CN102493665B - 一种扇形预埋件的定位安装方法 - Google Patents
一种扇形预埋件的定位安装方法 Download PDFInfo
- Publication number
- CN102493665B CN102493665B CN2011104357508A CN201110435750A CN102493665B CN 102493665 B CN102493665 B CN 102493665B CN 2011104357508 A CN2011104357508 A CN 2011104357508A CN 201110435750 A CN201110435750 A CN 201110435750A CN 102493665 B CN102493665 B CN 102493665B
- Authority
- CN
- China
- Prior art keywords
- built
- fitting
- embedded part
- control
- control point
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
一种扇形预埋件的定位安装方法,属于建筑施工技术领域。包括建立“一”字型控制网,分解外弧基准线等垂直线,往返三测回测距,高程测量;布设扇形段墙体控制点,计算预埋件顶部位置,预埋件测量放线;预埋件安装。其特征在于:依据一级控制网进行布设扇形段墙体控制点;根据设计图纸中的条件,计算出预埋件顶部位置;依据控制点、计算数据对预埋件进行实际测量放线,并固定在钢支架上。优点在于,预埋件位置准确,操作简单,节省费用,能满足设计要求。
Description
技术领域
本发明属于建筑施工技术领域,特别是提供了一种扇形预埋件的定位安装方法,现浇混凝土结构中预埋件的定位安装方法,适用于炼钢项目板坯连铸机扇形预埋件的定位安装。
背景技术
在现浇混凝土结构施工中,因预埋件位置不准,需要对混凝土进行剃凿,而剃凿出来的预埋件既不平整,也不规范,更有甚者,预埋件找不到了。这样,不仅影响建筑工程的外观质量,严重的还会影响结构强度,同时也增加了工作量,浪费了材料。因此,确保预埋件位置准确,对提高工程质量,加快施工进度,降低工程成本尤为重要。预埋件定位安装的常规做法是用测量仪器投好控制线,超好标高,然后用尺量方法确定预埋件的具体位置,与墙体钢筋固定在一起。现改为根据设计图纸上的预埋件角度、高程和墙体内侧面到控制线的距离,用测量仪器将预埋件定位安装在侧面墙体上,用钢支架固定预埋件。通过实践,预埋件的定位尺寸准确,固定方法得当,结构外观质量好,即方便快捷,又节省资金。
发明内容
本发明的目的在于提供一种扇形预埋件的定位安装方法,它克服了预埋件位置不准的问题,不但满足工程质量要求,而且还降低工程成本。本发明对扇形预埋件的施工方法作了进一步改进。
为解决上述技术问题,本发明的定位安装方法包括下述几个步骤:建立“一”字型控制网,分解外弧基准线等垂直线,往返三测回测距,高程测量;布设扇形段墙体控制点,计算预埋件顶部位置,预埋件测量放线;预埋件安装。
作为本发明的进一步改进,依据一级控制网布设扇形段墙体控制点,并将标高引测到墙体钢筋上,作为下道测量依据。采用这种方法,可以使预埋件的定位准确,施工方便。
作为本发明的另一种改进,依据控制点、计算数据,对预埋件进行实际测量放线。通过这种方法,可以减少人为因素的误差,使施工误差变得最小。
本发明的工艺步骤为:
(1)建立“一”字型控制网:“一”字型控制网是由纵向基准控制线和控制点组成,以建筑物轴线为纵向基准控制线,按图纸要求丈量出控制线(设备基础中心线),检查控制线上三点的直线度,其精度要求为180°±5″,且与建筑物列线相互平行。
(2)“一”字基线形成后,以建筑物列线为基准,确定外弧基准线,在外弧基准线上测量相应的各段距离,在交点处做垂直线段,其精度要求相交点的度数为90°±2.5″。
仪器架在第一个点上对第二个点测距离三次,之后搬到第二个点上架仪器对第一个点测距离三次,确定直线上的各控制点之间的距离;水平角观测要满足测角中误差≤5″,半测回归零差≤8″,一测回2C(一测回2C互差”是方向观测法中的标准的技术术语,2C值是两倍视准误差,若一测回2C互差超限,应重测)互差≤13″,同一方向各测回差值≤9″;
使用黑红双面尺,往返各测量一次,确定各控制点的高程;
依据一级控制网进行布设扇形段墙体控制点,并将标高引测到墙体钢筋上,作为下道测量依据。
(3)依据设计图纸上预埋件底部的定位条件,计算出预埋件底部到预埋件顶部的水平距离、垂直距离和预埋件底部垂直向上1米的水平距离,得到预埋件顶部位置。
(4)依据控制点、计算数据,对预埋件进行实际测量放线。
(5)将预埋件固定在钢支架上,钢支架坐在混凝土垫层上。
本发明的优点在于,预埋件的位置准确,施工方便,节省处理预埋件的费用,操作简单,能满足设计要求。
附图说明
下面结合附图和具体实施方式对本发明作进一步详细的说明:
图1是扇形段墙体控制点的平面示意图。
图2是计算扇形预埋件顶部定位的平面示意图。
图3是扇形预埋件测量放线的平面示意图。
图4是预埋件加固的立面示意图。
图5是预埋件加固的侧面示意图。
图中,控制点1、控制线2、墙体3、外弧基准线4、预埋件5、水平距离6、垂直距离7、预埋件底部8、预埋件顶部9、墨线10、预埋件底部交点11、墙体高度12,水平距离13、12#槽钢14做立柱、10#槽钢15做横撑、∠45角钢16、混凝土垫层17、浇筑平台18。
具体实施方式
图1~图5为本发明的一种具体实施方式。
本发明包括建立“一”字型控制网,分解外弧基准线等垂直线,往返三测回测距,高程测量;布设扇形段墙体控制点,计算预埋件顶部位置,预埋件测量放线;预埋件安装。
由图1所示扇形段墙体控制点的平面示意图可知,它是依据一级控制网进行布设扇形段墙体控制点1,控制点处埋设100×100×8mm的预埋件。控制网中的控制点1与墙体3距离为500mm,控制点1之间的距离以外弧基准线4为起算点,墙体3与控制线2之间的距离以控制线2为起算点。高程控制用水准仪将标高引测到墙体钢筋上,用红油漆标注,作为下道测量依据。
图3示出扇形预埋件测量放线的平面示意图。它是依据控制点、计算数据,对预埋件5进行实际测量放线。在外弧基准线4上的控制点1分别架设激光垂准仪,使用接收板接收激光点,利用钢线将两激光束连成一条线,引测到固定好的模板上。将设计标高测量到模板内侧,弹出墨线10;沿墨线10水平方向向上丈量设计尺寸,测得的交点为预埋件底部交点11;由于模板高度不能满足预埋件安装一次到位的条件,即预埋件顶点无法确定,解决方法由设计标高沿墙体模板向上实际丈量墙体高度12,计算出该高度的水平距离13,经丈量测得实际高度,计算出该点水平距离,重复前面方法,确定预埋件在该高度的位置;连接两点,弹出墨线10,并在预埋件底部8沿直线方向使用直角尺作垂直线,即得预埋件5的设计位置,对预埋件5进行安装,安装精度土2mm。
图4和图5示出预埋件的加固方法。由于扇形预埋件5体积大,比较重,设计要求精度高,固定难度大,所以把预埋件5固定在横截面为矩形的防变形又牢固的钢支架上,预埋件5与钢支架的连接方法是焊接。钢支架是由12#槽钢14做立柱、10#槽钢15做横撑、∠45角钢16做斜撑焊接而成,立柱间距1000mm,横撑间距1000mm。钢支架坐在混凝土垫层17的上面,在浇筑平台18的下面。
Claims (1)
1.一种扇形预埋件的定位安装方法,其特征在于,工艺步骤为:
(1)建立“一”字型控制网:“一”字型控制网是由纵向基准控制线和控制点组成,以建筑物轴线为纵向基准控制线,按图纸要求丈量出设备基础中心线,检查控制线上三点的直线度,其精度要求为180°土5″,且与建筑物列线相互平行;
(2)设备基础中心线形成后,以建筑物列线为基准,确定外弧基准线,在外弧基准线上测量相应的各段距离,在交点处做垂直线段,其精度要求相交点的度数为90°土2.5″;
仪器架在第一个控制点上对第二个控制点测距离三次,之后搬到第二个点上架仪器对第一个点测距离三次,确定直线上的各控制点之间的距离;水平角观测要满足测角中误差≤5″,半测回归零差≤8″,一测回2C互差≤13″,同一方向各测回差值≤9″;
使用黑红双面尺,往返各测量一次,确定各控制点的高程;
依据一级控制网进行布设扇形段墙体控制点,并将标高引测到墙体钢筋上,作为下道测量依据;
(3)依据设计图纸上预埋件底部的定位条件,计算出预埋件底部到预埋件顶部的水平距离、垂直距离和预埋件底部垂直向上1米的水平距离,得到预埋件顶部位置;
(4)依据控制点、计算数据,对预埋件进行实际测量放线;
(5)将预埋件固定在钢支架上,钢支架坐在混凝土垫层上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011104357508A CN102493665B (zh) | 2011-12-22 | 2011-12-22 | 一种扇形预埋件的定位安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011104357508A CN102493665B (zh) | 2011-12-22 | 2011-12-22 | 一种扇形预埋件的定位安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102493665A CN102493665A (zh) | 2012-06-13 |
CN102493665B true CN102493665B (zh) | 2013-11-20 |
Family
ID=46185519
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011104357508A Active CN102493665B (zh) | 2011-12-22 | 2011-12-22 | 一种扇形预埋件的定位安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102493665B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140163709A1 (en) * | 2012-12-07 | 2014-06-12 | lllinois Tool Works Inc. | Embedment positioning system |
CN106545131B (zh) * | 2016-10-25 | 2018-10-16 | 森特士兴集团股份有限公司 | 一种屋面板防跑偏施工方法及其施工系统 |
CN109614749A (zh) * | 2018-12-28 | 2019-04-12 | 中民筑友科技投资有限公司 | 基于装配式建筑的楼梯预埋件自动生成方法及装置 |
CN111089571A (zh) * | 2019-12-06 | 2020-05-01 | 上海建工集团股份有限公司 | 一种稳定型强制归心盘及其测量方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004316100A (ja) * | 2003-04-11 | 2004-11-11 | Shimizu Corp | 建物の構築方法 |
CN102080417A (zh) * | 2010-12-15 | 2011-06-01 | 中国二十二冶集团有限公司 | 大型t型套筒螺栓分体埋设施工方法 |
CN102134879A (zh) * | 2011-01-12 | 2011-07-27 | 陕西建工集团第六建筑工程有限公司 | 超长设备基础平台预埋件埋置精度控制施工方法 |
-
2011
- 2011-12-22 CN CN2011104357508A patent/CN102493665B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004316100A (ja) * | 2003-04-11 | 2004-11-11 | Shimizu Corp | 建物の構築方法 |
CN102080417A (zh) * | 2010-12-15 | 2011-06-01 | 中国二十二冶集团有限公司 | 大型t型套筒螺栓分体埋设施工方法 |
CN102134879A (zh) * | 2011-01-12 | 2011-07-27 | 陕西建工集团第六建筑工程有限公司 | 超长设备基础平台预埋件埋置精度控制施工方法 |
Non-Patent Citations (4)
Title |
---|
李颖峰.预埋螺栓在施工中的定位控制.《山西建筑》.2003,第29卷(第5期), |
邓建华.高精度预埋件施工技术.《福建建筑》.2010,(第1期), |
预埋螺栓在施工中的定位控制;李颖峰;《山西建筑》;20030531;第29卷(第5期);第58-60、42页 * |
高精度预埋件施工技术;邓建华;《福建建筑》;20100131(第1期);第88-89页 * |
Also Published As
Publication number | Publication date |
---|---|
CN102493665A (zh) | 2012-06-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102493665B (zh) | 一种扇形预埋件的定位安装方法 | |
CN103852059B (zh) | 反铲挖掘机的铲斗定位装置及方法 | |
CN103523169A (zh) | 一种双壳体船舶制造方法 | |
CN103277113B (zh) | 一种有关地铁隧道内的疏散平台的测量装置及控制方法 | |
CN102966254B (zh) | 用于短线匹配法施工的测量塔的设置方法 | |
CN103696410B (zh) | 齿轮齿条爬升式垂直升船机螺母柱高效安装方法及辅助装置 | |
CN103344214B (zh) | 一种1.6次抛物线型特大桥墩测量及墩身线形控制方法 | |
CN109610289A (zh) | 一种双曲面钢箱梁胎架的制作方法 | |
CN103603503A (zh) | 锚栓的安装方法 | |
CN203259122U (zh) | 一种有关地铁隧道内的疏散平台的测量装置 | |
CN209541687U (zh) | 一种十字布点法用测量组合架 | |
CN204404943U (zh) | 一种间距错牙二维测尺 | |
CN108425321B (zh) | 一种新型变截面桥梁线性控制装置的安装方法 | |
CN108571008A (zh) | 盖挖车站钢管柱定位施工方法 | |
CN104634219A (zh) | 一种间距错牙二维测尺 | |
KR101234372B1 (ko) | 토털스테이션을 이용한 수직도 관리측량방법 | |
CN105040992A (zh) | 逆作法结构型钢柱倒插式施工方法 | |
CN115077486A (zh) | 一种垂直升船机施工用模板测量装置及其应用方法 | |
CN107268666B (zh) | 一种辅助定位装置及地脚螺栓的定位方法 | |
CN103487040B (zh) | 一种钢柱安装的测量方法 | |
JP6292562B1 (ja) | 水平認識装置の設置装置 | |
CN205561822U (zh) | 一种桩墙顶水平位移矢量化测量装置 | |
CN105841592A (zh) | 一种顶进轴线偏移量的测量装置及其使用方法 | |
CN208171273U (zh) | 一种提高人字闸门门叶安装精度的装置 | |
CN105926663B (zh) | 环形地脚螺栓群的定位安装方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |