CN103487040B - 一种钢柱安装的测量方法 - Google Patents
一种钢柱安装的测量方法 Download PDFInfo
- Publication number
- CN103487040B CN103487040B CN201310391140.1A CN201310391140A CN103487040B CN 103487040 B CN103487040 B CN 103487040B CN 201310391140 A CN201310391140 A CN 201310391140A CN 103487040 B CN103487040 B CN 103487040B
- Authority
- CN
- China
- Prior art keywords
- steel column
- transit
- line
- journal offset
- offset line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C15/00—Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C1/00—Measuring angles
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C15/00—Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
- G01C15/02—Means for marking measuring points
- G01C15/06—Surveyors' staffs; Movable markers
- G01C15/08—Plumbing or registering staffs or markers over ground marks
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310391140.1A CN103487040B (zh) | 2013-08-30 | 2013-08-30 | 一种钢柱安装的测量方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310391140.1A CN103487040B (zh) | 2013-08-30 | 2013-08-30 | 一种钢柱安装的测量方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103487040A CN103487040A (zh) | 2014-01-01 |
CN103487040B true CN103487040B (zh) | 2015-10-28 |
Family
ID=49827454
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310391140.1A Active CN103487040B (zh) | 2013-08-30 | 2013-08-30 | 一种钢柱安装的测量方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103487040B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109018194B (zh) * | 2017-06-12 | 2022-03-22 | 上海外高桥造船海洋工程项目管理有限公司 | 集装箱箱脚立柱安装方法 |
CN110629780A (zh) * | 2019-08-23 | 2019-12-31 | 安徽世慧科技有限公司 | 一种组合拼接式上下层承台的设计、制作和安装方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW201005154A (en) * | 2008-07-21 | 2010-02-01 | jun-wen Wang | Measuring and positioning method of top-down construction steel column and structure thereof |
CN101691815A (zh) * | 2009-09-03 | 2010-04-07 | 中国建筑第四工程局有限公司 | 一种大型钢架快速吊装对正方法及钢架底座结构 |
CN102331225A (zh) * | 2011-06-08 | 2012-01-25 | 西安建筑科技大学 | 一种高支模体系立杆垂直度的测量方法 |
CN102400559A (zh) * | 2010-09-13 | 2012-04-04 | 五冶集团上海有限公司 | 苯加氢工程主体框架钢结构安装中钢柱校正方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2591978B2 (ja) * | 1988-04-19 | 1997-03-19 | 株式会社ソキア | 高塔の鉛直度の測定法 |
-
2013
- 2013-08-30 CN CN201310391140.1A patent/CN103487040B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW201005154A (en) * | 2008-07-21 | 2010-02-01 | jun-wen Wang | Measuring and positioning method of top-down construction steel column and structure thereof |
CN101691815A (zh) * | 2009-09-03 | 2010-04-07 | 中国建筑第四工程局有限公司 | 一种大型钢架快速吊装对正方法及钢架底座结构 |
CN102400559A (zh) * | 2010-09-13 | 2012-04-04 | 五冶集团上海有限公司 | 苯加氢工程主体框架钢结构安装中钢柱校正方法 |
CN102331225A (zh) * | 2011-06-08 | 2012-01-25 | 西安建筑科技大学 | 一种高支模体系立杆垂直度的测量方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103487040A (zh) | 2014-01-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104328799B (zh) | 一种盖挖逆作法地铁车站钢管柱精确定位方法 | |
CN102080960B (zh) | 基于gps的超高层建筑物垂直度测控方法 | |
CN103114732B (zh) | 铸钢相贯管节点空间定位方法 | |
CN104034319B (zh) | 一种高层建筑测量控制点投射定位辅助装置及其使用方法 | |
CN111174771A (zh) | 一种立柱垂直度测量方法 | |
CN102680942A (zh) | 一种基于全站仪的高炉框架测量定位方法 | |
CN203824548U (zh) | 一种桥梁结构砼表面观测区面积测定仪 | |
CN104949661A (zh) | 超高层建筑核心筒模板定位测量控制方法 | |
CN102966041A (zh) | 多跨连续s型景观桥空间斜拉索定位方法 | |
CN103669362B (zh) | 平仓机实时监测定位系统及方法 | |
CN103453886A (zh) | 一种测量既有建筑物不可触及测点垂直度的方法 | |
CN109443327A (zh) | 一种测量控制网的布设方法 | |
CN204881624U (zh) | 超高层建筑核心筒模板定位测量控制装置 | |
CN203464889U (zh) | 建筑模板垂直度专用检测尺 | |
CN103487040B (zh) | 一种钢柱安装的测量方法 | |
CN102306226A (zh) | 制图软件配合全站仪定位安装构件的方法以及用途 | |
CN102966254B (zh) | 用于短线匹配法施工的测量塔的设置方法 | |
CN203349814U (zh) | 沉降观测辅助装置 | |
CN103344214B (zh) | 一种1.6次抛物线型特大桥墩测量及墩身线形控制方法 | |
JP2024060019A (ja) | 測量システム、丁張設置支援方法、丁張設置支援プログラム | |
CN104792320A (zh) | 一种小区域空间测量定位方法 | |
CN103628511B (zh) | 一种用于桩基护筒的放样投点方法 | |
CN104634315A (zh) | 多层楼板分层水平位移监测系统 | |
CN104006798B (zh) | 墩柱垂直度测量仪 | |
CN104121897B (zh) | 卫星定位测量杆 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403 Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd. Address before: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403 Patentee before: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd. Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403 Patentee after: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd. Address before: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403 Patentee before: CMTCC Shanghai 13th Construction Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190705 Address after: Room A, Room 403, 1325 Mudanjiang Road, Baoshan District, Shanghai, 20199 Co-patentee after: CHINA MCC20 GROUP Corp.,Ltd. Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd. Address before: Room A, Room 403, 1325 Mudanjiang Road, Baoshan District, Shanghai, 20199 Patentee before: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd. |