CN101538833B - 竖向分条双壁钢围堰止水施工工法 - Google Patents
竖向分条双壁钢围堰止水施工工法 Download PDFInfo
- Publication number
- CN101538833B CN101538833B CN2009101316231A CN200910131623A CN101538833B CN 101538833 B CN101538833 B CN 101538833B CN 2009101316231 A CN2009101316231 A CN 2009101316231A CN 200910131623 A CN200910131623 A CN 200910131623A CN 101538833 B CN101538833 B CN 101538833B
- Authority
- CN
- China
- Prior art keywords
- double
- cofferdam
- steel
- steel cofferdam
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101316231A CN101538833B (zh) | 2009-04-10 | 2009-04-10 | 竖向分条双壁钢围堰止水施工工法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101316231A CN101538833B (zh) | 2009-04-10 | 2009-04-10 | 竖向分条双壁钢围堰止水施工工法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101538833A CN101538833A (zh) | 2009-09-23 |
CN101538833B true CN101538833B (zh) | 2011-06-08 |
Family
ID=41122209
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009101316231A Active CN101538833B (zh) | 2009-04-10 | 2009-04-10 | 竖向分条双壁钢围堰止水施工工法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101538833B (zh) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101838993B (zh) * | 2010-05-17 | 2012-04-18 | 中铁二十局集团有限公司 | 黄河河道内承台施工用钢板桩围堰施工工艺 |
CN102363961B (zh) * | 2011-11-11 | 2014-04-30 | 中交四航局第一工程有限公司 | 一种入土深度小的深水单壁钢板桩围堰结构及其施工方法 |
CN102747734A (zh) * | 2012-06-21 | 2012-10-24 | 中铁十三局集团有限公司 | 人工砂岛下沉钢围堰方法 |
CN102720140B (zh) * | 2012-07-12 | 2015-03-25 | 中铁二十局集团第一工程有限公司 | 大跨度预应力砼连续梁深水桥墩施工工艺 |
CN102817323A (zh) * | 2012-08-31 | 2012-12-12 | 中交公路养护工程技术有限公司 | 一种潮汐河段双柱式墩横系梁预制安装快速施工方法 |
CN102912809B (zh) * | 2012-11-06 | 2014-12-10 | 中铁大桥局股份有限公司 | 底面位于坚硬不透水层的承台施工方法 |
CN104499494B (zh) * | 2014-12-22 | 2017-01-18 | 江苏省交通科学研究院股份有限公司 | 双壁波纹钢围堰 |
CN105421473B (zh) * | 2015-11-02 | 2017-06-09 | 中铁大桥局集团有限公司 | 双壁锁口钢套箱围堰及施工方法 |
CN107869144B (zh) * | 2017-11-17 | 2023-07-18 | 中铁二十二局集团第四工程有限公司 | 一种预掏槽环封双壁钢围堰深水基础综合施工方法 |
CN111042144B (zh) * | 2019-12-27 | 2022-05-13 | 中冶天工集团有限公司 | 一种寒冷地区河道不断流情况下地系梁基坑开挖方法 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101368389A (zh) * | 2008-09-24 | 2009-02-18 | 中铁大桥局集团第五工程有限公司 | 单双壁结合钢围堰施工方法及其单双壁结合钢围堰 |
-
2009
- 2009-04-10 CN CN2009101316231A patent/CN101538833B/zh active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101368389A (zh) * | 2008-09-24 | 2009-02-18 | 中铁大桥局集团第五工程有限公司 | 单双壁结合钢围堰施工方法及其单双壁结合钢围堰 |
Non-Patent Citations (1)
Title |
---|
马新安.竖向分条双壁钢围堰止水工艺.《中国港湾建设》.2008,(第158期),54-56页. * |
Also Published As
Publication number | Publication date |
---|---|
CN101538833A (zh) | 2009-09-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101538833B (zh) | 竖向分条双壁钢围堰止水施工工法 | |
CN101725112B (zh) | 一种桥墩的施工方法 | |
CN106638640B (zh) | 岩层地质条件下无封底混凝土组合式围堰的施工方法 | |
CN102953341B (zh) | 一种设置于深水急流无覆盖层陡峭裸岩上的高位栈桥结构 | |
CN105386408A (zh) | 深水桥梁桩基施工方法 | |
CN102121251A (zh) | 一种在深水倾斜河床上浇筑桥梁主塔墩基础的施工方法 | |
CN107700366B (zh) | 深水高墩大跨度桥梁施工用坚石裸岩河床栈桥及施工方法 | |
CN103422510B (zh) | 钢管框架式围堰结构及施工方法 | |
CN110939303B (zh) | 一种旋流池半逆作法施工方法 | |
CN101696578A (zh) | 在深水倾斜河床上浇筑桥梁主塔墩基础的施工方法 | |
CN105350526B (zh) | 钢平台的搭设方法 | |
CN102134854B (zh) | 船台滑道水下桩基的施工方法 | |
CN101457526A (zh) | 圆形深基坑混凝土排桩支护及主体结构逆作施工方法 | |
KR101211811B1 (ko) | 조립케이슨을 이용한 현장타설말뚝 | |
CN108049393A (zh) | 用于富水厚砂层条件下的地铁车站附属围护结构施工工艺 | |
CN103321246A (zh) | 采用地下连续墙的基坑施工方法 | |
JP7352048B1 (ja) | 大スパン駅の両翼開放型半トップダウン掘削・半逆打ちによる建造方法 | |
CN102561371A (zh) | 岛遂结合部钢沉箱围护结构 | |
CN102979039A (zh) | 一种在深水急流无覆盖层陡峭裸岩上的高位栈桥施工方法 | |
CN108978643A (zh) | 支护桩施工方法、钢筋笼结构及支护桩结构 | |
WO2023207250A1 (zh) | 一种斜基面裸岩上栈桥钢管桩快速植桩工法 | |
CN113293773A (zh) | 一种基坑支护体系及其施工方法 | |
CN109778839A (zh) | 用于深水密实卵石覆盖层钢管桩的施工系统及施工方法 | |
CN110055973B (zh) | 施工空间受限时的高铁桥下基坑围护结构与止水方法 | |
CN210856971U (zh) | 一种桩基冲刷加固结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: CHINA COMMUNICATION CONSTRUCTION CO., LTD. |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Dejin Inventor after: Gao Yonghui Inventor after: Lu Lianzhou Inventor after: Wang Shiyu Inventor after: Su Lei Inventor after: Liu Zhendong Inventor after: Peng Danyan Inventor after: Gao Jingli Inventor after: Wang Chengsheng Inventor after: Zhang Zuosen Inventor after: Qu Lili Inventor before: Liu Dejin Inventor before: Wang Shiyu Inventor before: Su Lei Inventor before: Wang Chengsheng Inventor before: Zhang Zuosen Inventor before: Qu Lili Inventor before: Gao Yonghui Inventor before: Lu Lianzhou |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: LIU DEJIN WANG SHIYU SULEI WANG CHENGSHENG ZHANG ZUOSEN QU LILI GAO YONGHUI LU LIANZHOU TO: LIU DEJIN WANG SHIYU SULEI LIU ZHENDONG PENG DANYAN GAO JINGLI WANG CHENGSHENG ZHANG ZUOSEN QU LILI GAO YONGHUI LU LIANZHOU |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20110328 Address after: 266071 Shandong city of Qingdao province Fuzhou City Road No. 16 Applicant after: The Second Engineering Co. of CCCC First Harbor Engineering Co., Ltd. Co-applicant after: China Communications Construction Company Ltd. Address before: 266071 Shandong city of Qingdao province Fuzhou City Road No. 16 Applicant before: The Second Engineering Co. of CCCC First Harbor Engineering Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |