CN102398849A - 履带吊整体下船坞的方法 - Google Patents

履带吊整体下船坞的方法 Download PDF

Info

Publication number
CN102398849A
CN102398849A CN2011101886590A CN201110188659A CN102398849A CN 102398849 A CN102398849 A CN 102398849A CN 2011101886590 A CN2011101886590 A CN 2011101886590A CN 201110188659 A CN201110188659 A CN 201110188659A CN 102398849 A CN102398849 A CN 102398849A
Authority
CN
China
Prior art keywords
crawler crane
dock
lifting
crane
integral body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101886590A
Other languages
English (en)
Inventor
宋峥嵘
王勇
李黎霞
宫晨
陈阳
田旺生
王铁瑶
杨明旺
岳学
石继程
刘进华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Offshore Oil Engineering Qingdao Co Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Offshore Oil Engineering Qingdao Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, Offshore Oil Engineering Co Ltd, Offshore Oil Engineering Qingdao Co Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN2011101886590A priority Critical patent/CN102398849A/zh
Publication of CN102398849A publication Critical patent/CN102398849A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

一种履带吊整体下船坞的方法,其特征在于:采用以下步骤:第一步:将履带吊置于吊装托盘上;第二步:在吊装托盘上设置数个吊点;第三步:将龙门吊上的数个吊排与设在吊装托盘上的数个吊点相连,由龙门吊将履带吊整体吊下船坞。本发明其可以将履带吊整体吊下船坞,大大减少了工人拆装吊机的工作量及履带吊的拆分组合待机时间,省时省力;每台次吊装下船坞仅需要时间8小时;降低了生产成本,提高了履带吊下船坞的工作效率。

Description

履带吊整体下船坞的方法
技术领域
本发明涉及履带吊下船坞的方法,尤其涉及一种履带吊整体下船坞的方法。属于海洋工程技术领域。
背景技术
大型船舶、海洋工程在建造时会涉及到大量的吊装作业。因此,各个船厂、海洋工程单位的船坞上方通常会设置有龙门吊。然而,仅依靠龙门吊进行吊装作业,在很大程度上是不能满足吊装作业要求的。由于船坞下的起重设备不足会严重的影响建造工作的进行,甚至会耽误工期。
为了解决这一问题,大部分船舶建造单位都会将履带吊下到船坞中进行辅助作业,以保证施工的顺利进行。
现有的履带吊下到船坞所采用的方法是将履带吊拆散后,分别吊装至船坞下再进行组装。无疑,此方法可以缓解船坞内吊装设备不足的问题,对加快建造速度,保证工程如期完成是有帮助的。但是,对于每台履带吊而言,完成地面拆散——吊装——船坞下组装的过程需要5至7人,且工作5-8天,如果下坞的履带吊数量增多的话,对于控制工期、成本都会有一定影响。
发明内容
本发明的主要目的在于克服现有技术存在的上述缺点,而提供一种履带吊整体下船坞的方法,其可以将履带吊整体吊下船坞,大大减少了工人拆装吊机的工作量及履带吊的拆分组合待机时间,省时省力;降低了生产成本,提高了履带吊下船坞的工作效率。
本发明的目的是由以下技术方案实现的:
一种履带吊整体下船坞的方法,其特征在于:采用以下步骤:
第一步:将履带吊置于吊装托盘上;
第二步:在吊装托盘上设置数个吊点;
第三步:将龙门吊上的数个吊排与设在吊装托盘上的数个吊点相连,由龙门吊将履带吊整体吊下船坞。
所述吊装托盘为框架型结构,由型钢连接制成,框架上铺设有钢板。
所述吊装托盘的两侧各设有一履带吊行走斜坡。
所述履带吊行走斜坡采用钢板连接构成,行走斜坡的倾斜角度为:3.4°。
所述数个吊点设置后将形成一个三角形区域;相应龙门吊的数个吊排中心将形成一个三角形区域,吊装时,要将履带吊的总体重心控制在三角区域以内。
本发明的有益效果:本发明由于采用上述技术方案,其可以将履带吊整体吊下船坞,大大减少了工人拆装吊机的工作量及履带吊的拆分组合待机时间,省时省力;每台次吊装下船坞仅需要时间8小时;降低了生产成本,提高了履带吊下船坞的工作效率。
附图说明:
图1为本发明吊装托盘结构示意图。
图2为本发明履带吊行走斜坡侧视示意图。
图3为本发明履带吊行走斜坡俯视示意图。
图4为本发明龙门吊挂扣示意图。
图5为本发明吊装示意图。
图中主要标号说明:
1吊装托盘、2履带吊行走斜坡、3履带吊、4吊点、5龙门吊、6卸扣。
具体实施方式
如图1所示,为了实施本发明设计了一吊装托盘1,吊装托盘1为框架型结构,吊装框架高度720mm;本实施例:吊装框架尺寸为14m×15m,主要由型钢焊接制成,型钢框架上铺设有厚度为20mm的钢板,总重量84吨,吊装托盘在承载800吨吊机时的最大应力148Mpa。
如图2、图3所示,由于履带吊3的吊装托盘1高度为:720mm,履带吊3无法直接行驶于吊装托盘1上,需要设置一对履带吊行走斜坡2,履带吊行走斜坡2布置在吊装托盘1的两侧。行走斜坡2采用的材料均为厚度20mm的钢板,并采用焊接方式连接构成,其最高处为:720mm,最低处为:50mm。斜坡倾斜角度为:3.4°,履带吊3的爬坡能力为:15.6°,每个斜坡重量10t。
如图5所示,本发明采用以下步骤:
第一步:将履带吊3置于吊装托盘1上,履带吊3可以在吊装托盘1上行驶;本实施例为:履带吊3经设置在吊装托盘1两侧的行走斜坡2驶入吊装托盘1上。
第二步:如图1所示,在吊装托盘1上设置数个吊点4,本实施例为:在吊装托盘1吊装框架型钢上翼缘顶部设置的12个85吨吊点4,吊点4设置后将形成一个三角形区域。
第三步:如图4所示,将龙门吊5上的数个吊排与设在吊装托盘1上的数个吊点4通过卸扣6相连,由龙门吊5将履带吊3整体吊下船坞;本实施例为:吊装时,使用800吨的龙门吊5的上小车的两个吊排和下小车的一个吊排。龙门吊5下小车的吊排垂直于上小车吊排;这样,龙门吊5的三个吊排中心将形成一个三角形区域,如图2中的阴影部分,吊装时,要将履带吊3的总体重心控制在三角区域以内。
以上所述,仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制,凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。

Claims (5)

1.一种履带吊整体下船坞的方法,其特征在于:采用以下步骤:
第一步:将履带吊置于吊装托盘上;
第二步:在吊装托盘上设置数个吊点;
第三步:将龙门吊上的数个吊排与设在吊装托盘上的数个吊点相连,由龙门吊将履带吊整体吊下船坞。
2.根据权利要求1所述的履带吊整体下船坞的方法,其特征在于:所述吊装托盘为框架型结构,由型钢连接制成,框架上铺设有钢板。
3.根据权利要求1或2所述的履带吊整体下船坞的方法,其特征在于:所述吊装托盘的两侧各设有一履带吊行走斜坡。
4.根据权利要求3所述的履带吊整体下船坞的方法,其特征在于:所述履带吊行走斜坡采用钢板连接构成,行走斜坡的倾斜角度为:3.4°。
5.根据权利要求1所述的履带吊整体下船坞的方法,其特征在于:所述数个吊点设置后将形成一个三角形区域;相应龙门吊的数个吊排中心将形成一个三角形区域,吊装时,要将履带吊的总体重心控制在三角区域以内。
CN2011101886590A 2011-07-06 2011-07-06 履带吊整体下船坞的方法 Pending CN102398849A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101886590A CN102398849A (zh) 2011-07-06 2011-07-06 履带吊整体下船坞的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101886590A CN102398849A (zh) 2011-07-06 2011-07-06 履带吊整体下船坞的方法

Publications (1)

Publication Number Publication Date
CN102398849A true CN102398849A (zh) 2012-04-04

Family

ID=45881571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101886590A Pending CN102398849A (zh) 2011-07-06 2011-07-06 履带吊整体下船坞的方法

Country Status (1)

Country Link
CN (1) CN102398849A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014043995A1 (zh) * 2012-09-21 2014-03-27 湖南三一智能控制设备有限公司 一种拆分式起重机
CN110422773A (zh) * 2019-08-06 2019-11-08 海洋石油工程(青岛)有限公司 履带式起重机免拆拼下船坞工艺
CN111846141A (zh) * 2020-05-29 2020-10-30 招商局金陵船舶(南京)有限公司 使用低起吊能力吊车实现高负荷液化气运输船罐体吊装的方法
CN113815810A (zh) * 2021-09-29 2021-12-21 广州黄船海洋工程有限公司 一种带角度绕桩吊机水上安装方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06144774A (ja) * 1992-11-06 1994-05-24 Toyota Soken Kk Pc板の吊り上げ装置
JP2000327259A (ja) * 1999-05-19 2000-11-28 Ishikawajima Harima Heavy Ind Co Ltd 排熱回収ボイラの伝熱管パネルブロック吊り工法
CN1931663A (zh) * 2006-09-30 2007-03-21 沪东中华造船(集团)有限公司 小型船舶总段建造整体入坞组装的方法
CN101417693A (zh) * 2008-11-14 2009-04-29 大连船舶重工集团有限公司 一种海洋工程模块整体吊装方法
CN101987651A (zh) * 2010-11-09 2011-03-23 沪东中华造船(集团)有限公司 一种小型船舶总段的总组方法及总组托架

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06144774A (ja) * 1992-11-06 1994-05-24 Toyota Soken Kk Pc板の吊り上げ装置
JP2000327259A (ja) * 1999-05-19 2000-11-28 Ishikawajima Harima Heavy Ind Co Ltd 排熱回収ボイラの伝熱管パネルブロック吊り工法
CN1931663A (zh) * 2006-09-30 2007-03-21 沪东中华造船(集团)有限公司 小型船舶总段建造整体入坞组装的方法
CN101417693A (zh) * 2008-11-14 2009-04-29 大连船舶重工集团有限公司 一种海洋工程模块整体吊装方法
CN101987651A (zh) * 2010-11-09 2011-03-23 沪东中华造船(集团)有限公司 一种小型船舶总段的总组方法及总组托架

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014043995A1 (zh) * 2012-09-21 2014-03-27 湖南三一智能控制设备有限公司 一种拆分式起重机
CN110422773A (zh) * 2019-08-06 2019-11-08 海洋石油工程(青岛)有限公司 履带式起重机免拆拼下船坞工艺
CN111846141A (zh) * 2020-05-29 2020-10-30 招商局金陵船舶(南京)有限公司 使用低起吊能力吊车实现高负荷液化气运输船罐体吊装的方法
CN113815810A (zh) * 2021-09-29 2021-12-21 广州黄船海洋工程有限公司 一种带角度绕桩吊机水上安装方法

Similar Documents

Publication Publication Date Title
CN202988612U (zh) 平臂式塔式起重机
CN201882763U (zh) 一种双机抬吊专用扁担梁
CN202450774U (zh) 小步距自爬升电梯井筒模板
CN201172574Y (zh) 预制梁钢筋吊装架
CN205932941U (zh) 一种用于预制箱梁模板吊运的装置
CN207192616U (zh) 一种防止货物晃动的门式起重机
CN102398849A (zh) 履带吊整体下船坞的方法
CN207192617U (zh) 一种稳定作业的门式起重机
CN202625600U (zh) 一种双铸造桥式起重机抬吊超大型物件用的扁担梁
CN201473221U (zh) 悬索桥轻型缆载吊机
CN103086276B (zh) 一种吊装高层井塔型建筑物内桥式起重机的施工方法
CN206693061U (zh) 一种用于悬索桥主索鞍吊装的吊具装置
CN103663144A (zh) 钢构件专用翻身器
CN201873499U (zh) 移动转臂式主梁翻转机
CN207497887U (zh) 一种用于吊装钢包回转台的专用装置
CN202655839U (zh) 活动式管桁架组对胎具
CN216336124U (zh) 一种桥式起重机大梁加工用吊装装置
CN207328748U (zh) 一种快速实现横舱壁吊装定位及施工安全的辅助装置
CN220950800U (zh) 一种变电站吊运装置
CN201914830U (zh) 塔吊分绳器
CN110040622A (zh) 薄板分段拼板组件吊运工装及其使用方法
CN205637617U (zh) 钢梁施工多梁串吊装置
CN203624810U (zh) 一种巨型断面钢材专用吊具
CN212450257U (zh) 一种钢结构柱垂直吊装系统
CN220578699U (zh) 一种竖向构件的吊装接长装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120404