CN110158638A - 海上风电复合筒基础施工结构及施工方法 - Google Patents
海上风电复合筒基础施工结构及施工方法 Download PDFInfo
- Publication number
- CN110158638A CN110158638A CN201910507569.XA CN201910507569A CN110158638A CN 110158638 A CN110158638 A CN 110158638A CN 201910507569 A CN201910507569 A CN 201910507569A CN 110158638 A CN110158638 A CN 110158638A
- Authority
- CN
- China
- Prior art keywords
- steel cylinder
- composite tube
- steel plate
- buoyancy tank
- offshore wind
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
- E02D27/425—Foundations for poles, masts or chimneys specially adapted for wind motors masts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/52—Submerged foundations, i.e. submerged in open water
Abstract
本发明涉及海上风电复合筒基础施工结构及施工方法。该施工结构,包括钢筒和过渡段,钢筒包括竖向钢板和设置在竖向钢板顶部的水平向钢板,所述钢筒内部被竖向钢板分隔呈蜂窝状多仓室结构,竖向钢板底部开孔,临时支撑梁设置在竖向钢板底部的孔内,通过插销固定;钢筒内部仓室内设有浮箱,钢筒和浮箱通过锚链和锚块锚泊在船坞中。钢筒在码头上制造好,复合筒基础制造完成后,将基础固定在安装船上,拆除锚链和锚块,浮箱充水下沉从钢筒中取出。复合筒基础在海中制造,可节约制造场地,省去吊装复合筒基础的大吨位龙门吊,大幅降低制造成本,经济性好,有利于推广利用。
Description
技术领域
本发明涉及一种海上风电设备,具体涉及海上风电复合筒基础施工结构及施工方法。
背景技术
目前海上风电固定式基础类型主要有单桩基础,高桩承台基础,导管架基础,重力式基础和复合筒基础。复合筒基础和其他基础相比,具有基础材料成本低,刚度大,其一步式安装技术可缩短施工工期,但由于复合筒基础自重非常大(3500至7000吨),在码头上制作后需要用大型龙门吊吊入水中,然后通过专用船漂浮运输到指定地点安装,大型龙门吊购置费用昂贵,且复合筒基础体型大(直径30到50米),码头面积需要很大,从而增加了复合筒基础的成本。本发明可省去大型龙门吊,减小码头面积,进一步降低复合筒基础成本。
发明内容
为解决以上问题,本发明提供一种制作成本低、制造方便的海上风电复合筒基础施工结构及施工方法。
本发明采用的技术方案是:一种海上风电复合筒基础施工方法,其特征在于:包括以下步骤:
1)、在码头制造钢筒的竖向钢板和顶部水平向钢板,在竖向钢板底部开孔;
2)、将临时支撑梁插入钢筒的竖向钢板底部孔内,并固定;
3)、将浮箱装入钢筒竖向钢板的各仓室内,封闭钢筒顶部水平向钢板;
4)、将钢筒和浮箱整体吊入船坞;
5)、安装锚链和锚块,使钢筒和浮箱在船坞中锚泊;
6)、拆除临时支撑梁;
7)、在钢筒顶部浇筑钢筋混凝土底板和预应力混凝土过渡段;
8)、复合筒基础制造完成后,安装船将复合筒基础固定在船坞中;
9)、拆除锚链和锚块;
10)、通过浮箱的排气阀与排水阀进行排气充水,浮箱沉入海床;
11)、待安装船将复合筒基础运走后,再次通过浮箱的排气阀与排水阀,将浮箱内部水置换为气体,浮箱上浮回收利用。
作为优选,步骤1)中,在所述竖向钢板底部250mm高度范围内开孔。
作为优选,所述过渡段为预应力钢筋混凝土。
作为优选,所述混凝土底板和锚块为钢筋混凝土。
作为优选,所述钢筒内部呈蜂窝状多仓室结构。
作为优选,所述锚链和临时支撑梁为钢结构。
作为优选,所述浮箱为钢材或塑料复合材料制成的空心封闭结构。
一种海上风电复合筒基础施工结构,包括钢筒和设置在钢筒顶部混凝土底板上的过渡段,其特征在于:所述钢筒包括竖向钢板和设置在竖向钢板顶部的水平向钢板,所述钢筒内部被竖向钢板分隔呈蜂窝状多仓室结构,所述竖向钢板底部开孔,临时支撑梁设置在竖向钢板底部的孔内,通过插销固定;所述钢筒内部仓室内设有浮箱,所述钢筒和浮箱通过锚链和锚块锚泊在船坞中。
本发明取得的有益效果是:复合筒基础在海中制造,可节约制造场地,省去吊装复合筒基础的大吨位龙门吊,大幅降低制造成本,经济性好,有利于推广利用。
附图说明
图1为本发明的海上风电筒型基础的结构示意图;
图2为图1的A-A剖视图;
图3为图1的B-B剖视图;
图4为图1的C-C剖视图;
图5为图1中D处的放大图;
图6为图4中E处的放大图;
图7为图6的F-F剖视图;
附图标记:1、过渡段;2、混凝土底板;3、水平向钢板;4、竖向钢板;5、锚链;6、锚块;7、临时支撑梁;8、浮箱;9、插销。
具体实施方式
下面结合附图和具体实施例对本发明作更进一步的说明。
如图1-7所示,本发明的一种海上风电复合筒基础施工结构,包括钢筒,钢筒顶部设有混凝土底板2,过渡段1设置在混凝土底板2上。钢筒包括竖向钢板4和设置在竖向钢板4顶部的水平向钢板3,钢筒内部被竖向钢板4分隔呈蜂窝状多仓室结构,在钢筒内部的蜂窝状多仓室结构内放置浮箱8。竖向钢板4底部开孔,临时支撑梁7设置在竖向钢板4底部的孔内,通过插销9固定,浮箱8搁置在临时支撑梁7上。钢筒和浮箱8通过锚链5和锚块6锚泊在船坞中。
本实施例中,过渡段1为预应力钢筋混凝土;混凝土底板2为钢筋混凝土;锚链5和临时支撑梁7为钢结构;锚块6为钢筋混凝土;浮箱8由钢材或塑料复合材料组成的空心封闭结构。钢筒在码头上制造好,钢筒底部开孔,临时支撑梁7插入孔中用插销9连接,将浮箱8搁置在临时支撑梁7上,吊入水中,安装锚链5和锚块6,拆除临时支撑梁7,然后浇筑钢筒以上的混凝土底板2和过渡段1。复合筒基础制造完成后,将基础固定在安装船上,拆除锚链5和锚块6,浮箱8充水下沉从钢筒中取出。
本发明的一种海上风电复合筒基础施工方法,包括以下步骤:
1)、在码头制造钢筒的竖向钢板4和顶部水平向钢板3,其中竖向钢板4底部250mm高度范围内开孔;
2)、将临时支撑梁7插入钢筒的竖向钢板4底部孔内,用插销9固定;
3)、将浮箱8装入钢筒竖向钢板4的各仓室内,封闭钢筒顶部水平向钢板3;
4)、将钢筒和浮箱8整体吊入船坞;
5)、安装锚链5和锚块6,使钢筒和浮箱8在船坞中锚泊;
6)、拆除临时支撑梁7;
7)、在钢筒顶部浇筑钢筋混凝土底板2和预应力混凝土过渡段1;
8)复合筒基础制造完成后,安装船将基础固定在船坞中;
9)拆除锚链5和锚块6;
10)、通过浮箱8的排气阀与排水阀进行排气充水,浮箱8沉入海床;
11)、待安装船将复合筒基础运走后,再次通过浮箱8的排气阀与排水阀,将浮箱8内部水置换为气体,浮箱8上浮回收利用。
以上显示和描述了本发明的基本原理和主要结构特征。本发明不受上述实例的限制,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明的范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。
Claims (8)
1.一种海上风电复合筒基础施工方法,其特征在于:包括以下步骤:
1)、在码头制造钢筒的竖向钢板和顶部水平向钢板,在竖向钢板底部开孔;
2)、将临时支撑梁插入钢筒的竖向钢板底部孔内,并固定;
3)、将浮箱装入钢筒竖向钢板的各仓室内,封闭钢筒顶部水平向钢板;
4)、将钢筒和浮箱整体吊入船坞;
5)、安装锚链和锚块,使钢筒和浮箱在船坞中锚泊;
6)、拆除临时支撑梁;
7)、在钢筒顶部浇筑钢筋混凝土底板和预应力混凝土过渡段;
8)、复合筒基础制造完成后,安装船将复合筒基础固定在船坞中;
9)、拆除锚链和锚块;
10)、通过浮箱的排气阀与排水阀进行排气充水,浮箱沉入海床;
11)、待安装船将复合筒基础运走后,再次通过浮箱的排气阀与排水阀,将浮箱内部水置换为气体,浮箱上浮回收利用。
2.根据权利要求1所述的海上风电复合筒基础施工方法,其特征在于:步骤1)中,在所述竖向钢板底部250mm高度范围内开孔。
3.根据权利要求1所述的海上风电复合筒基础施工方法,其特征在于:所述过渡段为预应力钢筋混凝土。
4.根据权利要求1所述的海上风电复合筒基础施工方法,其特征在于:所述混凝土底板和锚块为钢筋混凝土。
5.根据权利要求1所述的海上风电复合筒基础施工方法,其特征在于:所述钢筒内部呈蜂窝状多仓室结构。
6.根据权利要求1所述的海上风电复合筒基础施工方法,其特征在于:所述锚链和临时支撑梁为钢结构。
7.根据权利要求1所述的海上风电复合筒基础施工方法,其特征在于:所述浮箱为钢材或塑料复合材料制成的空心封闭结构。
8.一种海上风电复合筒基础施工结构,包括钢筒和设置在钢筒顶部混凝土底板上的过渡段,其特征在于:所述钢筒包括竖向钢板和设置在竖向钢板顶部的水平向钢板,所述钢筒内部被竖向钢板分隔呈蜂窝状多仓室结构,所述竖向钢板底部开孔,临时支撑梁设置在竖向钢板底部的孔内,通过插销固定;所述钢筒内部仓室内设有浮箱,所述钢筒和浮箱通过锚链和锚块锚泊在船坞中。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910507569.XA CN110158638A (zh) | 2019-06-12 | 2019-06-12 | 海上风电复合筒基础施工结构及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910507569.XA CN110158638A (zh) | 2019-06-12 | 2019-06-12 | 海上风电复合筒基础施工结构及施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110158638A true CN110158638A (zh) | 2019-08-23 |
Family
ID=67628640
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910507569.XA Pending CN110158638A (zh) | 2019-06-12 | 2019-06-12 | 海上风电复合筒基础施工结构及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110158638A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111005399A (zh) * | 2019-12-04 | 2020-04-14 | 天津大学 | 一种码头前沿预制海上风电筒型基础的设备及方法 |
CN111005400A (zh) * | 2019-12-04 | 2020-04-14 | 天津大学 | 一种可迁移预制海上风电筒型基础的设备及方法 |
CN111535351A (zh) * | 2020-04-30 | 2020-08-14 | 天津大学 | 一种覆膜海上风电基础结构预制方法 |
CN111535350A (zh) * | 2020-04-30 | 2020-08-14 | 天津大学 | 一种气膜海上风电基础结构预制方法 |
CN113738591A (zh) * | 2021-08-27 | 2021-12-03 | 南京水科院勘测设计有限公司 | 一种海上复合筒基础风机整体出运码头平面布置及其吊装工艺 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2362090A2 (de) * | 2009-12-22 | 2011-08-31 | Ed. Züblin AG | Nachjustierbare Flächengründung, bevorzugt aufgelöst, für Offshore-Windenergieanlagen |
CN102277878A (zh) * | 2011-05-12 | 2011-12-14 | 天津大学 | 一种可浮运的浮式基础及其施工方法 |
CN102877482A (zh) * | 2012-09-11 | 2013-01-16 | 天津大学 | 一种重力式基础结构及其施工方法 |
CN103174150A (zh) * | 2013-03-28 | 2013-06-26 | 天津大学 | 一种重力式基础下沉装置及其应用方法 |
CN103758147A (zh) * | 2014-02-13 | 2014-04-30 | 天津大学前沿技术研究院有限公司 | 一种重力式海上风电机组基础及其拖航与下沉方法 |
CN210975864U (zh) * | 2019-06-12 | 2020-07-10 | 长江勘测规划设计研究有限责任公司 | 海上风电复合筒基础施工结构 |
-
2019
- 2019-06-12 CN CN201910507569.XA patent/CN110158638A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2362090A2 (de) * | 2009-12-22 | 2011-08-31 | Ed. Züblin AG | Nachjustierbare Flächengründung, bevorzugt aufgelöst, für Offshore-Windenergieanlagen |
CN102277878A (zh) * | 2011-05-12 | 2011-12-14 | 天津大学 | 一种可浮运的浮式基础及其施工方法 |
CN102877482A (zh) * | 2012-09-11 | 2013-01-16 | 天津大学 | 一种重力式基础结构及其施工方法 |
CN103174150A (zh) * | 2013-03-28 | 2013-06-26 | 天津大学 | 一种重力式基础下沉装置及其应用方法 |
CN103758147A (zh) * | 2014-02-13 | 2014-04-30 | 天津大学前沿技术研究院有限公司 | 一种重力式海上风电机组基础及其拖航与下沉方法 |
CN210975864U (zh) * | 2019-06-12 | 2020-07-10 | 长江勘测规划设计研究有限责任公司 | 海上风电复合筒基础施工结构 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111005399A (zh) * | 2019-12-04 | 2020-04-14 | 天津大学 | 一种码头前沿预制海上风电筒型基础的设备及方法 |
CN111005400A (zh) * | 2019-12-04 | 2020-04-14 | 天津大学 | 一种可迁移预制海上风电筒型基础的设备及方法 |
CN111535351A (zh) * | 2020-04-30 | 2020-08-14 | 天津大学 | 一种覆膜海上风电基础结构预制方法 |
CN111535350A (zh) * | 2020-04-30 | 2020-08-14 | 天津大学 | 一种气膜海上风电基础结构预制方法 |
CN113738591A (zh) * | 2021-08-27 | 2021-12-03 | 南京水科院勘测设计有限公司 | 一种海上复合筒基础风机整体出运码头平面布置及其吊装工艺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110158638A (zh) | 海上风电复合筒基础施工结构及施工方法 | |
US10822760B2 (en) | Maritime structure for laying the foundations of buildings, installations and wind turbines by means of gravity in a marine environment | |
JP6619204B2 (ja) | 締切工法および止水壁構造体 | |
CN110397069B (zh) | 一种带支撑结构的单筒多舱组合基础结构及其施工方法 | |
CN109610500B (zh) | 一种长短多桶负压导管架海上风电基础结构及其施工方法 | |
CN111926850A (zh) | 一种六边形海上风电筒型基础水上预制装置和方法 | |
CN104294749A (zh) | 一种圆筒基础栈桥结构的安装方法 | |
JP2012201218A (ja) | 洋上風力発電設備の施工方法 | |
CN110453715A (zh) | 可气液置换的组合式筒型导管架基础结构及其施工方法 | |
CN108487182A (zh) | 一种自升降式浮式防波堤 | |
CN210975864U (zh) | 海上风电复合筒基础施工结构 | |
CN208455565U (zh) | 一种自升降式浮式防波堤 | |
CN209162824U (zh) | 大直径钢混组合圆筒分散式多沉井基础 | |
CN214116682U (zh) | 一种海上风电吸力筒-单桩组合式基础 | |
CN212427179U (zh) | 一种六边形海上风电筒型基础水上预制装置 | |
CN215594101U (zh) | 一种桁架组合式钢混筒型风电基础 | |
CN109356186A (zh) | 一种适用于深水软土地区的桥塔复合基础及施工方法 | |
CN212294724U (zh) | 一种码头前沿预制海上风电筒型基础的设备 | |
CN211922691U (zh) | 一种可迁移预制海上风电筒型基础的设备 | |
CN211091352U (zh) | 一种抗风浪网箱浮架的底部框架 | |
CN113047331A (zh) | 一种组合式防波堤堤头导航灯桩基础结构 | |
KR20120022532A (ko) | 철근 콘크리트 단위 블록을 이용한 방파제의 시공방법 | |
CN206070380U (zh) | 一种可以提高封底混凝土承载力的装置 | |
CN111005400A (zh) | 一种可迁移预制海上风电筒型基础的设备及方法 | |
CN216839533U (zh) | 一种预制承台 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |