CN104594373A - 无掩护海域桥梁高桩没水承台钢吊箱施工工艺 - Google Patents

无掩护海域桥梁高桩没水承台钢吊箱施工工艺 Download PDF

Info

Publication number
CN104594373A
CN104594373A CN201410790032.6A CN201410790032A CN104594373A CN 104594373 A CN104594373 A CN 104594373A CN 201410790032 A CN201410790032 A CN 201410790032A CN 104594373 A CN104594373 A CN 104594373A
Authority
CN
China
Prior art keywords
steel
water
lifted trunk
concrete
cushion cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410790032.6A
Other languages
English (en)
Inventor
朱炜炜
杨晓雷
李新强
乔光
孙海舰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
CCCC Third Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
CCCC Third Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, CCCC Third Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201410790032.6A priority Critical patent/CN104594373A/zh
Publication of CN104594373A publication Critical patent/CN104594373A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种无掩护海域桥梁高桩没水承台钢吊箱施工工艺,包括以下步骤:A.安装钢吊箱混凝土底板,将吊挂系统的型钢主梁安装在钢护筒的顶部,履带吊水面以上分片组装预制混凝土底板,并将分片的混凝土底板湿接缝连接成一个整体;B.安装并下放钢吊箱,紧固吊挂系统的精轧螺纹钢筋,分片安装钢吊箱,并通过吊挂系统的穿心千斤顶同步下放钢吊箱;C.在钢吊箱内浇筑封底混凝土;D.进行钢吊箱内抽水;E.进行承台施工,绑扎承台钢筋和安装冷却水管,绑扎墩柱预埋钢筋,浇筑承台混凝土。本发明无掩护海域桥梁高桩没水承台钢吊箱施工工艺,工艺简单,施工效率高,成本低并且能保证施工安全和工程质量的工艺方法。

Description

无掩护海域桥梁高桩没水承台钢吊箱施工工艺
技术领域
本发明涉及一种无掩护海域桥梁高桩没水承台钢吊箱施工工艺。
背景技术
目前,已经施工完成的跨海大桥承台底面一般落潮能露出水面,或所在区域潮差风浪较小,或所在区域水较浅,本发明钢吊箱采用四周钢结构、底部混凝土结构的组装方式,水上安装整体下放至海中的施工工法,特别适用于外海无掩护、风大浪高、承台顶面位于水下或水位变动区、水较深的恶劣水域情况。
发明内容
本发明的目的是提供一种无掩护海域桥梁高桩没水承台钢吊箱施工工艺。
本发明为实现上述目的所采用的技术方案是:一种无掩护海域桥梁高桩没水承台钢吊箱施工工艺,包括以下步骤:
A、安装钢吊箱混凝土底板,将吊挂系统的型钢主梁安装在钢护筒的顶部,履带吊水面以上分片组装预制混凝土底板,并将分片的混凝土底板湿接缝连接成一个整体;
B、安装并下放钢吊箱,紧固吊挂系统的精轧螺纹钢筋,分片安装钢吊箱,并通过吊挂系统的穿心千斤顶同步下放钢吊箱;
在钢吊箱侧壁和混凝土底板之间安装橡胶止水条,并增设阻水钢筋,并将钢吊箱的水平方向用顶丝限位,竖直方向用拉杆和底板连接,使钢吊箱侧壁和混凝土底板形成一个整体。
C、在钢吊箱内浇筑封底混凝土;
D、进行钢吊箱内抽水;
E、进行承台施工,绑扎承台钢筋和安装冷却水管,绑扎墩柱预埋钢筋,浇筑承台混凝土。
所述步骤A中,在钢护筒上安装支撑牛腿,并放入钢吊箱十字撑杆件。
所述步骤B中,拆除钢护筒上的支撑牛腿,并安装内十字撑。
所述步骤C中,钢吊箱内浇筑封底混凝土之前,需要封堵预制的钢吊箱混凝土底板预留孔,并施工水下封底混凝土操作平台。
所述步骤D中,拆除吊挂系统和封底混凝土操作平台。
本发明一种无掩护海域桥梁高桩没水承台钢吊箱施工工艺,工艺简单,施工效率高,成本低并且能保证施工安全和工程质量的工艺方法。
具体实施方式
本发明的无掩护海域桥梁高桩没水承台钢吊箱施工工艺,承台施工采用单壁有底钢吊箱施工方案,钢吊箱既作为止水围堰又作为承台混凝土模板,侧模为钢结构,底板为预制混凝土结构;钢吊箱施工时,首先利用已经完成的桩基钢护筒,先将吊挂系统的型钢主梁安装在钢护筒顶部,履带吊水面以上分片组装预制混凝土底板,并将分片的混凝土底板湿接缝连接成一个整体;然后安装钢吊箱侧壁,利用吊挂系统的精轧螺纹钢筋将钢吊箱底板和吊挂主梁连接;最后利用吊挂系统的穿心千斤顶将钢吊箱组合体吊放至水中设计标高,并在箱内浇筑封底混凝土,待封底混凝土强度满足要求,箱内抽水后干法施工承台。
无掩护海域桥梁高桩没水承台钢吊箱施工工艺,具体步骤如下:步骤A, 钢吊箱砼底板安装:在钢护筒上切割支撑牛腿安装孔,安装支撑牛腿,履带吊分块安装混凝土底板,连接湿接缝钢筋、安装湿接缝模板,浇筑砼底板湿接缝,提前放入钢吊箱十字撑杆件;步骤B, 钢吊箱安装与下放:安装吊挂系统,紧固精轧螺纹钢筋,分片安装钢吊箱,拆除钢护筒上的支撑牛腿,穿心千斤顶同步下放钢吊箱,安装内十字撑;钢吊箱侧壁和混凝土底板之间安装橡胶止水条、增设阻水钢筋;并将钢吊箱的水平方向用顶丝限位,竖直方向用拉杆和底板连接,使钢吊箱侧壁和混凝土底板形成一个整体,此法解决了吊箱止水难题,另外,阻水钢筋必须使用φ12的圆钢,预制混凝土底板时一般安装在混凝土内,另一半外露,橡胶厚度30mm,硬度必须为HS35,步骤C, 浇筑封底混凝土:封堵预制砼底板预留孔,剪力牛腿顶部和钢护筒焊接,施工水下封底混凝土操作平台,浇筑水下封底混凝土;步骤D,箱内抽水:箱内抽水,剪力牛腿和伸入承台15cm钢护筒焊接,拆除吊挂系统,拆除封底混凝土操作平台,切割钢护筒和凿桩头,安装斜支撑、拆除十字支撑;步骤E,承台施工:绑扎承台钢筋和安装冷却水管,绑扎墩柱预埋钢筋,浇筑承台混凝土,本发明无掩护海域桥梁高桩没水承台钢吊箱施工工艺,工艺简单,施工效率高,成本低并且能保证施工安全和工程质量的工艺方法。

Claims (6)

1.一种无掩护海域桥梁高桩没水承台钢吊箱施工工艺,其特征在于,包括以下步骤:
A、安装钢吊箱混凝土底板,将吊挂系统的型钢主梁安装在钢护筒的顶部,履带吊水面以上分片组装预制混凝土底板,并将分片的混凝土底板湿接缝连接成一个整体;
B、安装并下放钢吊箱,紧固吊挂系统的精轧螺纹钢筋,分片安装钢吊箱,并通过吊挂系统的穿心千斤顶同步下放钢吊箱;
C、在钢吊箱内浇筑封底混凝土;
D、进行钢吊箱内抽水;
E、进行承台施工,绑扎承台钢筋和安装冷却水管,绑扎墩柱预埋钢筋,浇筑承台混凝土。
2.根据权利要求1所述的一种无掩护海域桥梁高桩没水承台钢吊箱施工工艺,其特征在于:所述步骤A中,在钢护筒上安装支撑牛腿,并放入钢吊箱十字撑杆件。
3.根据权利要求1所述的一种无掩护海域桥梁高桩没水承台钢吊箱施工工艺,其特征在于:所述步骤B中,拆除钢护筒上的支撑牛腿,并安装内十字撑。
4.根据权利要求2或3所述的一种无掩护海域桥梁高桩没水承台钢吊箱施工工艺,其特征在于:在钢吊箱侧壁和混凝土底板之间安装橡胶止水条,并增设阻水钢筋,并将钢吊箱的水平方向用顶丝限位,竖直方向用拉杆和底板连接,使钢吊箱侧壁和混凝土底板形成一个整体。
5.根据权利要求1所述的一种无掩护海域桥梁高桩没水承台钢吊箱施工工艺,其特征在于:所述步骤C中,钢吊箱内浇筑封底混凝土之前,需要封堵预制的钢吊箱混凝土底板预留孔,并施工水下封底混凝土操作平台。
6.根据权利要求1所述的一种无掩护海域桥梁高桩没水承台钢吊箱施工工艺,其特征在于:所述步骤D中,拆除吊挂系统和封底混凝土操作平台。
CN201410790032.6A 2014-12-19 2014-12-19 无掩护海域桥梁高桩没水承台钢吊箱施工工艺 Pending CN104594373A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410790032.6A CN104594373A (zh) 2014-12-19 2014-12-19 无掩护海域桥梁高桩没水承台钢吊箱施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410790032.6A CN104594373A (zh) 2014-12-19 2014-12-19 无掩护海域桥梁高桩没水承台钢吊箱施工工艺

Publications (1)

Publication Number Publication Date
CN104594373A true CN104594373A (zh) 2015-05-06

Family

ID=53120400

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410790032.6A Pending CN104594373A (zh) 2014-12-19 2014-12-19 无掩护海域桥梁高桩没水承台钢吊箱施工工艺

Country Status (1)

Country Link
CN (1) CN104594373A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696609A (zh) * 2016-03-02 2016-06-22 中建三局基础设施工程有限公司 一种钢吊箱下放系统及其安装方法
CN105862891A (zh) * 2016-04-20 2016-08-17 中铁建港航局集团路桥工程有限公司 对承台钢吊箱壁板与底板间隙止水的方法
CN115492141A (zh) * 2022-10-21 2022-12-20 中铁二院工程集团有限责任公司 一种钢吊箱围堰结构及其底板、施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007063950A (ja) * 2005-09-02 2007-03-15 Ps Mitsubishi Construction Co Ltd コンクリート躯体連結体の吊下げ構築方法
KR20100128580A (ko) * 2009-05-28 2010-12-08 정석으뜸기술(주) 분리형 우물통 시공방법
CN201891123U (zh) * 2010-11-16 2011-07-06 中铁二十四局集团有限公司 混凝土底板单壁钢吊箱
CN102154989A (zh) * 2011-04-29 2011-08-17 中铁大桥局集团第六工程有限公司 钢混结构吊箱及其拆除方法
CN202039375U (zh) * 2011-02-22 2011-11-16 山东省路桥集团有限公司 混凝土预制底板钢吊箱
CN103510529A (zh) * 2012-11-22 2014-01-15 中交第三公路工程局有限公司 用于水下高桩承台施工的钢吊箱系统及施工工艺

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007063950A (ja) * 2005-09-02 2007-03-15 Ps Mitsubishi Construction Co Ltd コンクリート躯体連結体の吊下げ構築方法
KR20100128580A (ko) * 2009-05-28 2010-12-08 정석으뜸기술(주) 분리형 우물통 시공방법
CN201891123U (zh) * 2010-11-16 2011-07-06 中铁二十四局集团有限公司 混凝土底板单壁钢吊箱
CN202039375U (zh) * 2011-02-22 2011-11-16 山东省路桥集团有限公司 混凝土预制底板钢吊箱
CN102154989A (zh) * 2011-04-29 2011-08-17 中铁大桥局集团第六工程有限公司 钢混结构吊箱及其拆除方法
CN103510529A (zh) * 2012-11-22 2014-01-15 中交第三公路工程局有限公司 用于水下高桩承台施工的钢吊箱系统及施工工艺

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中国土木工程学会桥梁及结构工程分会: "《第二十一届全国桥梁学术会议论文集(上册)》", 31 May 2014, 第573-579页 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696609A (zh) * 2016-03-02 2016-06-22 中建三局基础设施工程有限公司 一种钢吊箱下放系统及其安装方法
CN105862891A (zh) * 2016-04-20 2016-08-17 中铁建港航局集团路桥工程有限公司 对承台钢吊箱壁板与底板间隙止水的方法
CN115492141A (zh) * 2022-10-21 2022-12-20 中铁二院工程集团有限责任公司 一种钢吊箱围堰结构及其底板、施工方法
CN115492141B (zh) * 2022-10-21 2024-01-30 中铁二院工程集团有限责任公司 一种钢吊箱围堰结构及其底板、施工方法

Similar Documents

Publication Publication Date Title
CN100591863C (zh) 水下无封底混凝土套箱及其应用方法
CN101476326B (zh) 一种承台预制及施工方法
CN101476327B (zh) 一种水中承台施工方法
CN102979304A (zh) 一种高层建筑变形缝处双剪力墙模板的施工方法
CN103912007A (zh) 预留基础环孔和桩窝环孔的预制混凝土承台及基于该承台的装配式多桩基础的安装方法
CN103233479B (zh) 一种浇注混凝土杯型基础的方法
CN110158638A (zh) 海上风电复合筒基础施工结构及施工方法
CN104594373A (zh) 无掩护海域桥梁高桩没水承台钢吊箱施工工艺
CN104499494B (zh) 双壁波纹钢围堰
CN216475153U (zh) 一种海上风电高桩承台的施工模板系统
CN201137151Y (zh) 水下无封底混凝土套箱
CN112302028A (zh) 一种用于双壁钢围堰下放定位的导向装置
CN204266132U (zh) 采用d型梁的铁路框架墩横梁
KR20140009925A (ko) 항만구조물 시공장치 및 이를 이용한 항만구조물 시공방법
CN104975607A (zh) 近海区局部深基坑止水槽施工方法
CN114855839A (zh) 一种应用于水工构筑物的钢吊箱及其施工方法
CN108425374B (zh) 复杂海况下带系梁哑铃型承台钢吊箱围堰整体施工方法
CN116905534A (zh) 装配式围堰结构及围堰施工方法
CN211690397U (zh) 一种抗浮沉的单壁钢吊箱
CN106677075B (zh) 一种用于桥墩施工的围堰挂桩与度汛方法
CN204898696U (zh) 一种伸缩式钢围堰
CN203782734U (zh) 预留基础环孔和桩窝环孔的预制混凝土承台
CN208219582U (zh) 一种用于水电站厂房的尾水闸墩系统
CN202577324U (zh) 钢筋混凝土组合吊箱
CN203188223U (zh) 一种实现干作业100%回收的无底双壁钢套箱

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150506

RJ01 Rejection of invention patent application after publication