CN102344086A - 多绳摩擦轮绞车提升绳更换方法 - Google Patents

多绳摩擦轮绞车提升绳更换方法 Download PDF

Info

Publication number
CN102344086A
CN102344086A CN2010102466402A CN201010246640A CN102344086A CN 102344086 A CN102344086 A CN 102344086A CN 2010102466402 A CN2010102466402 A CN 2010102466402A CN 201010246640 A CN201010246640 A CN 201010246640A CN 102344086 A CN102344086 A CN 102344086A
Authority
CN
China
Prior art keywords
rope
container
winch
hoisting
ropes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010102466402A
Other languages
English (en)
Other versions
CN102344086B (zh
Inventor
张万忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201010246640 priority Critical patent/CN102344086B/zh
Publication of CN102344086A publication Critical patent/CN102344086A/zh
Application granted granted Critical
Publication of CN102344086B publication Critical patent/CN102344086B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

本发明公开了一种多绳摩擦轮绞车提升绳更换方法,包括:张力机、滑轮组、天轮、提升绳、绞车、牵引机、容器I、容器II,根据多绳摩擦轮绞车的特点,有效利用张力机和牵引机进行换绳,始终保持至少两根提升绳与容器相连,保证换绳施工过程中绞车有足够的牵引力来牵引容器,同时保证提升绳保持足够的强度,提高了机械化作业水平,减少了换绳时间,降低了工人的劳动强度及在井口的高空作业时间,达到安全换绳目的,保证生产正常进行。

Description

多绳摩擦轮绞车提升绳更换方法
技术领域:
本发明属于摩擦轮绞车提升绳更换技术领域。
背景技术:
随着矿井开采深度的延伸,越来越多采用多绳摩擦轮绞车进行提升运输。多绳摩擦轮绞车具有系统简单、能适应不同井深的特点。工作时,提升钢丝绳两端分别联接有容器,钢丝绳绕过天轮后再缠绕到绞车滚筒上,两个容器一个上升、另一个下降,当其中一个上升到井口时,而另一个则下降到井底。由于所用的钢丝绳会发生锈蚀、疲劳等原因,必须定期进行更换。《煤矿安全规程》第403条规定要求,摩擦轮绞车提升钢丝绳使用期限最长不得超过两年。目前摩擦轮绞车提升绳的更换,现在都是采用老绳带新绳的更换办法,即将要更换的新绳通过卡板与要更换的旧绳用螺丝连接在一起,新绳的重量和张紧力靠卡板的压力所产生的摩擦力来克服。把新绳带到井底后,井上、井下再分别进行人工作业,将新提升绳与容器联接,然后替换下旧提升绳;最后反向提升,逐步取下卡板,将旧提升绳逐步拉出,完成钢丝绳的更换过程。
目前的换绳方法有以下缺点。第一,工人劳动强度大,所有卡板都要靠人工将螺丝上紧,新钢丝绳依靠人工辅助进入提升井筒,将旧钢丝绳拉出也要靠人工进行。第二,所有上、下卡板的人员均需要在井口上作业,稍有不慎,将会在井筒中掉落物品,容易酿成事故。第三,更换作业时间较长,一般在20个小时左右,影响矿井的正常生产。
发明内容:
本发明的目的是提供一种工人劳动强度小、换绳时间短的多绳摩擦轮绞车提升绳更换方法。
为了实现上述目的,本发明包括:张力机、滑轮组、天轮、提升绳、绞车、牵引机、容器I、容器II,依次采用如下步骤进行:
a、将摩擦轮绞车的容器I提升到井口,将容器I联接的四条旧提升绳其中的一号和三号两条去掉,同时将去掉的旧提升绳的绳头与两台牵引机的收绳轮联接,将两条新提升绳分别通过两台张力机绕过滑轮组与容器I联接;
b、开动摩擦轮绞车提升容器II,两台牵引机的收绳轮把容器II上的两条旧提升绳收走,两台张力机保持一定的张力下放新提升绳,新提升绳在容器I的带领下保持一定的张力下放至井底;
c、容器II到达进口时,将新提升绳锁在井架上,将一号和三号提升绳去掉,新提升绳的另一端绕过绞车和天轮与容器II相连,完成一号和三号提升绳的更换;
d、控制绞车反向运转,利用上述相同的步骤,将二号和四号旧提升绳换掉,仍将容器II放到井底,完成整个换绳过程。
根据多绳摩擦轮绞车的特点,始终保持至少两根提升绳与容器相连,保证换绳施工过程中绞车有足够的牵引力来牵引容器,同时保证提升绳保持足够的强度。由于在更换提升绳工作中,有效利用张力机和牵引机进行换绳,提高了机械化作业水平,减少了换绳时间,降低了工人的劳动强度及在井口的高空作业时间,达到安全换绳目的,保证生产正常进行。
附图说明:
下面结合附图对本发明作详细说明。
图1为本发明各部件的连接结构示意图。
图中标号名称:1、张力机;2、滑轮组;3、天轮;4、提升绳;5、绞车;6、牵引机;7、容器I;8、容器II。
具体实施方式:
由图1可知,本发明包括:两台张力机、滑轮组、天轮、提升绳、绞车、两台牵引机、容器I、容器II。提升绳在绞车上按一号、二号、三号、四号依次排列设置,将摩擦轮绞车的容器I提升到井口后停止运行,将容器I联接的四条旧提升绳其中的一号和三号两条旧提升绳绳头解开去掉,同时将去掉的旧提升绳的绳头与两台牵引机的收绳轮联接在一起,将两条新提升绳分别通过两台张力机绕过滑轮组与容器I联接。张力机的规格参数与摩擦轮绞车的提升量相匹配,牵引机的规格参数与提升绳的长度相匹配。开动摩擦轮绞车提升容器II,两台牵引机的收绳轮把容器II上的两条旧提升绳缠绕后收走,两台张力机保持一定的张力下放新提升绳,新提升绳在容器I的带领下保持一定的张力下放至井底。当容器II上升到达进口时,将新提升绳锁在井架上,将一号和三号提升绳的另一端去掉,利用两台牵引机将旧提升绳收走。保持一定张力将新提升绳的另一端绕过绞车和天轮与容器II相连,完成一号和三号提升绳的更换。操作控制绞车反向运转,利用上述相同的步骤,将二号和四号旧提升绳换掉,仍将容器II放到井底,完成整个换绳过程。换绳施工前,要了解多绳摩擦轮绞车的有关参数和矿井的深度及提升量大小,根据不同情况,要匹配相应的张力机和牵引机,制定详细的施工安全措施,保证施工安全,提高换绳效率。

Claims (1)

1.一种多绳摩擦轮绞车提升绳更换方法,包括:张力机、滑轮组、天轮、提升绳、绞车、牵引机、容器I、容器II,其特征是依次采用如下步骤进行:
a、将摩擦轮绞车的容器I提升到井口,将容器I联接的四条旧提升绳其中的一号和三号两条去掉,同时将去掉的旧提升绳的绳头与两台牵引机的收绳轮联接,将两条新提升绳分别通过两台张力机绕过滑轮组与容器I联接;
b、开动摩擦轮绞车提升容器II,两台牵引机的收绳轮把容器II上的两条旧提升绳收走,两台张力机保持一定的张力下放新提升绳,新提升绳在容器I的带领下保持一定的张力下放至井底;
c、容器II到达进口时,将新提升绳锁在井架上,将一号和三号提升绳去掉,新提升绳的另一端绕过绞车和天轮与容器II相连,完成一号和三号提升绳的更换;
d、控制绞车反向运转,利用上述相同的步骤,将二号和四号旧提升绳换掉,仍将容器II放到井底,完成整个换绳过程。
CN 201010246640 2010-08-01 2010-08-01 多绳摩擦轮绞车提升绳更换方法 Expired - Fee Related CN102344086B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010246640 CN102344086B (zh) 2010-08-01 2010-08-01 多绳摩擦轮绞车提升绳更换方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010246640 CN102344086B (zh) 2010-08-01 2010-08-01 多绳摩擦轮绞车提升绳更换方法

Publications (2)

Publication Number Publication Date
CN102344086A true CN102344086A (zh) 2012-02-08
CN102344086B CN102344086B (zh) 2013-08-28

Family

ID=45543221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010246640 Expired - Fee Related CN102344086B (zh) 2010-08-01 2010-08-01 多绳摩擦轮绞车提升绳更换方法

Country Status (1)

Country Link
CN (1) CN102344086B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104590982A (zh) * 2014-07-01 2015-05-06 南通力威机械有限公司 一种缠绕式提升绞车换绳方法
CN109516356A (zh) * 2019-01-11 2019-03-26 淮南矿业(集团)有限责任公司 矿井主提升绳更换方法
CN110877852A (zh) * 2019-11-27 2020-03-13 山东东山古城煤矿有限公司 立井摩擦式提升机快速换绳系统及方法
CN111348534A (zh) * 2018-12-20 2020-06-30 洛阳威卡矿山机械设备有限公司 一种矿山提升机天轮结构

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1034979A1 (ru) * 1979-11-22 1983-08-15 Уральский Государственный Институт По Проектированию Предприятий Железнорудной,Марганцевой,Хромитовой И Флюсовой Промышленности "Уралгипроруда" Способ замены канатов в шахтной подъемной установке
CN101786570A (zh) * 2010-03-17 2010-07-28 山东煤安矿山提升设备安装有限公司 提升钢丝绳更换工艺

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1034979A1 (ru) * 1979-11-22 1983-08-15 Уральский Государственный Институт По Проектированию Предприятий Железнорудной,Марганцевой,Хромитовой И Флюсовой Промышленности "Уралгипроруда" Способ замены канатов в шахтной подъемной установке
CN101786570A (zh) * 2010-03-17 2010-07-28 山东煤安矿山提升设备安装有限公司 提升钢丝绳更换工艺

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
汪卫东 等: "矿井多绳摩擦式提升绞车的换绳方法", 《煤矿安全》, no. 8, 31 August 2000 (2000-08-31), pages 13 - 14 *
谢小展 等: "落地式摩擦提升机更换主提升绳方法与步骤", 《第3届全国煤炭工业生产一线青年技术创新文集》, 31 December 2008 (2008-12-31), pages 475 - 478 *
闵涛 等: "落地式多绳摩擦提升机提升钢丝绳换绳工艺", 《山东煤炭科技》, no. 6, 31 December 2005 (2005-12-31), pages 12 - 13 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104590982A (zh) * 2014-07-01 2015-05-06 南通力威机械有限公司 一种缠绕式提升绞车换绳方法
CN111348534A (zh) * 2018-12-20 2020-06-30 洛阳威卡矿山机械设备有限公司 一种矿山提升机天轮结构
CN109516356A (zh) * 2019-01-11 2019-03-26 淮南矿业(集团)有限责任公司 矿井主提升绳更换方法
CN110877852A (zh) * 2019-11-27 2020-03-13 山东东山古城煤矿有限公司 立井摩擦式提升机快速换绳系统及方法
CN110877852B (zh) * 2019-11-27 2022-06-28 山东东山古城煤矿有限公司 立井摩擦式提升机快速换绳系统及方法

Also Published As

Publication number Publication date
CN102344086B (zh) 2013-08-28

Similar Documents

Publication Publication Date Title
CN105016184B (zh) 立井多绳摩擦提升机提升钢丝绳更换工艺
CN204251168U (zh) 多绳摩擦轮提升机首绳无稳车更换系统
CN104590974A (zh) 一种多绳复合型矿井提升机
CN102344086B (zh) 多绳摩擦轮绞车提升绳更换方法
CN201961997U (zh) 一种塔式起重机内套架顶升作业电动平台
CN210003305U (zh) 一种实现超长隧道锚窄空间一次牵引到位的施工系统
CN205114916U (zh) 一种基于动定滑轮轮系的双绞车石油钻机起升系统
CN110002343B (zh) 一种自驱式城市地下预制综合管廊铺设吊装机及施工方法
CN105173975A (zh) 一种多绳缠绕式提升机的同步天轮平衡调整方法
CN204111228U (zh) 卷扬钢丝绳预紧装置和工程机械装置
CN102530694A (zh) 一种塔式多绳摩擦提升机首绳更换方法
RU2409513C1 (ru) Способ замены канатов шахтной подъемной установки со шкивом трения и устройство для его осуществления
CN112456276B (zh) 矿用摩擦式提升机调绳工艺
CN101941632A (zh) 一种立井单绳自动调、换绳起重装置
CN202089666U (zh) 斜巷行人助行器
CN104386602A (zh) 一种斜巷无轨辅助运输方法及装置
CN103264940A (zh) 卷筒式安全吊笼
CN202148473U (zh) 一种铁路专用拖拽机
CN207671583U (zh) 一种新型高效率绞车
CN108675098A (zh) 一种落地式摩擦提升机
CN205076612U (zh) 一种多绳缠绕式提升机的钢丝绳同步补偿轮装置
CN204265351U (zh) 一种斜巷无轨辅助运输装置
CN202481983U (zh) 液力穿提升大绳牵引工具
CN202924696U (zh) 井下行人辅助系统
RU2526868C1 (ru) Способ разматывания ослабленного участка талевого каната с барабана лебедки и устройство для его осуществления

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130828

Termination date: 20140801