3.根据权利要求1或2所述的油田橇块吊装结构,其特征在于:所述吊耳设置橇块的两条长轴边上,且位于橇块上大型设备鞍座所在的结构梁上。
4.根据权利要求1或2所述的油田橇块吊装结构,其特征在于:所述吊梁与吊机吊钩间接连接结构为:包括两根主吊索,所述两主吊索的上端与吊机吊钩连接,两主吊索的下端分别与吊梁的两端连接。
5.根据权利要求1所述的油田橇块吊装结构,其特征在于:所述吊耳主板的两端设置与吊耳垂直的加劲板,所述加劲板侧面与吊耳主板端面焊接固定,加劲板的下端面与橇块上端面焊接固定。
CN2011103652643A 2011-11-17 2011-11-17 一种油田橇块吊装结构 Pending CN102502392A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103652643A CN102502392A (zh) 2011-11-17 2011-11-17 一种油田橇块吊装结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103652643A CN102502392A (zh) 2011-11-17 2011-11-17 一种油田橇块吊装结构

Publications (1)

Publication Number Publication Date
CN102502392A true CN102502392A (zh) 2012-06-20

Family

ID=46214543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103652643A Pending CN102502392A (zh) 2011-11-17 2011-11-17 一种油田橇块吊装结构

Country Status (1)

Country Link
CN (1) CN102502392A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102935976A (zh) * 2012-11-07 2013-02-20 森松(江苏)海油工程装备有限公司 一种油田橇块吊装结构
CN109969926A (zh) * 2019-04-16 2019-07-05 中建四局第六建筑工程有限公司 一种动滑轮起吊吊具
CN110282534A (zh) * 2019-06-26 2019-09-27 北京航天发射技术研究所 一种箱体吊装装置及吊装方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2185459B (en) * 1986-01-17 1988-11-16 Fischer Ag Georg Spreading bar for use in lifting heavy loads
US4848966A (en) * 1987-04-23 1989-07-18 Aker Engineering A/S Arrangement in a production platform
FR2822890A1 (fr) * 2001-03-30 2002-10-04 Cammell Laird Marseille Procede d'installation des appareils de forage sur les plates-formes offshore et appareils de forage resultant de la mise en oeuvre de ce procede
CN101787687A (zh) * 2010-02-08 2010-07-28 天津市禾厘油气技术有限公司 一种海洋石油钻井平台橇块及其吊装工艺
CN202358822U (zh) * 2011-11-17 2012-08-01 森松(江苏)海油工程装备有限公司 一种油田橇块吊装结构

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2185459B (en) * 1986-01-17 1988-11-16 Fischer Ag Georg Spreading bar for use in lifting heavy loads
US4848966A (en) * 1987-04-23 1989-07-18 Aker Engineering A/S Arrangement in a production platform
FR2822890A1 (fr) * 2001-03-30 2002-10-04 Cammell Laird Marseille Procede d'installation des appareils de forage sur les plates-formes offshore et appareils de forage resultant de la mise en oeuvre de ce procede
CN101787687A (zh) * 2010-02-08 2010-07-28 天津市禾厘油气技术有限公司 一种海洋石油钻井平台橇块及其吊装工艺
CN202358822U (zh) * 2011-11-17 2012-08-01 森松(江苏)海油工程装备有限公司 一种油田橇块吊装结构

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102935976A (zh) * 2012-11-07 2013-02-20 森松(江苏)海油工程装备有限公司 一种油田橇块吊装结构
CN109969926A (zh) * 2019-04-16 2019-07-05 中建四局第六建筑工程有限公司 一种动滑轮起吊吊具
CN109969926B (zh) * 2019-04-16 2023-11-03 中建四局第六建筑工程有限公司 一种动滑轮起吊吊具
CN110282534A (zh) * 2019-06-26 2019-09-27 北京航天发射技术研究所 一种箱体吊装装置及吊装方法

Similar Documents

Publication Publication Date Title
CN201943007U (zh) 活动支架不变幅架梁吊机
CN202098976U (zh) 构件吊索长度及空中横向姿态自由调整装置
CN209009974U (zh) 一种自平衡吊架
CN105970819A (zh) 一种钢锚梁的安装施工方法
CN102502392A (zh) 一种油田橇块吊装结构
CN202358822U (zh) 一种油田橇块吊装结构
CN107419665B (zh) 一种大跨度钢梁吊装吊具及其吊装钢梁的方法
CN202214131U (zh) 三点式吊梁
CN207243234U (zh) 一种钢结构模块化房屋通用吊架
CN103818840A (zh) 一种吊装件以及吊装方法
CN201809032U (zh) 带可组合式吊架的自调整拉索装置
CN202643084U (zh) 拆除、安装钢梁的小型吊具
CN203612810U (zh) 一种海洋平台撬块吊装结构
CN105329766A (zh) 自动平衡式吊梁
CN204958149U (zh) 一种起重设备吊装工具
CN102050377B (zh) 一种组合吊机及采油平台钻井设备的安装方法
CN208948679U (zh) 装配式吊架
CN204689351U (zh) 一种h型钢结构构件吊具
CN105317031B (zh) 一种升船机主机房桥机主梁吊装方法
CN103264953B (zh) 一种钢筋笼对接调整装置
CN209583386U (zh) 预制构件吊装工具及吊装系统
CN203806947U (zh) 一种自平钢板吊装卡具
CN108928729B (zh) 一种吊具及使用该吊具的起吊装置
CN203159036U (zh) 一种一字型吊具
CN203612811U (zh) 一种水平模块吊装系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120620