CN104499494B CN201410814848.8A CN201410814848A CN104499494B CN 104499494 B CN104499494 B CN 104499494B CN 201410814848 A CN201410814848 A CN 201410814848A CN 104499494 B CN104499494 B CN 104499494B
Authority
CN
China
Prior art keywords
cofferdam
wall
corrugated steel
double
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410814848.8A
Other languages
English (en)
Other versions
CN104499494A (zh
Inventor
陈光林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huadong (Zhejiang) Engineering Design Co., Ltd.
Original Assignee
Jiangsu Transportation Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Transportation Research Institute Co Ltd filed Critical Jiangsu Transportation Research Institute Co Ltd
Priority to CN201410814848.8A priority Critical patent/CN104499494B/zh
Publication of CN104499494A publication Critical patent/CN104499494A/zh
Application granted granted Critical
Publication of CN104499494B publication Critical patent/CN104499494B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles

Abstract

本发明涉及一种双壁波纹钢围堰,该围堰的内壁板和外壁板为圆形的波纹钢板,内壁板的内表面呈横向波纹波浪型,形成围堰的内壁,外壁板的外表面呈竖向波纹波浪型,形成围堰的外壁,内壁板和外壁板之间具有位于河床地表以上的空腔段和位于河床地表以下的水下砼段,该围堰的底部为封底砼。本发明的双壁波纹钢围堰,与普通水中双壁钢围堰比,加工及整体连接简练省材;由于波纹钢比以往的钢板轻,与下沉的钢筋混凝土围堰比,工期、环境条件以及经济具有显著的优势;由于该围堰采用独特的双壁波纹钢板结构,内外壁之间波纹钢板通过螺栓连接,比普通围堰整体稳定性好,且桩体的抗压能力大大提升。

Description

双壁波纹钢围堰
技术领域
本发明涉及一种双壁波纹钢围堰。
背景技术
围堰是指在水利工程建设中,为建造永久性水利设施,修建的临时性围护结构。其作用是防止水和土进入建筑物的修建位置,以便在围堰内排水,开挖基坑,修筑建筑物。
在桥梁港口及类似的水下基础施工中,常用单壁、双壁钢围堰或钢筋混凝土实体围堰做工作平台的核心支承及隔水结构。
专利申请号为201020600814.6的专利文件公开了一种水中低桩承台双壁钢围堰,在内壁板、外壁板之间通过箱型梁获得整体固定,形成围堰内壁、外壁,内壁板、外壁板之间通过水平桁架协固,通过水平内撑和竖向撑杆对箱形壁体进行加强支护,刃脚为楔形,在钢护筒上安装牛腿、底节拼装平台、下放导向架、下放反力架。类似这种的钢围堰加劲结构焊接复杂,材料投入大、工期长。
钢筋混凝土围堰施工工艺流程为:人工筑岛→铺垫木→安装支撑排架及底模→拼装钢刃脚→立内模及内支撑→绑扎钢筋→立外模→浇筑底节混凝土→养生→抽垫→下沉→接高→再下沉→基础清底→封底→围堰内施工承台→拆除围堰。由此工艺做成的钢筋混凝土围堰笨重,费工费时。
发明内容
本发明要解决的技术问题是:基于上述问题,本发明提供一种施工方便、生产成本低、结构强度高的双壁波纹钢围堰。
本发明解决其技术问题所采用的技术方案是:提供一种双壁波纹钢围堰,该围堰的内壁板和外壁板为圆形的波纹钢板,内壁板的内表面呈横向波纹波浪型,形成围堰的内壁,外壁板的外表面呈竖向波纹波浪型,形成围堰的外壁,内壁板和外壁板之间具有位于河床地表以上的空腔段和位于河床地表以下的水下砼段,该围堰的底部为封底砼。
进一步地,所述内壁板和外壁板由若干圆弧状的波纹钢板段合围而成,波纹钢板段之间通过螺栓连接。
进一步地,所述封底砼的下部设置有三角形钢韧脚。
本发明的有益效果是:本发明的双壁波纹钢围堰,具有以下优点:
1、双壁波纹钢围堰与普通水中双壁钢围堰比,加工及整体连接简练省材,可节省40%的钢材及连接型钢;
2、由于波纹钢比以往的钢板轻,用吊车就可以分层、分环安装,因此与下沉的钢筋混凝土围堰比,工期、环境条件以及经济具有显著的优势;
3、由于该围堰采用独特的双壁波纹钢板结构,内外壁之间波纹钢板通过螺栓连接,比普通围堰整体稳定性好,且桩体的抗压能力大大提升。
附图说明
下面结合附图实施例对本发明进一步说明。
图1是本发明的结构示意图。
图中:1.内壁板,2.外壁板,3.空腔段,4.水下砼段,5.封底砼,6.三角形钢韧脚,7.钻孔桩。
具体实施方式
现在结合具体实施例对本发明作进一步说明,以下实施例旨在说明本发明而不是对本发明的进一步限定。
如图1所示,一种双壁波纹钢围堰,该围堰的内壁板1和外壁板2为圆形的波纹钢板,内壁板1的内表面呈横向波纹波浪型,形成围堰的内壁,外壁板2的外表面呈竖向波纹波浪型,形成围堰的外壁,内壁板1和外壁板2之间具有位于河床地表以上的空腔段3和位于河床地表以下的水下砼段4,该围堰的底部为封底砼5,封底砼5的下部设置有三角形钢韧脚6。其中,水下砼段4自空腔段3上向下灌注混凝土而成,构成河床地表以下的围堰段,钻孔桩7在围堰内开挖并浇注而成。
进一步地,内壁板1和外壁板2由若干圆弧状的波纹钢板段合围而成,波纹钢板段之间通过螺栓连接,并且可根据需求选择波纹钢板段的个数,合围成所需直径的壁板。
以上述依据本发明的理想实施例为启示,通过上述的说明内容,相关工作人员完全可以在不偏离本项发明技术思想的范围内,进行多样的变更以及修改。本项发明的技术性范围并不局限于说明书上的内容,必须要根据权利要求范围来确定其技术性范围。

Claims (3)

1.一种双壁波纹钢围堰,其特征在于:该围堰的内壁板(1)和外壁板(2)为圆形的波纹钢板,内壁板(1)的内表面呈横向波纹波浪型,形成围堰的内壁,外壁板(2)的外表面呈竖向波纹波浪型,形成围堰的外壁,内壁板(1)和外壁板(2)之间具有位于河床地表以上的空腔段(3)和位于河床地表以下的水下砼段(4),该围堰的底部为封底砼(5),水下砼段(4)自空腔段(3)上向下灌注混凝土而成,构成河床地表以下的围堰段,钻孔桩(7)在围堰内开挖并浇注而成。
2.根据权利要求1所述的双壁波纹钢围堰,其特征在于:所述内壁板(1)和外壁板(2)由若干圆弧状的波纹钢板段合围而成,波纹钢板段之间通过螺栓连接。
3.根据权利要求1所述的双壁波纹钢围堰,其特征在于:所述封底砼(5)的下部设置有三角形钢韧脚(6)。
CN201410814848.8A 2014-12-22 2014-12-22 双壁波纹钢围堰 Active CN104499494B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410814848.8A CN104499494B (zh) 2014-12-22 2014-12-22 双壁波纹钢围堰

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410814848.8A CN104499494B (zh) 2014-12-22 2014-12-22 双壁波纹钢围堰

Publications (2)

Publication Number Publication Date
CN104499494A CN104499494A (zh) 2015-04-08
CN104499494B true CN104499494B (zh) 2017-01-18

Family

ID=52940937

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410814848.8A Active CN104499494B (zh) 2014-12-22 2014-12-22 双壁波纹钢围堰

Country Status (1)

Country Link
CN (1) CN104499494B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049516A (zh) * 2016-06-16 2016-10-26 苏交科集团股份有限公司 波纹钢围堰挖孔空心桩及其制作工艺
CN109295990A (zh) * 2018-11-26 2019-02-01 中国铁建大桥工程局集团有限公司 一种带开口刃脚的有底钢套箱围堰
CN109972652B (zh) * 2019-04-23 2021-03-19 杭州昂创科技有限公司 预制拼装式塔吊基础围挡的施工方法
CN115162425A (zh) * 2022-06-29 2022-10-11 广东湾区交通建设投资有限公司 大埋深高水位地质条件下岩体承载力测试方法及系统

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB109198A (en) * 1917-01-20 1917-09-06 Charles Percy Lambert Improved Construction of Collision Patch or the like for Ships and other Floating or Submerged Structures.
JPH09158192A (ja) * 1995-12-07 1997-06-17 Nippon Steel Metal Prod Co Ltd 締め切り工法および締め切り工法用の鋼製構造体
JPH1054037A (ja) * 1996-08-09 1998-02-24 Nippon Steel Metal Prod Co Ltd 締め切り工法および締め切り工法用の鋼製構造体
JPH11131488A (ja) * 1997-11-04 1999-05-18 Nippon Kokan Light Steel Kk 水中橋脚補強工事用止水槽
CN101538833A (zh) * 2009-04-10 2009-09-23 中交一航局第二工程有限公司 竖向分条双壁钢围堰止水施工工法
CN201883444U (zh) * 2010-11-11 2011-06-29 中铁十三局集团有限公司 水中低桩承台双壁钢围堰
CN204385753U (zh) * 2014-12-22 2015-06-10 江苏省交通科学研究院股份有限公司 一种双壁波纹钢围堰

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB109198A (en) * 1917-01-20 1917-09-06 Charles Percy Lambert Improved Construction of Collision Patch or the like for Ships and other Floating or Submerged Structures.
JPH09158192A (ja) * 1995-12-07 1997-06-17 Nippon Steel Metal Prod Co Ltd 締め切り工法および締め切り工法用の鋼製構造体
JPH1054037A (ja) * 1996-08-09 1998-02-24 Nippon Steel Metal Prod Co Ltd 締め切り工法および締め切り工法用の鋼製構造体
JPH11131488A (ja) * 1997-11-04 1999-05-18 Nippon Kokan Light Steel Kk 水中橋脚補強工事用止水槽
CN101538833A (zh) * 2009-04-10 2009-09-23 中交一航局第二工程有限公司 竖向分条双壁钢围堰止水施工工法
CN201883444U (zh) * 2010-11-11 2011-06-29 中铁十三局集团有限公司 水中低桩承台双壁钢围堰
CN204385753U (zh) * 2014-12-22 2015-06-10 江苏省交通科学研究院股份有限公司 一种双壁波纹钢围堰

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《φ15 m超大直径空心桩在复杂岩溶地层中的应用》;褚东升等;《水运工程》;20140228(第2期);180-184 *
《新造珠江大桥双壁钢围堰的设计与分析》;李德钦等;《公路与汽运》;20090531(第3期);164-167 *

Also Published As

Publication number Publication date
CN104499494A (zh) 2015-04-08

Similar Documents

Publication Publication Date Title
CN102767189B (zh) 一种设置桩承台基础及其施工方法
CN205000355U (zh) 一种箱型重力式海上风电基础结构
CN103510529B (zh) 用于水下高桩承台施工的钢吊箱系统及施工工艺
CN104499494B (zh) 双壁波纹钢围堰
CN103510531A (zh) 一种分体式沉井加桩复合锚碇基础及其施工方法
CN205000256U (zh) 桥梁高墩现浇箱梁施工支撑体系
CN101914925A (zh) 利用优化复合预制拱墙作外墙的地下室
CN109537574B (zh) 一种极硬岩中地下连续墙的施工工艺
CN101418569B (zh) 预制拱片、支护与主体结构结合的优化复合拱墙
CN1952273B (zh) 一种带挡板的掏挖基础及其施工方法
CN104947682A (zh) 一种基坑支护施工方法及其装置
CN103133004B (zh) 一种冻结井筒内井壁地面预制及安装工艺方法
CN203160254U (zh) 一种基坑围护结构
CN204385753U (zh) 一种双壁波纹钢围堰
CN204000905U (zh) 一种带系梁深水承台施工的双壁钢围堰
CN202767095U (zh) 一种设置桩承台基础
CN203639929U (zh) 一种分体式沉井加桩复合锚碇基础
CN203049588U (zh) 坑中坑筒模
CN205894093U (zh) 一种适用于松散土质条件下的沉井
CN104594373A (zh) 无掩护海域桥梁高桩没水承台钢吊箱施工工艺
CN213709363U (zh) 一种水库装配式分层取水头部
CN207934052U (zh) 用于建筑工程施工的沉井基础
CN206428601U (zh) 模块化拼装式钢混组合涵
CN102061695A (zh) 一种排水管桩复合地基处理方法
CN201908303U (zh) 方框形钢腔混凝土现浇沉井护壁

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170515

Address after: 310011, No. 60, Dong Jia lane, Gongshu District, Zhejiang, Hangzhou 209

Patentee after: Transportation Planning & Design Co., Ltd. (Zhejiang)

Address before: 210017 Nanjing, Jianye Province Water West Gate Street, No. 223

Patentee before: Jiangsu Transportation Research Institute Co., Ltd.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 310011, No. 60, Dong Jia lane, Gongshu District, Zhejiang, Hangzhou 209

Patentee after: Huadong (Zhejiang) Engineering Design Co., Ltd.

Address before: 310011, No. 60, Dong Jia lane, Gongshu District, Zhejiang, Hangzhou 209

Patentee before: Transportation Planning & Design Co., Ltd. (Zhejiang)

CP01 Change in the name or title of a patent holder