CN102080960B - 基于gps的超高层建筑物垂直度测控方法 - Google Patents

基于gps的超高层建筑物垂直度测控方法 Download PDF

Info

Publication number
CN102080960B
CN102080960B CN 201010516078 CN201010516078A CN102080960B CN 102080960 B CN102080960 B CN 102080960B CN 201010516078 CN201010516078 CN 201010516078 CN 201010516078 A CN201010516078 A CN 201010516078A CN 102080960 B CN102080960 B CN 102080960B
Authority
CN
China
Prior art keywords
point
gps
coordinate
verticality
gps receiver
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201010516078
Other languages
English (en)
Other versions
CN102080960A (zh
Inventor
施志远
朱毅敏
徐峰
朱成捷
陈康
徐磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 1 Group Co Ltd
Original Assignee
Shanghai Construction No 1 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 1 Group Co Ltd filed Critical Shanghai Construction No 1 Group Co Ltd
Priority to CN 201010516078 priority Critical patent/CN102080960B/zh
Publication of CN102080960A publication Critical patent/CN102080960A/zh
Application granted granted Critical
Publication of CN102080960B publication Critical patent/CN102080960B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Position Fixing By Use Of Radio Waves (AREA)

Abstract

本发明公开了一种基于GPS的超高层建筑物垂直度测控方法,采用高精度GPS静态测量模式,将其中二台基准站置于地面上的基准控制网点上,一台流动站置于施工楼层面的任意位置,定时观测得到第一个楼面测量控制点,同样方法得到第二个楼面测量控制点,采用这两个控制点之一作为测站点,另一点作为后视点进行测点校验,无误后放样楼面轴线控制点。采用本发明可以消除传统方法中的累积误差,提高建筑结构垂直度。此外由于每次测量都从地面上的基准控制网出发,没有累积误差,消除超高层的垂直度控制的最大误差源。

Description

基于GPS的超高层建筑物垂直度测控方法
技术领域
本发明属于建筑工程施工技术领域,具体涉及超高层建筑垂直度测控方法,特别是涉及一种基于GPS的超高层建筑物垂直度测控方法。
背景技术
在超高层建筑施工过程中,由于主楼结构高度的原因,为高耸建筑主楼上部结构提供精确的定位点成为一个测量难题。目前传统的楼层测量方法是“天顶法”,即使用天顶仪将下面楼层的定位点通过预留孔道穿过楼层传递到施工楼层面上。但由于天顶法的观测高度限制的原因,需要进行基准点转换,从而不可避免的产生累积误差。而且在施工中,叠加结构自身的竖向变形,该误差还将被加剧放大。
因此,提供一种在高耸建筑的施工中,能够使整个建筑物的垂直度处在理想的受控范围内,消除传统方法中的累积误差,提高建筑结构垂直度的垂直度测控方法,成为本领域技术人员迫切需要解决的技术难题。
发明内容
本发明所要解决的技术问题在于提供一种基于GPS的超高层建筑物垂直度测控方法,以使整个建筑物的垂直度处在理想的受控范围内,消除传统方法中的累积误差,提高建筑结构垂直度,克服现有技术存在的上述缺陷。
本发明解决技术问题的技术方案如下:
一种基于GPS的超高层建筑物垂直度测控方法,其特征在于,采用高精度GPS静态测量模式,将其中二台基准站置于地面上的基准控制网点上,一台流动站置于施工楼层面的任意位置,定时观测得到第一个楼面测量控制点,同样方法得到第二个楼面测量控制点,采用这两个控制点之一作为测站点,另一点作为后视点进行测点校验,无误后放样楼面轴线控制点;
具体包括如下步骤:
(1)、将至少1台GPS接收器安装在整体提升钢平台的最高层;
(2)、在安装在整体提升钢平台的最高层的GPS接收器下面放置一个可倾斜的圆棱镜,将一台全站仪放置在整体提升钢平台的最高层能够看到GPS接收器的位置上,使GPS接收器与全站仪共同组成一套核心筒复测系统;
(3)、使GPS接收器在静态模式接收和记录卫星信号,与此同时全站仪测量到安置在接收器下面的圆棱镜的角度与距离;
(4)、观测完毕后数据导入计算机处理,使用解算软件计算GPS接收器当前的坐标位置;
(5)、全站仪的坐标计算根据最小二乘法进行计算,最后转换接收器天线的坐标,将全站仪坐标设置成主楼坐标体系,并根据此坐标体系校核所有测量控制点的实地位置。
由以上公开的技术方案可知,通过采用本发明测控方法,在高耸建筑的施工中,使建筑物最上层的轴线网与下部结构在一个投影面上,从而使整个建筑物的垂直度处在理想的受控范围内。消除传统方法中的累积误差,提高建筑结构垂直度。此外由于每次测量都从地面上的基准控制网出发,没有累积误差,消除超高层的垂直度控制的最大误差源。本发明测量的操作步骤简单,无需在结构楼面上层层留孔,无须穿过孔洞测量消除安全隐患。
附图说明
图1为本发明具体实施例基准控制网布置示意图;
图2为采用GPS静态模式进行主楼上部结构测量控制示意图;
具体实施方式
下面结合附图与实施例进一步说明本发明。
例如某具体施工工程中,楼层结构高度达632米,如果采用传统方法不仅会积累超过限度的累积误差,而且叠加了结构自身的竖向变形,该误差还将被加剧放大。其次由于核心筒施工对控制点数量的需求量巨大,而且预留给测量放线的时间相当紧凑。
采用本发明基于GPS的超高层建筑物垂直度测控方法进行测量,采用高精度GPS静态测量模式。图1为地面基准控制网布置图,将其中二台GPS基准站置于PM1-PM4中的任意二点上。一台流动站置于施工楼层面的任意位置,定时观测1个小时得到精度为3mm+0.5ppm的第一个楼面测量控制点,同样方法得到第二个楼面测量控制点,采用这两个控制点之一作为测站点,另一点作为后视点进行测点校验,无误后放样楼面轴线控制点。
使用GPS静态测量控制超高层建筑的楼层控制轴线及垂直度(如图2)。具体步骤如下:
同时使用GPS静态测量观测2个时段周期,对投影上来的控制点进行校核,校核无误后方可交付下道工序使用。
1.将至少1台GPS接收器安装在整体提升钢平台的最高层(如图2中的C点所示),整个系统由至少3台GPS接收器组网,另外两台GPS接收器位置如图2中A、B点所示。选用的GPS设备的静态模式测量精度为3mm+0.5ppm,从而在精度上满足土建结构的要求。
2.在安装在整体提升钢平台的最高层GPS接收器下面放置一个可倾斜的圆棱镜,将一台全站仪TCR1201+放置在整体提升钢平台的最高层能够看到GPS接收器的位置上。使GPS接收器与全站仪共同组成一套核心筒复测系统。
3.使GPS接收器在静态模式接收和记录接收和记录卫星信号1小时左右。与此同时全站仪可以测量到安置在接收器下面的圆棱镜的角度与距离。
4.观测完毕后数据导入计算机来处理。使用解算软件来计算GPS接收器当前的坐标位置。
5.全站仪的坐标计算根据最小二乘法进行计算,可以直接通过TCR1201+中的内置测量模块产生。最后转换接收器天线的坐标,将全站仪坐标设置成主楼坐标体系,并根据此坐标体系校核所有测量控制点的实地位置。
本发明通过采用GPS静态模式测量提供了这样一种从外部引用基准点的方式,该方法减少了测量步骤,对通视条件要求减少,无需预留测量专用孔洞以及省去相应的开合孔洞工作,提高了测量速度,并且绝不产生累积误差。

Claims (3)

1.一种基于GPS的超高层建筑物垂直度测控方法,其特征在于,采用高精度GPS静态测量模式,将其中二台基准站置于地面上的基准控制网点上,一台流动站置于施工楼层面的任意位置,定时观测得到第一个楼面测量控制点,同样方法得到第二个楼面测量控制点,采用这两个控制点之一作为测站点,另一点作为后视点进行测点校验,无误后放样楼面轴线控制点;
具体包括如下步骤:
(1)、将至少1台G PS接收器安装在整体提升钢平台的最高层;
(2)、在安装在整体提升钢平台的最高层的GPS接收器下面放置一个可倾斜的圆棱镜,将一台全站仪放置在整体提升钢平台的最高层能够看到GPS接收器的位置上,使GPS接收器与全站仪共同组成一套核心筒复测系统;
(3)、使GPS接收器在静态模式接收和记录卫星信号,与此同时全站仪测量到安置在接收器下面的圆棱镜的角度与距离;
(4)、观测完毕后数据导入计算机处理,使用解算软件计算GPS接收器当前的坐标位置;
(5)、全站仪的坐标计算根据最小二乘法进行计算,最后转换接收器天线的坐标,将全站仪坐标设置成主楼坐标体系,并根据此坐标体系校核所有测量控制点的实地位置。
2.根据权利要求1所述的超高层建筑物垂直度测控方法,其特征在于,定时观测时间为1小时。
3.根据权利要求1所述的超高层建筑物垂直度测控方法,其特征在于,GPS接收器的静态模式测量精度为3mm+0.5ppm。
CN 201010516078 2010-10-22 2010-10-22 基于gps的超高层建筑物垂直度测控方法 Active CN102080960B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010516078 CN102080960B (zh) 2010-10-22 2010-10-22 基于gps的超高层建筑物垂直度测控方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010516078 CN102080960B (zh) 2010-10-22 2010-10-22 基于gps的超高层建筑物垂直度测控方法

Publications (2)

Publication Number Publication Date
CN102080960A CN102080960A (zh) 2011-06-01
CN102080960B true CN102080960B (zh) 2013-01-02

Family

ID=44087054

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010516078 Active CN102080960B (zh) 2010-10-22 2010-10-22 基于gps的超高层建筑物垂直度测控方法

Country Status (1)

Country Link
CN (1) CN102080960B (zh)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102607515B (zh) * 2012-03-29 2013-11-20 上海微小卫星工程中心 楼宇沉降与倾斜监测设备及监测方法
CN102636161B (zh) * 2012-04-28 2013-11-13 天津二十冶建设有限公司 利用吊线法测设平面控制点的方法
CN102890281B (zh) * 2012-10-14 2016-04-06 上海城建市政工程(集团)有限公司 一种用于高层建筑的gps高精度定位测量方法
CN103741945A (zh) * 2013-12-29 2014-04-23 山西四建集团有限公司 超高层建筑核心筒轴网外控施工方法
CN104406577A (zh) * 2014-12-22 2015-03-11 郑洪宇 一种垂直模板验收器及其操作方法
CN106468549B (zh) * 2015-08-19 2019-08-20 天津市北斗卫星导航定位技术有限公司 基于rtk系统的建筑施工垂直度测量方法
CN106597504A (zh) * 2017-01-12 2017-04-26 山东北斗华宸导航技术股份有限公司 建筑施工测量系统及方法
CN106840124B (zh) * 2017-03-30 2019-07-05 中铁四局集团建筑工程有限公司 一种用于高层建筑快速测量放样的方法
CN107192381A (zh) * 2017-05-24 2017-09-22 中国建筑局(集团)有限公司 一种任意无序空间结构的测量放样方法
CN107478209B (zh) * 2017-07-12 2019-11-19 中国建筑第八工程局有限公司 超高层轴线控制网的检测方法
CN108088428A (zh) * 2018-01-08 2018-05-29 北京城建集团有限责任公司 一种测量高标塔
CN108645379A (zh) * 2018-04-03 2018-10-12 广州地铁设计研究院有限公司 一种高层密集地区建筑物倾斜的观测方法
CN109470222B (zh) * 2018-12-13 2021-08-10 潍坊科技学院 一种超高层建筑工程测量的监理控制方法
CN109882081A (zh) * 2019-03-12 2019-06-14 中铁十二局集团有限公司 一种基于无棱镜全站仪的垂直度简洁测量方法
CN110470210B (zh) * 2019-07-17 2021-01-05 西安威尔图像数据技术研究院有限公司 一种基于卫星定位系统的高大架体垂直度监测系统及方法
CN110231055B (zh) * 2019-07-18 2022-09-23 南京市测绘勘察研究院股份有限公司 一种垂准仪和天顶仪的检校方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5734348A (en) * 1995-08-31 1998-03-31 Nikon Corporation Surveying system using GPS
CN201173773Y (zh) * 2008-03-14 2008-12-31 河南工程学院 Gps rtk全站型测量仪
CN101614807B (zh) * 2009-06-18 2011-09-14 东南大学 基于数字图像技术的建筑容积率确定方法

Also Published As

Publication number Publication date
CN102080960A (zh) 2011-06-01

Similar Documents

Publication Publication Date Title
CN102080960B (zh) 基于gps的超高层建筑物垂直度测控方法
CN109470222B (zh) 一种超高层建筑工程测量的监理控制方法
CN108871266B (zh) 一种基于中间法三角高程方法的自动化沉降监测方法
CN109033592B (zh) 一种异形饰面板的bim放样方法
CN108253946B (zh) 多功能竖向测量联系测量一体化三维坐标传递装置及方法
CN103591944B (zh) 一种弧形建筑测量施工方法
CN108444432B (zh) 一种铁路既有线控制网及轨道线形同步测量方法
CN107121123A (zh) 卫星精度单机测量方法
CN103499340A (zh) 一种实现大高差高程竖直传递的测量装置及测量方法
KR20120051981A (ko) Gnss를 이용한 건물의 수직도 측정 방법 및 시스템
CN105973215A (zh) 一种激光垂准仪进行铅锤定位测量的系统及方法
CN102296497B (zh) 一种crtsii型板式道岔无砟轨道道岔板精调施工方法
Okiemute et al. Comparative analysis of dgps and total station accuracies for static deformation monitoring of engineering structures
JP2024060019A (ja) 測量システム、丁張設置支援方法、丁張設置支援プログラム
CN110146057B (zh) 一种检测隧道断面的方法
KR100820339B1 (ko) 지하공간으로의 기준점 측량방법
CN104316027B (zh) 复合水准仪本方高度测定方法
CN110411430A (zh) 强制归心观测墩测设地铁车站施工方法
KR101234372B1 (ko) 토털스테이션을 이용한 수직도 관리측량방법
JP3280812B2 (ja) 構造物の鉛直精度計測方法
CN111945564B (zh) 一种框架桥顶进的施工方法及其施工系统
CN107478209A (zh) 超高层轴线控制网的检测方法
CN103512507A (zh) 一种大跨距钢轨轨距测量方法
CN102636161B (zh) 利用吊线法测设平面控制点的方法
CN110940322A (zh) 一种高精度铁路跨活动断裂变形监测方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 200120 33 Fushan Road, Shanghai, Shanghai, Pudong New Area

Applicant after: Shanghai Construction No.1 (Group) Co., Ltd.

Address before: 200120 33 Fushan Road, Shanghai, Shanghai, Pudong New Area

Applicant before: Shanghai First Construction Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: SHANGHAI NO.1 CONSTRUCTION CO., LTD. TO: SHANGHAI CONSTRUCTION NO.1 GROUP CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20110601

Assignee: Shanghai Yijian Construction Technology Consulting Co.,Ltd.

Assignor: SHANGHAI CONSTRUCTION NO.1 (Group) Co.,Ltd.

Contract record no.: X2021310000017

Denomination of invention: Measurement and control method of verticality of super high rise building based on GPS

Granted publication date: 20130102

License type: Common License

Record date: 20210407