CN102275218B - 一种合模或拆模装置及使用该装置进行合模或拆模的方法 - Google Patents

一种合模或拆模装置及使用该装置进行合模或拆模的方法 Download PDF

Info

Publication number
CN102275218B
CN102275218B CN 201110235903 CN201110235903A CN102275218B CN 102275218 B CN102275218 B CN 102275218B CN 201110235903 CN201110235903 CN 201110235903 CN 201110235903 A CN201110235903 A CN 201110235903A CN 102275218 B CN102275218 B CN 102275218B
Authority
CN
China
Prior art keywords
matched moulds
mould
suspension bracket
die
form removal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110235903
Other languages
English (en)
Other versions
CN102275218A (zh
Inventor
苟德胜
陈巧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jianhua Construction Materials China Co Ltd
Original Assignee
Jiangsu Builds China Pipe Pile Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Builds China Pipe Pile Co Ltd filed Critical Jiangsu Builds China Pipe Pile Co Ltd
Priority to CN 201110235903 priority Critical patent/CN102275218B/zh
Publication of CN102275218A publication Critical patent/CN102275218A/zh
Application granted granted Critical
Publication of CN102275218B publication Critical patent/CN102275218B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种合模或拆模装置及使用该装置进行合模或拆模的方法,其特征在于:包括安装在地面基础上的吊架,在所述的吊架前方设有模具运送设备,在所述的吊架上活动设置有可将合模或拆模过程中模具上的螺丝拧紧或卸下的风炮,所述的风炮通过输气管与压缩机相连接,在所述的吊架下方的地面基础上设有人工操作平台,在所述的吊架上设有可控制所述运送设备的控制箱。本发明的目的是为了克服现有技术中的不足之处,提供一种结构简单,能降低生产混凝土预制桩过程中合模或拆模的劳动强度,降低模具螺丝的损耗,提高生产的安全,提高生产效率的合模或拆模装置。本发明的另一个目的是提供一种使用上述装置进行合模或拆模的方法。

Description

一种合模或拆模装置及使用该装置进行合模或拆模的方法
技术领域
本发明涉及一种合模或拆模装置,本发明还涉及一种使用该装置进行合模或拆模的方法。 
背景技术
预应力混凝土预制桩,以其优越的性能被广泛应用于建筑、道路、码头等基础工程建设中。目前高强混凝土桩主要生产工艺流程为:配料→搅拌→布料→合模→预应力张拉→离心成型→倒余浆→常压蒸养→脱模→高压蒸养→成品。其中在合模及脱模过程中采用风炮将螺丝拧紧或者卸下来,所采用的风炮自重较大,生产工人需要消耗较大的人力来克服风炮自重所产生的力,然后将风炮对准螺丝进行操作。在对螺丝进行拧紧或者卸下来时,所产生的力量通常跟空压机的压力是成正比的,压力大产生的力量大,反之则小。所以一旦用的压力过大,在拧紧螺丝的时候容易损坏螺丝,非常耗时耗力,而且容易产生安全问题,影响了生产效率。 
发明内容
本发明的目的是为了克服现有技术中的不足之处,提供一种结构简单,能降低生产混凝土预制桩过程中合模或拆模的劳动强度,降低模具螺丝的损耗,提高生产的安全,提高生产效率的合模或拆模装置; 
本发明的另一个目的是提供一种使用上述装置进行合模或拆模 的方法。 
为了达到上述目的,本发明采用以下方案: 
一种合模或拆模装置,其特征在于:包括安装在地面基础上的吊架,在所述的吊架前方设有模具运送设备,在所述的吊架上活动设置有可将合模或拆模过程中模具上的螺丝拧紧或卸下的风炮,所述的风炮通过输气管与压缩机相连接,在所述的吊架下方的地面基础上设有人工操作平台,在所述的吊架上设有可控制所述运送设备的控制箱。如上所述的一种合模或拆模装置,其特征在于所述的吊架包括左、右支架,在所述左、右支架上设有横梁,在所述的横梁上设有小车,在所述的小车下方连接有平衡器,所述的平衡器与所述的风炮尾端相连接。 
如上所述的一种合模或拆模装置,其特征在于在所述的横梁上设有多个吊挂环,所述的输气管穿过所述的吊挂环悬吊在所述的横梁上。 
如上所述的一种合模或拆模装置,其特征在于在所述的平衡器上缠绕有钢丝绳。 
如上所述的一种合模或拆模装置,其特征在于所述的运送设备为铁链滚动链条。 
如上所述的一种合模或拆模装置,其特征在于所述的人工操作平台为阶梯型台阶。 
本发明一种使用如上所述设备进行合模或拆模的方法,其特征在于包括以下步骤: 
A、安装合模或拆模装置; 
B、合模或拆模时,把所要合模或拆模的模具吊至运输设备上,开启操作箱上的操作按钮,使运输设备前后匀速平动,从而使运输设备上的模具实现前后平动,当模具平动至风炮下面时,用手移动风炮,使风炮口对准模具上的螺丝帽,然后往下压使风炮口套在螺丝帽上,然后启动风炮即可实现对模具的合模或拆模; 
C、合模或拆模完毕后,通过运输设备使模具匀速的运送回原点,然后通过吊机将模具运走,从而完成模具的合模或拆模。 
如上所述的合模或拆模的方法,其特征在于所述的安装合模或拆模装置包括开挖地面基础,在所述的地面基础上设置吊架并通过混凝土浇注连接,在所述的吊架内侧设置人工操作平台,在所述的吊架上设置风炮,用输气管将风炮和压缩机相连接。 
本发明中所述的吊架为“∏”型。 
综上所述,本发明相对于现有技术其有益效果是: 
利用本发明所述装置及方法能降低生产混凝土预制桩过程中合模或拆模的劳动强度,降低模具螺丝损耗,提高混凝土预制桩的生产的安全,提高其生产效率。 
在现场实际操作中,当操作工人合模或拆模的速度无法跟上模具的平动速度时,可通过操作平台的控制箱实现模具的暂停;模具的平动速度慢于操作工人合模或拆模的速度时,可通过操作平台的控制箱实现模具的加速前进或后退;使操作工人轻松的根据实际情况来调节模具的运行。 
附图说明
图1为用本发明侧视结构示意图; 
图2为用本发明的俯视结构示意图; 
图3为用本发明的前视结构示意图。 
具体实施方式
下面结合附图说明和具体实施方式对本发明作进一步描述: 
如图1至3所示的一种合模或拆模装置,包括安装在地面基础1上的吊架2,在所述的吊架2前方设有模具12运送设备5,在所述的吊架2上活动设置有可将合模或拆模过程中模具12上的螺丝121拧紧或卸下的风炮9,所述的风炮9通过输气管20与压缩机22相连接,在所述的吊架2下方的地面基础2上设有人工操作平台3,在所述的吊架2上设有可控制所述运送设备5的控制箱4。 
本发明中所述的吊架2包括左、右支架22,23,在所述左、右支架22,23上设有横梁21,在所述的横梁21上设有小车6,在所述的小车6下方连接有平衡器8,所述的平衡器8与所述的风炮9尾端相连接。在所述的横梁21上设有多个吊挂环7,所述的输气管10穿过所述的吊挂环7悬吊在所述的横梁21上。在所述的平衡器8上缠绕有钢丝绳81。 
本发明中所述的运送设备5为铁链滚动链条。所述的人工操作平台3为阶梯型台阶。 
本发明使用所述设备进行合模或拆模的方法,包括以下步骤: 
A、安装合模或拆模装置;所述的安装合模或拆模装置包括开 挖地面基础1,在所述的地面基础1上设置吊架2并通过混凝土浇注连接,在所述的吊架2内侧设置人工操作平台3,在所述的吊架2上设置风炮9,用输气管10将风炮9和压缩机11相连接; 
B、合模或拆模时,把所要合模或拆模的模具吊至铁链滚动链条上,开启操作箱4上的操作按钮41,使铁链滚动链条5前后匀速平动,从而使铁链滚动链条5上的模具12实现前后平动,当模具12平动至风炮9下面时,用手移动风炮9,使风炮口对准模具12上的螺丝帽121,然后往下压使风炮口套在螺丝帽121上,然后启动风炮9即可实现对模具的合模或拆模; 
C、合模或拆模完毕后,通过铁链滚动链条5使模具12匀速的运送回原点,然后通过吊机将模具12运走,从而完成模具的合模或拆模。 

Claims (7)

1.一种合模或拆模装置,其特征在于:包括安装在地面基础(1)上的吊架(2),在所述的吊架(2)前方设有模具(12)运送设备(5),在所述的吊架(2)上活动设置有可将合模或拆模过程中模具(12)上的螺丝(121)拧紧或卸下的风炮(9),所述的风炮(9)通过输气管(20)与压缩机(22)相连接,在所述的吊架(2)下方的地面基础(2)上设有人工操作平台(3),在所述的吊架(2)上设有可控制所述运送设备(5)的控制箱(4),所述的吊架(2)包括左、右支架(22,23),在所述左、右支架(22,23)上设有横梁(21),在所述的横梁(21)上设有小车(6),在所述的小车(6)下方连接有平衡器(8),所述的平衡器(8)与所述的风炮(9)尾端相连接。 
2.根据权利要求1所述的一种合模或拆模装置,其特征在于在所述的横梁(21)上设有多个吊挂环(7),所述的输气管(10)穿过所述的吊挂环(7)悬吊在所述的横梁(21)上。 
3.根据权利要求1所述的一种合模或拆模装置,其特征在于在所述的平衡器(8)上缠绕有钢丝绳(81)。 
4.根据权利要求1所述的一种合模或拆模装置,其特征在于所述的运送设备(5)为铁链滚动链条。 
5.根据权利要求1所述的一种合模或拆模装置,其特征在于所述的人工操作平台(3)为阶梯型台阶。 
6.一种使用权利要求1所述设备进行合模或拆模的方法,其 特征在于包括以下步骤: 
A、安装合模或拆模装置; 
B、合模或拆模时,把所要合模或拆模的模具吊至运输设备上,开启操作箱(4)上的操作按钮(41),使运输设备(5)前后匀速平动,从而使运输设备(5)上的模具(12)实现前后平动,当模具(12)平动至风炮(9)下面时,用手移动风炮(9),使风炮口对准模具(12)上的螺丝帽(121),然后往下压使风炮口套在螺丝帽(121)上,然后启动风炮(9)即可实现对模具的合模或拆模; 
C、合模或拆模完毕后,通过运输设备(5)使模具(12)匀速的运送回原点,然后通过吊机将模具(12)运走,从而完成模具的合模或拆模。 
7.根据权利要求6所述的合模或拆模的方法,其特征在于所述的安装合模或拆模装置包括开挖地面基础(1),在所述的地面基础(1)上设置吊架(2)并通过混凝土浇注连接,在所述的吊架(2)内侧设置人工操作平台(3),在所述的吊架(2)上设置风炮(9),用输气管(10)将风炮(9)和压缩机(11)相连接。 
CN 201110235903 2011-08-17 2011-08-17 一种合模或拆模装置及使用该装置进行合模或拆模的方法 Active CN102275218B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110235903 CN102275218B (zh) 2011-08-17 2011-08-17 一种合模或拆模装置及使用该装置进行合模或拆模的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110235903 CN102275218B (zh) 2011-08-17 2011-08-17 一种合模或拆模装置及使用该装置进行合模或拆模的方法

Publications (2)

Publication Number Publication Date
CN102275218A CN102275218A (zh) 2011-12-14
CN102275218B true CN102275218B (zh) 2013-03-27

Family

ID=45101102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110235903 Active CN102275218B (zh) 2011-08-17 2011-08-17 一种合模或拆模装置及使用该装置进行合模或拆模的方法

Country Status (1)

Country Link
CN (1) CN102275218B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106926358B (zh) * 2017-04-26 2023-10-13 博奥重工装备制造(天津)有限责任公司 一种预制混凝土管涵模具拆模机
CN107803926B (zh) * 2017-11-21 2019-04-09 湖北工业大学 一种适应多规格管桩模合模系统
CN109624061B (zh) * 2018-12-24 2021-04-02 广州德亚机械制造有限公司 高效合模方法及系统
CN111873169B (zh) * 2020-08-03 2021-09-21 宁波宁东混凝土有限公司 一种预应力预制混凝土管桩浇筑成型工艺
CN112411568B (zh) * 2020-11-11 2022-02-08 中天建设集团有限公司 一种基坑混凝土支撑梁梁底拆模装置和拆模方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2928395Y (zh) * 2006-07-16 2007-08-01 毕魁雨 节能风炮
CN201439216U (zh) * 2009-08-11 2010-04-21 宁波一中管桩有限公司 一种离心混凝土桩装拆模风炮架
CN102001133A (zh) * 2010-09-20 2011-04-06 浙江金鑫管桩有限公司 一种管桩立体循环生产工艺

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2928395Y (zh) * 2006-07-16 2007-08-01 毕魁雨 节能风炮
CN201439216U (zh) * 2009-08-11 2010-04-21 宁波一中管桩有限公司 一种离心混凝土桩装拆模风炮架
CN102001133A (zh) * 2010-09-20 2011-04-06 浙江金鑫管桩有限公司 一种管桩立体循环生产工艺

Also Published As

Publication number Publication date
CN102275218A (zh) 2011-12-14

Similar Documents

Publication Publication Date Title
CN102275218B (zh) 一种合模或拆模装置及使用该装置进行合模或拆模的方法
CN102966121B (zh) 一种管廊现浇施工整体移动式模架
CN203022024U (zh) 一种管廊现浇施工整体移动式模架
CN202985870U (zh) 高效自转式脱模装置
CN101890756A (zh) 一种新型高效、节能、环保离心混凝土桩的制造方法及系统
CN202448226U (zh) 顶进施工法预应力钢筒混凝土管成型模具组
CN203527638U (zh) 浇捣预应力钢筒混凝土管的自动下料装置
CN202185975U (zh) 一种合模或拆模装置
CN102398305B (zh) 一种预制混凝土桩的生产方法
CN105500510A (zh) 建筑构件蒸汽养护系统
CN103496434B (zh) 一种船用脚手架底座
CN107472824A (zh) 一种具有长皮带更换机构的系统及更换方法
CN201626039U (zh) 一种新型高效、节能、环保离心混凝土桩的制造系统
CN207138808U (zh) 一种取件系统
CN102248601B (zh) 横向流水生产预制混凝土桩的方法
CN202639230U (zh) 一种双金属铸造的无箱化浇注系统
CN202292050U (zh) 汽车轮毂铝合金轮圈钢套压入机
CN204602898U (zh) 一种阳极板自动整形装置
CN104552593B (zh) 一种通过双振动源挤压脱模生产钢筋砼管的方法
CN204309091U (zh) 一种小箱梁内模自动拆装装置
CN103286899B (zh) 脱模装置
CN206169191U (zh) 一种皮带式砂箱填充系统
CN218118172U (zh) 一种安装球墨铸铁管的液压装置
CN208374642U (zh) 立柱导向套拔取装置
CN202507535U (zh) 一种脱模机

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 212413 Development Zone along the Yangtze River, Shu Shu Town, Jiangsu, Jurong

Patentee after: Jianhua building materials (Jiangsu) Co., Ltd.

Address before: 212413 Development Zone along the Yangtze River, Shu Shu Town, Jiangsu, Jurong

Patentee before: Jiangsu builds China pipe pile Co., Ltd.

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 212413 Jurong City, Jiangsu Province under the town along the Yangtze River Development Zone

Patentee after: Jianhua building materials (Jiangsu) Co., Ltd.

Address before: 212413 Development Zone along the Yangtze River, Shu Shu Town, Jiangsu, Jurong

Patentee before: Jianhua building materials (Jiangsu) Co., Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 212413 the development zone along the Yangtze River in Xia Shu Town, Jurong City, Zhenjiang, Jiangsu

Patentee after: Jianhua building materials (China) Co., Ltd.

Address before: 212413 the development zone along the Yangtze River in Xia Shu Town, Jurong City, Zhenjiang, Jiangsu

Patentee before: Jianhua building materials (Jiangsu) Co., Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Die assembling or removing device and method for assembling or removing die by using same

Effective date of registration: 20200403

Granted publication date: 20130327

Pledgee: Industrial Bank Co., Ltd. Zhenjiang Branch

Pledgor: JIANHUA CONSTRUCTION MATERIALS (CHINA) Co.,Ltd.

Registration number: Y2020980001285

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20210927

Granted publication date: 20130327

Pledgee: Industrial Bank Co.,Ltd. Zhenjiang Branch

Pledgor: JIANHUA CONSTRUCTION MATERIALS (CHINA) Co.,Ltd.

Registration number: Y2020980001285