CN102337893B CN 201110278615 CN201110278615A CN102337893B CN 102337893 B CN102337893 B CN 102337893B CN 201110278615 CN201110278615 CN 201110278615 CN 201110278615 A CN201110278615 A CN 201110278615A CN 102337893 B CN102337893 B CN 102337893B
Authority
CN
China
Prior art keywords
medium
tunnel
drilling
blasting
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110278615
Other languages
Chinese (zh)
Other versions
CN102337893A (en
Inventor
宫国慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Group Mining Co Ltd
Original Assignee
Angang Group Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Group Mining Co Ltd filed Critical Angang Group Mining Co Ltd
Priority to CN 201110278615 priority Critical patent/CN102337893B/en
Publication of CN102337893A publication Critical patent/CN102337893A/en
Application granted granted Critical
Publication of CN102337893B publication Critical patent/CN102337893B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a method for processing suspension top by medium-deep hole blasting on upper and lower shoes, comprising the steps of: simultaneously tunneling two drilling connection tunnels, on a tunnel upper shoe and a tunnel lower shoe of an electric shovel discharging tunnel, perpendicularly passing through a mineral vein; after the drilling connection tunnels pass through the mineral vein, tunneling two medium-deep hole drilling tunnels which is in parallel with the electric shovel discharging tunnel, faces towards the direction of the suspension top part, and is perpendicularly connected with the drilling connection tunnel, wherein the medium-deep hole drilling tunnels are tunneled exceed the suspension top part; performing construction of medium-deep holes in the two drilling tunnels towards the suspension top part according to the data for ore bring-down through blasting, such as row distance of 1-1.5m and hole bottom distance of 1-1.5m; drilling holes in each row; loading explosive in the medium-deep holes by a explosive loading machine; performing millisecond blasting by a millisecond detonator; and thereby breaking the suspension top by one-time blasting. The method for processing suspension top by medium-deep hole blasting on upper and lower shoes has the advantages that the deslagging is performed by the electric shovel, so that the labor intensity is small and the construction efficiency is high; operation is not performed on the tops of gobs so that the operation is ensured to be absolutely safe.

Description

Help medium-length hole blasting to handle the method on outstanding top up and down
Technical field
The invention belongs to the mining technique field, relate in particular to a kind of method of helping medium-length hole blasting to handle outstanding top up and down.
Background technology
At present the main mining methods of high-dipping ore block are sublevel caving method without sill pillar, and this mining methods are to tunnel mining tunnel in ore body, in the utilization to the scallop hole explosion method that the ore deposit digs up mine that falls.But this mining methods are sometimes because drawing is inaccurate, or construction location is inaccurate, cause that hole depth design is not in place, the position is not got in the hole, or powder charge does not install to the position, causes demolition effect bad, and the top is not put down, Here it is outstanding top.Behind the outstanding top, not only influence output, and if handle and ought just become potential safety hazard, in case get off, just very dangerous.Original outstanding top processing method is to help or help down gallery of pick on forklift ore removal tunnel, upwards dig a courtyard again, after arriving outstanding top bit, driving chamber master lane, driving carries out Chamber Construction after finishing in the entity of outstanding top, as shown in Figure 1, the operation of need manually slagging tap, the excavation work amount is very big, and labour intensity is big, long in time limit, and the workman constructs abnormally dangerous in the entity of outstanding top.The loss of mineral resources is not only caused on outstanding top, mining cost is strengthened, the more important thing is and stay potential safety hazard, directly threaten cutter's life security, therefore, no matter the actual needs from producing is still considered from security standpoint, outstanding top all must be well solved, and 1 is that outstanding top bit, 2 is that chamber master lane, 3 is that courtyard, 4 is forklift ore removal tunnel among Fig. 1.
Summary of the invention
The object of the present invention is to provide a kind of efficiency of construction that improves, reduce labour intensity, guarantee the double entry road of job safety, help medium-length hole blasting to handle the method on outstanding top up and down.
The objective of the invention is to realize by following technical proposals:
The method of helping medium-length hole blasting to handle outstanding top up and down of the present invention, it is characterized in that: it is characterized in that: vertical rock drilling of wearing two of arteries and veins drivings joins the lane when helping under the tunnel in power shovel ore removal tunnel group and tunnel, after mineral ore is passed in this rock drilling connection lane, again towards outstanding top bit direction and two of the parallel drivings in power shovel ore removal tunnel, and with described rock drilling connection long and medium hole drilling connected vertically tunnel, lane, and this long and medium hole drilling tunnelling surpasses outstanding top bit, in this two drilling drift, press array pitch 1-1.5 rice to outstanding top bit respectively then, carry out the medium-length hole construction apart from the ore deposit parameter that falls of 1-1.5 rice at the bottom of the hole, every row's perforation, with explosive loader blasting charge in the medium-length hole, with the short-delay blasting of millisecond detonator, onepull will be hanged the top avalanche.
Advantage of the present invention is: utilize this said method to handle outstanding top technology, level is carried out lane construction in the ore removal tunnel, driving, medium-length hole construction, bursting work are all a level, need not upwards construct, construction organization is simple, utilize the power shovel operation of slagging tap, labour intensity is little, the efficiency of construction height; Maximum benefit is not at the dead zone operation at top, has guaranteed being perfectly safe of operation.
Description of drawings
Fig. 1 is the structural representation of original outstanding top processing method.
Fig. 2 is the structural representation of the outstanding top of the present invention processing method.
Fig. 3 is the A-A sectional view of Fig. 2.
Fig. 4 is the A-A sectional view of Fig. 2.
The specific embodiment
Below in conjunction with description of drawings the specific embodiment of the present invention.
As Fig. 2, Fig. 3, shown in Figure 4: the method for helping medium-length hole blasting to handle outstanding top up and down of the present invention, it is characterized in that: vertical rock drilling of wearing two of arteries and veins drivings joins the lane when helping under the tunnel in power shovel ore removal tunnel group and tunnel, after mineral ore is passed in this rock drilling connection lane, again towards outstanding top bit direction and two of the parallel drivings in power shovel ore removal tunnel, and with described rock drilling connection long and medium hole drilling connected vertically tunnel, lane, and this long and medium hole drilling tunnelling surpasses outstanding top bit, in this two drilling drift, press array pitch 1-1.5 rice to outstanding top bit respectively then, carry out the medium-length hole construction apart from the ore deposit parameter that falls of 1-1.5 rice at the bottom of the hole, every row's perforation is used
Explosive loader blasting charge in the medium-length hole, with the short-delay blasting of millisecond detonator, onepull will be hanged the top avalanche.
The present invention is in the vertical rock drilling connection lanes 6 of wearing two 3m * 3m of arteries and veins driving with 10 whiles of group under the tunnel of the tunnel in described power shovel ore removal tunnel 4 group 9, after 6 meters of mineral ores are passed in this rock drilling connection lane 6, again towards two 3m * 3m of outstanding top bit 1 direction and power shovel ore removal tunnel 4 parallel drivings, and with described rock drilling connection 6 long and medium hole drilling connected vertically tunnels 5, lane, these long and medium hole drilling tunnel 5 drivings surpass outstanding top bit 2-3m, leave enough spaces like this, guarantee medium-length hole all outstanding top bit of can constructing.In this two drilling drift 5, carry out medium-length hole 12 constructions apart from 1 meter the ore deposit parameter that falls to outstanding top bit 1 at the bottom of by 1 meter of array pitch, hole respectively then, every row makes a call to 4 holes, row's number of construction medium-length hole 12 is determined by outstanding top bit length, with BQF100 type explosive loader blasting charge in the medium-length hole, with I section, III section, V section, VII section 18m millisecond detonator line, as shown in Figure 4, the I section is detonated earlier, be III section, V section successively, be that the VII section is detonated at last, like this, towards the Xuan Ding scope of freedom 13 directions, but not the covering of the fan direction is carried out short-delay blasting by row, and onepull will be hanged the top avalanche.
Number in the figure 7 is that armor rock on the ore body, 8 is that ore body boundary line, 11 is ore body lower wall country rock.The present invention carries out lane construction in ore removal tunnel level, and driving, medium-length hole construction, bursting work all a level, need not upwards be constructed, and construction is simple, utilizes the power shovel operation of slagging tap, and labour intensity is little, the efficiency of construction height; Maximum benefit is not at the dead zone operation at top, and this safety in production hidden danger of outstanding top is eliminated substantially.
Handle the scheme of outstanding top problem with the prior art medium-length hole and compare, this scheme is to help two drilling drifts of new pick up and down, carrying out double treatment, and maneuverability is arranged in the tunnel, does not disturb mutually, has a style of one's own.If carry out the single face explosion in segmentation lower wall connection lane, not only the rock drilling hole depth is big, easy sideslip, and precision is difficult to control, and treatment effect is undesirable.And charge explosion destroy easily the connection lane, to thousand one-tenth influences of subsequent production.

Claims (2)

1. help medium-length hole blasting to handle outstanding method of pushing up up and down for one kind, it is characterized in that: vertical rock drilling of wearing two of arteries and veins drivings joins the lane when helping under the tunnel in power shovel ore removal tunnel group and tunnel, after mineral ore is passed in this rock drilling connection lane, again towards outstanding top bit direction and two of the parallel drivings in power shovel ore removal tunnel, and with described rock drilling connection long and medium hole drilling connected vertically tunnel, lane, and this long and medium hole drilling tunnelling surpasses outstanding top bit, in this two drilling drift, press array pitch 1-1.5 rice to outstanding top bit respectively then, carry out the medium-length hole construction apart from the ore deposit parameter that falls of 1-1.5 rice at the bottom of the hole, every row's perforation, with explosive loader blasting charge in the medium-length hole, with the short-delay blasting of millisecond detonator, onepull will be hanged the top avalanche.
2. the medium-length hole blasting of helping up and down according to claim 1 is handled outstanding method of pushing up, vertical rock drilling of wearing two 3m * 3m of arteries and veins driving joins the lane when helping under the tunnel in described power shovel ore removal tunnel group and tunnel, after 6 meters of mineral ores are passed in this rock drilling connection lane, again towards outstanding top bit direction and two 3m * 3m of the parallel driving in power shovel ore removal tunnel and described rock drilling connection long and medium hole drilling connected vertically tunnel, lane, and this long and medium hole drilling tunnelling surpasses outstanding top bit 2-3m, in this two drilling drift, press 1 meter of array pitch to outstanding top bit respectively then, carry out the medium-length hole construction apart from 1 meter the ore deposit parameter that falls at the bottom of the hole, every row makes a call to 4 holes, row's number of construction medium-length hole is determined by outstanding top bit length, with explosive loader blasting charge in the medium-length hole, use the I section, the III section, the V section, VII section 18m millisecond detonator line, the I section is detonated earlier, be the III section successively, the V section, be that the VII section is detonated at last, carry out short-delay blasting by row towards Xuan Ding scope of freedom direction, onepull will be hanged the top avalanche.
CN 201110278615 2011-09-20 2011-09-20 Method for processing suspension top by medium-deep hole blasting on upper and lower shoes Active CN102337893B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110278615 CN102337893B (en) 2011-09-20 2011-09-20 Method for processing suspension top by medium-deep hole blasting on upper and lower shoes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110278615 CN102337893B (en) 2011-09-20 2011-09-20 Method for processing suspension top by medium-deep hole blasting on upper and lower shoes

Publications (2)

Publication Number Publication Date
CN102337893A CN102337893A (en) 2012-02-01
CN102337893B true CN102337893B (en) 2013-07-10

Family

ID=45513816

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110278615 Active CN102337893B (en) 2011-09-20 2011-09-20 Method for processing suspension top by medium-deep hole blasting on upper and lower shoes

Country Status (1)

Country Link
CN (1) CN102337893B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102808622B (en) * 2012-08-03 2014-08-20 西北矿冶研究院 Method for recovering ore pillar by medium-length hole and deep hole combined blasting technology
CN109029168B (en) * 2018-08-20 2020-11-03 河北钢铁集团矿业有限公司 Blasting treatment method for underground suspended roof
CN109974545B (en) * 2019-04-04 2020-05-19 中南大学 Medium-length hole blasting suspended roof processing method in sublevel caving method
CN111578797B (en) * 2020-07-06 2022-05-31 酒泉钢铁(集团)有限责任公司 Underground medium-length hole blasting suspended roof processing method
CN112857162A (en) * 2020-12-31 2021-05-28 中国华冶科工集团有限公司 Mine blast hole time-delay blasting method
CN113605895B (en) * 2021-09-15 2022-11-04 长沙矿山研究院有限责任公司 Safe and efficient mining method for sectional medium-length hole stope

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4272128A (en) * 1980-01-30 1981-06-09 Jacoby Charles H Method of creating a safe environment in salt mining
US5139312A (en) * 1991-04-09 1992-08-18 Jackson Daryl L Method and apparatus removing a mineable product from an underground seam
CN100535387C (en) * 2005-05-23 2009-09-02 东北大学 Improved sublevel caving method without bottom column
CN1730904A (en) * 2005-09-08 2006-02-08 东北大学 Induction caving method for disposing goaf
CN101328809B (en) * 2008-06-25 2010-12-15 深圳市中金岭南有色金属股份有限公司凡口铅锌矿 Non-bottom pillar deep hole falling-back type mining method
CN101403304A (en) * 2008-10-30 2009-04-08 昆明理工大学 Large dead zone residual ore recovery method

Also Published As

Publication number Publication date
CN102337893A (en) 2012-02-01

Similar Documents

Publication Publication Date Title
CN205561688U (en) Go up big gun hole arrangement structure to medium -length hole undercutting blasting
CN102337893B (en) Method for processing suspension top by medium-deep hole blasting on upper and lower shoes
CN103590831B (en) A kind of gentle dip is thin-the novel mining methods of middle thickness orebody
CN101338674B (en) Non-pillar sublevel caving mining method for direct loading for ore
CN102778182B (en) Beside-roadway topping pressure relief method of roadway driving along gob of small coal pillar influenced by dynamic pressure
CN104481539B (en) From kerve tight-face blasting caved stopes
CN102953732A (en) Room-and-pillar major-diameter longhole inverted-step-like segmented lateral caving subsequent filling mining method
CN102182461A (en) Efficient mining method for thick metal ore body in slanting
CN106223956B (en) Medium-length hole courtyard mining afterwards filling method
CN104453901A (en) Sublevel open-stoping mining method with subsequent backfilling for long-hole caving in thin ore bodies
CN104481543B (en) Stage shrink caved stopes
CN104989404A (en) Diagonal ore-break-down medium-length hole mining method for steeply-inclined thin vein ore body
CN108661646A (en) A kind of false top house column type shrink afterwards filling mining method
CN103244180B (en) Gob-side entry driving surrounding rock control method using remaining small pillars
CN102720500A (en) Mechanized underground mining method for sharply inclined thin ore body
CN106640080B (en) Under a kind of deep high stress environment mining methods are arranged from steady gallery shape stope
CN111058847B (en) Continuous large-aperture deep hole blasting mechanized mining method for thick and large ore body
CN110331978A (en) A kind of environment reconstruction segmentation medium-length hole afterwards filling mining method
CN105673014A (en) Method for controlling rock burst of hard roof jump mining working face
CN108590649A (en) A kind of broken narrow vein medium-length hole recovery method of low-angle dip
CN101285384A (en) Large diameter, deep borehole and non undercutting mining method
CN104594903A (en) Ore breaking method for whole-section high combination rock drilling blasting
CN103982186A (en) Bottom-pillar-free retreating vertical inclined strip sublevel caving mining method
CN105863727B (en) Method for treating pillar goaf
CN110219650A (en) A kind of environment remodeling stage deep hole afterwards filling mining method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 114001 Anshan District, Liaoning, No. 219 Road, No. 39, Tiedong

Patentee after: Anshan Iron and Steel Group Mining Co., Ltd.

Address before: 114001 Anshan District, Liaoning, No. 219 Road, No. 39, Tiedong

Patentee before: Angang Group Mine Company