CN102454297A - Construction method for installing core layer for light composite thermal insulation wall - Google Patents

Construction method for installing core layer for light composite thermal insulation wall Download PDF

Info

Publication number
CN102454297A
CN102454297A CN2010105273702A CN201010527370A CN102454297A CN 102454297 A CN102454297 A CN 102454297A CN 2010105273702 A CN2010105273702 A CN 2010105273702A CN 201010527370 A CN201010527370 A CN 201010527370A CN 102454297 A CN102454297 A CN 102454297A
Authority
CN
China
Prior art keywords
core layer
sandwich layer
construction
bulk core
supporting member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105273702A
Other languages
Chinese (zh)
Inventor
吴淑环
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2010105273702A priority Critical patent/CN102454297A/en
Publication of CN102454297A publication Critical patent/CN102454297A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The invention relates to a construction method for installing a core layer for a light composite thermal insulation wall, relating to a construction method for a light thermal insulation wall, aiming at the problem that the construction for installing the core layer for the light composite thermal insulation wall is inconvenient. Method 1: sticking fixed core layers on the outer side of a main structure of a building, and sticking block core layers on an entrance of the frame of the main structure of the building, and sealing a gap between the block core layers with polyurethane foam rubber. Method 2: fixing the block core layers on the outer side of a bearing member of the main structure of the building, and sealing and fixing the joint seal for the block core layers with the polyurethane foam rubber. Method 3: fixing the block core layers on the entrance of the frame; then, spray coating the polyurethane foam rubber on the outer side of the main structure of the building to be bonded and sealed with the block core layers; sealing the gap between the block core layers with polyurethane foam rubber to fix them. Method 4: sticking the block core layers in the entrance of the frame of the main structure of the building, and sealing the gap between the adjacent block core layers with polyurethane foam rubber to fix them. The construction method for installing a core layer for a light composite thermal insulation wall disclosed in the invention has advantages of quick installation speed and low construction cost.

Description

A kind of job practices of installing sandwich layer of light composite insulation wall
Technical field
The present invention relates to a kind of job practices of building installing sandwich layer of light composite insulation wall.
Background technology
In the building frame construction light steel frame and flooring are up and down fixed at present, done the exterior wall of frame construction, compressed straw slab is fixed on the light steel frame with drift bolt with compressed straw slab, or directly and frame fixation; Also have with benzene plate and cement fibrolite plate compound after, also be fixed on the light steel frame with drift bolt; Also have small-sized LIGHT WEIGHT STEEL STRUCTURES with honeycomb card board or honeycomb card board and the compound back sandwich layer as exterior wall of benzene plate, honeycomb card board is to be fixed on the steel work through steel tank road and steel connector.The method construction trouble that more than fixing these light heat insulation materials are sandwich layer, cost is higher, particularly has the heat transfer of light steel frame and steel work heat bridge, and has slit blow-by, the problem of unfavorable building energy conservation of installing.
Present patent application inventor proposed the patent of invention name be called " inside and outside be provided with reinforcing bar/with the combined wall of metal lath and plaster ", number of patent application is 200710167871.2 patent; Also propose the patent of invention name and be called " a kind of composite component of alkaline-resisting glass fiber net plasterer ", number of patent application is 200910141007.4 patent.The combined wall of these two patents can alleviate wall weight significantly, becomes self heat insulation wall, but has the inconvenient problem of sandwich layer construction of installing.
For prevent that sandwich layer is shifted under wind; Number of patent application be 200710167871.2 patents combined wall fixedly the way of sandwich layer be, on floor, vertical reinforcing bar is set by a determining deviation, on indoor vertical reinforcing bar by a determining deviation weldable steel pad; With nut the stainless steel bolt of non-standard component being socketed part is fixed on the indoor steel plate washer; Pass sandwich layer, the outside is fixed on the steel plate washer with nut again, promptly is with bolt sandwich layer and indoor reinforcing bar to be fixed.Cause indoor vertical amount of reinforcement many, welding capacity is big, and stainless steel bolt sockets part and steel plate washer quantity is many, and cost is high.Be to be adhesively fixed each other between the sandwich layer with interfacial agents or cement polymer mortar; This need be not less than 24 hours and just can cling; Influence the next procedure construction, inevitable collision not only possibly damage the very low sandwich layer of intensity in wind-force and the construction therebetween, and sandwich layer usually is shifted; Disaster hidden-trouble is big, and the construction feasibility is poor.
Number of patent application 200910141007.4 patents have provided the combined wall structure at embodiment one; Such description sandwich layer is installed after the structure narration of embodiment one finishes: " when sandwich layer is constructed for the macromolecule heat insulating material; should on polymer sandwich layer, smear first pass cement mortar or pea gravel concreten topping 8 earlier, see Fig. 3.Through interfacial agents topping of plastering 8 and sandwich layer 3 bondings are formed building blocks, building block size so that move is advisable.As the cementing agent between sandwich layer 3 building blocks, build top one deck building block with interfacial agents again by laying bricks or stones ...,, and at any time the slit between the seam between the building block is filled and led up with mortar until the body of wall height of needs.……。”。This is the formation building block of plastering earlier in the sandwich layer both sides, relies on the weight of building block or also paste alkaline-resisting screen cloth the stable of sandwich layer building block when keeping the combined wall construction.Make the insulation blocks operation but having increased plasters in advance, it is big to take the construction plant area, and moves bulk building block inconvenience is installed, and the building block that the higher position particularly is installed is inconvenient; Also require the bonding plane between the building block to coincide, otherwise the centre there is the slit can not be bonding with interfacial agents, must uses cement polymer mortar levelling bonding; But the hardening time of cement polymer mortar is long; And increase the heat transfer heat bridge, sandwich layer is installed also inconvenient, and bonding fixedly time of sandwich layer also long.
Above-mentioned situation explanation, present in engineering, the solution conveniently installs and fixes sandwich layer and quickens the fixedly way of bulk core layer.Can not be very soon fixedly sandwich layer just can not carry out next procedure very soon---wire lath or alkaline-resisting screen cloth be installed and plastered.In the combined wall of number of patent application 200910141007.4, if sandwich layer is the EPS plate, the EPS plate is afraid of to collide with, inflammable, easy damage, be afraid of the wind displacement, and quickening fixedly, sandwich layer is the important assurance of combined wall smooth construction; And in frame construction; If can sandwich layers such as EPS plate or honeycomb card board directly fast just need not used fixedly sandwich layer of light steel frame with the frame beam column bonding is fixing; Need not be fixed on the steel work with steel tank road and steel connector yet; This had both saved the cost that light steel frame or steel tank road and steel connector are installed, and had reduced light steel frame and steel work, steel tank road and the steel connector heat bridge adverse effect to building energy conservation again.
How the present invention quickens to fix in order to solve exactly, the convenient sandwich layer of installing, the light steel frame, steel tank road and the steel connector that adopt during cancellation is installed; Vertical reinforcing bar, steel plate washer and stainless steel bolt that the combined wall of number of patent application 200710167871.2 patents needn't rely on the floor are fixed; The combined wall of the number of patent application 200910141007.4 patents making insulation blocks of needn't plastering in advance relies on the weight of insulation blocks to guarantee the stable of combined wall construction stage.
Summary of the invention
The purpose of this invention is to provide the job practices that a kind of light composite insulation wall quickens to install and fix sandwich layer.
First kind of job practices of a kind of installing sandwich layer of light composite insulation wall of the present invention, said job practices are the first fixing sandwich layers in the outside of the supporting member of major structure of construction; After sandwich layer is fixing; Bulk core layer is sticked in the supporting member framework hole scope of major structure of construction; The supporting member outside of bulk core layer and major structure of construction is pasted between the fixing sandwich layer and is left the slit; The slit is sealed and adhesively fixed with polyurethane foam glue is foam filled, and the seam between the adjacent bulk core layer is sealed and adhesively fixed with polyurethane foam glue is foam filled; The supporting member 1 of said major structure of construction is beam, plate, post, load bearing wall; Said sandwich layer and bulk core layer are the macromolecule heat insulating material, or are mineral wool panels or straw plate or honeycomb card board, and said sandwich layer is identical heat insulating material with the bulk core, or is different heat insulating materials.
Second kind of job practices of a kind of installing sandwich layer of light composite insulation wall of the present invention; Said job practices is the outside that bulk core layer is fixed on the supporting member of major structure of construction, and the seam that bulk core layer is positioned at the supporting member frame beam column hole scope of major structure of construction is sealed and adhesively fixed with polyurethane foam glue is foam filled; The supporting member of said major structure of construction is beam, plate, post, load bearing wall; Said bulk core layer 3 is the macromolecule heat insulating material, or is mineral wool panels or straw plate or honeycomb card board.
The third job practices of a kind of installing sandwich layer of light composite insulation wall of the present invention; Said job practices is earlier bulk core layer to be sticked in the supporting member framework hole scope of major structure of construction; After the bulk core layer that is stuck is fixing, be bonded and sealed in the outside spraying polyurethane foam adhesive of the supporting member of major structure of construction and with bulk core layer; Seam between the bulk core layer is sealed and adhesively fixed with polyurethane foam glue is foam filled; The supporting member of said major structure of construction is beam, plate, post, load bearing wall; Said bulk core layer is the macromolecule heat insulating material, or is mineral wool panels or straw plate or honeycomb card board.
The 4th kind of job practices of a kind of installing sandwich layer of light composite insulation wall of the present invention; Said job practices is that bulk core layer is sticked in the framework hole scope of supporting member of major structure of construction, and the slit between the adjacent bulk core layer is sealed and adhesively fixed with polyurethane foam glue is foam filled; The supporting member of said major structure of construction is beam, plate, post, load bearing wall; Said bulk core layer is the macromolecule heat insulating material, or is mineral wool panels or straw plate or honeycomb card board.
Technique effect of the present invention is: the job practices of a kind of installing sandwich layer of light composite insulation wall of the present invention; Can fixedly mount sandwich layer fast, manpower consumption reduce is installed and because of the consumption of support shuttering overlong time, avoid because of the sandwich layer set time long; Damaged in collision sandwich layer in wind-force and the construction; The loss that causes material unaccounted-for (MUF) and do over again and install, convenient construction reduces cost.In the combined wall engineering of light heat insulation material as sandwich layer, the job practices of a kind of installing sandwich layer of light composite insulation wall of the present invention construction feasibility is strong, and favourable building energy conservation.Just because of job practices of the present invention has been arranged, just make the combined wall of number of patent application 200910141007.4 patents have very strong construction feasibility.
To the fill plug seal in slit is installed, also be applied in the heat insulating work of body of wall or roofing when polyurethane foam glue is used for door and window installing at present in large quantities, spraying polyurethane is as insulation layer.Bonding between colored heat-insulating steel plate and the benzene plate is with polyurethane foam glue pressurization bonding.Steel wire net rack cement sandwiched plate body of wall is that a kind of external hanging type with steel crab-bolt and agent structure is installed, if with benzene plate slit to last, overlap connection in the outside, slit mutually with the steel mesh sheet of 0.2m width and get final product.At present; All be with the cement polymer mortar insulation layer that bonds in the construction of composite thermal-insulating wall; Insulation layer and basic unit's body of wall bonding is fixing, and polyurethane foam glue is not suitable at wall external pasting benzene plate, because when adopting the polyurethane foam glue, need pressurization; The benzene plate that wall outer side is pasted is provided with the water booster system trouble, and there do not have pressure not guarantee to be sticking.Need install in the combined wall construction of bulk lightweight core layer in frame construction at present; Polyurethane foam glue of no use quickens the fixedly job practices of sandwich layer of bonding; Just because of this; The described number of patent application of background technology is that 200710167871.2 patent, number of patent application are 200910141007.4 patent, and small-sized LIGHT WEIGHT STEEL STRUCTURES fixedly honeycomb card board all taked the structure of pretty troublesome fixedly sandwich layer.
Description of drawings
Fig. 1 is the horizontal profile sketch map of installing sandwich layer of light composite insulation wall of a kind of building of embodiment one; Sandwich layer part thickness is positioned at the supporting member frame beam column hole of major structure of construction, when some thickness of sandwich layer is positioned at the outside of supporting member frame beam column hole scope of major structure of construction;
Fig. 2 is the vertical cut-away schematic view of installing sandwich layer of light composite insulation wall of a kind of building of embodiment one; Sandwich layer part thickness is positioned at the supporting member frame beam column hole of major structure of construction, when some thickness of sandwich layer is positioned at the outside of supporting member frame beam column hole scope of major structure of construction;
Fig. 3 is the vertical cut-away schematic view of installing sandwich layer of light composite insulation wall of a kind of building of embodiment three, when sandwich layer is positioned at the major structure of construction outside fully;
Fig. 4 is the horizontal profile sketch map of installing sandwich layer of light composite insulation wall of a kind of building of embodiment three,, when sandwich layer is positioned at the major structure of construction outside fully;
Fig. 5 is the vertical cut-away schematic view of installing sandwich layer of light composite insulation wall of a kind of building of embodiment five;
Fig. 6 is the horizontal profile sketch map of installing sandwich layer of light composite insulation wall of a kind of building of embodiment five;
Fig. 7 is the vertical cut-away schematic view of installing sandwich layer of light composite insulation wall of a kind of building of embodiment seven;
Fig. 8 is the horizontal profile sketch map of installing sandwich layer of light composite insulation wall of a kind of building of embodiment seven.
The specific embodiment
The specific embodiment one: see Fig. 1, Fig. 2, the job practices of a kind of installing sandwich layer of light composite insulation wall of this embodiment is, said job practices is the fixing sandwich layer 3-1 in the outside of the supporting member 1 of major structure of construction earlier; After sandwich layer 3-1 is fixing; Bulk core layer 3 is sticked in the supporting member 1 framework hole scope of major structure of construction; Supporting member 1 outside of bulk core layer 3 and major structure of construction is pasted between the fixing sandwich layer 3-1 and is left the slit; With foam filled being sealed and adhesively fixed of polyurethane foam glue 3-3, the seam between the adjacent bulk core layer 3 is with foam filled being sealed and adhesively fixed of polyurethane foam glue 3-3 with the slit; The supporting member 1 of said major structure of construction is beam, plate, post, load bearing wall; Said sandwich layer 3-1 and bulk core layer 3 are the macromolecule heat insulating material, or are mineral wool panels or straw plate or honeycomb card board, and said sandwich layer 3-1 is identical heat insulating material with bulk core layer 3, or is different heat insulating materials.
The specific embodiment two: this embodiment is that the both sides of the bulk core layer 3 of this embodiment or a side or part and cement fibrolite plate or calcium silicate board with microporous are pasted compound, sandwich layer 3 formation light-weight precast slabs with the difference of embodiment one.
In the embodiment two " or local paste compound " with cement fibrolite plate or calcium silicate board with microporous to be meant that bulk core layer 3 is positioned at part and cement fibrolite plate or the calcium silicate board with microporous stickup at door and window hole edge compound, can strengthen the rigidity of edge, hole sandwich layer.Sandwich layer 3 to paste compound back rigidity very big with cement fibrolite plate or calcium silicate board with microporous, when plastering, generally needn't prop up diagonal brace, make things convenient for plastering construction.
Embodiment one and two is applicable to the job practices of the installing sandwich layer of light composite insulation wall of outer insulation, and the outside of the supporting member 1 of major structure of construction fixedly sandwich layer 3-1 can add the crab-bolt method by now common method of attaching or stickup and fixes.The sandwich layer part thickness of external heat insulating composite wall is positioned at the supporting member frame beam column hole of major structure of construction; Some thickness of sandwich layer is positioned at the outside of the supporting member frame beam column hole scope of major structure of construction; The sandwich layer of pasting with the supporting member outside of major structure of construction bonds fixing each other; The thickness of framework inner sandwich layer is seen Fig. 1, Fig. 2 greater than the sandwich layer in the frame beam column outside.The sandwich layer of external heat insulating composite wall also can be positioned at the outside of the supporting member of major structure of construction fully, like Fig. 3, shown in Figure 4.The combined wall of the outer thermal insulation structure of Fig. 1~Fig. 4 can adopt the job practices of embodiment one and two installation sandwich layer.
External heat insulating composite wall beam column outboard wick layer thickness generally all surpasses 60mm; The core layer thickness that paste in the severe cold area beam column outside reaches 100~200mm; Under beam column outside sandwich layer (or being referred to as insulation layer) at first bonds fixing condition; With polyurethane foam glue bulk core layer and beam column outside sandwich layer is fixed, fast because of the polyurethane foam adhesive curing, adhesive strength is high, can frame beam column hole scope inner sandwich layer very fast with beam column outside the sandwich layer secure bond fix.
The specific embodiment three: see Fig. 3, Fig. 4; The job practices of a kind of installing sandwich layer of light composite insulation wall of this embodiment is; Said job practices is the outside that bulk core layer 3 is fixed on the supporting member 1 of major structure of construction, and bulk core layer 3 is positioned at the seam of supporting member 1 frame beam column hole scope of major structure of construction with foam filled being sealed and adhesively fixed of polyurethane foam glue 3-3; The supporting member 1 of said major structure of construction is beam, plate, post, load bearing wall; Said bulk core layer 3 is the macromolecule heat insulating material, or is mineral wool panels or straw plate or honeycomb card board.
The specific embodiment four: this embodiment is that the both sides of the bulk core layer 3 of this embodiment or a side or part and cement fibrolite plate or calcium silicate board with microporous are pasted compound, sandwich layer 3 formation light-weight precast slabs with the difference of embodiment three.
Embodiment three and four also is a kind of job practices of installing sandwich layer of light composite insulation wall of outer insulation.Embodiment three and four and embodiment one and two difference be; Embodiment three and four sandwich layer 3 are completely fixed in the outside of major structure of construction supporting member 1; The indoor anchor bar 2 of the combined wall of number of patent application 200910141007.4 patents is positioned at the edge of the beam column of major structure of construction supporting member 1, and indoor alkaline-resisting screen cloth or metal net plaster are positioned at the edge of the beam column of major structure of construction supporting member 1.This embodiment can be installed bulk core layer 3 by floor height or near floor height, but it is local with fritter sandwich layer 3-1 not get rid of the beam column outside, and seeing that Fig. 4 center pillar is positioned at the sandwich layer of corner can be without bulk core layer 3, and with fritter sandwich layer 3-1.The supporting member 1 of embodiment three and four bulk core layer 3 and major structure of construction fixing should satisfy the more stable requirement of sandwich layer 3 in supporting member 1 outside that is suspended in major structure of construction.
Bulk core layer 3 is installed to be adopted and pastes that to add the plastics nail that expands fixing the most convenient.This embodiment is easy for installation, and speed of application is faster, and it is simpler to calculate the body of wall mean thermal transmittance.Sandwich layer 3 is positioned at the slit of major structure of construction supporting member 1 part can fill sealing with polyurethane foam glue; But regulation according to existing stickup EPS plate thin plastering; When the slit is not more than 3mm, can not fill yet, must be bonded and sealed but sandwich layer 3 is positioned at the slit of the framework hole part of major structure of construction supporting member 1.
The specific embodiment five: see Fig. 5, Fig. 6; The job practices of a kind of installing sandwich layer of light composite insulation wall of this embodiment is; Said job practices is earlier bulk core layer 3 to be sticked in the framework hole scope of supporting member 1 of major structure of construction; After the bulk core layer that is stuck 3 is fixing, be bonded and sealed at the outside spraying polyurethane foam adhesive 3-3 of the supporting member 1 of major structure of construction and with bulk core layer 3; Seam between the bulk core layer 3 is with foam filled being sealed and adhesively fixed of polyurethane foam glue 3-3; The supporting member 1 of said major structure of construction is beam, plate, post, load bearing wall; Said bulk core layer 3 is the macromolecule heat insulating material, or is mineral wool panels or straw plate or honeycomb card board.
This embodiment with embodiment one and two identical point is; Sandwich layer part thickness is positioned at the supporting member frame beam column hole of major structure of construction, and some thickness of sandwich layer is positioned at the outside of the supporting member frame beam column hole scope of major structure of construction; Difference is that the sandwich layer 3-3 in supporting member 1 outside of bulk core layer 3 and major structure of construction is not a kind of material, and promptly sandwich layer 3-3 is the polyurethane foam glue of in-situ spraying.The coefficient of thermal conductivity of sandwich layer 3-3 is lower than EPS plate, the XPS plate of common employing, can remedy because of the outside sandwich layer of the supporting member 1 of major structure of construction is thin, to the adverse effect of insulation.
This embodiment is that insulation layer is selected polyurethane heat-insulation for use in the beam column outside; The interior bulk core layer of the fixed frame beam column hole that at first bonds; Though it is long hardening time with cement polymer mortar; But behind the spraying polyurethane of the beam column outside, bond very soon thereupon, just fixing very soon the bulk core layer in the frame beam column hole.
The specific embodiment six: the difference with embodiment five of this embodiment is that the both sides of the bulk core layer 3 of this embodiment or a side or part and cement fibrolite plate or calcium silicate board with microporous are pasted compound, sandwich layer 3 formation light-weight precast slabs.
The specific embodiment seven: see Fig. 7, Fig. 8; The job practices of a kind of installing sandwich layer of light composite insulation wall of this embodiment is; Said job practices is that bulk core layer 3 is fixed in the framework hole scope of supporting member 1 of major structure of construction, and the seam between the adjacent bulk core layer 3 is with foam filled being sealed and adhesively fixed of polyurethane foam glue 3-3; The supporting member 1 of said major structure of construction is beam, plate, post, load bearing wall; Said bulk core layer 3 is the macromolecule heat insulating material, or is mineral wool panels or straw plate or honeycomb card board.
The specific embodiment eight: this embodiment is that the both sides of the bulk core layer 3 of this embodiment or a side or part and cement fibrolite plate or calcium silicate board with microporous are pasted compound, sandwich layer 3 formation light-weight precast slabs with the difference of embodiment seven.
Embodiment seven and eight is applicable to that the frame beam column outside of the supporting member 1 of major structure of construction is not provided with sandwich layer, uses the heat-preserving wall that certain energy-conservation requirement is arranged with non-heat-preserving wall or Xia Redong cryogenic region building.Bulk core layer 3 is fixed in the framework hole scope of supporting member 1 of major structure of construction, and the supporting member 1 of bulk core layer 3 and major structure of construction fixing normally pasted fixing or pasted and add crab-bolt and fix (fixing at the root oblique drilling hole).
Be meant scope in the supporting member 1 framework hole scope of major structure of construction according to the invention at the framework hole of exterior wall projecting direction; Both comprise the sandwich layer that the supporting member 1 framework scope that is positioned at major structure of construction is provided with, also comprised the sandwich layer of the supporting member 1 framework outside scope that is positioned at major structure of construction.
The present invention is with beam, plate, post, the load bearing wall bonding of bulk core layer 3 with the supporting member 1 of major structure of construction, available cement polymer mortar bonding, also available polyurethane foam glue bond.For quickening the curing of cement polymer mortar, can adopt low alkali cement, the low alkali cement kind is different, and hardening time is different.Seam between the sandwich layer is during with the foam filled sealing of polyurethane foam glue, and the bonding fixed speed is very fast, just solidifies in 15~20 minutes under the normal temperature, and it is very convenient to construct.
Sandwich layer of the present invention and cement fibrolite plate or calcium silicate board with microporous are pasted compound available polyurethane foam glue, also available emulsion class bonding adhesive, or the polymer bonding of emulsion class bonding adhesive preparation, and latter's cost is low, but tack time is long slightly.
So-called size is relative notion, and bulk core layer according to the invention is meant and is convenient construction, is installed in the hole between the frame beam column, for example with bulk core layer as far as possible: embodiment three can be installed bulk core layer 3 by floor height or near floor height; The height of a bulk of sandwich layer of embodiment is that the clear height between the frame construction beam slab deducts bonding adhesive thickness (if construction need deduct polymer mortar thickness when confirming between sandwich layer and the agent structure to bond with cement polymer mortar); The width of bulk core layer is confirmed according to the width that design size and producer can reach; The length of bulk core layer deducts the width (also considered opening protection layer thickness) of sandwich layer slit with polyurethane foam glue fill plug seal for window length under the windowsill, and the height of bulk core layer is not limit (being advisable with a whole plate sandwich layer under the certainly general window windowsill) in the windowsill altitude range of design code.The Breadth Maximum of apparatus processing EPS plate is 1.2m at present.The specification of bulk core layer according to the invention in principle should be greater than the specification 600 * 600~600 * 1200 of current stickup EPS plate thin plastering; But because of row's chi error is arranged when not getting rid of construction and installation; For the adjustment size also need be installed less sandwich layer in some position, and for utilizing leftover pieces, minimizing loss thereby utilize the possibility of less sandwich layer; But this situation does not account for the main flow that the sandwich layer engineering construction is installed, because this is inconvenient to construct.
The present invention can reduce the bonding slit of installation with bulk core layer, and construction install convenience reduces the consumption of polyurethane foam glue, and reduces the heat waste through the slit, and is more favourable to building energy conservation.The light thermal-insulation sandwich layer is installed is adopted job practices of the present invention, fix with steel drift bolt and light steel frame than background technology is said, or through steel tank road and steel connector and steel work fixedly method such as sandwich layer construct simple and conveniently, cost is low, energy-saving heat preserving is good.

Claims (8)

1. the job practices of an installing sandwich layer of light composite insulation wall is, it is characterized in that, said job practices is the first fixing sandwich layer (3-1) in the outside of the supporting member (1) of major structure of construction; After sandwich layer (3-1) is fixing; Bulk core layer (3) is sticked in the framework hole scope of supporting member (1) of major structure of construction; Supporting member (1) outside of bulk core layer (3) and major structure of construction is pasted between the fixing sandwich layer (3-1) and is left the slit; With foam filled being sealed and adhesively fixed of polyurethane foam glue (3-3), the seam between the adjacent bulk core layer (3) is with foam filled being sealed and adhesively fixed of polyurethane foam glue (3-3) with the slit; The supporting member of said major structure of construction (1) is beam, plate, post, load bearing wall; Said sandwich layer (3-1) and bulk core layer (3) are the macromolecule heat insulating material, or are mineral wool panels or straw plate or honeycomb card board, and said sandwich layer (3-1) is identical heat insulating material with bulk core layer (3), or is different heat insulating materials.
2. the job practices of a kind of installing sandwich layer of light composite insulation wall according to claim 1 is, it is characterized in that, the both sides of said bulk core layer (3) or a side or part and cement fibrolite plate or calcium silicate board with microporous are pasted compound, and sandwich layer (3) forms light-weight precast slab.
3. the job practices of an installing sandwich layer of light composite insulation wall is; It is characterized in that; Said job practices is the outside that bulk core layer (3) is fixed on the supporting member (1) of major structure of construction, and bulk core layer (3) is positioned at the seam of supporting member (1) frame beam column hole scope of major structure of construction with foam filled being sealed and adhesively fixed of polyurethane foam glue (3-3); The supporting member of said major structure of construction (1) is beam, plate, post, load bearing wall; Said bulk core layer (3) is the macromolecule heat insulating material, or is mineral wool panels or straw plate or honeycomb card board.
4. the job practices of a kind of installing sandwich layer of light composite insulation wall according to claim 3 is, it is characterized in that, the both sides of said bulk core layer (3) or a side or part and cement fibrolite plate or calcium silicate board with microporous are pasted compound, and sandwich layer (3) forms light-weight precast slab.
5. the job practices of an installing sandwich layer of light composite insulation wall is; It is characterized in that; Said job practices is earlier bulk core layer (3) to be sticked in the framework hole scope of supporting member (1) of major structure of construction; After the bulk core layer that is stuck (3) is fixing, be bonded and sealed in the outside spraying polyurethane foam adhesive (3-3) of the supporting member (1) of major structure of construction and with bulk core layer (3); Seam between the bulk core layer (3) is with foam filled being sealed and adhesively fixed of polyurethane foam glue (3-3); The supporting member of said major structure of construction (1) is beam, plate, post, load bearing wall; Said bulk core layer (3) is the macromolecule heat insulating material, or is mineral wool panels or straw plate or honeycomb card board.
6. the job practices of a kind of installing sandwich layer of light composite insulation wall according to claim 5 is, it is characterized in that, the both sides of said bulk core layer (3) or a side or part and cement fibrolite plate or calcium silicate board with microporous are pasted compound, and sandwich layer (3) forms light-weight precast slab.
7. the job practices of an installing sandwich layer of light composite insulation wall is; It is characterized in that; Said job practices is that bulk core layer (3) is sticked in the framework hole scope of supporting member (1) of major structure of construction, and the seam between the adjacent bulk core layer (3) is with foam filled being sealed and adhesively fixed of polyurethane foam glue (3-3); The supporting member of said major structure of construction (1) is beam, plate, post, load bearing wall; Said bulk core layer (3) is the macromolecule heat insulating material, or is mineral wool panels or straw plate or honeycomb card board.
8. the job practices of a kind of installing sandwich layer of light composite insulation wall according to claim 7 is, it is characterized in that, the both sides of said bulk core layer (3) or a side or part and cement fibrolite plate or calcium silicate board with microporous are pasted compound, and sandwich layer (3) forms light-weight precast slab.
CN2010105273702A 2010-11-02 2010-11-02 Construction method for installing core layer for light composite thermal insulation wall Pending CN102454297A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105273702A CN102454297A (en) 2010-11-02 2010-11-02 Construction method for installing core layer for light composite thermal insulation wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105273702A CN102454297A (en) 2010-11-02 2010-11-02 Construction method for installing core layer for light composite thermal insulation wall

Publications (1)

Publication Number Publication Date
CN102454297A true CN102454297A (en) 2012-05-16

Family

ID=46037937

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105273702A Pending CN102454297A (en) 2010-11-02 2010-11-02 Construction method for installing core layer for light composite thermal insulation wall

Country Status (1)

Country Link
CN (1) CN102454297A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264798A (en) * 2014-09-12 2015-01-07 北京首钢建设集团有限公司 Method for constructing prefabricated cladding panel and steel frame column split joint seam

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1282831A (en) * 1999-07-28 2001-02-07 段梦麟 Insulating light wall slab and its making method
CN2447447Y (en) * 2000-09-30 2001-09-12 梁茂杰 Light insulated wall board
CN101144294A (en) * 2006-08-11 2008-03-19 樊立 Composite thermal insulation wall body and method for producing and mounting the same
CN101215133A (en) * 2008-01-17 2008-07-09 天津浩伟建材科技发展有限公司 Polymer mortar face outside wall heat-insulating board and preparing technique thereof
CN101793065A (en) * 2010-03-22 2010-08-04 吴淑环 Flexible heat-insulating composite wall
CN101892744A (en) * 2010-07-22 2010-11-24 吴淑环 Construction method for installing sandwich layer of light composite insulation wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1282831A (en) * 1999-07-28 2001-02-07 段梦麟 Insulating light wall slab and its making method
CN2447447Y (en) * 2000-09-30 2001-09-12 梁茂杰 Light insulated wall board
CN101144294A (en) * 2006-08-11 2008-03-19 樊立 Composite thermal insulation wall body and method for producing and mounting the same
CN101215133A (en) * 2008-01-17 2008-07-09 天津浩伟建材科技发展有限公司 Polymer mortar face outside wall heat-insulating board and preparing technique thereof
CN101793065A (en) * 2010-03-22 2010-08-04 吴淑环 Flexible heat-insulating composite wall
CN101892744A (en) * 2010-07-22 2010-11-24 吴淑环 Construction method for installing sandwich layer of light composite insulation wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264798A (en) * 2014-09-12 2015-01-07 北京首钢建设集团有限公司 Method for constructing prefabricated cladding panel and steel frame column split joint seam

Similar Documents

Publication Publication Date Title
WO2021253808A1 (en) Building technique for low-carbon society in high-technology era
CN103114663B (en) Assemble type multifunctional outer wall body and production and installation method thereof
WO2010081278A1 (en) Construction composite heat preservation member
WO2018205646A1 (en) Building enclosure structure
CN103572866A (en) Assembly type wall
CN101892744A (en) Construction method for installing sandwich layer of light composite insulation wall
CN105421816B (en) Insulation energy-saving assembling house and construction method
CN111236499B (en) Prefabricated superposed component and production method thereof, prefabricated superposed wall and construction method thereof
CN103835505A (en) Outer wall compound heat preservation board construction method
CN202787603U (en) Light-weight heat preservation house roof plate or floor plate
CN110259003B (en) Seamless treatment method for cement type decorative hanging plate of building exterior wall
JP4480181B2 (en) Outer insulation structure of wooden building
CN203066294U (en) Assembled multifunctional outer wall body
CN101793065A (en) Flexible heat-insulating composite wall
CN207363044U (en) Assembled integrated insulation construction and wall
CN111139978A (en) Roof structure
CN102454297A (en) Construction method for installing core layer for light composite thermal insulation wall
CN115977278A (en) Assembled light steel combined truss supported steel wire mesh frame mortar-perlite-polyphenyl composite shear wall and manufacturing method thereof
CN213115186U (en) Composite wall board
CN107355017A (en) Assembled integrated insulation construction, wall and construction method
JP2006328805A (en) Construction method of external heat-insulation prestressed building using precast concrete body
JPS5947784B2 (en) Structure of external walls in concrete buildings
CN106522408A (en) Assembly type cast-in-place concrete frame thermal-insulating wall component
CN106149966A (en) A kind of multi-layer combined skeleton sandwich layer self-insulating external wall panel
EP2840195A1 (en) Thermal insulation modular panels for external coating and assembling method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120516