A kind of mechanized continuous mining method for wall-type gentle-inclined thin ore body
Technical field
The present invention relates to a kind of sub-terrain mines mechanical mining method, especially relate to a kind of mechanized continuous mining method for wall-type gentle-inclined thin ore body that is applicable in the underground metallic ore gentle dip lean ore body.
Background technology
Be subject to the restriction of orebody occurrence, gentle dip lean ore body is regarded as a kind of complicated uneasily mining orebody because the ore that its exploitation can not realize stope inside by gravity from slipping, and is difficult to realize large-scale do mechanization operation in limited underground mining space always.And in traditional mining methods, the problem that panel caving method is faced is that stoping work is complicated, efficient is low, the production material consumption is high, causes that the stope production management is complicated, mining cost is high; Room-and-pillar method and breasting method, the subject matter that faces are that the ore pillar loss is larger, and ore recovery ratio is lower, resource utilize degree low, sometimes need to adopt the supporting measures such as anchor pole, complex procedures, and personnel carry out operation under the goaf or under the avalanche rock stratum, and its production security is relatively poor.
Summary of the invention
Technical problem to be solved by this invention provides a kind of stope Mechanization Level and production efficiency is high, realizes the continuously mechanized continuous mining method for wall-type gentle-inclined thin ore body of exploitation of through thickness.
In order to solve the problems of the technologies described above, mechanized continuous mining method for wall-type gentle-inclined thin ore body provided by the invention, the large-sized stope structure parameter of design in the lean ore body, realize the mining pattern of do mechanization operation, adopt jumbo rock drilling, scraper ore removal, the realization through thickness is exploited continuously, and technical essential is as follows:
(1), panel stope arranges along the capwise of ore body, length of stope 115~125m, width 6~8m, the overall height of high 2.5~3.5m or ore body, staying panel barrier between the panel is the haulage drift safety pillar, the wide 5~8m of panel barrier; The underground pressure management that hydraulic prop carries out stope is set in exploitation process, selects flexibly to stay 3~5m ore deposit studding or artificial ore pillar to support at poor value and horsestone section;
(2), in stope, carry out presplit blasting hole, bottom, the ore body side collapses the rock drilling of shot hole and effecting of induction caving roof shot hole, utilize presplit blasting to realize dilution and the damage control of ore, the goaf is processed in the avalanche of inducing of adopting the effecting of induction caving roof shot hole to carry out top board;
(3), for controlling methods of blasting toes in open and the explosion step of stope, to the processing of sinking of the drilling drift of stope, the tunnel deflection is 0.4~0.8 meter, and when the scraper ore removal, utilize ore to build the ore removal platform of sinking position and stope, realize the operating condition of mechanization;
(4), the production explosion adopt to press the heap blasting technique, the slungshot of controlled blasting and the position of ore utilize scraper to carry out the transportation of stope ore; In process of production, utilize hydraulic prop to realize the stope underground pressure management, after carrying out safe production distribution, reclaim the hydraulic prop of the last section of adopting, implement to induce avalanche to process the goaf.
The ore body capwise is arranged, length of stope 120m, width 7m, high 3m, staying panel barrier between the panel is the haulage drift safety pillar, and the wide 5~8m of panel barrier carries out stope pillar or the artificial ore pillar that poor value flexibly or horsestone give over to 3~5m at stope middle part according to the occurrence condition of ore body.
The ground in goaf is pressed and is processed the upper two kinds of control models that adopt, and in the back production manufacturing process of stope, because the top board exposed area is large, the underground pressure management that hydraulic prop carries out stope is set, the maximum exposure area of control stope; When back production reaches certain dead zone parameters of structural dimension and namely is less than limit exposed area, the roof rock avalanche filling treatment goaf of carrying out the goaf is induced in utilization, form the production of working continuously of down-hole, and according to the geological conditions of ore body, leave the permanent studding of wide 3~5m in poor value and horsestone section and support.
Utilize sunk type stope drilling drift technology, the base plate sinking 0.5m in tunnel, methods of blasting toes in open and the explosion step of solution ore body blasting process are for the mechanical mining of processing gentle dip lean ore body provides condition.
Carry out long-armed pressure heap controlled blasting technology at the length direction of stope, use to press and pile slungshot and the control of quick-fried heap that explosion reduces ore, reduce dispersion and the fine ore amount of ore, realize centralization operation processing.
The invention has the beneficial effects as follows, mining preparation work is carried out in ore body, it is the ore extraction of the useless evil of a kind of nothing, the cutting engineering that need not to undercut, stope do mechanization operation degree is high, and production efficiency is high, through thickness is exploited continuously, solved a scraper ore removal difficult problem, ore loss ratio is low, has improved the rate of recovery of resource.
Description of drawings
Fig. 1 is that longwell presses the heap explosion to induce the front view of caved stopes design.
Fig. 2 is along the I-I line cut-away view among Fig. 1.
Fig. 3 is along the II-II line cut-away view among Fig. 1.
Fig. 4 is along the III-III line cut-away view among Fig. 1.
Fig. 5 is along the IV-IV line cut-away view among Fig. 1.
Fig. 6 is along the V-V line cut-away view among Fig. 1.
Fig. 7 is along the VI-VI line cut-away view among Fig. 1.
The specific embodiment
The present invention is further described below in conjunction with drawings and Examples.
Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6 and Fig. 7, among the figure: 1. airway, 2. hydraulic prop, 3. ore, 4. big gun hole, 5. ore body, 6. haulage drift, 7. drilling drift, 8. drop shaft, 9. safety pillar, 10. collective conveyance tunnel, 11. country rocks, 12. ore pillars, stope arranges that along the capwise of ore body stope structure parameter is length 120m, width 7m, high 3m or full orebody thickness, staying panel barrier between the panel is the haulage drift safety pillar, the wide 5~8m of panel barrier.Because the top board exposed area is large, the underground pressure management that hydraulic prop 2 carries out the operation stope is set, and according to the geological conditions of ore body in exploitation process, leave permanent studding in poor value and horsestone section and support, the width of studding reaches 3~5m.Because single length of stope is longer, namely reaches dead zone after the limit range of exposed area in the certain zone of back production and carry out the avalanche of inducing of roof rock and process.
The ground in goaf is pressed and is processed the upper two kinds of control models that adopt, and in the back production manufacturing process of stope, because the top board exposed area is large, the underground pressure management that hydraulic prop carries out stope is set, the maximum exposure area of control stope; When back production reaches certain dead zone parameters of structural dimension and namely is less than limit exposed area, the roof rock avalanche filling treatment goaf of carrying out the goaf is induced in utilization, form the production of working continuously of down-hole, and according to the geological conditions of ore body, leave the permanent studding of wide 3~5m in poor value and horsestone section and support.
Exploitation process utilizes first the jumbo of short formula to carry out the driving of drilling drift in ore body, the drilling drift base plate sinks 0.5 meter on basis, ore body base plate border, explosion step and foundation that the production control explosion forms in ore body, then do cutting vertical-horizontal groove in the drilling drift bottom, take cutting groove as the scope of freedom, make parallel medium-length hole in drilling drift, side direction is pressed heap explosion ore caving, carries out retrusive continuous stoping order in the nugget.
Stope utilizes scraper to carry out the ore removal transportation, with the stope transport channel of drilling drift as scraper, utilizes the contact platform in slag realization stope and sinking tunnel to construct, and realizes the mechanization ore removal operation of scraper; The stope production period, utilize callable hydraulic pressure (hydraulic pressure) pillar to form the temporary supporting of stope, the Support Position advances along with the propelling of exploitation, for not destroyed by blasting vibration and can guarantee that the safety of ore drawing in stope is as the criterion, concrete supporting parameter is comprehensively determined by analog computation and safe exposed area analysis and field trial apart from the length of work plane.
Carry out long-armed pressure heap controlled blasting technology at the length direction of stope, use to press and pile slungshot and the control of quick-fried heap that explosion reduces ore, reduce dispersion and the fine ore amount of ore, realize centralization operation processing.