CN102409844B - 墩身翻模施工第二段墩身模板支撑体系及施工方法 - Google Patents

墩身翻模施工第二段墩身模板支撑体系及施工方法 Download PDF

Info

Publication number
CN102409844B
CN102409844B CN 201110258927 CN201110258927A CN102409844B CN 102409844 B CN102409844 B CN 102409844B CN 201110258927 CN201110258927 CN 201110258927 CN 201110258927 A CN201110258927 A CN 201110258927A CN 102409844 B CN102409844 B CN 102409844B
Authority
CN
China
Prior art keywords
pier body
formwork
support system
segment
pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201110258927
Other languages
English (en)
Other versions
CN102409844A (zh
Inventor
贾东荣
孙述灿
朱德军
任金林
张飞
吕鹏
姚松柏
王玉林
冯海珍
程桂芝
陈兆强
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN 201110258927 priority Critical patent/CN102409844B/zh
Publication of CN102409844A publication Critical patent/CN102409844A/zh
Application granted granted Critical
Publication of CN102409844B publication Critical patent/CN102409844B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种墩身翻模施工第二段墩身模板支撑体系及施工方法,其特征是设置由三角支架和位于三角支架的顶部的凳面构成的马凳;以马凳沿首段墩身的外围间隔放置在承台的顶面,第二段墩身模板是以马凳的凳面为支撑面。本发明在首段墩身完成养生之后,即可直接拆除首段墩身模板,以马凳构成第二段墩身模板支撑体系,在安装第二段墩身模板之前即可拆除用于支护基坑的拉森钢板桩,使首段墩身模板和拉森钢板桩得到及时回用。

Description

墩身翻模施工第二段墩身模板支撑体系及施工方法
技术领域
本发明涉及一种地下水位较高及砂土地质,深埋承台的墩身翻模施工,为满足快速拆除基坑支护,支撑墩身模板的工具及施工方法。
背景技术
对于地下水位较高及砂土地质,已有使用深埋承台的墩身翻模施工方法。比如,在我国大西铁路客运专线站前施工11#标黄河以西位于陕西省渭南市合阳县境内,此地地下水位较高,且是国家级湿地森林公园。如图1所示,承台1的埋设深度一般达到2-3m。承台基坑2的开挖需要拉森钢板桩3进行支护。拉森钢板桩3为周转设备,可循环利用。墩身采用翻模施工,首段墩身4浇筑高度为2.5m,混凝土养生后,再绑扎第二段墩身钢筋及利用首段墩身模板5作为支撑结构支立第二段墩身模板6、浇筑混凝土及养生共需9天。然后才能拆除首段墩身模板5,第三段墩身立模时,利用第二段墩身模板6作为墩身的第三段墩身模板的支撑体系。以此类推,完成整个墩身的施工。
这一方法存在的问题是:在这种地质条件中,首段墩身混凝土浇筑后,由于需要以第一段墩身模板5作为第二段墩身模板6的支撑体系,因此不能及时拆除首段墩身模板5,也就不能及时回填承台基坑2,直至第二段墩身养生完成,能够在第二段墩身模板6上支撑第三段墩身模板7,才能拆除首段墩身模板5及拉森钢板桩3进行承台基坑2的回填,如图2所示。这显然导致拉森钢板桩3及首段墩身模板的压制,使周转设备不能得到充分利用,也因此耽误工期。
发明内容
本发明是为避免上述现有技术所存在的不足之处,提供一种墩身翻模施工第二段墩身模板支撑体系及施工方法,以使首段墩身模板及拉森钢板桩能够及时周转而得到充分利用,同时提高工效。
本发明为解决技术问题采用如下技术方案:
本发明墩身翻模施工第二段墩身模板支撑体系的结构特点是:设置由三角支架和位于三角支架的顶部的凳面构成的马凳;以所述马凳沿首段墩身的外围间隔放置在承台的顶面,第二段墩身模板是以马凳的凳面为支撑面。
本发明墩身翻模施工第二段墩身模板支撑体系的特点也在于:在所述马凳凳面与第二段墩身模板之间设置模板卸落层,所述模板卸落层是放置在马凳凳面与第二段墩身模板之间的楔形木板。
本发明墩身翻模施工第二段墩身模板支撑体系的施工方法,其特征是按如下步骤进行:
第一步:在首段墩身完成养生之后,直接拆除首段墩身模板,随后将马凳沿首段墩身的外围间隔放置在承台的顶面,形成第二段墩身模板支撑体系;
第二步:拆除用于支护基坑的拉森钢板桩,回填基坑,调整马凳凳面的高程;
第三步:在马凳凳面上安装第二段墩身模板,将第二段墩身模板调整至工作状态即可进行第二段墩身混凝土的浇筑。
本发明墩身翻模施工第二段墩身模板支撑体系的施工方法的特点也在于在所述步骤三中,在马凳凳面与第二段墩身模板之间放置有模板卸落层,所述模板卸落层是放置在马凳凳面与第二段墩身模板之间的楔形木板。
与已有技术相比,本发明有益效果体现在:
本发明在首段墩身完成养生之后,即可直接拆除首段墩身模板,以马凳构成第二段墩身模板支撑体系,在安装第二段墩身模板之前即可拆除用于支护基坑的拉森钢板桩,使首段墩身模板和拉森钢板桩得到及时回用,大大提高了拉森钢板及首段墩身模板的使用效率,提高工效。
附图说明
图1为已有技术中墩身翻模施工示意图;
图2为已有技术中基坑回填示意图;
图3a本发明马凳主视示意图;图3b为本发明马凳立体示意图;
图4为本发明第二段墩身模板支撑体系俯视示意结构图;
图5为本发明第二段墩身模板支撑体系施工状态示意图;
图中标号:1承台;2承台基坑;3拉森钢板桩;4首段墩身;5首段墩身模板;6第二段墩身模板;7第三段墩身模板;8三角支架;9凳面。
具体实施方式
如图3a和图3b所示,本实施例中设置由三角支架8和位于三角支架8的顶部的凳面9构成的马凳;
如图4、图5所示,具体实施中是马凳沿首段墩身4的外围间隔放置在承台1的顶面,第二段墩身模板6是以马凳的凳面9为支撑面,为便于第二段墩身模板的拆除,可以在马凳凳面9与第二段墩身模板6之间放置模板卸落层,模板卸落层为楔形木板。
本实施例中墩身翻模施工第二段墩身模板支撑体系的施工方法按如下步骤进行:
第一步:在首段墩身4完成养生之后,直接拆除首段墩身模板5,随后将马凳沿首段墩身4的外围间隔放置在承台1的顶面形成第二段墩身模板支撑体系;
第二步:拆除用于支护基坑2的拉森钢板桩3,回填基坑2,调整马凳凳面9的高程;
第三步:在马凳凳面9上安装第二段墩身模板6,将第二段墩身模板6调整至工作状态即可进行第二段墩身混凝土的浇筑(如图5所示)。
具体实施中,三角支架8采用Φ48×3mm的钢管,凳面9采用2cm的钢板
为了便于第二段墩身模板的拆卸,可以在马凳凳面9与第二段墩身模板6之间设置模板卸落层,模板卸落层是放置在马凳凳面9与第二段墩身模板6之间的楔形木板,在拆除第二段墩身模板前,首先拆除该楔形木板构成的模板卸落层,然后就可以较容易地拆除第二段墩身模板。

Claims (2)

1.墩身翻模施工第二段墩身模板支撑体系的施工方法,其特征是按如下步骤进行:
第一步:在首段墩身(4)完成养生之后,直接拆除首段墩身模板(5),随后将马凳沿首段墩身(4)的外围间隔放置在承台(1)的顶面,形成第二段墩身模板支撑体系;
第二步:拆除用于支护承台基坑(2)的拉森钢板桩(3),回填承台基坑(2),调整马凳凳面(9)的高程;
第三步:在马凳凳面(9)上安装第二段墩身模板(6),进行第二段墩身混凝土的浇筑。
2.根据权利要求1所述的墩身翻模施工第二段墩身模板支撑体系的施工方法,其特征是在所述第三步中,在马凳凳面(9)与第二段墩身模板(6)之间放置有模板卸落层,所述模板卸落层是放置在马凳凳面(9)与第二段墩身模板(6)之间的楔形木板。
CN 201110258927 2011-09-02 2011-09-02 墩身翻模施工第二段墩身模板支撑体系及施工方法 Expired - Fee Related CN102409844B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110258927 CN102409844B (zh) 2011-09-02 2011-09-02 墩身翻模施工第二段墩身模板支撑体系及施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110258927 CN102409844B (zh) 2011-09-02 2011-09-02 墩身翻模施工第二段墩身模板支撑体系及施工方法

Publications (2)

Publication Number Publication Date
CN102409844A CN102409844A (zh) 2012-04-11
CN102409844B true CN102409844B (zh) 2013-11-06

Family

ID=45912149

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110258927 Expired - Fee Related CN102409844B (zh) 2011-09-02 2011-09-02 墩身翻模施工第二段墩身模板支撑体系及施工方法

Country Status (1)

Country Link
CN (1) CN102409844B (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201176703Y (zh) * 2008-04-25 2009-01-07 中冶京唐建设有限公司 双曲线冷却塔风筒施工用三角架
CN101696604A (zh) * 2009-09-24 2010-04-21 东北电业管理局烟塔工程公司 一种烟囱筒壁施工方法及专用电动顶升平桥
CN201554217U (zh) * 2009-09-15 2010-08-18 王永利 折叠式多功能马凳
CN201802007U (zh) * 2010-08-13 2011-04-20 中国二十二冶集团有限公司 结构底板上反梁托模架
CN202194375U (zh) * 2011-09-02 2012-04-18 中铁上海工程局有限公司 墩身翻模施工第二段墩身模板支撑体系

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040261331A1 (en) * 2003-06-27 2004-12-30 Progressive Tool & Industries, Co. Studding layout

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201176703Y (zh) * 2008-04-25 2009-01-07 中冶京唐建设有限公司 双曲线冷却塔风筒施工用三角架
CN201554217U (zh) * 2009-09-15 2010-08-18 王永利 折叠式多功能马凳
CN101696604A (zh) * 2009-09-24 2010-04-21 东北电业管理局烟塔工程公司 一种烟囱筒壁施工方法及专用电动顶升平桥
CN201802007U (zh) * 2010-08-13 2011-04-20 中国二十二冶集团有限公司 结构底板上反梁托模架
CN202194375U (zh) * 2011-09-02 2012-04-18 中铁上海工程局有限公司 墩身翻模施工第二段墩身模板支撑体系

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
刘飞.自然通风冷却塔筒壁.《建筑安全》.2008,(第1期),
大型双曲线形冷却塔风筒施工方法探讨;竺召炜;《施工技术》;20040228;第33卷(第2期);全文 *
竺召炜.大型双曲线形冷却塔风筒施工方法探讨.《施工技术》.2004,第33卷(第2期),
自然通风冷却塔筒壁;刘飞;《建筑安全》;20080131(第1期);2.1节 *

Also Published As

Publication number Publication date
CN102409844A (zh) 2012-04-11

Similar Documents

Publication Publication Date Title
US11143027B2 (en) Rectangular working well with preset pipe jacking hole and sliding back wall in water-rich stratum and construction method thereof
CN103981898B (zh) 一种整体明挖节点逆作的地下工程施工方法
CN101538833B (zh) 竖向分条双壁钢围堰止水施工工法
CN105220703B (zh) 一种基于回砂平衡法条件下围挡式深水承台施工方法
CN105672337B (zh) 现浇沉井支模体系的施工方法
CN105350526B (zh) 钢平台的搭设方法
CN102817372A (zh) 地下深基础混凝土反模施工方法
CN104988915A (zh) 一种可拆卸钢护筒装置及水下联系梁预制安装方法
CN105953078A (zh) 高压燃气管道的保护装置及保护方法
CN110965473B (zh) 一种桥梁承台的施工方法
CN108035379B (zh) 一种综合管廊及其施工方法
CN102852094B (zh) 无掩护海洋环境下预制墩台安装板桩组合结构施工方法
CN109706952A (zh) 大型沉井施工方法
CN110055973B (zh) 施工空间受限时的高铁桥下基坑围护结构与止水方法
CN203160254U (zh) 一种基坑围护结构
CN104032767A (zh) 一种深基坑内塔吊基础及其施工方法
CN105040709A (zh) 一种深基坑围护桩支护换撑的施工方法
CN113431065A (zh) 一种咬合桩与钢套箱组合围堰快速施工方法及结构
CN104563497A (zh) 一种新型有梁板支撑施工方法
CN109056804B (zh) 一种综合管廊基坑支护结构及其实现方法
CN111395353A (zh) 一种基于钢板桩联合竖向斜撑的基坑支护装置及支护方法
CN202194375U (zh) 墩身翻模施工第二段墩身模板支撑体系
CN110820756A (zh) 一种盾构井及竖井深基坑开挖安全施工方法
CN102409844B (zh) 墩身翻模施工第二段墩身模板支撑体系及施工方法
CN207862964U (zh) 一种陆上承台施工系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI CIVIL ENGINEERING CO., LTD. OF CREC

Free format text: FORMER NAME: SHANGHAI CIVIL ENGINEERING CO., LTD. OF CREC

CP01 Change in the name or title of a patent holder

Address after: 272 No. three, No. 278, Shanghai Road, Zhabei District, 200436

Patentee after: Shanghai Civil Engineering Co., Ltd. of Crec

Patentee after: THE FIRST CIVIL ENGINEERING CO., LTD. OF CREC SHANGHAI GROUP

Address before: 272 No. three, No. 278, Shanghai Road, Zhabei District, 200436

Patentee before: Shanghai Civil Engineering Co., Ltd. of CREC

Patentee before: The 1st Civil Engineering Co., Ltd. of CREC Shanghai

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131106

Termination date: 20200902

CF01 Termination of patent right due to non-payment of annual fee